E POWR CHAPTER 5 POWER UNIT EXPLODED DIAGRAM ................................................................................... 5-1 PREPARATION FOR OVERHAUL .................................................................. 5-3 REMOVAL ....................................................................................................... 5-3 DISASSEMBLY ............................................................................................... 5-5 INSPECTION ................................................................................................... 5-6 CYLINDER HEAD...................................................................................... 5-6 CLEANING ......................................................................................... 5-6 INSPECTION ...................................................................................... 5-6 CYLINDER BLOCK.................................................................................... 5-7 CLEANING ......................................................................................... 5-7 INSPECTION ...................................................................................... 5-7 PISTON ..................................................................................................... 5-8 CLEANING ......................................................................................... 5-8 INSPECTION ...................................................................................... 5-8 PISTON RING ........................................................................................... 5-9 INSPECTION ...................................................................................... 5-9 PISTON PIN AND SMALL END BEARING ............................................ 5-10 CLEANING ....................................................................................... 5-10 INSPECTION .................................................................................... 5-10 CRANKSHAFT ........................................................................................ 5-10 INSPECTION .................................................................................... 5-10 REED VALVE........................................................................................... 5-11 INSPECTION .................................................................................... 5-11 THERMOSTAT........................................................................................ 5-12 CLEANING ....................................................................................... 5-12 INSPECTION .................................................................................... 5-12 CRANK MAIN BEARING ........................................................................ 5-12 CLEANING ....................................................................................... 5-12 INSPECTION .................................................................................... 5-12 DRIVE GEAR (OIL INJECTION PUMP DRIVE) ...................................... 5-13 INSPECTION .................................................................................... 5-13 DRIVEN GEAR (OIL INJECTION PUMP DRIVE).................................... 5-13 INSPECTION .................................................................................... 5-13

Upload: doananh

Post on 30-Jan-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

EPOWR

CHAPTER 5

POWER UNIT

EXPLODED DIAGRAM

................................................................................... 5-1

PREPARATION FOR OVERHAUL

.................................................................. 5-3

REMOVAL

....................................................................................................... 5-3

DISASSEMBLY

............................................................................................... 5-5

INSPECTION

................................................................................................... 5-6CYLINDER HEAD...................................................................................... 5-6

CLEANING ......................................................................................... 5-6INSPECTION ...................................................................................... 5-6

CYLINDER BLOCK.................................................................................... 5-7CLEANING ......................................................................................... 5-7INSPECTION ...................................................................................... 5-7

PISTON ..................................................................................................... 5-8CLEANING ......................................................................................... 5-8INSPECTION ...................................................................................... 5-8

PISTON RING ........................................................................................... 5-9INSPECTION ...................................................................................... 5-9

PISTON PIN AND SMALL END BEARING............................................ 5-10CLEANING ....................................................................................... 5-10INSPECTION .................................................................................... 5-10

CRANKSHAFT ........................................................................................ 5-10INSPECTION .................................................................................... 5-10

REED VALVE........................................................................................... 5-11INSPECTION .................................................................................... 5-11

THERMOSTAT........................................................................................ 5-12CLEANING ....................................................................................... 5-12INSPECTION .................................................................................... 5-12

CRANK MAIN BEARING........................................................................ 5-12CLEANING ....................................................................................... 5-12INSPECTION .................................................................................... 5-12

DRIVE GEAR (OIL INJECTION PUMP DRIVE) ...................................... 5-13INSPECTION .................................................................................... 5-13

DRIVEN GEAR (OIL INJECTION PUMP DRIVE).................................... 5-13INSPECTION .................................................................................... 5-13

