Pradhan Mantri Awas Yojana (PMAY-U) Proposal for New 261 projects under Vertical IV Presented to 46 th CSMC meeting on 29.08.2019 Government of Tamil Nadu SLNA Tamil Nadu Slum Clearance Board

Upload: others

Post on 05-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Pradhan Mantri Awas Yojana (PMAY-U)

Proposal for New 261 projects under Vertical IVPresented to 46th CSMC meeting on 29.08.2019

Government of Tamil NaduSLNA – Tamil Nadu Slum Clearance Board

Page 2: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Housing requirement assessed under the Four Verticals in 666 Cities/Towns

1,391,609

484,105389,141

518,363

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

Total ISSR CLSS AHP BLCUnits

34.79 % 29.96 %100 % 37.25 %

v HFAPoAs for 666 cities /Towns have been submitted to GoI . v 429 HFAPoAs have been approved, balance approval awaited.

Houses in Nos.

Source: ULB Survey, Common Service Centre (CSC) & Online/Citizen

2

Page 3: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Houses Sanctioned under AHP & BLC (from 08.12.2015)Houses in Nos.

67.78%32.22 %

Houses Sanctioned

Pending Demand

Demand under AHP - 3,89,141BLC - 5,18,363Total - 9,07,504

0100000200000300000400000500000600000700000800000900000

1000000

Demand (AHP/BLC)

Approved 2015-16 2016-17 2017-18 2018-19 2019-20

907504

615079

34013

187679 203194 172139

18054

Total Units sanctioned under AHP & BLC : 6,15,079

3

Page 4: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Rs.in Crore

Details of the Projects Approved so far

4

Vertical No of Projects

No. of tenements /

houses

Project cost

GOI Grant

GoTNGrant

Institutional share/TDR

Beneficiaries share

AHP 276 136977 14096.40 2054.66 8069.43 430.08 3542.19

BLC 2272 478102 14476.34 7171.53 2868.61 0 4436.20

Total 2548 615079 28572.70 9226.19 10938.04 430.08 7978.39

4

Page 5: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

5

Demand Survey Vs Approval (upto 43rd CSMC)

389141

518363

136977

478102

0

100000

200000

300000

400000

500000

600000

AHP BLCDemand Units approved

( 35.20 %)

( 92.23 %)

5

Page 6: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

6

Approval Vs Progress(upto 31.7.2019)

615079

136977

478102

136707

22707

114000

197164

48803

148361

0

100000

200000

300000

400000

500000

600000

700000

Over All AHP BLCUnits Approved Completed In Progress

( 22.22%)

(32.06%)

( 16.58 %)

( 35.63 %) (23.84 %)

( 31.03 %)

6

Page 7: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Physical Progress - AHP PROJECTS

No. Of Projects approved

No. Of Units Approved

HousesTendered/Grounded

CompletedTender /

Work Order Stage

Estimate Stage

276 136977 72458 22707 27204 37315

7

7

Road Map for Completion of 49,751 units (In progress)

Ø By October’19 - 6,000 (12.30 %)

Ø By December’19 - 6,500 (13.32%)

Ø By March’20 - 6,500 (13.32%)

Ø By March’21 - 29,803 (61.07%)

Total - 48,803 (100.00%)

Page 8: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Physical Progress - BLC PROJECTS

No. Of Projects

No. Of Units

Work order

issuedGrounded

In Progress

CompletedFoundation Plinth Lintel Roof Total

2272 478102 390713 390713 56492 17460 29233 45176 148361 156411

8

8

Road Map for Completion of 2,34,302 units in progress

Ø By October’19 - 15,000 (10.11%)

Ø By December’19 - 15,000 (10.11%)

Ø By March’20 - 17,983 (12.12%)

Ø By March’21 - 1,00,378 (67.66%)

TOTAL - 1,48,361 (100.00%)

Page 9: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Indicators Current Status (No.)

