![Page 1: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/1.jpg)
PPLElectricUtilitiesCorporationDefaultServiceProcurementPlan
(October2020Solicitation)
BidderInformationWebcast
Wednesday,September2,2020
JimRouland(PPLElectric)
BenChee(NERA)
JuliRaventos(NERA)
ChristianPark(NERA)
![Page 2: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/2.jpg)
Questions
Tosubmitquestionstothepanelists,pleaseclickonthe“Chat”onthebottomofyourscreen;thechatwillappearontheright;typeinyourquestionandclick“Enter”tosubmityourquestion
AllpresentationmaterialsandQ&Aswillbepostedto:http://www.ppldsp.com
![Page 3: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/3.jpg)
3
Disclaimer
Anystatementshereindescribingorreferringtodocumentsandagreementsaresummariesonly,andarequalifiedintheirentiretybyreferencetosuchdocumentsandagreements.
Thegoverningdocumentsare:‒ theCommission’sOrderdatedOctober27,2016relatedtoPPL
Electric’sDefaultServicePrograminDocketNo.P‐2016‐2526627‒ DefaultServiceRFPRules‒ DefaultServiceSupplierMasterAgreement(“DefaultService
SMA”)‒ theCommission’sOrderdatedMay17,2018relatedtoPPL
Electric’sTime‐Of‐UsePrograminDocketNo.M‐2016‐2578051
PleaseseetheRFPwebsiteforcompletedocumentationhttp://www.ppldsp.com
![Page 4: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/4.jpg)
4
Agenda
ScopeofPresentation RegulatoryBackgroundandUpdate RFPTimeline ProductsSolicited
![Page 5: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/5.jpg)
ScopeofPresentation
5
![Page 6: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/6.jpg)
Multi‐SolicitationProcess
FullRequirementsRFPforload‐following,fullrequirementsproducts
Eight(8)solicitationsplannedbetweenApril2017andOctober2020‒ April2017‒ October2017‒ April2018‒ October2018‒ April2019‒ October2019
April2020‒ October2020(thissolicitation)
6
![Page 7: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/7.jpg)
PresentationisspecifictoOctober2020
ThisPresentationisfocusedonlyoninformationspecifictotheOctober2020Solicitation
AseparatepresentationwithinformationcommontoallsolicitationsregardingtheDefaultServiceRFPprocessandthequalificationrequirementsisprovidedontheRFPwebsiteunderthe“Documents”pageofthe“DefaultServiceRFP”section
7
![Page 8: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/8.jpg)
SummaryofUpdates
LettersofCreditshouldbedeliveredatthefollowingaddress:PPLElectricUtilitiesCorporation2NorthNinthStreet(TW20)Allentown,PA18101Attn:JamesM.Rouland,RegulatoryPolicyManager
AnelectronicsignatureincludesdigitalsignaturesforuseintheRFPandSMAdocuments;Attestation/WitnessRequirementsarewaived
TimeProvidedforConfirmingReceiptofBidProposalSpreadsheetshasbeenchangedfrom30minutesto60minutes
UpdatedBindingBidWithdrawalAgreement(RFPAppendix10):AcceptanceofbidderspecificpasswordasalternativetosignatureonBindingBidWithdrawalAgreement
8
![Page 9: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/9.jpg)
RegulatoryBackgroundandUpdate
9
![Page 10: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/10.jpg)
TheFourthDefaultServiceProgram(DSPIV)
InJanuary29,2016,PPLElectricfiledapetitionforapprovalofitsfourthDefaultServiceProgramandProcurementPlan(“DSPIV”)fortheperiodofJune1,2017toMay31,2021
‒ July19,2016:JointPetitionforApprovalofPartialSettlement
‒ October27,2016:CommissionOrderapprovingJointPetition
Thedefaultserviceplancontains8solicitationsbetweenApr.2017throughOct.2020forFullRequirementsService:
‒ FixedPriceProductsforResidentialandSmallC&ICustomerGroups
‒ SpotMarketProductsfortheLargeC&ICustomerGroup
10
![Page 11: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/11.jpg)
DSPIVTOUProgram
InAugust10,2017,PPLElectricfiledapetitionforapprovalofnewpilotTOUProgram fortheperiodsameastheremainingDSPIV
‒ March13,2018:JointPetitionforSettlement