Page 2: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

E

1 2 3 4 5 6 7 8 9

POWR

ASSEMBLY AND ADJUSTMENT

................................................................ 5-14BEARING, OIL SEAL AND O-RING ....................................................... 5-14PISTON AND PISTON RING.................................................................. 5-14SMALL END BEARINGS AND PISTON ASSEMBLY............................ 5-15CONNECTING ROD BIG END BEARING ASSEMBLY (75, 80, 90 hp)........................................................................................ 5-16OIL SEAL HOUSING .............................................................................. 5-17CRANK CYLINDER ASSEMBLY (50, 60, 70 hp).................................... 5-17CRANK CYLINDER ASSEMBLY (75, 80, 90 hp).................................... 5-18CYLINDER HEAD AND EXHAUST COVER ........................................... 5-19DRAINAGE HOSE................................................................................... 5-20INTAKE MANIFOLD ............................................................................... 5-20FUEL SYSTEM AND ELECTRICAL SYSTEM ........................................ 5-20

INSTALLATION

............................................................................................. 5-21

Page 3: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-1

POWR

E

G20000-0

EXPLODED DIAGRAM

1

Cylinder head cover

2

Head cover gasket

3

Cylinder head

4

Cylinder head gasket

5

Thermostat

6

Thermostat cover

7

Exhaust cover gasket

8

Exhaust inner cover

9

Exhaust outer cover

0

Piston pin clip

A

Piston pin

B

Drive gear

C

Bearing

D

Oil seal

E

O-ring

F

Oil seal housing

G

Intake manifold

H

Valve seat packing

I

Reed valve plate

J

Reed valve assembly

EXPLODED DIAGRAM

Page 4: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-2

POWR

E

EXPLODED DIAGRAM

1

Thermostat cover

2

Thermostat

3

Thermo sensor

4

Cylinder head cover

5

Head cover gasket

6

Cylinder head

7

Cylinder head gasket

8

Exhaust cover gasket

9

Exhaust inner cover

0

Exhaust outer cover

A

Piston pin clip

B

Piston pin

C

Bearing

D

Drive gear

E

Circlip

F

Oil seal

G

O-ring

H

Oil seal housing

I

Intake manifold

J

Valve seat packing

K

Reed valve plate

L

Reed valve assembly

*B90TR/90AETO

Page 5: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-3

POWR

E

PREPARATION FOR OVERHAUL/REMOVAL

G30000-0

PREPARATION FOR OVERHAUL

1. Clean all dirt, mud, dust and foreignmaterial from the engine before theengine is removed and disassembled.

2. To ensure that you can perform thework cleanly and efficiently, check thatyou have the proper tools and cleaningequipment before commencing engineremoval and disassembly.

3. During engine disassembly, as parts aredisassembled, clean them and placethem in trays in their order of disassem-bly. This will speed up assembly andhelp ensure that all parts are correctlyreinstalled.

NOTE:

When disassembling the engine, keepmated parts together, e.g., cylinder and pis-ton and other parts that have been ‘mated’through normal wear. Mated sets should bere-used on reassembly or replaced com-pletely.

G40003-0*

REMOVAL1. Remove the electrical system parts.

Refer to “ELECTRICAL COMPONENTS”section in chapter 8.

1 Ground lead from the cylinder head cover Battery cablePower trim and tilt motor leads (PTT model)Power trim and tilt relay (PTT model)Oil level sensor lead (oil injection model)

2. Remove the fuel system parts and hose.Refer to “FUEL SYSTEM” section inchapter 4.

1 Cooling water pilot hose Fuel hose on the strainer

Page 6: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-4

POWR EREMOVAL

3. Remove the throttle cable and the shiftmechanism.

1 Throttle cable joint by removing the hair pin 2 Shift rod bracket bolt3 Shift cable joint and bushing by removing

the hair pin

4. Remove the front and rear aprons.

5. Remove the power head installationbolts, and then remove the power headfrom the upper casing.50, 60, 70 hp ..................................8 bolts75, 80, 90 hp ................................11 bolts

NOTE:

The power head may be difficult to separatefrom the bottom cowling because of a stuckgasket holding them together. If this is thecase, lever it off the bottom cowling with apiece of wood. Use care not to damage thebottom cowling or power head with thewood.

