    TABLE OF CONTENTS

    10.

    INTRODUCTION

    CADD SYSTEMDRAWING PLANNING AND SETUPTEXTLAYERSPLOTTINGPEN SETTINGSLINETYPESXREFABBREVIATIONSDRAWING COUTESY

    APPENDIX A GRAPHICAL STANDARDSAPPENDIX B - LAYER LISTAPPENDIX C ABBREVIATION LIST

    The good thing about standards is that there are so many tochoose from

    2

  • 8/7/2019 PPES Standard for CAD

    3/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    1. INTRODUCTION

    Through the years CADD technology has expanded and grown into a multi-faceted way to store and communicate information. This CADD manual hasbeen compiled to provide consistent & standard criteria by which all CADDdrawings shall be constructed for Texas Tech University Physical Plant

    Engineering Services (TTUES).

    2. CADD SYSTEM

    TTUES currently operates in the Autodesk 2005 family of products. Thisfamily includes, but is not limited to, AutoCAD, ADT, LDT, Map as well asseveral others. All drawings submitted to TTUES shall be of a compatibleformat.

    3. DRAWING PLANNING & SETUP

    Drawing Setup

    The typical TTUES working drawing shall be setup to take advantage ofPaper Space/Model Space. Paper Space shall include the title block andall of the information associated with it. All sheet specific informationshall be contained in Paper Space as well. Model Space shall containthe objects necessary to convey the design intent. All objects in ModelSpace shall be drawn at full scale (1:1) and be located at an origin of0,0,0 unless an accurate survey of the site has been completed. (Thelower left hand corner of a building or site shall be at 0,0,0)

    A set of templates (*.dwt) have been established to facilitate in the set

    up of drawings that are to be done by/for TTUES. These templatesshould be utilized in the creation of all drawings by/for TTUES.

    The standard sheet size for projects done by/for TTUES is either34x22 or 17x11.

    Drawing Template

    Standard drawing template files have been created according to thestandards that are outlined in this manual. These templates aredesigned to aid in the creation of a standard product. These templates

    shall be used by everyone internal to TTUES as well as all AE firmsworking on projects for TTUES.

    1

  • 8/7/2019 PPES Standard for CAD

    4/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    Template SettingsTitleblock Attributes:

    BuildingTitle of SheetDescriptionSheet ## of SheetsProject NumberProject ManagerDate

    Text Style:Name TTUESFont RomanS.shxFont Size 3/32"

    Dimension Style:Name TTUESLines and Arrows:

    Baseline Spacing 3/32Offset 3/32Arrowheads:

    Size 1/8

    Dimension Lines

    Architectural TickLeaders Close Filled ArrowText:

    Style TTUESPlacement CenteredAlignment Aligned With Dimension Line

    Fit:Scale for dimension features Scale dimensions to layout

    (paper space)Primary Units:

    Unit Format ArchitecturalPrecision 1/32

    Special Dimensioning Note

    The dimension style in the drawing template is set up to utilize paperspace units for scaling purposes. This allows all of the drawingsdimension text to print the same height. In order to effectivelyutilize the dimension style set up in the drawing template youmust dimension in mspace through the layout tabs mview

    2

  • 8/7/2019 PPES Standard for CAD

    5/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    window. The result of dimensioning in the model tab is indiscernibletext regardless of the scale of the mview window.

    File Naming Principles

    Each file shall contain a whole project (i.e. architectural, mechanical &electrical sheets). Accordingly files shall be named to fit the followingpattern. First, the discipline code followed by a hyphen, next the sheetsequence identifier followed by an optional user-definable, four-character code. The following illustration shows the pattern.

    4. TEXT

    All general text on TTUES drawings shall be plotted at a height of 1/16 andbe font style RomanS.shx. The only exception to this is the title block, coverand user inserted standard blocks.

