Environmental Monitoring Report Project Number: 42012 March 2017
PRC: Chongqing Urban-Rural Infrastructure Development Demonstration Project
Prepared by Chongqing ADB Project Management Office Chongqing, PRC This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Chongqing Urban-Rural Infrastructure Development
Demonstration Project (The first phase)
Summary Environmental Monitoring Report
(For Period of July 2016. to December 2016)
Chongqing ADB Project Management Office
Feb 2017
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table of Contents 1 Project Introduction .................................................................................................. 3
2 Overview of the semiyearly report ............................................................................ 3
2.1 Project Overview ............................................................................................... 4
2.2 Organizations .................................................................................................. 25
2.3 Project progress, environmental sensitive points and the environmental
standards ............................................................................................................... 32
2.4 Implementation of the mitigation measure ....................................................... 49
2.5 Monitoring Results .......................................................................................... 72
2.5.1External Monitoring ...................................................................................... 72
2.5.2 Internal monitoring ....................................................................................... 94
2.6 Training records and public consultation ............................................................ 98
3 Conclusion ................................................................................................................. 99
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
1 Project Introduction
The first phase of the Chongqing's Overall Planning Rural and Urban Infrastructure
Construction Pilot Project with Asian Development Bank (ADB) loan covers 8 poor counties
in Chongqing; the project types are to build or rebuild rural roads and drinking water service
system including 21 road subprojects and 9 water service subprojects, with a total road length
of 362 km and water service capacity of 72.5 thousand t/d. The number and scale of the
sub-projects have been reduced after adjustment in the second half of 2012. The sub-projects
have been started at present are Water Service Sub-projects in Longtan Town and Mawang
Town of Youyang Country, Gaoguan Town of Chengkou County, Jiangkou Town, Yanglu
Village, Nixi Village of Yunyang County;the Wuling Mountain to Baitao Road Sub-project of
Fuling district;Gaoguan Town Road Sub-project of Chengkou Country;Highway Sub-project
in Tuxiang Town,Hongtu Village,the highway of Caotang Town,Qinglong Town of Fengjie
Country;Water Service Sub-project in Baiquan Village,the highway of Hongmiao
Village,Longjing Village of Wushan Country;Highway Sub-project in Meijiang of Xiushan
Country to the highway of Zhongling Village,Zhongling Village to Shi Zikou Tunnel,Shi
Zikou Tunnel to Yun’ai.Among them, the main part of the sub-project of water service in
Gaoguan Town of Chengkou County has been completed in December, 2012, landscape
engineering and its affiliated facilities (housing decoration and pool decoration) have been
completed in March, 2013, and begun trial operation in January, 2013. Its operation
management is responsible by the professionals in the water service company in Chengkou
County. Since it started to supply water to Gaoguan Town, the water system operates well. In
the first phase of the Chongqing's Overall Planning Rural and Urban Infrastructure
Construction Pilot Project with the ADB loan, the project that has signed a civil engineering
construction contract but not officially started at present is the road sub-project of Gaoguan
Town of Chengkou County.
2 Overview of the semiyearly report
Main contents of the semiyearly report of the second half year in 2016
① Environmental protection report during the building period of Mawang Town of Youyang
County, water supply sub-component of Yunyang County, road subproject of Gaoguan
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Town of Chengkou, road project of Tuxiang Town of Fengjie County, road subproject of
Qinglong Twon, Baiquan village project of Wushan, road project of Hongmiao village,
water supply sub-component of Jinshui Town, Meijiang-Zhongling Town road project in
Xiushan, Zhongling Town-Shizikou tunnel road, Shizikou tunnel road and Shizikou
tunnel-Yun’ai road subproject;
② The water supply sub-component of Gaoguan Town of Chengkou County, Longtan Town
of Youyang County, Jiangkou Town of Yunyang County, Yanglu County and Nixi County,
as well as the road subproject of Hongtu Town of Caotang Town of Fengjie County, and
Wulinshan-Baitao road subproject of Fuling district that have been completed and put into
trial period should report the environmental management plan during the trial operation
period.
2.1 Project Overview
The details of civil engineering for the water supply sub-projects in Longtan Town, Mawang
Town of Youyang County, Jiangkou Town, Yanglu Village, Nixi Village of Yunyang County
and the Wuling Mountain to Baitao Road Sub-project of Fuling district;Highway Sub-project
in Tuxiang Town,Hongtu Village,the highway of Caotang Town,Qinglong Town of Fengjie
Country;Water Service Sub-project in Baiquan Village,the highway of Hongmiao
Village,Longjing Village of Wushan Country;Highway Sub-project in Meijiang of Xiushan
Country to the highway of Zhongling Village,Zhongling Village to Shi Zikou Tunnel,Shi
Zikou Tunnel to Yun’ai. (See Table 1)
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 1 Overview of Sub-projects which have started
Proje
ct
Type
s
Project
Name
Construction
site and
Design Scale
Main contents of civil
engineering
invest
ment
for
civil
engine
ering
Starting
date of
project
Remark
Wate
r
Supp
ly
Sub-
proje
ct
Longtan
Town of
Youyang
County
Designed
water supply
capacity is
30000m3/d
( have been
constructed
6000 m3/d);
the water
purification
plant is located
at right bank
of Longtan
reservoir,
Liujiao Kiosk
Length of pipelines for water
purification plant and water
transportation and distribution is
28.3km. Main contents: Water
intake, pump station, distribution
well, Grid flocculation inclined
tube sedimentation tank, valveless
filtering pool, clean-water
reservoir, chemical feeding room,
water distributing network, power
supply and distribution, the
construction of matched retaining
wall to prevent soil erosion and the
closure flood discharge trench etc.,
the water supplying could get to
people within 11.21km2 in
Longtan Town
Total
assets
of
project:
7.6606
2
million
, total
prize of
contrac
t:5998.
078104
billion
Civil
engineerin
g work
officially
started on
Apr. 28,
2011
In has been under the
operation stage. The
related greening works
has been completed.
Mawang Designed Length of pipelines for water 54.080 Civil 1. Tunnel has been
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Town of
Youyang
County
water supply
capacity is
20000m3/d, the
water
purification
plant is located
at Yuanba
pond slope,
Qingxiang
Village,
Mawang
Town,
Youyang
County
purification plant and water
transportation and distribution is
32.9km. Main contents: Water
intake, distribution well、 inflow
regulating pond, Grid flocculation
inclined tube sedimentation tank,
valveless filtering pool,
clean-water reservoir, chemical
feeding room, water tunnel, water
distributing network, Switching
room mechanical repair shop,
complex building, the construction
of matched retaining wall to
prevent soil erosion and the
closure flood discharge trench etc.