6. Remove the dowel pins from the bot-tom cowling or power head. To protectthe dowel pins against damage, coverthem with rags.

Page 7: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-5

POWR EDISASSEMBLY

G50003-0

DISASSEMBLYReferring to the exploded diagram, removethe following parts.

1. Cylinder head

2. Intake manifold

3. Exhaust cover and thermostat cover.

4. Oil seal housingUsing the oil seal remover, remove theoil seal one by one from the housing.

5. CrankcaseRemove the two dowel pins.

6. Crankshaft and connecting rod.(50, 60, 70 hp)

7. Connecting rod caps, needle bearingsand crankshaft. (75, 80, 90 hp)

8. Piston and piston pin

9. Piston ringsNote the following points:

1. When disassembling the piston and pis-ton pin, place a tray under the connect-ing rod to catch the needle bearings.

2. Only carry out exchange of the crank-shaft bearing if the bearing is malfunc-tioning.

Page 8: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-6

POWR EINSPECTION

G61000-0*

INSPECTIONCYLINDER HEAD

CLEANING

1. Using a gasket scraper, remove alltraces of gasket material from the cylin-der head.

2. Using a round scraper, remove carbondeposits from the combustion chamber.

CAUTION:

Do not scratch the surfaces of the cylinder

and combustion chamber.

3. Using a soft brush, clean the waterjacket.

INSPECTION

1. Using a precision straight-edge andthickness gauge, measure the surfacecontacting the cylinder block forwarping.

Å Lines indicate straight-line measurement

If the degree of warping exceeds thisspecification, re-surface the cylinder-head as follows:Place 400-600 grit wet-or-dry paper onthe surface-plate, and resurface the cyl-inder-head using a figure-eight sandingpattern.

Warpage limit:0.1 mm (0.004 in)

Å

Page 9: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-7

POWR EINSPECTION

G61501-0*

CYLINDER BLOCK

CLEANING

1. Using a gasket-scraper, remove alltraces of gasket material from the cylin-der-block surface.

2. Using a soft brush and solvent, cleanthe cylinder-block.

INSPECTION

1. Visually inspect the cylinder sleeves forcracks and scratches.If cracks are found, replace the cylinderblock.If scratches are found, check the degreeof out-of-round, and then hone the cyl-inder or re-bore it if necessary.

2. Using a cylinder-gauge, measure thecylinder bore at three positions in thethrust and axial directions.

1 Axial direction2 Thrust direction

A: 10 mm (0.4 in) below the cylinder topB: 5 mm (0.2 in) above the exhaust portC: 5 mm (0.2 in) below the scavenging port

NOTE:

Do not place the cylinder-gauge on the porthole.

If diameter is greater than the limit,hone or rebore the cylinder or, if neces-sary, replace the cylinder-block.

Cylinder bore size;50, 60, 70 hp: 72.00 ~ 72.02 mm

(2.834 ~ 2.835 in)75, 80, 90 hp: 82.00 ~ 82.02 mm

(3.228 ~ 3.229 in)Taper limit:

0.08 mm (0.003 in)Out of round limit:

0.05 mm (0.002 in)

Page 10: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-8

POWR EINSPECTION

G62001-0*

PISTON

CLEANING

1. Using a gasket-scraper, remove the car-bon from the piston top.

2. Using a broken ring, clean the ringgrooves.

3. Using a soft brush and solvent, thor-oughly clean the piston. If necessary,use 600 ~ 800 grit wet-or-dry sandpaperto remove score marks or varnish.

INSPECTION

1. Using a micrometer, measure the pis-ton diameter at right angles to the pis-ton-pin center line, 10 mm (0.4 in)above the bottom edge.

2. Using the measured cylinder borediameter in thrust directions, subtractthe piston diameter measurement fromthe cylinder bore diameter measure-ment.