    5. LAYERS

    The AIA/NIBS National CADD Standard layer names are organized as ahierarchy. This arrangement allows expansion and addition of user-definedextensions to the layer list. Layer names are alphanumeric and useabbreviations that are readily identifiable.Layers shall be named in a fourteen-character system with the first twocharacters denoting discipline code; the next four characters denoting themajor group followed by a hyphen; the following four characters denoting theminor group followed by a hyphen; the final four characters denoting status.

    Discipline Code

    A - W A L L - F

    Discipline Code

    Major Group

    Minor Group

    U L L - P H S 3

    Status (optional)

    A -

    Discipline Code

    User Definable (customizable)

    0 1

    Job Number (five digits)

    0 1 1

    3

  • 8/7/2019 PPES Standard for CAD

    6/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    The discipline code is a two-character field with the second characterbeing a hyphen. The defined discipline codes are as follows:

    A ArchitecturalC Civil

    E ElectricalF Fire ProtectionG GeneralH Hazardous MaterialI InteriorsL LandscapeM MechanicalP PlumbingQ EquipmentR ResourceS StructuralT TelecommunicationsX Other Disciplines

    Z Contractor/shop drawings

    Major Group

    The major group designation identifies the building system. Althoughthe major groups are grouped logically with specific codes, it ispossible to combine major group codes with any of the disciplinecodes. For example, a drawing might contain the following layers:

    A-WALL Architectural WallsS-WALL Structural Walls

    Minor Group

    This is a four-character field for further differentiation of major groups.For example, A-WALL-PRHT indicates architectural, new, wall, partialheight.

    Status Field

    The status field is a four-character field designator that differentiatesnew construction from remodeling and existing to remain. It is onlyneeded when phases of work must be differentiated. A-WALL-PRHT-DEMO indicates architectural, wall, partial height that is to be demolished. Defined valuesfor this field are as follows:

    EXST Existing to remainDEMO Existing to be demolished

    4

  • 8/7/2019 PPES Standard for CAD

    7/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    FUTR Future workTEMP Temporary WorkMOVE Items to be movedRELO Relocated ItemsNICN Not in contractPHS1-9 Phase numbers

    Annotation

    Annotation comprises text, dimensions, sheet borders, detailreferences, and other elements on CADD drawings that dont representphysical aspects of a building. Annotation is designated as follows:

    *-ANNO-DIMS Dimensions*-ANNO-KEYS Keynotes*-ANNO-LEGN Legends and symbols*-ANNO-NOTE Notes*-ANNO-NPLT Construction lines, non-plotting information*-ANNO-REDL Redline*-ANNO-REVS Revisions*-ANNO-SYMB Symbols*-ANNO-TEXT Text*-ANNO-TTLB Borders and title blocks

    (Note: * represents a discipline code)

    User-Definable Fields

    The minor group field can be defined by the user to meet their specific

    needs. This should only be done if a defined layer does not apply.

    Master Layer List

    Users may add user defined layers in situations where a layer doesnot exist in this standard to accommodate the need or the layerneeded is project specific. These user defined layers must follow theconventions set forth by the aforementioned layer guidelines. ThisMaster Layer List in by no means all-inclusive but shows the mostcommonly used layer names. The Master Layer List is located inAppendix B of this manual.

    6. PLOTTING

    Each layout tab should represent one, and only one, plotted drawing

    A sheet should always be plotted at full scale (1=1) from paper space.

    The origin of the sheet should be located at the lower left, outsidecorner of the sheet border, not the title block border.

    All layouts need to be plotted using extents.

    5

  • 8/7/2019 PPES Standard for CAD

    8/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    A sheet should not contain any information placed outside the titleblock border, with the exception of the plot stamp block

    Please note that a guide to pen assignment/line weight and colors canbe found in APPENDIX A.

    7. PEN SETTINGS

    A standard CTB file has been established for use with all drawingsby/for TTUES. This file is called TTUES.