‒ May17,2018:CommissionOrderapprovingJointPetition
TheTOURFPisseparatefromtheDefaultServiceRFP
‒ TOUbidsfortheResidentialandSmallC&ICustomerGroupareseparate
‒ ThefirstTOUsolicitationtookplaceafterDefaultServiceApril2019solicitation;TOUsolicitationstakeplaceaftereachDefaultServicesolicitation
‒ ThefourthTOUsolicitationwilltakeplaceimmediatelyfollowingthecompletionofthisDefaultServiceOctober2020solicitation;theTOURFPBidDateisscheduledforNovember10,2020
11
![Page 12: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/12.jpg)
DSPIVTOUProgram(cont’d)
Biddersbid%discounttothegenerationportionofthePrice‐to‐Compare(“PTC”)
‒ PTCisexpectedtobereleasedonNovember1,2020
‒ PTCisseparateforeachofResidentialandSmallC&ICustomerGroups
TOULoadisexcludedfromDSLoadifthereisaTOUsupplier
‒ Currently,pursuanttotheTOUcontingencyplan,theTOULoadisincludedintheDSLoad
‒ DSsuppliersareservingTOULoadaspartoftheDSLoad
‒ IfNovember2020TOURFPhasawinningTOUsupplierforacustomergroup,TOULoadwillbeexcludedfromtheDSLoadforthatcustomergroup
‒ TOULoaddatawillbeavailableontheDatapageoftheRFPwebsite
12
![Page 13: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/13.jpg)
OtherDSPIVElements
StandardOfferProgram(SOP)‒ UnderDSPIV,PPLElectricwillcontinuetheSOPthroughthetermoftheplan
withlimitedmodifications‒ CustomersareabletosignupforSOPonlinethroughthe“ChooseYour
Supplier”pageorbysigningupasanewormovingcustomer
CustomerAssistanceProgramStandardOfferProgram(CAPSOP)‒ PerDSPIVsettlement,PPLElectricimplementedaCAPSOP‒ ThisprogrammirrorsthebaseSOP,withafewexceptions:
OnlyPPLElectricCAPcustomersmayparticipateintheprogram; EGSsmustseparatelyelecttoparticipateintheCAPSOP; attheconclusionofthe12‐monthcontract,CAPcustomersmustbe
returnedtoDefaultServiceor beenrolledinthenewCAPSOP(i.e. notcontinueshoppingonanon‐CAPSOPrate)
13
![Page 14: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/14.jpg)
PASolar– ClosingtheStateBorders
InOctober2017,thePennsylvaniaStateLegislaturepassedanadjustmenttoAct40,anamendmenttothePAAEPSActof2007,effectivelyclosingtheStateborderstosolargenerationoutsideofPennsylvania
ThePUCissuedanImplementationOrderinJuly2018,andaReconsiderationOrderinAugust2018.TheOrdersassertthatanySolarAECsusedforanLSE’ssolarAEPScomplianceobligationmustbegeneratedwithinPennsylvania
ContractsthatwereenteredintobypartiespriortotheAct40amendmentutilizingSolarAECsfrompreviouslyapprovedoutofstatesolargenerationsourcesmayfileapetitionwiththePUCforapproval
SolarAECsalreadygeneratedfrompreviouslyapprovedsolarsources(includingthoseoutsideofPA)aregrandfatheredanddeemedavailableforusetocomplywiththesolarAEPScomplianceobligation
FromtheOctober2018solicitationandon,SolarAECsmustbegeneratedfromwithintheStateofPennsylvania,orfromafacilityapprovedbythePUCAEPSManager
14
![Page 15: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/15.jpg)
DSPVandOtherUpdates
PPLElectricDefaultServicePlanV(“DSPV”)– DocketNo.P‐2020‐3019356‒ TheDSPVwasfiledbyPPLElectricinMarch2020.
‒ PPLElectric’sPetitionforDSPVincludes:updatestocustomerproductmixes,theintroductionofanAEC‐onlyauction,updatestoTOU,proposalofarenewableenergyrateprogram,andupdatestotheCAPSOPandbaseSOPprograms.AllelementsoftheCompany’spetitionarependingbeforetheAdministrativeLawJudge(“ALJ”)andPUC.
‒ TheALJ’srecommendeddecisionisexpectedinOctober2020.
‒ ThePUCFinalOpinionandOrderisexpectedinDecember2020.
FERCMinimumOfferPricingRule(“MOPR”)‒ InDecember2019,theFERCorderedPJMto adopt changestothedesignofthecapacitymarket,
expandingtheMOPRtoinclude additional state‐subsidizedcapacityresources.
‒ InApril2020,theFERCissuedanOrderonRehearingandClarificationwherebytheFERCheldthatstatedefaultserviceauctionscouldmeetthedefinitionofastate subsidy.PJMhassincecompletedacompliancefilingwiththeFERC,whichiscurrentlypendingapproval.