If this clearance is not within the specifi-cations, replace the piston with stan-dard or oversize and/or rebore thecylinder.

* Except for USA

Piston diameter:Standard:

50, 60, 70 hp:71.945 ~ 71.970 mm(2.8325 ~ 2.8335 in)

75, 80, 90 hp:81.935 ~ 81.960 mm(3.2258 ~ 3.2268 in)

Piston clearance:50, 60, 70 hp: 0.050 ~ 0.055 mm

(0.0020 ~ 0.0022 in)75, 80, 90 hp: 0.060 ~ 0.065 mm

(0.0024 ~ 0.0026 in)

Oversize piston:50, 60, 70 hp:

*1st 72.25 mm (2.844 in)2nd 72.50 mm (2.854 in)

75, 80, 90 hp:*1st 82.25 mm (3.238 in)2nd 82.50 mm (3.248 in)

Page 11: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-9

POWR EINSPECTION

G62501-0*

PISTON RING

INSPECTION

1. Using a thickness gauge, measure theclearance between the piston ring andthe groove land.

If the clearance is not within the specifi-cations, replace the piston.

Å Top/2nd: Keystone typeı Piston marked with “W” (50, 60, 70 hp)

2. Insert the piston ring into the cylinder.Using a piston, push the piston ring alittle beyond the bottom of the ringtravel to a depth of 20 mm (0.8 in) fromthe top of the cylinder block.

CAUTION:

Take care not to scratch the piston. Using a

thickness gauge, measure the end-gap.

If the clearance is not within the specifi-cations, replace the piston-ring.

NOTE:

If the clearance is greater than maximum,even with a new piston ring, rebore the cyl-inder and use an over-size piston and pis-ton-ring.

Side clearance:50, 60, 70 hp:

Top/2nd ring:0.03 ~ 0.07 mm(0.0012 ~ 0.0028 in)

75, 80, 90 hp:Top/2nd ring:

0.03 ~ 0.06 mm(0.0012 ~ 0.0024 in)

Ring end gap (installed):50, 60, 70 hp:

0.3 ~ 0.5 mm (0.012 ~ 0.020 in)75, 80, 90 hp:

0.4 ~ 0.6 mm (0.016 ~ 0.024 in)

Å ı

Page 12: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-10

POWR EINSPECTION

G63000-0

PISTON PIN AND SMALL END

BEARING

CLEANING

1. Use a soft brush and solvent to cleanthe parts.

INSPECTION

1. Visually inspect for surface defects,breakage, scratches and pitting. If it isdecided to replace the small end bear-ings, replace them all.

G63500-0*

CRANKSHAFT

INSPECTION

1. Place the crankshaft on a crankshaft-aligner or on V-blocks.

2. Using a dial gauge, measure the con-necting-rod axial play.

If this axial play is greater than the max-imum axial play, replace the crankshaftassembly.

Maximum axial play:2.0 mm (0.08 in)

3. Using feeler gauges, measure the con-necting-rod side clearance.(50, 60, 70 hp)

If this side clearance exceeds the speci-fication, replace the crankshaft assem-bly.

Connecting-rod side clearance:50, 60, 70 hp:

0.2 ~ 0.7 mm (0.008 ~ 0.028 in)75, 80, 90 hp:

0.12 ~ 0.26 mm (0.005 ~ 0.010 in)

Page 13: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-11

POWR EINSPECTION

4. Using dial gauges, measure the deflec-tion.

If the deflection is greater than the spec-ified maximum, correct the alignmentby use of a copper hammer and awedge.

If the deflection is greater than the spec-ified maximum, replace the crankshaftassembly.

Maximum deflection:50, 60, 70 hp:

0.03 mm (0.0012 in)75, 80, 90 hp:

0.05 mm (0.0020 in)

G64000-0*

REED VALVE

INSPECTION

1. Visually inspect for warping of the reedvalve. If warped, measure the distortionwith feeler gauges.

If the amount of warping is greater thanthe specification, replace the reed valve.