    8. LINETYPES

    Standard linetype formatting shall be adhered to. An example of thestandard TTUES linetypes is located in APPENDIX A. The variableLTSCALE shall be set to one-half (1/2) of the dimscale. The variablePSLTSCALE shall be set to one (1).

    9. XREF

    All drawings by/for TTUES shall utilize xrefs. Xrefs shall include, but isnot limited to, titleblocks and floorplans. Xrefs shall be located in thesame directory/folder as the drawing files that they are referencedinto. This eliminates the need for saving full path. The followingdiagram illustrates a typical xref scenario:

    The variable VISRETAIN shall be set to one (1). This allows for layermanipulation in the drawings themselves instead of relying on the xreflayer control.

    6

  • 8/7/2019 PPES Standard for CAD

    9/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    10. ABBREVIATIONS

    A list of approved abbreviations has been established for use on alldrawings by/for TTUES. These approved abbreviations can be locatedin APPENDIX C of this manual. Periods shall not be used unless the

    abbreviation can be confused with a whole word. For example if onewas to abbreviate Number as No it would require a period to avoidpossible confusion.

    11. DRAWING COURTESY

    The following list is an example of things that should be done in everydrawing before exiting it and/or submitting it for review.

    1. Save the file in the fist layout if multiple layouts are used.2. Make certain that ONLY the layers that are needed for plotting

    are left on.

    3. Ensure that the layout is zoomed to extents and that there areno extraneous objects outside of the titleblock area.

    4. Purge the drawing files to ensure that it is as compact and cleanas possible.

    5. Set all attribute pulldowns to by layer

    APPENDIX A

    GRAPHICAL STANDARDSAll graphical features of a PPES working drawing shall adhere to the

    aesthetic examples given in APPENDIX A of this manual. All graphicalrepresentations in APPENDIX A can be found in digital format in theU:\STNDRD directory. The AutoCAD DesignCenter may be used inorder to insert these features. All annotation objects (i.e. planidentifiers, detail/elevation marks etc.) are scaled according to thestandards contained in Appendix A so that they need only be insertedand text edited.

    7

  • 8/7/2019 PPES Standard for CAD

    10/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    APPENDIX B

    DEFINED LAYER NAMES

    8

  • 8/7/2019 PPES Standard for CAD

    11/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    LAYER NAME DESCRIPTION

    Annotation Layers

    *-ANNO-TEXT*-ANNO-REDL*-ANNO-SYMB*-ANNO-LEGN*-ANNO-DIMS*-ANNO-TTLB*-ANNO-NOTE*-ANNO-NPLT*-ANNO-KEYN*-ANNO-REVS

    TextRedlineSymbolsLegends & schedulesDimensionsBorders & title blocksNotesConstruction lines, non-plotting informationkey notesrevisions

    Common Modifiers*-****-PATT*-****-IDEN*-****-ELEVX-RDME

    Cross-hatching, pocheIdentification tagsElevationsRead-me layer, not to be plotted

    Status FieldModifiers*-****-NEWW*-****-EXST*-****-DEMO*-****-FUTR*-****-TEMP

    *-****-MOVE*-****-RELO*-****-NICN*-****-PHS1-9

    New workExisting to remainDemolitionFuture workTemporary work

    Items to be removedRelocated itemsNot in contractPhase numbers (1-9)

    ArchitecturalLayersA-WALL-FULLA-WALL-PRHTA-WALL-MOVEA-WALL-HEADA-WALL-JAMB

    A-WALL-PATTA-WALL-ELEVA-WALL-FIRE

    A-DOORA-DOOR-FULLA-DOOR-PRHTA-DOOR-IDENA-DOOR-ELEV

    Full-height walls, stairs and shaft walls, wallsto structurePartial-height wallsMovable partitionsDoor & window headers

    Door & window jambsWall insulation, hatching & fillWall surfaces-elevationFire wall patterning

    DoorsFull-height doors: swing & leafPartial-height doors: swing and leafDoor number, hardware group, etc.