Water delivery tunnel earthwork
excavation
666
Million
engineerin
g work
officially
started on
Apr. 25,
2013
completed 8.5km;
2. Nonprestressed
reinforcement has been
completed 3.8t in the
tunnel;
3. rock bolt has been
completed 2.6t;
4. Earth and stone
excavation has been
completed 14929.95m in
the factory; Because of
the house demolish
there’s no progress by
the end of the report
period;
5. The concrete works of
the tunnel has been
completed 1184.8m;
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Gaoguan
Town of
Chengko
u County
Designed
water supply
capacity is
2000m3/d; the
project water
point is
located at the
end of Gaohe
barrage, and
the
purification
plant is located
at about 100m
on the hillside
behind
Gaoguan
Town primary
school
The main construction contents
include water plant and Water
supply pipe network project,
among them, the factory project
includes water in taking wells,
water suction pump room, variable
power distribution room, water
pipe, distribution well, chlorine
dosing room, chemical feeding
room, desilter, valveless filtering
pool, clean-water reservoir, plant
road, barricade, rock bolt,
afforestation etc.. Water
distribution network project
includes water distribution main
(branch) pipe, pipe fitting,
infrastructure, pavement repairing
etc.; water supplying pipeline is
about 13.81km, and covers
Gaoguanchang Town, Gaoguan
Village, Puchi Village, Shuangzhu
Village, Shili Village and Baiyan
Village
13
million
Civil
engineerin
g work
officially
started on
Mar. 19,
2013
The main project has
been completed on
December,2012;
landscape engineering
and subsidiary facilities
have been completed on
March, 2013, and start
a test run on January,
2013
Jiangkou
Town of
The designed
scale of
Water delivery and distribution
parts: intake dam concrete is
54.462
7
Civil
engineerinUnder operation
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Yunyang
County
purification
water plant is
3,000 m3/d ;
water
transportation
and
distribution
capacity is
8,000m3/d;
purification
water plant is
located at
Wuxing
Village,
Jiangkou
Town,
Yunyang
County
660m³;water delivery of seamless
steel tube double-barrelled
DN300*8 is 12km;8 valve
chambers;22 mud valve wells;22
vent valve wells,;16 sluice
vavles;44 mud vavles,;44 vent
valves; pipeline crossing road 7.
Water purification plant parts; 1
Perforation cyclone flocculation; 1
filtering pool; 1 clean water basin.
Water distribution and supply
parts: DN355 PE water supply
pipeline is 1km; DN315 PE water
supply pipeline is 7.5km; DN250
PE water supply pipeline is 6.8km;
DN160 PE water supply pipeline
is 9.6km; DN110 PE water supply
pipeline is 6.3km; 10100 pipe
fitting and valve ; 12500 inlet line
and meter
million g work
officially
started on
June. 30,
2012
Yanglu
Village
of
Yunyang
County
water
transportation
and
distribution
capacity is
Main contents include water plant
and Water supply network project,
water plant: distribution well,
Vortex reaction inclined-tube
sedimentation tank, valveless
19.361
9millio
n
Civil
engineerin
g work
officially
started on
Under operation
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
1500 m3/d,
purification
water plant is
located at
Yanglu
Community,
Yanglu Town,
Yunyang
County
filtering pool, clean-water
reservoir and ancillary works.
Double pipe water delivery, length
of single tube is 5.69km ,
distribution system is 11.8km,
water supplying area covers
residents live in Yanglu Town.
Nov. 10,
2012
Nixi
Village
of
Yunyang
County
Designed
water supply
capacity is
1000 m3/d ;
purification
water plant is
located at Nixi
community,
Nixi Town,
Yunyang
County
Main contents include water plant
and Water supply network project,
water plant: distribution well,
Vortex reaction inclined-tube
sedimentation tank, valveless
filtering pool, clean-water
reservoir and ancillary works.
Single pipe water delivery, length
of pipe is 4.5km , distribution
system is 4.5km, water supplying
area covers residents live in Nixi
Town.
Civil
engineerin
g work
officially
started on
Dec. 10,
2012
Afforest completed
30% ;water supply and
drainage has been
completed ;
Installation of water
plant has been
completed, and other
equipment installation
has not been started yet.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Wate
r
Supp
ly
Sub-
proje
ct
The
Water
Supply
Sub-proj
ect in
Longjing
village
of
Wushan
county
Construction
site:
Hongmiao
village in
Longjing
countryside of
Wushan
county
Design size:
4200 cubic
meters/day,
pipeline: 13km
Chemical and chlorine feeding
room, complex building, retaining
wall’s foundation trench
excavation, strip foundation, solid
brick wall masonry ,etc..
47.312
393
million
September
2013
The whole construction
has been completed in
Nov 2016. Now it is
under operation.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road
sub-p
roject
The road
sub-p in
Gao
Guan
town of
Cheng
Kou
Chengguan
second road
Chengkou
country
Chongqing
city.K19+710
—K31+047.03
2 section.
Designed
scale: the
length of the
line is
13.32km.Desi
gned running
speed is
20km/h; the
width of
pavement is
6.5m, and
pavement is
made of pitch
concrete.
Excavation: 244800m³; file:
170600m³; roadbed entrench and
drainage dirty work: 80200m³;
culvert: 49; grade crossing: 10;
pavement: 120100m³.
3.3985
197
million
March
first,2014
In the entrance of
Gaoguan Town, the
4000m fending groyne
has been constructed;
4000m water stable layer
and water drainage has
been constructed;
In the Xiuqi Town, 500m
landslide control is
under construction;
In the Gecheng Town,
400m roadbed
construction has been
completed.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Wuling
Mountai
n to
Baitao
Road
sub-proje
ct of
Fuling
district
Wuling
Mountain to
Baitao Road,
full length of
the road is
15.977km ,
width of
subgrade is
10m, width of
carriageway is
9m.
Subgrade excavation area is
670,000m³, Subgrade fill area is
200,000m³, C15 fine aggregate
concrete retaining wall is 66825m³,
51 culverts, pavement engineering
is 146599 ㎡: including 4% cement
stabilized broken stone basement
(15cm), 6 % cement stabilized
broken stone basement(20cm),
AC-16 Medium asphalt concrete
pavement (thickness is 50mm),
AC-13 fine-grained asphalt
concrete pavement (thickness is
40mm) ; 1559m³anchoring
shotcrete to prevent landslides,
traffic project, etc.
64.043
1
million
Civil
engineerin
g work
officially
started on
Oct. 16,
2012
The construction was
completed in Aug, 2014.
It is under operation
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Sub-proj
ect in
Baiquan
and
Hongmia
o of
Wushan
(Baiquan
sections)
located in
Longjing
village of
Wushan
county, the
course starts
from 103
provincial
highway, and
finish in the
G42
Shanghai-Che
ngdu Wushan
exports of
about
400m.(Hongm
iao sections)
starting points
is located in
Hongmiao
village and
ending points
is located in
Mayakou.
Baiquan road
is at the length
of 5.878
kilometers and
7.5 meters
wide.
Hongmiao
road is at the
length of 3.425
kilometers and
4.5 meters
wide
Subgrade construction (Earthwork,
The slope production structure,
Special roadbed processing,
Subgrade drainage)Pavement
engineering, Bridge engineering,
Traffic engineering.
35.999
97981
million
March
19,2013
The construction was
completed in Aug, 2016.
It is under operation
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Subproje
ct of
Meijiang
of
Xiushan
Country
to
Zhonglin
g village
Lied on
Meijiang town
to Zhongling
village of
Xiushan
country project
site. According
to the tertiary
highways
standard to
carry on the
design, at the
length of
12.764km
(K0+000—K
12+764) ,two
-lane, the
subgrade is
7.5m wide, the
road is 6.5m
wide, asphalt
concrete
pavement,
design speed
of 30km/h
Roadbed project (earthwork
excavation and filling, entrench
structure), pavement project,
bridge and culvert, affiliate
project, afforest project.