2. Using a vernier caliper, measure thevalve stopper height.

If the valve stopper height is outside thespecification, adjust it by bending it.

3. Visually inspect for cracks on the reedvalve. If cracks are found, replace thereed valve.

Warpage limit a:0.2 mm (0.01 in)

Valve stopper height b:50, 60 hp:

3.0 ± 0.2 mm (0.12 ± 0.01 in)70, 75, 80, 90 hp:

9.9 ± 0.2 mm (0.39 ± 0.01 in)

Page 14: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-12

POWR EINSPECTION

G64500-0*

THERMOSTAT

CLEANING

1. Using a soft brush and water, removeall traces of salt, dirt or corrosion.

INSPECTION

1. Visually inspect the thermostat for dam-age. If the thermostat is damaged or if itopens when cold, replace it.

2. Immerse the thermostat in water andheat the water gradually. Check thevalve opening temperature and thevalve lift.

If the valve opening and/or temperatureand valve-lift are not within the specifi-cations, replace the thermostat.

Water

temperatureValve lift

Below 48 ~ 52˚C

(118 ~ 126˚F)0 mm

Above 60˚C

(140˚F)

Minimum

3 mm (0.12 in)

G65000-0*

CRANK MAIN BEARING

CLEANING

1. Using a soft brush and solvent, thor-oughly clean the bearing. Dry it with air,and sparingly lubricate it with 2-strokeoutboard motor oil.

NOTE:

Do not spin bearing with air blower. Thiscan damage the bearing. Also, take care notto scratch the bearing balls when cleaning.

INSPECTION

1. Hold the bearing inner race and slowlyturn the bearing outer race with yourfingers. If any rough spots are felt,replace the bearing.

Page 15: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-13

POWR EINSPECTION

G65500-0

DRIVE GEAR

(OIL INJECTION PUMP DRIVE)

INSPECTION

1. Visually inspect drive gear teeth forcracks, pitting or wear and replace thegear if any are found.

DRIVEN GEAR

(OIL INJECTION PUMP DRIVE)

INSPECTION

1. Visually inspect driven gear teeth forcracks, pitting or wear and replace thegear if any are found.

Page 16: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-14

POWR EASSEMBLY AND ADJUSTMENT

G71000-1

ASSEMBLY AND ADJUSTMENTBEARING, OIL SEAL AND O-RING

1. Press in the new bearing.

CAUTION:

When reassembling the lower crank bear-

ing and/or the oil-pump drive gear, the

tapered side of the drive gear and the seal-

cap side of the bearing should be installed

towards the crank side as shown in the

illustration.

75, 80, 90 hp:

Install the circlip

1 Circlip2 Oil injection pump drive gear3 Crank lower bearing

2. Install the new oil seal in the needlebearing.

CAUTION:

The direction of the oil seal must be as

shown in the illustration, otherwise dam-

age will be caused.

3. Install the new O-ring.

4. Lubricate the bearing with 2-stroke out-board motor oil. Apply water resistantgrease or equivalent to the inside lip ofthe oil seal and to the O-ring.

G72001-0

PISTON AND PISTON RING

1. Install the top and 2nd piston rings intotheir respective ring grooves with themarkings facing upward.

2. Align each ring end-gap with their loca-tion pins.

Page 17: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-15

POWR EASSEMBLY AND ADJUSTMENT

G73000-0*

SMALL END BEARINGS AND PISTON

ASSEMBLY

1. Count the small-end bearing needles.

CAUTION:

Do not use a mixture of new and used bear-

ing needles in the same small end.

2. Using the special service tool, install thebearings in the connecting-rod smallend and place washers on both sides.

CAUTION:

The washer should be placed with their

convex sides facing the piston.

Number of needles per small end: 28-pcs.