    9

  • 8/7/2019 PPES Standard for CAD

    12/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    Doors-elevation

    10

  • 8/7/2019 PPES Standard for CAD

    13/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    LAYER NAME DESCRIPTION

    A-GLAZA-GLAZ-FULLA-GLAZ-PRHTA-GLAZ-SILL

    A-GLAZ-IDENA-GLAZ-ELEV

    A-FLORA-FLOR-OTLNA-FLOR-LEVLA-FLOR-STRSA-FLOR-RISRA-FLOR-HRALA-FLOR-EVTRA-FLOR-TPTNA-FLOR-SPCL

    A-FLOR-WDWKA-FLOR-CASEA-FLOR-OVHDA-FLOR-RAISA-FLOR-IDENA-FLOR-PATTA-FLOR-PFIXA-FLOR-FIXTA-FLOR-SIGN

    A-EQPMA-EQPM-FIXDA-EQPM-MOVEA-EQPM-NICNA-EQPM-ACCSA-EQPM-IDENA-EQPM-ELEVA-EQPM-CLNG

    A-FURNA-FURN-FREEA-FURN-CHARA-FURN-FILEA-FURN-PNLSA-FURN-WKSFA-FURN-STORA-FURN-POWRA-FURN-IDENA-FURN-PLNTA-FURN-PATTA-FURN-ELEV

    Windows, window walls, curtain walls, glazedpartitionsFull-height glazed walls and partitionsPartial-height glazed walls and partitions

    WindowsillsWindow numberGlazing and mullions-elevation

    Floor informationFloor or building outlineLevel changes, ramps, pits, depressionsStair treads, escalators, laddersStair risersStair & balcony handrails, guard railsElevator cars and equipmentToilet partitions

    Architectural specialties (accessories, displaycases)Architectural Woodwork (cabinets & counters)Casework (manufactured cabinets)Overhead items (skylights, etc.-usually dashedlines)Raised floorsRoom numbers, names, targets, etc.Paving, tile, carpet patternsPlumbing fixturesMiscellaneous fixturesSignage

    EquipmentFixed equipmentMovable equipmentEquipment not in contractEquipment accessEquipment identification numbersEquipment surfaces-elevationCeiling-mounted or suspended equipment

    FurnitureFree-standing furnitureChairs and other seatingFile cabinetsFurniture system panelsFurniture system work surface componentsFurniture system storage componentsFurniture system power designationsFurniture numbersPlants

    11

  • 8/7/2019 PPES Standard for CAD

    14/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    Finish patternsFurniture-elevations

    LAYER NAME DESCRIPTION

    A-CLNGA-CLNG-GRIDA-CLNG-OPEN

    A-CLNG-TEESA-CLNG-SUSPA-CLNG-PATTA-CLNG-ACCS

    A-LITE

    A-COLS

    A-HVAC-SDFFA-HVAC-RDFFA-HVAC-GRID

    A-ROOFA-ROOF-OTLNA-ROOF-LEVLA-ROOF-STRSA-ROOF-RISRA-ROOF-HRALA-ROOF-PATTA-ROOF-ELEV

    A-AREAA-AREA-PATT

    A-AREA-IDENA-AREA-OCCP

    A-ELEVA-ELEV-OTLNA-ELEV-FNSHA-ELEV-CASEA-ELEV-FIXTA-ELEV-PFIX

    Ceiling informationCeiling gridCeiling/roof penetrations

    Main teesSuspended elementsCeiling patternsCeiling access

    Light Fixtures

    Columns

    Supply diffusersReturn air diffusersHVAC ceiling plan

    RoofRoof outlineLevel changesStair treads, laddersStair risersStair handrails, nosing and guardrailsRoof surface patterns, hatchingRoof surfaces-elevations

    Area calculations boundary linesArea cross hatching

    Room numbers, tenant identifications, areacalculationsOccupant/employee names

    Interior and exterior elevationsBuilding outlinesFinishes, woodwork, trimWall-mounted caseworkMiscellaneous fixtures