35.506
1978
million
July12,20
13
The construction of road
has been completed and
now the related road
equipment
improvements are under
construction.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Subproje
ct in
Zhonglin
g village
of
Xiushan
Country
to Shi
Zikou
Tunnel
The road of
Zhongling
village to Shi
Zikou
designed
according to
the 3rd class.
The length of
the road is
7.836km(K12
+764-K20+60
0) , double
lane, the width
of pavement is
6.5m the width
of roadbed is
7.5m, pitch
concrete
pavement ,
designed speed
is 30km/h.
1.Roadbed earthwork project
2.Roadbed entrench project
3.Culvert project
4.Bridge project.
5.Roadbed drainage project
26.620
83589
million
June
6,2013
The construction of
road has been
completed.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Sub-proj
ect in
Shizikou
Tunnel
of
Xiushan
Country
The stake
mark of the
starting point
is
K20+760,and
end with
K21+995.the
contract
section is at
the total length
of
1.528646km,d
esign the road
elevation:
708.83m , at
the total length
of 1235m,the
tunnel cross
section size is
in the form of
three heart
round contour,
cave
span:7.5m,the
height of the
cave:4.5m
1. Entrance K20+718-K20+760
section roadbed entrenched project
2. Entrance K+20718-K20+760
section roadbed earthwork project
3. Entrance roadbed drainage
project
42.967
28176
million
June
6,2013
The construction of
tunnel has been
completed and it is under
operation.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Sub-proj
ect in
Shizikou
Tunnel
of
Xiushan
Country
to Yun’ai
This project
lies on
Hongsha
village and
Yun’ai village,
overall length
is 10.5km. It
divide in to
roadbed
earthwork
project,
retaining
project, bridge
and culvert
project,
pavement
project and
afforest
project. Shi
Zikou to
Yun’ai of
Xiushan
country
section road
(K22+100~K3
4. Roadbed earthwork project
5. Roadbed entrench project
6.Culvert project
7.Bridge project
42.351
496
million
June
17,2013
The construction of road
has been completed and
it is now under
operation.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
2+550.826),
overall length
of road is
10.022km
construction
and
installation
costs 5.5182
million.
Road’s grade
divide in to
three classes,
design running
speed is
30km/h, the
width of
roadbed is
7.5m, the
width of
pavement
6.5m. The
structure of
pavement is
pitch concrete.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Sub-proj
ect in
Tuxiang
town of
Fengjie
Country
The road
engineering of
Tuxiang town
(T-FJ-C01),
across the
main towns of
Gaoya village,
Huangsi
village, Mayi
village to
benefit 12000
people, at the
total length of
23.107km,with
the total
investment of
31.417677
million yuan,
build by FJTX.
Most of them
are earth work
engineering,
subgrade
protection
engineering,
culvert
engineering
and asphalt
concrete
pavement
engineering.
The width of
subgrade is
5.5m,the width
of lane is
5.0m,the hard
shoulder
reinforcement
Most of them are earth work
engineering, subgrade protection
engineering, culvert engineering and
asphalt concrete pavement
engineering. The width of subgrade
is 5.5m,the width of lane is 5.0m,the
hard shoulder reinforcement is
2*0.25m,the hardened verge use the
concrete:C25,Asphalt concrete
pavement structure: 22cm5.5%
cement stabilized gravel+through
reservoir+6cmAC-16 grain type of
asphalt concrete pavement
31.417
677
million
July
15,2013
The construction of road
was completed in Dec,
2015.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The
Road
Sub-proj
ect in
Hongtu
village,
Caotang
town of
Fengjie
Country
(1).The road of
Hongtu county
starts from
Baihe village
in Hongtu
county, across
Daya village,
Jiutai village
to Taiyang
village in
Gongping
town, with the
total length of
15.845km,widt
h of
pavemwnt:4.5
m.Main
content of the
work:
subgrade,
pavement and
safety
facilities. Main
content of the
construction:
The main content of the work in
Hongtu village: subgrade,
pavement and safe facilities. Main
content of the construction: start
subgrade earthwork, subgrade
filling,M7.5 cement mortar flaky
ditches, marginal strip, use C15 to
lay a foundation ditch of fine stone
concrete, mortar rubble retaining
wall, culvert pipe, culvert, road
shoulder, water stable layer,
cement concrete pavement and
safe facilities
24.793
19754
million
July
15,2013
The road construction in
Ouying Village, Caotang
Town has been
completed; the waste
earth backfilling and
plant restoration has
been completed.
Hongtu road
construction has been
completed.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
start subgrade
earthwork,
subgrade
filling, M7.5
cement mortar
flaky ditches,
marginal strip,
use C15 to lay
a foundation
ditch of fine
stone concrete,
mortar rubble
retaining wall,
culvert pipe,
culvert, road
shoulder,
water stable
layer, cement
concrete
pavement and
safety
facilities.
(2). The road
of Caotang
town starts
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
from Shima
cement plant
in Caotang
town, and ends
with Ouying
village in
Caotang town,
with the total
length of
7.45km,width
of
pavement:5.5
m,Main
content of the
work: :
subgrade,
pavement and
safety
facilities. Main
content of the
construction:
start subgrade
earthwork,
subgrade
filling, M7.5
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
cement mortar
flaky ditches,
marginal strip,
use C15 to lay
a foundation
ditch of fine
stone concrete,
mortar rubble
retaining wall,
culvert pipe,
culvert, road
shoulder,
water stable
layer, cement
concrete
pavement and
safty facilities.
The
Road
Sub-proj
ect in
Qinglong
Town of
Fengjie
Country
The highway
engineering of
T-FJ-C03 in
Qinglong town
starts from
Damuba of
Qinglong
town, across
Most of them are earth work
engineering, subgrade protection
engineering, culvert engineering and
asphalt concrete pavement
engineering. The width of subgrade
is 6.5m,the width of lane is 6.0m,the
hard shoulder reinforcement is
2*0.25m,the hardened verge use the
concrete:C25,Asphalt concrete
pavement structure: 22cm5.5%
cement stabilized gravel+through
35.089
29091
million
July15,20
13
The road construction of
Damu town to Miaoba
town was completed in
Sep, 2015. It is under
operation.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Dawo village,
Jingfeng
mountain,
ends with
Xinglong town
and
Miaowanchan
g town, with
the total length
of
30.127km,6.5
m wide. The
pavement
structure:
thickness of
cement
stabilized
gravel base
22cm+through
reservoir+grai
n type of
asphalt
concrete
pavement
6cmAC-16.
reservoir+6cmAC-16 grain type of
asphalt concrete pavement
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
2.2 Organizations
The environmental management organizations for the water supply sub-projects in
Gaoguan town of Chengkou County, Longtan Town, Mawang Town of Youyang County,
Jiangkou Town, Yanglu Village, Nixi Village of Yunyang County and the Wuling Mountain to
Baitao Road sub-project of Fuling district have been formed, they are respectively responsible
for the environmental management of civil engineering during the construction period. See
Table 2 for the relevant environmental management organizations.
