Page 2: Practicize the Plan Building a Progressive Exercise Program

Why

• Requirement

• Helps you determine readiness and gaps

• History is not kind

• Expectation of your residents and family

Page 3: Practicize the Plan Building a Progressive Exercise Program

What

Page 4: Practicize the Plan Building a Progressive Exercise Program

What

Page 5: Practicize the Plan Building a Progressive Exercise Program

Where to Start

• Emergency Operations Plan (EOP)

–This is your foundation for exercising

Page 6: Practicize the Plan Building a Progressive Exercise Program

Ensuring a Successful Drill

• Emergency Operations Plan

• Administration Committed

• Engagement of Participants

Page 7: Practicize the Plan Building a Progressive Exercise Program

Expectations

• Staff Drill – - test efficiency , knowledge, and

response of personnel

• Unannounced Staff Drill – -measure staff responsiveness

Page 8: Practicize the Plan Building a Progressive Exercise Program

Exercise the Survey

• Hospitals do this.

Page 9: Practicize the Plan Building a Progressive Exercise Program

Steps in Planning

• 1. Synchronize training and EOP

• 2. Set up Exercise Design Team

• 3.Identify Key Roles: Objectives

• 4.Determine type of Exercise and Date

Page 10: Practicize the Plan Building a Progressive Exercise Program

Steps in Planning

• 5. Identify partners and scope

• 6. Conduct exercise

• 7. Evaluate the exercise (AAR)

• 8. Improvement Plan (IP) and Track Progress

Page 11: Practicize the Plan Building a Progressive Exercise Program

What to test: Objective

• SMART– Specific who is supposed to act– Measurable how will you know it’s

met– Attainable can it be done– Realistic how far must the plan go– Time period for

accomplishment

Page 12: Practicize the Plan Building a Progressive Exercise Program

Examples

• Assess, Record, Evaluate, Demonstrate

• Use “Action” words

• Describe the communication method to contact family members and local Emergency Management.

• Describe the response for a “bomb threat” when called in.

Page 13: Practicize the Plan Building a Progressive Exercise Program

Keep it Simple

• Plan

• Train

• Exercise

Page 14: Practicize the Plan Building a Progressive Exercise Program

Planning Practice

• A threatening phone call to your facility

• “ I am coming to get even because you fired me.”

Page 15: Practicize the Plan Building a Progressive Exercise Program

What Should Happen

Turn the actions into SMART Objectives

– Specific– Measurable– Attainable– Realistic– Time Bound

Page 16: Practicize the Plan Building a Progressive Exercise Program

Scenario 2

• You receive a call from your EM “advising you of a large forest fire 10 miles to the north”.

• Specific• Measurable• Attainable• Realistic• Time

Page 17: Practicize the Plan Building a Progressive Exercise Program

Building The Scenario

• You receive a follow up call 2 hours later that the fire has changed directions and heading your way.

• Do our objectives change???

Page 18: Practicize the Plan Building a Progressive Exercise Program

Fire Drills

• Incorporate Shelter in Place and Evacuation

• Incorporate a specific action (drill)• Calls out , different communications,

Evacuation equipment, MOU verification,