    12

  • 8/7/2019 PPES Standard for CAD

    15/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    A-ELEV-SIGNA-ELEV-PATTA-ELEV-IDEN

    A-SECTA-SECT-MCUT

    A-SECT-MBNDA-SECT-PATTA-SECT-IDEN

    Plumbing fixtures-elevationsSignage-elevationsTexture & hatch patternsComponent identification numbers

    Sections

    Material cut by sectionMaterial beyond cut sectionTexture & hatch patternsComponent identification numbers

    LAYER NAME DESCRIPTION

    A-DETLA-DETL-MCUTA-DETL-MBNDA-DETL-PATTA-DETL-IDEN

    DetailsMaterial cut by sectionMaterial beyond cut sectionTexture & hatch patternsComponent identification numbers

    Civil Layers

    13

  • 8/7/2019 PPES Standard for CAD

    16/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    C-PROPC-PROP-ESMTC-PROP-BRNGC-PROP-CONS

    C-TOPO

    C-TOPO-SPOTC-TOPO-BOREC-TOPO-RTWL

    C-BLDG

    C-PKNGC-PKNG-STRPC-PKNG-CARSC-PKNG-ISLDC-PKNG-DRAN

    C-ROADC-ROAD-CNTRC-ROAD-CURB

    C-STRMC-STRM-UNDR

    C-COMMC-COMM-UNDR

    C-WATRC-WATR-UNDR

    C-FIREC-FIRE-UNDR

    C-NGASC-NGAS-UNDR

    C-SSWRC-SSWR-UNDR

    Property lines, survey benchmarksEasements, right-of-way, setback linesBearings and distance labelsConstruction controls

    Proposed contour lines and elevations

    Spot elevationsTest boringsRetaining wall

    Proposed building footprints

    Parking lotsParking lot striping, handicapped symbolsGraphic illustration of carsParking islandsParking lot drainage slope indications

    RoadwaysCenterlinesCurbs

    Storm drainage catch basins, manholesStorm drainage pipe-underground

    Site communication/telephone poles, boxes,towersUnderground communication lines

    Domestic water-manholes, pumping sta., stor.

    TanksDomestic water-underground lines

    Fire protection-hydrants, connectionsFire protection-underground lines

    Natural gas-manholes, meters, storage tanksNatural gas-underground lines

    Sanitary sewer-manholes, pumping stationsSanitary sewer-underground lines

    LAYER NAME DESCRIPTION

    Electrical LayersE-LITEE-LITE-SPCLE-LITE-EMERE-LITE-EXITE-LITE-CLNG

    LightingSpecial lightingEmergency lightingExit lightingCeiling-mounted lighting

    14

  • 8/7/2019 PPES Standard for CAD

    17/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    E-LITE-WALLE-LITE-FLORE-LITE-OTLNE-LITE-NUMBE-LITE-ROOFE-LITE-SITE

    E-LITE-SWCHE-LITE-CIRCE-LITE-IDENE-LITE-JBOX

    E-POWRE-POWR-WALLE-POWR-CLNGE-POWR-PANLE-POWR-EQPME-POWR-SWBDE-POWR-CIRC

    E-POWR-URAC

    E-POWR-UCPTE-POWR-CABLE-POWR-FEEDE-POWR-BUSWE-POWR-NUMBE-POWR-IDENE-POWR-SITEE-POWR-ROOFE-POWR-OTLNE-POWR-JBOX

    E-CTRLE-CTRL-DEVCE-CTRL-WIRE

    E-GRNDE-GRND-CIRCE-GRND-REFRE-GRND-EQUIE-GRND-DIAG

    Wall-mounted lightingFloor-mounted lightingLighting outline for background (optional)Lighting circuit numbersRoof lightingSite lighting

    Lighting-switchesLighting circuitsLuminarie identification and textJunction Box

    PowerPower wall outlets and receptaclesPower-ceiling receptacles and devicesPower PanelPower equipmentPower switchboardsPower circuits

