Fall 2017 Tracking & Traceability Workshop ASTM F2897 Greg Goble, R.W. Lyall Maggie Emery, NW Natural October 17, 2017

Upload: others

Post on 19-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

Fall 2017 Tracking & Traceability Workshop

ASTM F2897

Greg Goble, R.W. Lyall

Maggie Emery, NW Natural

• October 17, 2017

Page 2: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

What to expect…..

• ASTM

• Intro and basic structure

• How ASTM F2897 fits within ASTM

• ASTM F2897

• Expandability and perceived limitations

• Examples of codes

• ASTM Standards Review and Revision Process

Page 3: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

• Voluntary consensus standards developing organization

• Members are volunteers

• Over 12,000 ASTM standards found in the 80 volume

“Annual Book of ASTM Standards”

• Over 150 committees in ASTM

• Membership is $75/year

• Committees of interest to our industry:

• A01 Steel, Stainless Steel, and Related Alloys

• F17 Plastic Piping System

Page 4: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM Committee F17

• Approximately 520 members

• 18 subcommittees

• Meetings in April and November

• Specific Subcommittees:

» F17.10 Fittings

» F17.20 Joining

» F17.60 Gas

Page 5: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

Development of ASTM F2897

• Need was identified

• Work item requested and Task Group formed to

create/design standard within Subcommittee F17.60

• Draft standard was balloted to every member of F17.60

• Once approved in F17.60, ballot was sent to the Main

F17 committee

• Initial publication in 2011. Revisions in: 2011, 2011,

2014, 2015.

Page 6: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Tracking Tracing

§192.1007 (a)(5) Provide for the capture and retention of data on any new pipeline installed. The data must include, at a minimum, the location where the new pipeline is installed and the material of which it is constructed.

Page 7: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Page 8: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

INDUSTRY STAKEHOLDER STEERING COMMITTEEE

Page 9: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

ASTM F2897-15 16-Character Code

Page 10: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

•Where did it go?

•Where is it installed now?

•How many are there like it?

•Who Made it?

Improves Safety by quickly

identifying and removing the risk.

•What is it?

•Where did it come from?

•What is it made of?

•How was it made?

Finding root

cause of

quality

variations

Page 11: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Component Manufacturer

Current Number of Manufacturers Registered = 35

Limit to Number of Manufacturers that can Register = 3843

Less than 1% of the F2897 Capacity used

Page 12: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Component Manufacturer

Page 13: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Mfg. Lot Code

Manufacturer can use the number any way they choose.

Limited to a 7 digit Positive Integer Less Than or Equal to: 9999999

Allows a Base62 four character code between 0000 & FXsj

Page 14: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Mfg. Date

Manufacturer Date Code has a 100 year resolution

Limited to a 3 digit Positive Integer between 001 & 365 correlating to the day of the year and a 2 digit Positive Integer between 00 & 99

Allows a Base62 four character code between 01C & 9wj

Page 15: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Component Material

Current Number of Component Materials = 32

Limit to Number of Material that can listed = 62

Less than 52% of the F2897 Capacity used

Page 16: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Component Type

Current Number of Component Category or Sub Category Listed = 190

Limit to Number of Component Category or Sub Category Listed = 3843

Less than 5% of the F2897 Capacity used

Page 17: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Component Size

Current Number of Sizes listed = 318

Less than 85% of the Current Revision F2897 Capacity used

Limit to Number of Component Sizes Currently is 378 established by a matrix from the equation -

Page 18: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review C2

C1

Base 62 = 068

Base 62 = BgH

Page 19: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review C2

C1

Page 20: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review C2

C1

C

1

End of IPS

Page 21: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

Component Size – Potential with Revision

Three character Base62 Integer Limit =

Limit to Number of Component Sizes could be 487 established by a matrix from the equation -

Less than 66% of the Potential Revision F2897 Capacity used

Page 22: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review C2

C1

Base 62 = 07T

Base 62 = ZPb

Page 23: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897 Review

A Pointer to Track and Trace and gather information about a Gas Distribution Component

Page 24: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

Circling back - ASTM

• ASTM Standards Revision process

• Request Work Item

• Task Group

• Ballot

• Standard required to be

reviewed every 5 years

• To participate – join ASTM

www.astm.org/join

Page 25: PowerPoint Presentation · Revision F2897 Capacity used . ASTM F2897 Review C2 C1 Base 62 = 07T Base 62 = ZPb . ASTM F2897 Review A Pointer to Track and Trace and gather information

ASTM F2897

Greg Goble [email protected] Maggie Emery [email protected]