Small end bearing installer:50, 60, 70 hp:

YB-6287/90890-0652775, 80, 90 hp:

YB-6107/90890-06527

3. Insert the piston-pin into the piston.

4. Align the “UP” mark on the pistoncrown towards the crankshaft's taperedend. Install the piston in the connecting-rod small end, insert the piston-pin,then install new piston-pin clips.

5. Lubricate each bearing with 2-strokeoutboard-motor oil.

Page 18: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-16

POWR EASSEMBLY AND ADJUSTMENT

G78000-0*

CONNECTING ROD BIG END

BEARING ASSEMBLY (75, 80, 90 hp)

1. Install the piston.Align the ring ends with locating pins inthe grooves and using the piston slider,push the piston into the cylinder.

NOTE:

The “UP” mark on the piston crown shouldbe on the flywheel side. Be sure to apply oilto the piston and cylinder wall.

Piston slider:YU-33294/90890-06530

2. Place the crankshaft on the cylinder,and align the upper, upper middle andlower middle bearing pin holes with thepins on the cylinder, and fit the crank-shaft correctly to the cylinder.

3. Install the bearing in the big end andinstall the cap.The cap bolts should be tightened in thefollowing manner.a. Lightly screw in the bolts by hand

while making sure the cap and rodends are aligned completely. Then,tighten the bolts to the 1st specifiedtorque.Next, tighten to the 2nd specifiedtorque. Check to see that the cap androd ends are aligned. If not aligned,do the above procedure all overagain.

b. Loosen the bolts 1/2 turn and tightenthem to the 1st specified torque.Then, tighten to the 2nd specifiedtorque.

Page 19: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-17

POWR EASSEMBLY AND ADJUSTMENT

NOTE:

Replace the cap bolts each time the con-necting rod is disassembled.

G79000-1*

OIL SEAL HOUSING

1. Press-fit the oil seals one by one.

CAUTION:

When press-fitting the oil seal, be sure that

if faces in the correct direction.

2. Fit the new O-ring in the grooves in theoil seal housing outer surfaces.

3. After installing the oil seal and O-ring,pack the oil seal lip and outer surface ofthe O-ring with water resistant grease.

NOTE:

Avoid cutting or stretching the oil sealhousing O-ring.

4. Install the oil seal housing onto the cyl-inder and align the bolt holes.

T R.

.

Connecting rod big end: (75, 80, 90 hp)

1st step:12 Nm (1.2 m • kg, 8.7 ft • lb)

2nd step:35 Nm (3.5 m • kg, 25 ft • lb)

G74000-0*

CRANK CYLINDER ASSEMBLY

(50, 60, 70 hp)

1. Lubricate the piston-rings and pistonswith 2-stroke outboard-motor oil andinstall the crank assembly into the cylin-der block.

Page 20: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-18

POWR EASSEMBLY AND ADJUSTMENT

2. Lift the crank assembly a little in orderto install a washer on the lower crank-case and align each location-pin of thebearings and labyrinth-seals with eachcut on the cylinder-block. Then, fit thecrank assembly in place.

3. Film-coat the cylinder-block mating sur-face with Gasket Maker or equivalent.

4. Install the dowel-pins.

5. Match the cylinder-block and tightenthe bolts to the specified torque insequence and in two steps.

6. Check that the crankshaft turnssmoothly.

G74002-0*

CRANK CYLINDER ASSEMBLY

(75, 80, 90 hp)

1. Align each locating-pin of the bearingsand labyrinth-seals with each cut on thecylinder-block. Then, fit the crankassembly in place.

2. Film-coat the cylinder-block mating sur-face with Gasket Maker or equivalent.

3. Install the dowel-pins.

4. Match the cylinder-block and tightenthe bolts to the specified torque insequence and in two steps.

5. Check that the crankshaft turnssmoothly.

T R.

.

Crankcase bolt (50, 60, 70 hp)1st step:

M8: 10 Nm (1.0 m • kg, 7.2 ft • lb)M10: 20 Nm (2.0 m • kg, 14 ft • lb)

2nd step:M8: 20 Nm (2.0 m • kg, 14 ft • lb)M10: 40 Nm (4.0 m • kg, 29 ft • lb)

T R.

