PRESENTATION ON

Solar Powered LED Lighting Installation at JECRC Campus

Er. Ram Singh(Asst.HOD)DEPARTMENT OF ELECTRICAL ENGINEERING

JAIPUR ENGINEERING COLLEGE AND RESEARCH CENTRE,JAIPUR

Page 2: ppt on solar project (2)

LED SOLAR STREET LIGHTNING SYSTEM

Page 3: ppt on solar project (2)

PRESENT SCENARIO

THERE ARE 13 POLES ON STREET

4 POLES INSIDE THE GIRLS HOSTEL

EVERY POLE HAVE 1 SODIUM VAPOUR LAMP WITH 250 WATT POWER RATING

SPEND AROUND 1 LAKH ANNUALY

Page 4: ppt on solar project (2)

HERE WE USE

LED LIGHTS WHICH HAS HIGHER ILLUMINATION IN LOW POWER CONSUMPTION

POWERED BY SOLAR PANELS NO EXTERNAL POWER REQURED

GREEN INITIATIVE FROM COLLEGE

CONSERVE NATURAL RESOURCES

Page 5: ppt on solar project (2)

PHASE 1AS A PILOT PROJECT IN THE FIRST PHASE 5 POLES WILL BE INSTALLED IN THE GIRLS HOSTEL

EXISTING LIGHTNING SYSTEM CAN BE INSTALLED AT ANY OTHER SUITABLE LOCATION AT JECRC OR UDML CAMPUS

Page 6: ppt on solar project (2)

SPECIFICATIONS

Page 7: ppt on solar project (2)

QUALITY PROVISION

Page 8: ppt on solar project (2)

COMPANIES INVOLVED

GREEN ADD VARDAAN ENERGY LTD.

Page 9: ppt on solar project (2)

BENEFITSFOR STUDENTS

BY THIS STUDENTS GET THE PRACTICAL KNOWLEDGE OF INSTALLATION AND BASICS OF ELECTRICAL ENGINEERING

IF RENEWABLE ENERGY SEMINAR WITH PRACTICLE HANDOUTS ORGANISED BY GREEN ADD THEN CERTIFICATION FROM CAMBRIDGE UNIVERSITY WILL BE PROVIDED.

OPTIONS FOR INTERENSHIP AND SCHOLARSHIP PROGRAMS GREEN TECHNOLOGY

ENCOURAGE STUDENTS FOR GREEN TECHNOLOGY AND FUTURE ENERGY SOURCES.

Page 10: ppt on solar project (2)

TO COLLEGE

FIRST GREEN INITIATIVE FROM COLLEGE WHICH WILL BE HIGHLIGHTED AT THE MNRE, COLLEGE WILL GET 30% SUBSIDY OR TAX REBATE OF THE TOTAL COST OF PROJECT.

IN FUTURE COMPANY CAN SIGN MoU WITH COLLEGE WHICH MAKE CORPORATE RELATIONSHIP.

ELECTRICIY BILL WILL BE REMOVED COMPLETELY FROM STREET

LIGHTS.

Page 11: ppt on solar project (2)

FUTURE SCOPE

IN FUTURE AFTER SUCCESSFUL INSTALLATION OF PILOT PROJECT ALL STREET LIGHTS WILL BE SOLAR ELECTRIFIED.

SOLAR WATER HEATING SYSTEM OF THREE HOSTELS CAN BE

IMPLEMENTED.

Page 12: ppt on solar project (2)

BUDGETPER POLE

14,201 WITH POLE

IN FIRST PHASE 5 POLES 71,005 .

INCLUDING ALL INSTALLATION AND TRANSPORTATION CHARGES

COMPANY NEEDS 70% IN ADVANCE (50,000 )