ppt ofthe project

Upload: mbaupi

Post on 06-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Ppt Ofthe Project

    1/30

    5/4/12

    Aproject report onStudy on improvement of health

    industry and there standard

    Project work carried out at:

    institute for plasma research

    Submitted By :Amin Zankhana vEnrolment no :107900592072

  • 8/3/2019 Ppt Ofthe Project

    2/30

    5/4/12

    Practical learning

  • 8/3/2019 Ppt Ofthe Project

    3/30

    5/4/12

    ContentIntroduction of organization

    History of organization

    Vision & Mission

    Plasma at international levelUnderstanding & Theme of Topic

    of Project

    Scope & limitation of the study

    Research methodology & Dataanalysis

    H othesis Testin

  • 8/3/2019 Ppt Ofthe Project

    4/30

    5/4/12

    Introduction of theOrganisation

    Institute for Plasma Research (IPR) is anautonomous Institute under the Department ofAtomic Energy, Government of India to conductresearch in the fields of plasma physics and

    associated technologies, with special mandates toperform various developments in the area ofcontrolled thermonuclear fusion as a futuresource of energy and to develop industrially

    beneficial technologies using plasmas

  • 8/3/2019 Ppt Ofthe Project

    5/30

    5/4/12

    History of company

    The Institute for Plasma Research cantrace its roots back to early 1970's when acoherent and interactive programmed of

    theoretical and experimental studies inplasma physics with an orientationtowards understanding space plasmaphenomena was established at the

    Physical Research laboratory

  • 8/3/2019 Ppt Ofthe Project

    6/30

    5/4/12

    MISSION & VISION

    To perform excellent research on plasmabased technologies that not only satisfiescustomer needs by providing innovative

    solutions through quality research andadvanced technology, but also contributesto the fulfilment of the Organization'seducation, research and public service

    commitments through

    the involvement of the scientificcommunity, students, faculty and external

  • 8/3/2019 Ppt Ofthe Project

    7/30

    5/4/12

    PLASMA ATINTERNATIONAL LEVEL

    FRANCE

    CHINA

    GERMANY

    UGANDA

    AMERICA

    EUROPE

  • 8/3/2019 Ppt Ofthe Project

    8/30

    5/4/12

    STUDY OF HEALTH INDUSTRIESSTANDERD AND THEIR

    IMPROVEMENT

    Objective Of project

    Aware the people for this particular standards for the health care Get the perception of the patients about this standards

    How it will be important for the health care

    For the improvement healthcare the patients are satisfied or expected

    more improvement about the hospitals facility

    To develop a healthcare system based on total quality managementprinciples and application of information technology to achieveefficiency

    For the improve the healthcare of patients the hospitals org howmuch satisfied them facility

    F th t d f thi i t th t

  • 8/3/2019 Ppt Ofthe Project

    9/30

    5/4/12

    For the study of this improvement the tenstandards are available for the health

    care

    Patients Centered Standards

  • 8/3/2019 Ppt Ofthe Project

    10/30

    5/4/12

    Organisation Centered Standards

  • 8/3/2019 Ppt Ofthe Project

    11/30

    5/4/12

    Research design and researchmethodology

    Primary objective:

    Analyses on the health industry are indicating moreimprovement or not

    For the improvement the hospitals are consider the

    healthcare standards

    Secondary objective:

    I will do the analysis on the how the hospital org will beimprove them facility them services , How to handle the

    patients s treatment the health industry will be whichfactors are consider for the improve the health care the

    patients view

  • 8/3/2019 Ppt Ofthe Project

    12/30

    5/4/12

    Research design and researchmethodology

    SCOPE OF PROJECT:The survey of patients for the study purpose was limited to few randomly selected

    hospitals of the decided towns. TIME SCOPE OF PROJECT: six weeks of Summer Training

    Sample Size: sample size is 200

    Research design : I will use descriptive design

    DATA COLLECTION IN THE PROJECT:

    Primary Method: Questionnaire

    Secondary Methods: Magazines, Newspapers,Websites,ReferenceBooks.

    . Types of Questionnaire :There are two type of questionnaire

    1. Structure Questionnaire 2. Unstructured Questionnaire

    . I will use Unstructured Questionnaire

  • 8/3/2019 Ppt Ofthe Project

    13/30

    5/4/12

    Analysis of data

  • 8/3/2019 Ppt Ofthe Project

    14/30

    5/4/12

    1.In which location do youlive ?