    Underfloor raceways

    Under-carpet wiringCable traysFeedersBuswaysPower circuit numbersPower identificationSite powerRoof powerPower outline for backgroundsJunction box

    Electric control systemsControl systems devicesControl system wiring

    Ground systemGround system circuitsReference ground systemEquipotential ground systemGround system diagram

    LAYER NAMES DESCRIPTIONS

    E-AUXLE-LTNGE-FIREE-COMME-DATAE-SOUNE-TVAN

    Auxiliary systemsLightning protection systemFire alarm, fire extinguishersTelephone, communication outletsData outletsSound/PA systemTV antenna system

    15

  • 8/7/2019 PPES Standard for CAD

    18/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    E-CCTVE-NURSE-SERTE-PGNGE-DICTE-BELL

    E-CLOKE-ALRME-INTCE-LEGNE-1LINE-RISR

    E-SITEE-SITE-LITEE-SITE-UNDRE-SITE-POLEE-SITE-OVHD

    Closed-circuit TVNurse call systemSecurityPaging systemCentral dictation systemBell system

    Clock systemMiscellaneous alarm systemIntercom systemLegend of symbolsOne-line diagramsRiser diagrams

    Site electrical substations, polesSite lightingUnderground electrical linesElectric polesOverhead lines

    Fire ProtectionLayersF-CO2SF-CO2S-PIPEF-CO2S-EQPM

    F-HALNF-HALN-EQPMF-HALN-PIPE

    F-IGASF-IGAS-EQPMF-IGAS-PIPE

    F-SPRNF-SPRN-CLHDF-SPRN-OTHDF-SPRN-PIPEF-SPRN-STAN

    F-STAN

    CO2 systemCO2 sprinkler pipingCO2 equipment

    HalonHalon equipmentHalon piping

    Inert gasInert gas equipmentInert gas piping

    Fire protection sprinkler systemSprinkler head-ceilingSprinkler head-otherSprinkler pipingSprinkler system standpipe

    Fire protection standpipe system

    LAYER NAME DESCRIPTION

    F-PROTF-PROT-EQPMF-PROT-ALRMF-PROT-SMOK

    Fire protection systemsFire protection system equipmentFire alarmSmoke detectors/heat sensors

    Hazardous Layers

    16

  • 8/7/2019 PPES Standard for CAD

    19/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    H-PLANH-SITE

    Floor planSite plan

    Interior LayersSame as architecturallayers with one

    exception, thediscipline code is I.For example, I-WALL-FULL is for full-heightwalls, stairs, shaftwalls and walls tostructure just as withA-WALL-FULL.

    Landscape LayersL-PLNTL-PLNT-TREE

    L-PLNT-GRNDL-PLNT-BEDSL-PLNT-TURFL-PLNT-PLAN

    Plant & landscape materialsTrees

    Ground cover & vinesRock, bark & other landscape beddingLawn areasPlanting plants

    L-IRRGL-IRRG-SPKLL-IRRG-PIPEL-IRRG-EQPML-IRRG-COVR

    L-WALK

    L-WALK-PATT

    L-SITEL-SITE-FENCL-SITE-WALLL-SITE-STEPL-SITE-DECKL-SITE-BRDGL-SITE-POOLL-SITE-SPRTL-SITE-PLAYL-SITE-FURN

    Irrigation systemIrrigation sprinklersIrrigation pipingIrrigation equipmentIrrigation coverage

    Walks & steps

    Walks & steps-cross-hatch patterns

    Site improvementsFencingWallsStepsDecksBridgesPools and spasSports fieldsPlay structuresSite furnishings