Survey entry made in PMAY-MIS by ULBs (Door to door survey)

90.54 % (8,07,320 / 8,91,682)(Achieved / Target)

Survey Entry (ULBs + CSC+ Online)

Approved in PMAY MIS (%)

Vertical ISSR CLSS AHP BLC Total

Entry 3,17,764 3,60,341 5,06,356 7,41,005 19,25,466

Validated 20,415 3,61,476 3,68,468 5,74,264 13,24,623

No of Projects approved: 2548 (AHP –276 , BLC -2272 )

No of Projects entered (7A/B/C/D) 2548 (AHP –276 , BLC -2272 )

No of Dwelling Units approved AHP BLC Total

136,977 4,78,102 6,15,079

Beneficiaries attached (4B form) 33,842( 24.71 %)

4,27,664( 89.45 %)

4,61,506 ( 75.03 %)

Houses Geo-tagged 1,29,273(94.38%)

3,38,916( 70.89 %)

4,68,189 (76.12%)

Aadhaar seeded 33,632( 24.55 %)

4,16,922( 87.20 %)

4,50,554(73.25%)

Status of MIS Entries(upto 25.6.2019)

9

Page 10: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Sl. No VerticalNo of

ProjectsNo. ofunits

Projectcost

GoI totalGrant

GoI 1st & 2nd

Installment share

Released

UC submitted

against 1st & 2nd

installmentRelease

UC Submitted date

Eligible share to be Release by GoI against 1st

Installment

1 AHP 276 136977 14096.35 2054.65 453.44 385.45

21.05.2019 (3rd

to 22nd), 16.05.2019 (27th,30th)

7.05.2019(24th)

176.92

2. BLC 2272 478102 14476.34 7171.53 2445.68 1864.02 10.05.2019 696.32

Total 2548 615079 28572.69 9226.18 2899.12 2249.47 873.24

Details of UCs submitted(Rs. In Crore)

10

RAY – GoI has so far released Rs.33.21Cr. against 45.37 Cr. and the balance amount of Rs.11.16 Cr. is yet to be released.

Note: In Total GoI have to be release a sum Rs. 884.40 Crore

Page 11: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

PROGRESS OF VERTICAL – II (CLSS)

Indicators Current Status (No.)

Total Demand of CLSS

ULB : 2,01,164CSC : 2,45,986Online : 36955

Total no of Loans Sanctioned 29466 ( NHB – 28922 , HUDCO - 544 )

Loan AmountRs. 5668.77 Cr( NHB – 5578.00 Cr , HUDCO – 90.77 Cr)

Disbursed Amount Rs. 4033.01 Cr( NHB – 3962.80 Cr , HUDCO – 70.21 Cr)

Subsidy Amount Rs.511.67 Cr( NHB –501.08 Cr , HUDCO – 10.59 Cr)

4,84,105

11

11

Page 12: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

BRIEF OF PROJECT PROPOSALS FOR 46TH CSMC

VerticalsUnit Cost Central

ShareState Share

BeneficiaryShare /Cross Subsidy

Completion Time

AHP 8.60-10.50 1.5 7.00 0.10-2.04 1.5 years

BLC 3.00 – 3.90 1.5 0.60 0.90 – 1.90 1 years

(Rs. Lakhs)

Sl. No

ComponentNo. of Projects

No of units

Projectcost

GoIShare

GoTNShare

Beneficiary Share

1Vertical IV -

BLC246 50424 155689.20 75636.00 30254.40 49798.80

2Vertical III -

AHP15 1881 18436.57 2821.50 13161.24 2453.83

Total (BLC + AHP) 261 52305 174125.77 78457.50 43415.64 52252.63

12

Break up for unit Cost

Page 13: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Glimpse of Progress Photographs of AHP in

Tamil Nadu

14

Page 14: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP - KOVAIPUDUR

COIMBATORE

No. of Unit : 672 Project Cost : 5641.02 Lakh

15

Page 15: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

THIRU.VI.KA NAGAR

COIMBATORE

No. of Unit : 256 Project Cost : 2058.73 Lakh

16

Page 16: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Kottagoundampatty - Salem