    2. Have you facedifficulty for gettingmedical treatmenteasily?

  • 8/3/2019 Ppt Ofthe Project

    15/30

    5/4/12

    3. Do you feel all kindhealth problems solveunder one roof?

    4. Are You Aware aboutHospital Standard?

  • 8/3/2019 Ppt Ofthe Project

    16/30

    5/4/12

    5.If yes than are you awareabout benefit of standards?

    6. Do You Feelregistration processwill be different forthe ipd, opd andemergency patients?

  • 8/3/2019 Ppt Ofthe Project

    17/30

    5/4/12

    7. You are usually kept waiting for along time when you need doctor'sattention/consultation

    8. have You easy access tothe medical specialists in

    the hospital.

  • 8/3/2019 Ppt Ofthe Project

    18/30

    5/4/12

    9.Do you satisfied with theskill and competency of thehospital staff?

    10. Do yousatisfied with

    easily availabilityof medication?

  • 8/3/2019 Ppt Ofthe Project

    19/30

  • 8/3/2019 Ppt Ofthe Project

    20/30

    5/4/12

    12.What is your opinion forbelow mention facilities?

  • 8/3/2019 Ppt Ofthe Project

    21/30

    5/4/12

    13. Do you feel hospital takemore responsibility at the time ofserious injuries?

    14. Have you goteasily your all oldrecord?

  • 8/3/2019 Ppt Ofthe Project

    22/30

    5/4/12

    15. Which factors are importantfor the medical care you choosethe hospital?

    16. What sector of thehealth care industrydo you believe needsthe mostimprovement in

    patient satisfaction?

  • 8/3/2019 Ppt Ofthe Project

    23/30

    5/4/12

    17. Do you Feel patientsatisfaction directly affected toreach hospital at bottom line?

    18. Would yourefer your hospitalto your friends or

    relative?

  • 8/3/2019 Ppt Ofthe Project

    24/30

    5/4/12

    HypothesesQue.2 68% patients havent

    any difficulty in getting themedical treatment during thepast years

    Null Hypothesis: Ho: 71% ofpatients havent any difficulty ingetting the medical treatment

    during the past yearsAlternative Hypothesis: H1:

  • 8/3/2019 Ppt Ofthe Project

    25/30

    5/4/12

    Standard error of sample proportion p = (Ho* H1) / n

    = (0.32*0.68) / 200

    = 0.033

    This is the lower limit case with the significance level of0.05

    Z = p-h0

    p

    = 0.32 0.71

    0.033

    = - 11.82

    Here value of Z cal is falling in the rejectedregion. So null a hypothesis is rejected that 68%

    patients havent any difficulty in getting themedical treatment durin the ast ears

  • 8/3/2019 Ppt Ofthe Project

    26/30

    5/4/12

    Chi-squareQue 4 . Chi-square test testing the proportion of male and female ofAware about Hospital Standard?

    Male female total per

    yes 10 12 22 11

    No 114 64 178 89

    total 124 76 200 100

    Hypothesis:Null hypothesis H0= H1-H2Alternative hypothesis H1 H1 H2

    Significance of level is=

    0.05%Expected frequency:Row total * Colum total

    Grand total

  • 8/3/2019 Ppt Ofthe Project

    27/30

    5/4/12

    Categories Observation (Q) Expected

    frequency(Exi)

    (Q-Exi) 2

    (Q-exi)

    Male yes 10 13.64 - 3.64 13.25

    Female yes 12 8.36 3.64 13.25

    Male no 114 110.36 3.64 13.25

    Female no 64 67.64 -3.64 13.25

    total 200 0 66.25

    Chi square =

    = 66.25/200= 0.33 ans

    Degree of freedom = 4-1= 3

    5 degree of freedom and significance of level shoe the chi square table value is= 7.8147

    Conclusion: this query is in accepted on the these 11 % people areaware about the healthcare standards and the alternative hypotheses isrejected

  • 8/3/2019 Ppt Ofthe Project

    28/30

    5/4/12

    Conclusion & Findings

    Benefits for Patients

    Benefits for Hospitals

    Benefits for HospitalStaff

  • 8/3/2019 Ppt Ofthe Project

    29/30

    5/4/12

    Suggestion

  • 8/3/2019 Ppt Ofthe Project

    30/30

    5/4/12

    Thank you