Environmental management plan, as one part of the contract, has been listed as a special
provision in the bidding documents.
Table 2 Profile of environmental management organizations and staff on projects
have started
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
Chongqing ADB PMO Wang Yin Chongqing Asian
development bank
officer
management
qualifications
023-6305637
9
Advisory Group of
Experts
Hu
Mingfu
Professor, senior
engineer
Trained by NEPA 13594691447
External independent
supervise institutions :
Chongqing Huijiang
Environmental
Engineering Co. , Ltd.
Zhu
Xinzhong
Company manager、
environmental
monitoringsenior
engineer
Trained by NEPA 13983207373
Water supplying sub-project in Longtan County of Youyang County, short for YYLT;
Water supplying sub-project in Mawang Town of Yunyang County, short for YYMW
Youyang County
environmental protection
agency
Yao
Chuanjia
ng
Deputy Director Environmental
supervision
management
13372791888
Youyang County Project
office
Qin
Guangwe
i
Project office section
chief
Trained by Asian
Development Bank
experts
13594906371
Chongqing Xinyou Water
supplying Co., Ltd. Shi
Yonghua
Project owner’s
project field chief、
engineer
Trained by Asian
Development Bank
experts
13388998895
Chongqing Longhui
Construction Company
Yang Tao construction unit’s
project manager
Construction and
environmental
management
13618068707
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
Chongqing Huaxing
construction
supervision company,
Youyang Longtan project
office
Lang
Tianxue
supervision
company’s project
director
Supervision
engineer 18696869959
Water supplying sub-project in Gaoguan Town of Chengkou County,short for CKGG
Youyang County
environmental protection
agency
Li
Xinzhong
i
Vice director Environmental
supervision
management
13996635610
Chengkou County Project
office
Guo
Xianglian
Vice director of the
Development and
Reform Commission
Trained by Asian
Development Bank
experts
023-5922069
5
Chongqing Chengkou
County Water supplying
company
Li Jiang
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
13709449100
Yuan
Jingping
township water
supply management
department director
13709449072
Li
Xiankui
township water
supply management
department officer
13896219966
Wu Ming
township water
supply management
department officer
13983556849
Road sub-project in Chenguan second road of Chengkou country: Short for CKCG
Youyang County
environmental protection
agency
Li
Xinzhong
Vice director Environmental
supervision
management
13996635610
Chengkou County Project
office
Guo
Xianglian
Vice director of the
Development and
Reform Commission
Trained by Asian
Development Bank
experts
023-5922069
5
Chengkou country High
way Bureau Shenrui Project owner’s
project field chief
Trained by Asian
Development Bank
experts
13896310680
Chongqing traffic
engineering consulting
Co., Ltd.
supervision
company’s project
supervisor
Supervision
engineer 13696471134
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
Water supplying sub-project in Jiangkou Town of Yunyang County,Short for YYJK
Yunyang County
environmental protection
agency
Ren
Shunshen
g
environment
monitoring stations,
director
Environmental
supervision
management
13668466856
Yunyang County Project
office
Li
Jingwen
Yunyang County
Asian Development
Bank office director
Trained by Asian
Development Bank
experts
13038381163
Yunyang County Jinyu
water electricity Co., Ltd. Zeng
Guang
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
15870558359
Chongqing Jiangong The
second construction Co.,
Ltd.
Fu
Chonghu
a
construction unit’s
project manager
Construction and
environmental
management
15123126297
Chongqing Hengjia
Engineering technology
Consulting Co., Ltd.
Yu Jiang
supervision
company’s project
supervisor
Supervision
engineer 15223776625
Water supplying sub-project in Yanglu Village, Yunyang County,short for YYYL;
Water supplying sub-project in Nixi Village, Yunyang County,short for YYNX
Yunyang County
environmental protection
agency
Ren
Shunshen
g
environment
monitoring stations,
director
Environmental
supervision
management
13668466856
Yunyang County Project
office
Li
Jingwen
Yunyang County
Asian Development
Bank office
director
Trained by Asian
Development Bank
experts 13038381163
Yunyang County Jinyu
water electricity Co., Ltd. Zeng
Guang
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
15870558359
Chongqing Zhonghang
construction Co., Ltd. Chen Ji
construction unit’s
project manager
Construction and
environmental
management
18602328131
Chongqing Yongan
engineering construction
supervisionCo., Ltd.
Zhang
Xianzhi
supervision
company’s project
supervisor
Supervision engineer 18623524246
Wuling Mountain--Baitao Road sub-project of Fuling District, short for FLWLS-BT
Fuling environmental
protection agency Zeng
Fanhai
environment
monitoring stations,
director
Environmental
supervision
management
13320361557
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
Fuling County Project
office
Jiang
Zhaohua
County Asian
Development Bank
office director
Trained by Asian
Development Bank
experts
72288242
Chongqing Fuling
Zhonglong
Communications
Construction Co., Ltd.
Jiang Hai Project owner’s
project field chief
Trained by Asian
Development Bank
experts 13709460887
Chongqing Chuandong
Road &bridge
engineering Co., Ltd.
Wang
Kaixin
construction unit’s
project manager
Construction and
environmental
management
13709472031
Chongqing Fuling
Highway engineering
supervision Co., Ltd.
Wen Hao
supervision
company’s project
supervisor
Supervision
engineer 13908250845
Highway Project Sub-project in Baiquan and Hongmiao of Wushan Country(Hereinafter referred to
as WSBQHM)
Wushan Country
environmental protection
agency
Wu
Guangyi
ng
environment
monitoring stations,
director
Environmental
supervision
management
13635361608
Wushan Country project
office
Zhou
Hongtao
Wushan Country
development bank
office director
Trained by Asian
Development Bank
experts
18996649008
Wushan Country traffic
development Co., Ltd.
Cao
Ming
Project owner’s
project field chief
13609441136
Chongqing Jiaxin
construction bloc Co.,
Ltd.
Wu Xing Construction unit’s
project field chief
13896159715
Chongqing Guofu
construction supervision
Consulting Co., Ltd.
Zeng
Lingmin
g
Supervision
company’s project
director
Head supervision
engineer
13883617915
Water Supply sub-project in Longjing village of Wushan Country(Hereinafter referred to as WSLJ)
Wushan Country
environmental protection
agency
Wu
Guangyi
ng
environment
monitoring stations,
director
Environmental
supervision
management
13635361608
Wushan Country project
office
Zhou
Hongtao
Wushan Country
development bank
office director
Trained by Asian
Development Bank
experts
18996649008
Wushan Lonsheng
construction development
Gu
Xianhua
Project owner’s
project field chief
13609447718
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
Co., Ltd.
Chongqing Chengjian
Holdings(Bloc) Co., Ltd.
Lv Bo Construction unit’s
project field chief
Yangtze River
construction supervision
Consulting Co., Ltd.
