Page 1: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

P&A Workshop09.06.2011

CannSeal Annular isolation on One single wireline run.Bengt Gunnarssson

Page 2: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

www.agr.com

Page 3: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• History• Started tool development in 2005

• Demo2000, Statoil, Eni, Total, Shell

• Internally qualified 2010• Scheduled to be pilot tested 3rd quarter 2011

Page 4: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM
Page 5: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• The CannSeal™ tool

System layout

Page 6: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

Injection Pads

Anchor keysFull length tool

Page 7: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

Specifications Imperial Units Metric units Max Outside Diameter 4,4 Inc 111,76 mm

Max External Pressure 5000 psi 345 bar

Temperature rating 248 F 120 C

Casing/Tubing size to operate inside

5 ½ “ 20.00 lb/ft

To 7” 20.000 lb/ft

ID 121,4mm

to ID 164mm

Length: total

10 litre of sealent

20 litre of sealent

38 litre of sealant

39,4 ft

51,2 ft

72,0 ft

12,0 m

15,6 m

22,0 m

3,3” OD tool available mid 2012

Page 8: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• The CannSeal Tool – run on electric w/l

• Online Communication• P&T in tool and well

• Positive feedback on stroker/arm/injection-pad actuation

• Positive feedback on perforation

• Sealant Injection Volume control

• Sealant temperature & pressure control

Page 9: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• P&A Key words (Norsok D-010)

• 2 independant well barriers

• The complete borehole shall be isolated• WBE with verified quality in all annuli

• When well completion tubulars are left in the hole and permanent plugs are installed through and around the tubular, reliable methods and procedures to install and verify position of the plug inside the tubular and in the tubular annulus shall be established.

Page 10: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• P&A Key words• A permanent well barrier should have the following properties:• a) Impermeable

• b) Long term integrity.

• c) Non shrinking.

• d) Ductile – (non brittle) – able to withstand mechanical loads/impact.

• e) Resistance to different chemicals/ substances (H2S, CO2 and hydrocarbons).

• f) Wetting, to ensure bonding to steel.

Steel tubular is not an acceptable permanent WBE unless it is supported by cement, or a plugging material

with similar functional properties as listed above, (inside and outside).

Page 11: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM
Page 12: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• Perforate below CS setting depth • Circulate and clean out A annuli• Run CS tool• Locate and perforate• Set CS plug• Verify placement / Test CS plug

Perforate above CS plugCirculate in 100m cement/sealant Test WBE from above and below

Perforate in to B annulus above A WBERun CS toolLocate and perforateSet CS plugVerify placement / Test CS plug in B annuli

Perforate just above top CannSeal plugSet patch/straddle over top tubing perfsCirculate to clean/wash B annulusCirculate in 100 m cement/sealantin to B annulus, and Fill tubing with cement/sealant Test WBE

36 h 60 h 108 h 156 h

Page 13: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM
Page 14: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

Or is this a viable option???

Page 15: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

Sealing material• Sealant Resin will be available with different specific gravity,

temperature and viscosity spans

• Selection for the actual application will be based on specified application, well temperature and permeability.

• Elasticity of the Sealant Resin can be adjusted by additives

Page 16: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

Sealing material

Injection of sealant into an annular test cell fi lled with gravel and circulation of crude oil

Page 17: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM

• Epoxy Resin HSE – chemical or inert product??• All constituents of the sealant are mixed onshore at the factory to

form a one component high viscous liquid. • The sealant canister is completely sealed with a bursting disc in the

front and a piston at the backside allowing thermal expansion of 15 %

• The sealant canister is transported to location in a wooden box filled with a chock absorbing material

• The box contains sensor to indicate if the box has been subjected to unexpected temperature variations or external forces exceeding XX G during handling and transportation

• The epoxy sealant stored in the canister will only get access to the environment when injection is started and the sharable plug in front of the canister is sheared by the high injection pressure.

Page 18: PowerPoint Presentation · Title: PowerPoint Presentation Author: Frode Nilsen Created Date: 6/21/2011 1:21:40 PM