    17

  • 8/7/2019 PPES Standard for CAD

    20/23

  • 8/7/2019 PPES Standard for CAD

    21/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    LAYER NAME DESCRIPTIONM-BRINM-BRIN-EQPMM-BRIN-PIPE

    M-CHIM

    M-HOTWM-HOTW-EQPMM-HOTW-PIPE

    M-CWTRM-CWTR-PIPEM-CWTR-EQPM

    M-MACH

    M-MDGSM-MDGS-EQPMM-MGDS-PIPE

    M-LGASM-LGAS-EQPMM-LGAS-PIPE

    M-NGASM-NGAS-EQPMM-NGAS-PIPE

    M-PROC

    M-PROC-EQPMM-PROC-PIPE

    M-REFGM-REFG-EQPMM-REFG-PIPE

    M-SPCLM-SPCL-EQPMM-SPCL-PIPE

    M-STEMM-STEM-CONPM-STEM-EQPMM-STEM-LPIPM-STEM-HPIPM-STEM-MPIP

    M-TEST

    Brine systemsBrine system equipmentBrine system piping

    Prefabricated chimneys

    Hot water heating systemHot water equipmentHot water piping

    Chilled water systemChilled water pipingChilled water equipment

    Machine shop equipment

    Medical gas systemsMedical gas equipmentMedical gas pipe

    Laboratory gas systemsLaboratory gas equipmentLaboratory gas pipe

    Natural gas systemsNatural gas equipmentNatural gas pipe

    Process systems

    Process equipmentProcess piping

    Refrigeration systemsRefrigeration equipmentRefrigeration pipe

    Special systemsSpecial gas equipmentSpecial gas pipe

    Steam systemsSteam condensate pipingSteam systems equipmentLow pressure steam pipingHigh pressure steam pipingMedium pressure steam piping

    Test equipment

    19

  • 8/7/2019 PPES Standard for CAD

    22/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    LAYER NAME DESCRIPTION

    Plumbing LayersP-ACID

    P-ACID-PIPE

    P-DOMWP-DOMW-EQPMP-DOMW-HPIPP-DOMW-CPIPP-DOMW-RISR

    P-EQPM

    P-FIXT

    P-SANRP-SANR-PIPEP-SANR-FIXTP-SANR-FLDRP-SANR-RISRP-SANR-EQPM

    P-STRMP-STRM-PIPEP-STRM-RISRP-STRM-RFDR

    Acid, alkaline, oil waste systems

    Acid, alkaline, oil waste piping

    Domestic hot and cold water systemsDomestic hot and cold water equipmentDomestic hot water pipingDomestic cold water pipingDomestic hot and cold water risers

    Plumbing miscellaneous equipment

    Plumbing fixtures

    Sanitary drainageSanitary pipingPlumbing fixturesFloor drainsSanitary risersSanitary equipment

    Storm drainage systemStorm drain pipingStorm drain risersRoof drains

    Equipment LayersQ-OTLNQ-POWRQ-PIPE

    Equipment outlinesPower informationPiping information

    Structural layersS-GRIDS-GRID-EXTRS-GRID-INTRS-GRID-DIMSS-GRID-IDEN

    S-FNDNS-FNDN-PILES-FNDN-RBAR

    S-SLABS-SLAB-EDGES-SLAB-RBARS-SLAB-JOIN

    Column gridExterior column gridInterior column gridColumn grid dimensionsColumn grid tags

    FoundationPiles, drilled piersFoundation reinforcing

    SlabEdge of slabSlab reinforcingSlab control joints

    20

  • 8/7/2019 PPES Standard for CAD

    23/23

    TTU Physical Plant Engineering Services CADD Manual 2/25/2011

    LAYER NAME DESCRIPTION

    S-ABLTS-COLSS-WALLS-METL

    S-BEAMS-JOISS-DECK

    Anchor boltsColumnsStructural bearing or shear wallsMiscellaneous metal

    BeamsJoistsStructural floor deck

    Telecommunications LayersT-CABLT-EQPMT-JACKT-DIAG

    Cable planEquipment planData/Telephone jacksDiagram

    -END OF STANDARD -