Wang
Shengfu
Supervision
company’s project
director
Head supervision
engineer
13983541405
Highway sub-project in Meijiang to Zhongling village of Xiushan Country(Hereinafter refers to as
XSMJZL)
Xiushan Country
environmental protection
agency
Xiao
Yongjun
Environment
monitoring stations,
director
Environmental
supervision
management
13609494985
Xiushan Country project
office
Shi Hui development bank
office section chief
Trained by Asian
Development Bank
experts
13330398718
Xiushan Huaxin state
assets operation Co., Ltd.
Wu
Xiaoyon
g
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
13709487006
Chongqing Huangpu
Construction(Bloc) Co.,
Ltd.
Hu
Zaiquan
Construction unit’s
project manager
Trained by Asian
Development Bank
experts
15123439785
Chongqing Guofu
construction supervision
Consulting Co., Ltd.
Yuan
Ping
Supervision
company’s project
director
Head supervision
engineer
13896459819
Highway sub-project in Zhongling village to Shi Zikou of Xiushan Country(Hereinafter referred to as
XSZLSZK)
Xiushan Country
environmental protection
agency
Xiao
Yongjun
Environment
monitoring stations,
director
Environmental
supervision
management
13609494985
Xiushan Country project
office
Shi Hui development bank
office section chief
Trained by Asian
Development Bank
experts
13330398718
Xiushan Huaxin state
assets operation Co., Ltd.
Wu
Xiaoyon
g
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
13709487006
Sichuan Jinhai
construction Co., Ltd.
Qin
Jianbing
Construction unit’s
project head engineer
13896658425
Guangdong Huashen
constuction project
Deng
Yanfei
Supervision
company’s site
18696504199
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
supervision Co., Ltd. director
Tunnel sub-project in Shi Zikou of Xiushan Country (Hereinafter referred to as XSSZKSD)
Xiushan Country
environmental protection
agency
Xiao
Yongjun
Environment
monitoring stations,
director
Environmental
supervision
management
13609494985
Xiushan Country project
office
Shi Hui development bank
office section chief
Trained by Asian
Development Bank
experts
13330398718
Xiushan Huaxin state
assets operation Co., Ltd.
Wu
Xiaoyon
g
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
13709487006
Heinan highway
development road and
bridge Co., Ltd.
Zhang
Yang
Construction unit’s
project head engineer
18211953255
Guangdong Huashen
construction project
supervision Co., Ltd.
Deng
Yanfei
Supervision
company’s site
director
18696504199
Highway sub-project in Shi Zikou tunnel to Yun’ai of Xiushan Country (Hereinafter referred to as
XSSZKYY)
Xiushan Country
environmental protection
agency
Xiao
Yongjun
Environment
monitoring stations,
director
Environmental
supervision
management
13609494985
Xiushan Country project
office
Shi Hui development bank
office section chief
Trained by Asian
Development Bank
experts
13330398718
Xiushan Huaxin state
assets operation Co., Ltd.
Wu
Xiaoyon
g
Project owner’s
project field chief
Trained by Asian
Development Bank
experts
13709487006
China Railway the
seventeenth Bureau Bloc
the first construction Co.,
Ltd.
Chen
Jinlong
Construction unit’s
project head engineer
15310586676
Guangdong Huashen
construction project
supervision Co., Ltd.
Deng
Yanfei
Supervision
company’s site
director
18696504199
Highway sub-project in Tuxiang Town of Fengjie Conutry (Hereinafter refers to as FJTX)
Fengjie Country
environmental protection
Li Meijin Environment
monitoring stations,
Environmental
supervision
13709446086
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
agency director management
Fengjie Country project
office
Mao
Xiaoping
development bank
office section chief
13436227388
Fengjie road and bridge
company
Jiang
Fang’an
Project owner’s
representative
Yes 13896963040
Jiangxi Zhongheng
construction group Co.,
Ltd.
Zhang
Shengho
ng
Project manager Yes 13609446528
Qinghai traffic
construction supervision
experience detection
consulting Co., Ltd.
Pu
Zhiming
Supervision
company’s project
director
Head supervision
engineer
15223606633
Highway sub-project in Hongtu village and Caotang Town of Fengjie Country(Hereinafter referred to
as FJHTCT)
Fengjie Country
environmental protection
agency
Li Meijin Environment
monitoring stations,
director
Environmental
supervision
management
13709446086
Fengjie Country project
office
Mao
Xiaoping
development bank
office section chief
Trained by Asian
Development Bank
experts
13436227388
Fengjie road and bridge
company
Lin
Zhicheng
Project owner’s
representative
Yes 13595891798
9
Fujian road harbour(bloc)
Co., Ltd.
Li
Guohao
Project manager Yes 13908301333
Qinghai traffic
construction supervision
experience detection
consulting Co., Ltd.
Pu
Zhiming
Supervision
company’s project
director
Head supervision
engineer
15223606633
Highway sub-project in Qinlong Town of Fengjie Country(Hereinafter referred to as FJQL)
Fengjie Country
environmental protection
agency
Li Meijin Environment
monitoring stations,
director
Environmental
supervision
management
13709446086
Fengjie Country project
office
Mao
Xiaoping
development bank
office section chief
Trained by Asian
Development Bank
experts
13436227388
Fengjie road and bridge
company
Jiang
Fang’an
Project owner’s
representative
Yes 13896963040
Chongqing Shili highway Yang Project manager Yes 18996531555
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environmental
management
organizations
Staff
name Position
Qualification or if
trained by
environmental
management
(supervision)
Contact
number
development Co., Ltd. Yuanjing
Qinghai traffic
construction supervision
experience detection
consulting Co., Ltd.
Pu
Zhiming
Supervision
company’s project
director
Head supervision
engineer
15223606633
2.3 Project progress, environmental sensitive points and the environmental standards
See Table 3 is the project progress, environmental sensitive points and implemented
environmental standards of the water supply sub-projects in Gaoguan town of Chengkou
County, Longtan Town, Mawang Town of Youyang County, Jiangkou Town, Yanglu Village,
Nixi Village of Yunyang County and the Wuling Mountain to Baitao Road sub-project of
Fuling district; Highway Sub-project in Tuxiang Town, Hongtu Village, the highway of
Caotang Town, Qinglong Town of Fengjie Country; Water Service Sub-project in Baiquan
Village, the highway of Hongmiao Village, Longjing Village of Wushan Country; Highway
Sub-project in Meijiang of Xiushan Country to the highway of Zhongling Village, Zhongling
Village to Shi Zikou Tunnel, Shi Zikou Tunnel to Yun’ai.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 3 Overview of the works program, environmental sensitivity points and standards of the under-constructed subproject
Item
Overview of the works program of building projects
Environmental sensitive points and implemented
environmental standards
Before the semiannual report During the semiannual report
Water
supply
sub-compo
nent of
Longtan
Town of
Youyang
County
The plant restoration was completed and the
fence around the water factory has been
completed.
Total operation period sensitive points:Longtan Reservoir, Reservoir dam,
spillway and upstream and downstream of Longtan
River, reservoir dormitory which is 25 m away from
Longtan River, Longtan River, Longtan Reservoir
belongs to Ⅲ water area, acoustic environment
implement Second environmental noise standard, air
environment implement second Environmental Air
Standard.