‒ TheFERCMOPRisdirectedatPJMandgenerationresourcesthatparticipateinthecapacitymarket–notEDCslikePPLElectric.WhiletheMOPRcouldaffectthePPLElectricauctions,specificallyasitpertainstosettingcapacityprice– theCompanyhasnopositiontoprovideorinformationtocommunicatependingthePJMcompliancefiling.
15
![Page 16: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/16.jpg)
DSPVandOtherUpdates(cont.)
16
PennsylvaniaMoratorium‒ GovernorWolf,inconjunctionwiththePAPUC,continuestomaintainamoratoriumontermination
ofcustomerserviceduetolackofpayment.
‒ ThiswillnotaffectPPLElectricdefaultservicesuppliers.Perthetermsofdefaultservicewholesalecontracts,wholesalesuppliersarestillobligatedtoprovideserviceforallscheduleddefaultservicecustomers,andPPLElectricisobligatedtopaysuppliersforsuchservice.Todate,themoratoriumhasnotimpacteddefaultservicecontractsanditisnotexpectedtoimpactthesecontractsgoingforward.
![Page 17: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/17.jpg)
RFPTimeline
17
![Page 18: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/18.jpg)
SolicitationisinThreeSteps
Step1• BidderQualification• RFPBidderssubmitqualificationmaterialsthroughonlineform• DueDate:12pm(noon)EPTonSeptember14,2020
Step2• BidAssuranceCollateral/SMA• RFPBidderssubmitfinancialguaranteesandsignedcontracts• DueDate:12pm(noon)EPTonOctober2,2020
Step3• BidProposals• QualifiedRFPBidderssubmitBids• DueDate:10am– 12pmEPTonOctober6,2020
18
![Page 19: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/19.jpg)
19
October2020RFPSchedule
BidderInformationSession Wednesday,September2BidderQualificationsDue*– NOONEPT Monday,September14QualifiedBiddersNotified Monday,September28BidderTraining Tuesday,September29BidAssuranceCollateralandSMADue– NOONEPT Friday,October2BidProposalsDue– NOONEPT Tuesday,October6PUCDecision Thursday,October8
TransactionConfirmation(s)Executed– 2PMEPT Tuesday,October13
*Ifqualificationmaterialsaredeficient,RFPBiddersmustrespondbythedeadlinespecifiedinthedeficiencynotice.This isgenerallyby6PMonthesecondbusinessdayfollowingthefirstdeficiencynotice.Ifadditionalinformationisrequired,RFPBiddersmustrespondbythedeadlinespecifiedinanysubsequentdeficiencynotice.InnoeventwillanRFPBidderbeallowedtocontinuetocureitsdeficiencyaftertheCureDeficiencyDeadline.
![Page 20: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/20.jpg)
LoginCredentialstoQualificationForm
YouwillreceiveanemailfromPPL‐[email protected]“PPLElectricRFP:LoginCredentialsandInstructions”.Clickonthe“AccessMessage”buttontosetupandactivateyouraccount.Onceyoucompletethesetup,youwillbeabletodownloadthelogincredentials.
![Page 21: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/21.jpg)
Step1:SubmittheQualificationForm
1. ExpressionofInterest2. ConfidentialityAgreement3. PJMandFERCQualifications4. CreditApplicationandFinancialInformation5. BindingBidAgreement
6. DesignationofAdditionalRepresentatives7. ProposedModificationstoBidAssuranceLOC8. ProposedModificationstoPerformanceAssuranceLOCandGuaranty
RequiredintheQualificationForm:RequiredintheQualificationForm:
OptionalintheQualificationForm:OptionalintheQualificationForm:
DueDate:12pm(noon)EPTonSeptember14
21
![Page 22: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/22.jpg)
AbbreviatedProcessforRFPBidderQualifiedforPreviousSolicitation
ExpressionofInterest ConfidentialityAgreement PJMandFERCQualifications1. CreditApplicationandFinancialInformation2. BindingBidAgreement
6. DesignationofAdditionalRepresentatives7. ProposedModificationstoBidAssuranceLOC8. ProposedModificationstoPerformanceAssuranceLOCandGuaranty
RequiredintheQualificationForm:RequiredintheQualificationForm:
OptionalintheQualificationForm:OptionalintheQualificationForm:
DueDate:12pm(noon)EPTonSeptember14
ResubmitAppendix6orRefreshusingAppendix6b
Resubmit
22
![Page 23: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/23.jpg)
23
Step2:BidAssuranceCollateral/SMA