.

Crankcase bolt (75, 80, 90 hp)1st step:

M6: 4 Nm (0.4 m • kg, 2.9 ft • lb)M10: 20 Nm (2.0 m • kg, 14 ft • lb)

2nd step:M6: 12 Nm (1.2 m • kg, 8.7 ft • lb)M10: 40 Nm (4.0 m • kg, 29 ft • lb)

Page 21: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-19

POWR EASSEMBLY AND ADJUSTMENT

G75000-0*

CYLINDER HEAD AND EXHAUST

COVER

1. Install the gaskets cylinder-head coverand exhaust cover.

2. Tighten the bolts to the specified torquein sequence and in two steps.

Å Tightening sequence

T R.

.

Cylinder head (50, 60, 70 hp):1st step:

15 Nm (1.5 m • kg, 11 ft • lb)2nd step:

32 Nm (3.2 m • kg, 23 ft • lb)Cylinder-head (75, 80, 90 hp):

1st step:15 Nm (1.5 m • kg, 11 ft • lb)

2nd step:30 Nm (3.0 m • kg, 22 ft • lb)

Å

Å

ı Tightening sequenceı

Ç Tightening sequence

3. Install the thermostat, gasket and cover.

T R.

.

Exhaust cover (50, 60, 70 hp):1st step:

3 Nm (0.3 m • kg, 2.2 ft • lb)2nd step:

8 Nm (0.8 m • kg, 5.8 ft • lb)Exhaust cover (75, 80, 90 hp):

1st step:9 Nm (0.9 m • kg, 6.5 ft • lb)

2nd step:18 Nm (1.8 m • kg, 13 ft • lb)

Ç

Ç

Page 22: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-20

POWR EASSEMBLY AND ADJUSTMENT

G75500-0

DRAINAGE HOSE

1. Fit two clips around the drainage hose.

2. Connect one end of the hose to thedelivery side of the check valve and theother end to the joint on the intake sideand lock with the clips.

G76000-0*

INTAKE MANIFOLD

1. Install the reed-valve assembly and thegasket reed-valve plate to the intakemanifold.

2. Install the manifold assembly to thecrankcase and tighten the bolts to thespecified torque in sequence and in twosteps.

T R.

.

Intake manifold (50, 60, 70 hp):1st step:

4 Nm (0.4 m • kg, 2.9 ft • lb)2nd step:

8 Nm (0.8 m • kg, 5.8 ft • lb)Intake manifold (75, 80, 90 hp):

1st step:4 Nm (0.4 m • kg, 2.9 ft • lb)

2nd step:12 Nm (1.2 m • kg, 8.7 ft • lb)

G77000-0*

FUEL SYSTEM AND ELECTRICAL

SYSTEM

1. Install the fuel system.Refer to “FUEL SYSTEM” section inchapter 4.

2. Install the electrical system.Refer to “ELECTRICAL COMPONENTS”section in chapter 8.

Page 23: POWR E - East Marineeastmarine.ru/incp/katalog/outboard/90/Power_unit.pdf · POWR E CHAPTER 5 POWER UNIT ... Using a cylinder-gauge, measure the cylinder bore at three positions in

5-21

POWR EINSTALLATION

G8000-0*

INSTALLATION1. Install locating pins in position on the

exhaust guide.

2. Align the locating-pin holes on the gas-ket with dowel pins and place the gas-ket on the bottom cowling.

3. Install the power head onto the bottomcowling, tighten the mounting-bolts tothe specified torque.

4. Connect the hoses, cables and wires.

5. Install the apron.

6. Check the fittings installation, cableconnections and functions before start-ing the engine to check operation and tocheck for leaks.

T R.

.

Mounting bolts:21 Nm (2.1 m • kg, 15 ft • lb)