Water
supply
sub-compo
nent of
Mawang
Town of
Youyang
County
After the restoration of the construction in
August, the water intake tunnel has been
excavated for nearly 1000 meters, the
construction of purification plant in Sandaoguai
is slow
Operation Sensitive points:Upstream of Lengshui River Shengli
Reservoir and the stream segment from Shengli
Reservoir to diversion tunnel, the purification plant
Sandaoguai, Shengli Reservoir and Lengshui River
belongs to Ⅲ water area, acoustic environment
implement Second environmental noise standard, air
environment implement second Environmental Air
Standard.
Water
supply
sub-compo
nent of
Operation period
Operation period
Sensitive points:Goguan Town Primary School which
is 200m away from purification water construction
Site and spread dwellers live 100m around
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Gaoguan
Town of
Chengkou
County
construction site, upstream of Ren River,
Huangbaiyan reach belongs to Ⅲ water area, acoustic
environment implement Second environmental noise
standard, air environment implement second
Environmental Air Standard.
Water
supply
sub-compo
nent of
Jiangkou
Town of
Yunyang
County
Operation period
Operation period
Sensitive points : left branch of Tuantan River,
upstream of Guping River shuimamen reach, spread
residents live around 100m of water plant, Shuiyuandi
brook belongs to Ⅱ water area, acoustic environment
implement Second environmental noise standard, air
environment implement second Environmental Air
Standard.
Water
supply
sub-compo
nent of
Yanglu
Town of
Yunyang
County
Operation period
Operation period
Sensitive points: first tributary of Pengxi River,
Hangjiagou reach of Yanglu River brunch, spread
residents live 100m around water plant, Shuiyuandi
brook belongs toⅡwater area, acoustic environment
implement First environmental noise standard, air
environment implement second Environmental Air
Standard..
Water
supply
sub-compo
nent of
Nixi Town
of
Yunyang
County
Operation period
Operation period
Sensitive points:Modao brook brunch, Daqiaogou
reach of Nixi River brunch, spread residents live
100m around water plant, Shuiyuandi brook belongs
toⅡwater area, acoustic environment implement First
environmental noise standard, air environment
implement second Environmental Air Standard..
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Chenggau
n Second
road
subproject
of
Chengkou
County
Roadbed construction along the river and
protective wall construction; part of the road
was paved with the water stable layer during the
whole project
Built about 4000 meters of the
protective embankment, water stable
layer and drainage ditch along the
river;
Sensitive points: road in Gaoguan country: in the
31.13km new construct 24km, remould 7.13 km, level
for, pitch pavement.
Renhe water environment third class water area ;
acoustic environment second and 4a class , air
environment second class , sensitive points is road
along the line around 200m
Wulingsha
n-Baitao
Road
subproject
in Fuling
District
Test operation Test operation
Sensitive points:spread residents live 200m along the
road, Water environment Yangtze River, Wu River
belongs to Ⅲ water area, acoustic environment
implement Second and 4a environmental noise
standard, air environment implement second
Environmental Air Standard..
Road
subproject
in Baiquan
and
Hongmiao
in Wushan
County
200 meters in Mayakou has not yet completed
the laying, and other sections have been in
operation. Operation
The sensitive spot is the residents live scattered along
the range of 200m near the road, water environment:
The Yangtze river Ⅲ waters, acoustic environment:
kind of 2 and 4a.the secondary air environment.
Water
supply
sub-compo
nent of
Longjing
Town in
Wushan
County
Electrical installation and installation of process
equipment in the factory
Operation
The sensitive spot is the residents live scattered along
field with the range of 100m, water source: Jinjigou
reservoir Ⅲ waters. Acoustic environment: kind of 2,
the secondary air environment.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Meijiang-
Zhongling
Town road
subproject
in Xiushan
Operation period Operation period
The sensitive spot of the water environment: Meijiang
river and Zhongling reserve, Ⅱ class waters, acoustic
environment 2,4a class, the sensitive spot is near the
road side 15-20m of Meijiang middle school, Qipan
primary school, Yunyicun primary school etc; the
atmospheric environment is at the second level, the
sensitive spot is 200m within the scope of residents
along the road, the primary and secondary schools,
and the road side 8m of the ginkgo king.
road
subproject
in
Zhongling
Town-Shiz
ikou
tunnel in
Xiushan
Operation period Operation period
The sensitive spot of the water environment: Meijiang
river and Zhongling reserve, Ⅱ class waters, acoustic
environment 2,4a class, the sensitive spot is near the
road side 15-20m of Meijiang middle school, Qipan
primary school, Yunyicun primary school, etc; the
atmospheric environment is at the second level, the
sensitive spot is 200m within the scope of residents
along the road, the primary and secondary schools,
and the road side 8m of the ginkgo king.
Construction of soil protection layer in tunnel Operation period
The sensitive spot of the water environment: Meijiang
river and Zhongling reserve, Ⅱ class waters, acoustic
environment 2,4a class, the sensitive spot is near the
road side 15-20m of Meijiang middle school, Qipan
primary school, Yunyicun primary school, etc; the
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Shizikou
tunnel
subproject
in Xiushan
atmospheric environment is at the second level, the
sensitive spot is 200m within the scope of residents
along the road, the primary and secondary schools,
and the road side 8m of the ginkgo king.
Shizikou
tunnel-Yu
n’ai road
subprojkec
t in
Xiushan
Complete the second road building and clean up
the surrounding environment
Operation period
The water environment: Chejia river, Caotang river,
Moxi river, Ⅲ class waters
Acoustic environment:2,4a class
The air environment is at second level, the sensitive
spot: residents live scattered along the road of 100m
range.
Road
subproject
in Tuxiang
Town in
Fengjie
County
test operation
test operation
The water environment: Chejia river, Caotang river,
Moxi river, Ⅲ class waters
Acoustic environment:2,4a class
The air environment is at second level, the sensitive
spot: residents live scattered along the road of 100m
range.
Test operation Test operation
The water environment: Chejia river, Caotang river,
Moxi river, Ⅲ class waters
Acoustic environment:2,4a class
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road
subproject
in Hongtu
Town and
Caotang
Town in
Fengjie
County
The air environment is at second level, the sensitive
spot: residents live scattered along the road of 100m
range.
Roadsubpr
oject of
Qinglong
Town in
Fengjie
County
Test operation Test operation
The water environment :Chejia river, Caotang river,
Moxi river, Ⅲ class waters
Acoustic environment:2,4a class
The air environment is at second level, the sensitive
spot: residents live scattered along the road of 100m
range.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
The following pictures are the profiles of the pollution prevention and environmental protection within the construction site for the Chengguan
second road of Chengnkou County, the water supply sub-component of jiangkou Town, Yanglu Town and Nixi Town in Yunyang County, the
Wuling mountain-Baitao road in Fuling district, the road project in Tuxiang Town in Fengjie County, Hongtu Town and Caotang Town, the road
subproject of Qinglong Town, the road project of Baiquan village and Hongmiao village in Wushan, the water supply sub-component in
Longjing village, the Meijiang-Zhongling village road in Xiushan, the Zhongling village-Shizikou tunnel road, Shizikou tunnel and the Shizikou
tunnel-Yun’ai road subproject.