BidAssuranceCollateral‒ $500,000pertranche‒ intheformofaletterofcreditorcash
Onescannedsignedcopyoftheentire DefaultServiceSMAmustbereceivedbyuploadtotheRFPwebsite,includingtheFormofNoticefilledinwiththeappropriatecontactinformation
RFPBiddersthathavepreviouslysubmittedDefaultServiceSMAsinDSPIVdonotneedtodosoagain,butareresponsibleforprovidinganyupdates
DueDate:12pm(noon)EPTonOctober2
![Page 24: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/24.jpg)
24
Step3:SubmitBidProposals
BidProposalDueDateofOctober6‒ SubmissionWindow:10AM– 12PM(noon)EPT
OneBidProposalSpreadsheetforeachProduct‒ DifferentspreadsheetsforRESandSC&Iproducts‒ AllshadedcellsonSpreadsheetmustbecompleted
BidProposalSpreadsheetsmustbesubmittedonlinebyelectronicfiletransfer tothePPLElectricsecureserver
![Page 25: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/25.jpg)
ProductsSolicited
25
![Page 26: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/26.jpg)
BidProducts
26
CustomerGroup
ProductDescription
DeliveryPeriod(Beginningon
December1,2020)
TranchestobeProcured
TrancheSize
Residential FixedPrice12months 16 2.50%
6months 8 2.50%
SmallC&I FixedPrice12months 5 5.00%
6months 9 5.00%
SuppliersprovideFullRequirementsServiceandarepaidafixedprice($/MWh)
![Page 27: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/27.jpg)
27
TwoTypesofLoadCaps
MaximumnumberoftranchesRFPBiddercanbidonisbasedon:‒ An85% solicitationloadcapbasedontranchesineachsolicitation
‒ A50% aggregateloadcap basedonpercentofdefaultserviceloadofaCustomerGroupaRFPBiddercanserveatanygivenpointintime AppliestobothResidentialandSmallC&I Limitontranchesbidinagivensolicitationwilltakeintoaccount
percentageofloadassociatedwithtrancheswonunderpriorFullRequirementsRFPsunderDSPIV
Product AvailableTranches
SolicitationLoadCap
MaximumTranchesBiddercanBid
ResidentialFixedPrice(12‐mo) 1685% 20
ResidentialFixedPrice(6‐mo) 8SmallC&IFixedPrice(12‐mo) 5
85% 11SmallC&IFixedPrice(6‐mo) 9
![Page 28: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/28.jpg)
AEPSandAllocatedAECs
28
ReportingPeriod TierI SolarPV TierII
6/1/2020– 5/31/2021 8.5% 0.5000% 10.00%
6/1/2021– 5/31/2022 8.5% 0.5000% 10.00%
TherewillbenoAECsallocatedtoSuppliersparticipatingintheOctober2020solicitation
SeeExhibit2ofSMAissuedforOctober2020solicitationfordetails
![Page 29: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/29.jpg)
29
DataandDocumentsProvidedonRFPwebsite
AlldocumentsrequiredforParticipation:‒ RFPRulesandAddendums
‒ DefaultServiceSMAandsampleExhibits
‒ Creditinstruments
‒ BidProposalSpreadsheets
‒ Trainingmaterials
Data:‒ HistoricalLoadData
‒ DefaultServiceLoadData
‒ BilledSales&Counts
‒ NYPASupplyDataandNYPAContract
‒ PJMDerationFactors
‒ DailyICAP&NITSTagData
‒ CapacityandNSPLData
![Page 30: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/30.jpg)
30
HeadsUp!TOURFPtobereleasedOct.12
AllqualifiedbiddersundertheDefaultServiceRFPmayparticipateinanabbreviatedprocesstoqualifyfortheTOURFP
TOURFPseekstosecuresupplyforTOUCustomersintheResidentialandSmallC&ICustomerGroups
ForaCustomerGroup,oneTOUSupplieristoserve100%oftheTOULoadforthatCustomerGroup
TOUSupplierispaidOn‐PeakPricefortheTOUsupplyduringon‐peakhoursandOff‐PeakPricefortheTOUsupplyduringoff‐peakhours
BiddersareprovidedwiththegenerationportionofPrice‐to‐ Compare(“PTC”)andon‐peakmultiplier
ABidisforpercentagediscount(%)belowthegenerationportionofPTC,whichsetstheOff‐PeakPrice
On‐PeakPriceisproductofOff‐PeakPriceandon‐peakmultiplier
![Page 31: PPL Electric Utilities Corporation Service Procurement ... · 9/2/2020 · This Presentation is focused only on information specific to the October 2020 Solicitation A separate presentation](https://reader033.vdocuments.net/reader033/viewer/2022051910/5fff7114b68d0011ae454ca1/html5/thumbnails/31.jpg)
Questions
Tosubmitquestionstothepanelists,pleaseclickonthe“Chat”onthebottomofyourscreen;thechatwillappearontheright;typeinyourquestionandclick“Enter”tosubmityourquestion