![Page 1: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/1.jpg)
W.BENGAL
BIHAR
JHARKHAND
ORISSA
Sikkim
132 kV Sahupuri-Karmanasa S/C -
132 kV Rihand - Sonenagar
220 kV Dehri -Sahupuri
220 kV Balimela (Orissa) -Upper Sileru
220 kV Birpara-Salakti D/C line 1999
132 kv Rihand-Garwah
220 KV Korba (MP) – Budhipadar (Orissa)
Tala
Allahabad
B’nggon
Raipur
VizagKolar
Rourkella
Talcher
![Page 2: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/2.jpg)
YEAR ISGS Thermal GEN
(MU)
EXPORT(MU)
TOTALSAVING(RS. CR)
1995-96 9584 854 691996-97 10628 652 751997-98 13585 2389 3091998-99 14063 3438 4611999-00 16381 5931 7352000-01 18228 6773 7552001-02 18279 8721 9432002-03 20460 9382 961
Savings of ER Constituents Due to Export
![Page 3: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/3.jpg)
National GridNational Grid
CTU – INTER REGION
CTU_WEST
CTU_SOUTH
CTU_NORTH
CTU_EAST
CTU_NE
STU
STU
STU
RLDC
NLDC
RLDC
RLDC
RLDC
RLDC
![Page 4: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/4.jpg)
ERLDC:POWERGRIDERLDC:POWERGRID
![Page 5: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/5.jpg)
BULK POWERTRANSACTION
POWERGRID EHV
W.RN.R
NER SR
C.S.GENERATORS
STATE SYSTEMS STATE SECTOR
GENERATORS
![Page 6: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/6.jpg)
Operating Frequency
49 to 50.5 Hz
Frequency band for safe operation of Steam Turbine as
recommended in IEGC
![Page 7: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/7.jpg)
Pre ABT Settlement system
• The payment to Central Generating Station by a constituent - proportion to total energy drawal – Recommendation of K.P.Rao Committee Report.• Both Fixed and Variable charge was payable as per energy drawal• Based on Monthly Regional Energy Account- REA • Conventional Meter Readings • Fixed cost recoverable with deemed generation ( generation not made available)•Incentive payable after accounting for deemed generationAlthough a two part tariff- Single part for constituent
![Page 8: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/8.jpg)
Inadequacies • Non-utilization of Utilities’ Surplus Power
– No incentive for Maximization of own/ IPP/captive generation within a State as the cost of power paid is based on pooled rate of ISGS stations.
– No effective commercial mechanism for pricing deviations from schedule.
• Dumping of surplus power at High Freq– Forced Backing down/ Reserve Shut down– Deemed generation for backing down
• Non-utilization of embedded IPP/Licensee surplus Power.– Administrative problems and no commercial arrangements for utilization of this
power. Any surplus remains unutilized.
• Non-utilization of Pumped Storage Scheme– No commercial mechanism to draw cheap off peak power for pumping. Bhira
PSS/Kadamkadai is not being utilized in the pumping mode.
![Page 9: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/9.jpg)
Contd..
• Inability to Despatch Generation according to Grid requirement.– Generation of Licensees cannot be despatched as per Grid requirements due to
commercial problems.
• Curtailment of Bilateral Transactions due to Grid Indiscipline.– Overdrawing State(s) deliberately increase drawls and cause frequency to dip
below 48.5 Hz so that inter-regional transactions are terminated.
• Absence of Merit Order Operation– As payments are based on drawls and not on shares/schedules, fixed
cost are not perceived as sunk costs.
![Page 10: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/10.jpg)
Inherent Disadvantage• No incentives for generators /utilities to respond to
dispatch orders for issues like frequency control– No Incentive for helping the grid– No disincentive for hurting the grid
• No signal to generators to match availability with system needs
• Did not promote Grid Discipline• No signal for trading of power.
Overall economy was lost.
![Page 11: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/11.jpg)
EFFECT• Backing down of cheaper CS generation
– Caused high per unit cost
• Dumping of energy by other utility at high frequency/off peak hours-
– additional fixed cost liability for generation & transmission.
• More payment Liability
- Even when helped the grid
![Page 12: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/12.jpg)
Ultimate EffectUltimate Effect• Grid Indiscipline-
• Low Frequency during peak• High Frequency during off peak
• Control Instructions• Subjective decisions• Not based on overall economy
• Perpetual Operational & Commercial Dispute amongst Utilities/Central Generators
• Poor Supply quality to consumers/industries
• Damage to equipments• Shifting of Industries/Investments
![Page 13: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/13.jpg)
Why ABT?Why ABT?•Promote competition, efficiency and Promote competition, efficiency and economy- Merit order dispatcheconomy- Merit order dispatch
•Competitive market based systemCompetitive market based system•Possibility of trading on a non-firm Possibility of trading on a non-firm basis- selling of capacity entitlementbasis- selling of capacity entitlement
•Facilitating Grid discipline- Incentive Facilitating Grid discipline- Incentive and disincentive for deviationand disincentive for deviation
![Page 14: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/14.jpg)
![Page 15: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/15.jpg)
Capacity Ch.Capacity Ch. + + Energy Ch.Energy Ch. UIUI
A + B A + B C C
![Page 16: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/16.jpg)
TOPICS DEALT IN THE ORDERTOPICS DEALT IN THE ORDER• TARGET AVAILABILITYTARGET AVAILABILITY
• CRITERIA FOR INCENTIVECRITERIA FOR INCENTIVE
• PROCEDURE FOR PREVENTION OF GAMINGPROCEDURE FOR PREVENTION OF GAMING
• PROLONGED OUTAGESPROLONGED OUTAGES
• UI CHARGES AND FREQUENCY VARIATIONUI CHARGES AND FREQUENCY VARIATION
• SETTLEMENT OF UI ACCOUNTSETTLEMENT OF UI ACCOUNT
• TREATMENT OF UNALLOCATED CAPACITIESTREATMENT OF UNALLOCATED CAPACITIES
![Page 17: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/17.jpg)
Availablity Based Tariff (ABT)• Links commercial mechanism & Grid Operation• Promotes grid operation• ABT Structure – 3 parts of tariffs
A. Capacity charges– Proportionate to entitlements (not actual drawals)– Full recovery at target availability (not PLF)– Incentives linked to Availability (80%) and PLF (77%)– Incentives half of per KWh fixed charges at target availability /
capped at 21 p/u
B. Energy charges– Payable for schedules (not as per actual drawals)
C. Unscheduled Interchange– Payable for deviations from schedules– Linked to average frequency for 15 minute time block (graph
enclosed)
![Page 18: [PPT]PowerPoint Presentation - Global Alumni Association of ... · Web viewTitle PowerPoint Presentation Author Laptop Last modified by Laptop Created Date 8/31/2004 3:26:38 AM Document](https://reader035.vdocuments.net/reader035/viewer/2022062909/5b1e0f4e7f8b9a7e6d8ba722/html5/thumbnails/18.jpg)
.
Central Govt. CEA
CERC REB State Govt SERC CTU RLDC SEB/STU SLDC
ISTS & ISGS
X= L- G
Control AreaControl Area