Jiangkou Town water supply sub-component in Yunyang County
Fig.1 Jiangkou Town purification plant in trial operation Fig.2 vegetation work has been completed
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Fig. 3 Afforestation within the plant Fig.4 the pipe network paved has not influenced the surrounding environment
Water supply sub-component of Nixi Town of Yunyang County
Fig.5 Afforestation within site Fig.6 Environmental situation around the plant
Fig.7 water plant that have not been put into operation Fig.8 Environmental situation around the plant
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Water supply sub-component of Yanglu Town of Yunyang County
Fig.9 Environmental situation within plant Fig.10 Environmental situation within the plant
Fig.11 Fabrication processing district Fig.12 Potential safety hazards from the wasted soil outside the plant
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road subproject of Baiquan Hongmiao County in Wushan district
Fig.13 Potential safety hazards from slopes to roads Fig. 14 Uncompleted sclerous road in Mayakou section
Fig. vegetation has been completed in parts of sections Fig. 16 Potential safety hazards in terminals
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road subproject of Meijiang and Zhongling of Xiushan
Fig.17 Road origin of Meijiang-Zhongling section
Fig. 18 Influence prevention from the traffic of Meijiang section
Fig. 20 slope collapse in Zhongling section
Fig. 19 Treatment to environment and slope in Zhongling-Shizikou section after open to traffic
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road subproject of Shizikou Tunnel of Xiushan
Fig.21 Construction camps
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road of Shizikou tu Yunai road
Road subproject of Tuxiang of Fengjie
Fig.24 Environmental situation of the origin of Tuxiang road Fig.25 Completed safety auxiliary facilities along road
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Road subproject of Qinglong Town of Fengjie
Fig.26 environmental situation of the road origin
Fig.27 Complete drainage facility Fig.28 environmental restoration after road construction
Fig.29 vegetation
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Wuling-Baitao road subproject in Fuling
Fig.30 Formal drainage ditch Fig.31 vegetation completion of the road surroundings
Fig.32 Slope protection Fig.33 Dwellings after opening to traffic
Chengguan second road subproject
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Fig.34 Dwellings along the road Fig.35 Construction has no big influence to the
environment
Fig.36 Construction site of the road
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Mawang Water Subcomponent
2.4 Implementation of the mitigation measure
Table 4 shows the implementation of mitigation measure to the unfavorable influence on
environment during the construction period of Mawang water supply sub-component in
Youyang county, water supply sub-component in Nixi county and road project of Baiquan
village of Wushan and Hongmiao village, water supply sub-component in Longjing village,
Shizikou tunnel, Shizikou-Yun’ai road subproject and Chengguan second road subproject;
Table 5 shows the implementation of mitigation measure to the unfavorable influence on
environment during the construction period of the water supply sub-component in Longtan
town of Youyang county, Yanglu town of Yunyang county, Jiiangkou town of Yunyang county
and Gaoguan town of Chengkou county, as well as the Wulingshan-Baitao road subproject in
Fuling district, road project of Tuxiang town in Fengjie county, Qinglong town road
subproject, Hongtu town of Fengjie county and Caotang town road subproject,
Meijiang-Zhongling town road project of Xiushan, and Zhongling-Shizikou tunnel road
project.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 4 Potential environmental influence and mitigation measure implementation during the construction period(July.2016-Jan.2017)
Influencin
g factors
Water supply and road subproject
Youyang Mawang water supply subprojetc(YYMW), Yunyang
Nixi water supply sub-component ( YYNX ) ,Chengkou
Chengguan second road(CKCG), Wushan Longjing town water
supply sub-component(WSLJ), Wushan Baiquan and Hingmiao
road projects(WSBQHM ) , Xiushan Shizikou tunnel
(XSSZK),Xiushan Shizikoutunnel-Yun’ai road(XSSZKYY)
Environmental
influence Mitigation measures Implementation situation
Water
Illegal discharges of
sanitary sewage in
construction site
All temporary toilets, septic tank and the
surrounding drainage ditch set up in
construction camps should be cleared up
after the completion of the construction; the
construction site should be cleaned by
removing or transferring all the rubbish.
YYMW:the construction site is at Qidaoguai, which is equipped
with temporary toilet and septic tank; the sanitary sewage of the
constructors are discharged in the surrounding drainage ditches;
the rubbish and waste water are around the construction site, and
to deal with it, the rectification advice was put forward to the
construction and supervisor unit, so as to reduce the influence of
the household garbage and waste water to the environment.
YYNX: Parts of the processing equipment have been installed; in
this survey, there was no constructor in construction site. The
sewage disposal facility of the purification plant has been
basically completed and has no influence to the environment.
CKCG: both the personnel in project department and the
constructors rent the residents’ houses, and the little sanitary
sewage was discharged into the toilets of the local residents.
WSLJ: As the road construction draws to a close, the number of
the on-site constructors gradually reduced, these personnel were
local residents; no fixed construction camps; the sanitary sewage
from the construction was discharged into the toilets of the
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
residents for collection and to be treated in digester; the sanitary
sewage produced from the construction unit would be discharged
into the municipal sewage pipe network.
Water The influence of
sewage water produced
from the construction
and excavation, vehicle
washing, concrete
curing and so on to
receiving water
Establish sedimentation tank and oil
separating tank for sewage water collection
YYMW: In addition to the existing traffic vehicles on road, there
were little transport vehicles for construction; the sewage water
for water intake, water purification plant and the machinery work
and maintenance on construction site would be under centralized
treatment by construction unit.
CKGG:For Chengguan second road was under construction
along the river, therefore, in order to prevent the receiving water
from being affected, the construction unit strictly complied with
the requirements of environmental protection, and uniformly
collected the sewage water produced from the construction
machinery, transport vehicles and other resources and discharged
them into the municipal pipe network after a period of treatment.
YYNX:The main construction has been completed, but the
processing equipment has not been under construction.
WSLJ:The sewage water produced from the vehicle washing was
collected in the collection tank in construction site. The sewage
water produced from the construction tools was collected in the
collection tank for centralized discharge.
WSBQHM:The waste water and waste oil would be under
centralized treatment and everyday supervision of supervision
company. Any sewage water was prohibited into the receiving
water.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
XSSZK:XSSZKYY: The construction vehicles were all washed
or repaired in car wash; the car wash had the collection tank and
undertook the centralized treatment. The concrete was well
conserved and covered with plastic film during the conservation
period.
Air
Dust
Cover the vehicles that transfer the oil, sand
and other disperse materials with awning
cloth; wash the vehicles coming out from the
construction site with muddy tires;
Watering the construction site and cleaning
the passageway twice everyday; keeping
clean of the transferring vehicles of
contractors, subcontractors or suppliers,
keeping clean of the road and sidewalk;
cleaning the vehicles, roads and sidewalks
timely.
YYMW:Construction unit formulated the corresponding carriage
requirement and covered the vehicles that load gravel with
awning cloth; took measures to control the secondary pollution
from the dust; cleaned the construction site timely; kept clean
of the adjacent municipal road of the construction site, protect
the roads from dust;
CKCG: No influence on environment yet;
YYNX: There is no construction dust during the facility
equipment process, protection requirements have been carried out
for the installation of the loading equipment and accessories of the
vehicle, so as to prevent the environment from destruction and
influence.