No of Unit : 216 Project Cost : 1795.00 Lakh

17

Page 17: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP Project

Namakkal – Nagarajapuram

No. of Unit : 240 Project Cost : 1954.00 Lakh

18

Page 18: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP Project

Namakkal – LBS PH III & PH IV

No. of Unit : 1152 Project Cost : 9162.48 Lakh

19

Page 19: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP ProjectsNamakkal –Phase IV

20

Page 20: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP Projects

Nagamangalam MGR Nagar -Trichy

Unit: 512 Project Cost : 3701.00 Lakh

21

Page 21: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP Projects

Pillayarpatti-Thanjavur

No. of Unit: 256 Project Cost : 1948.00 Lakh

22

Page 22: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

AHP ProjectNo. of Unit: 192 Project Cost : 1590.23

23

Page 23: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Madurai - Rajakkur Ph IINo. of Unit : 1088, Project Cost : 8975.00

24

Page 24: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

VEERAPANDITIRUPPUR No. of Unit: 1280 Project Cost : 9611.42

25

Page 25: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Indira Gandhi Kuppam - ChennaiAHP Projects

No. of Unit : 128 Project Cost :1090.00 Lakh

26

Page 26: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Dhobikana – ChennaiAHP Projects

No. of Unit : 128 Project Cost : 1021.00 Lakh

27

Page 27: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

POONGA NAGAR – MADURAIAHP Projects

No. of Unit: 76 Project Cost : 502.39

28

Page 28: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Sambathottam- NagapattinamAHP Projects No. of Unit: 336 Project Cost : 2602.36 Lakh

29

Page 29: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Erode - Bhavani Road Phase I

No. Of Unit: 448 Project Cost :3546.77 Lakh

30

Page 30: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

30

Pudukottai - NarimeduNo. Of Unit: 1920 Project Cost :15058.14 Lakh

31

Page 31: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

BHARATHI NAGARTIRUPPUR

No. of Unit: 288 Project Cost : 2257.00 Lakh

32

Page 32: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

JAYA NAGARTIRUPPUR

33

Page 33: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Chennai - Manali New Town Phase 1No.of Unit : 288 ;Project Cost : 3168.00 Lakh

34

Page 34: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Pre – Fab Technology - Photos

Page 35: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Chennai – NTO Kuppam No. of Unit : 480 Project Cost :5880.00 Lakh

36

Page 36: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Monolithic Concrete Technology -Photos

Page 37: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Kilkathirpur – Kancheepuram No. of Unit : 2112 Project Cost :19008.00 Lakh

38

Page 38: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Chithode TP – Gandhi Nagar No. of Unit : 1824 Project Cost :14917.99 Lakh

39

Page 39: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Karur - Nehru Nagar No. Of Unit : 640 Project Cost : 5550.00 Lakh

40

Page 40: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Chennai - Moolakothalam – phase 1No. of Unit 648Project Cost : 8424.00 Lakh

41

Page 41: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Glimpse of Photographs of Completed Houses Under

BLC in Tamil Nadu

Page 42: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Sathyamangalam

43

Page 43: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Thiruchirappalli

44

Page 44: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Ramanthapuram Municipality

45

Page 45: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

45

TIRUNELVELI DISTRICT

46

Page 46: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

46

VIRUDHUNAGAR DISTRICT

47

Page 47: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Avadi Municipality

48

Page 48: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Tiruchengode Municipality

49

Page 49: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Alampalayam TP Padaiveedu TP

50

Page 50: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

50THOOTHUKUDI DISTRICT

51

Page 51: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

51

KANYAKUMARI DISTRICT

52

Page 52: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

52

KANYAKUMARI DISTRICT

53

Page 53: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Kodaikanal Municipality

54

Page 54: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

Coimbatore Corporation

55

Page 55: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

56

Page 56: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

56

Pollachi Municipality

57

Page 57: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

57

Udumalaipettai Municipality

58

Page 58: Pradhan Mantri Awas Yojana (PMAY-U) Nadu_46...Released UC submitted against 1st & 2nd installment Release UC Submitted date Eligible share to be Release by GoI against 1st Installment

THANK YOU