WSLJ: There was only 200 meters uncompleted in Mayakou
section, and this would have no influence to environment.
XSSZK:XSSZKYY:The control of the dust during the vehicle
transportation process in construction site has satisfied the
requirements; the construction vehicles would be covered by
awning cloth according to the environment management
requirement, and the influence on the surrounding residence has
been reduced to the minimum degree.
Mechanical noise Ensure the equipment noise to satisfy the YYMW:All construction facilities adopted the low-noise
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Noise
produced from vehicles
and construction
machine
limiting value (PRC-GB12523-90)of the
noise in construction site;
The noise equipment should be away from
noise sensitive area like school, hospital and
resident district and so on; if the influence
could not be prevented, the sound insulation
facilities such as temporary baffle and
barricade should be set up; if there was
resident area within 200m from the
construction site, the construction activities
should be stopped from 22:00 to 6:00.
equipment, for the construction site was far away from the
sensitive sites, the transportation vehicles should attention to
blow, speed and overloading travel, and not produce noise
pollution to relative places; the construction of retaining wall
was forbidden during the night.
CKCG: Construction time should be not over 10:00pm,and the
low-noise equipment should be put into use as far as possible;
Set up baffle to prevent the noise produced from construction
around the sensitive places.
YYNX: There was a shut-down period after the completion of
the main work; there was no noise influence.
WSLJ:No influence。
WSBQHM:There was no housing estate, the noise influence did
not exist.
XSSZK:XSSZKYY:The construction site kept working in day
time mainly, so as to avoid the influence to the surrounding
residents as far as possible; the sound insulation was set up
around the environment sensitive places.
vibration and explosion
Restrictions on excessive vibration operation
of heavy vehicles and equipment in the areas
of sensitive construction and residential
areas
YYMW:Because the site is far away from the residential area, a
small amount of blasting operations would not affect the
surrounding
CKCG: Away from the sensitive point, through the speed
control of the vehicles and the overloading prohibition, to avoid
excessive noise.
YYNX:no such influence.
WSLJ:WSBQHM:no explosion work。
XSSZK:XSSZKYY: Construction site is far from the residential
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
construction; there was no explosion work after the operation of
tunnel; the passage of heavy vehicles is also greatly reduced
Solid
waste
Rubbish in construction
site
Contractor provided appropriate waste
storage capsule;
Regularly spray pesticides to the garbage
collection box to reduce the harm of flies and
rats;
The waste is stored in a place far away from
the water body, and is regularly transported
for landfill designated by municipal or
environmental protection administrative
department;
For garbage disposal, make clear of the
administrative license of the garbage dump;
YYMW: Construction sites and camps were set with garbage
collection bin or trash by the construction units, and were
sprayed with insecticide regularly, in order to reduce the
harm of flies, mosquitoes and rats in summer; when in
summer, the number of spraying should be increased; the
garbage should be sent to landfill disposal in Youyang
County by vehicles; rectification advice on irregular
garbage collection site around construction camps were put
forward to the construction unit and supervision unit for
better management of the solid waste from the constructors,
so as to ensure the regular sanitary condition of the
construction site.
CKCG; Construction units have set up the special collection
places for garbage produced in construction sites; for the
construction was carried out along the river, the collection of the
relevant solid waste was required to be far away from the
environmental sensitive places; the collected wastes were
transferred outside for treatment by the municipal departments.
YYNX:After the completion of the amount of the construction
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
garbage was greatly reduced.
WSLJ:All the solid waste produced in construction site of solid
waste garbage have fixed collection box or trash for unified
collection, and then they will be periodically transported by
municipal sanitation garbage truck.
WSBQHM:The garbage dump was strictly prohibited by the
construction unit, all kinds of waste garbage were collected with a
centralized way while part of the garbage were backfilled, the
other should be treated by municipal units in a unified way.
XSSZK:XSSZKYY:Set up trash or temporary refuse collection
points in residents along the road for unified treatment. The waste
should be collected by municipal units timely, and the temporary
trash should be in a regular disinfection. Construction waste
should be disposed by the construction unit.
Solid
waste Construction and
demolition waste
Timely transport or treat the construction
waste that cannot be repeatedly used, and do
not accumulate them in construction site.
YYMW:Except the earth work, there was no other solid waste
produced from the demolition during the engineering period; the
construction should keep a balance between the backfill and
excavation as far as possible, the earth work should be used and
disposed on site as far as possible.
CKCG:The construction waste should be transferred to
designated place for treatment.
YYNX: There was not much construction garbage after the
construction.
WSBQHM:The building garbage produced during the
construction process should be transferred to designated residue
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
for piling up, and partially used for backfill.
XSSZK:XSSZKYY:The construction project basically has no
building demolition, the waste residue in construction process are
stacked to the designated slag field.
Soil
erosion
and
ecology
Erosion produced by
waste residue, quarry
and soil pits
Build the slag dump or spoil ground before
dumping the waste residue;
Protect the vegetation near the construction
site;
YYMW:Make a comprehensive utilization of the earthwork
excavation as far as possible, and take backfill to level the ground
and embankment; strictly prohibit the deforestation, destruction of
vegetation; the vegetation around the construction site should be
kept well.
CKCG:The project is now in the construction along the river
with a special dumping site, so as to control the influence of it to
soil and vegetation.
YYNX: The engineering work has been completed, and entered
into the process of installation stage which will not affect the soil
and vegetation.
WSLJ:Compact the waste soil on site as far as possible and piled
up the ones that can not be used in the construction. The
revegetation should be implemented by a way of grass planting.
WSBQHM:Use the flat place to construct the waste dump site,
and do not close to the place where there is vegetation.
XSSZK:XSSZKYY:Make comprehensive utilization of the
earthwork excavation for leveling the ground, and the rest should
be stacked in the specified storage yard.
Drainage control Based on the catchment area of the drainage
line to build enough size of culvert;
YYMW:the interception drains which can withstand the flash
floods were constructed on both sides of the retaining walls; the
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
To construct the interception ditch on one
side of the permanent road mountain in order
to collect the surface runoff;
To construct the permanent drainage port in
the place that the excess water will not
damage the environment, and to strengthen
the quality of the material of water surface
and the quality of construction;
lateral interception drainage canal of the interception drains can
collect drainage of surface runoff in the catchment area; the
upstream face of the permanent drainage port adopts the
erosion-resistant stone, so as to combat the discharge of the
channel erosion of surface runoff, and do not lead to large bodies
of water erosion from dike formation.
CKCG:Construct the retaining walls along the construction
routines, to prevent the impact of debris flow on the construction
of drainage ditch.
YYNX: there was no impact after the completion of construction.
WSLJ:Construct the retaining walls and drainage ditch, to take
the safety measures to prevent the debris flow
WSBQHM:Construct retaining walls along the construction
routines, dig ditches, build the retaining wall after the cutting
processing of the patron side slope.
XSSZK:XSSZKYY:In temporary slag heap area, the surface soil
which is easy to produce a mound of soil erosion was piled up in
the middle of the venue, the stones produced from excavation
were stacked in the surrounding as temporary bar; and the slope
protection and drainage treatment were conducted in temporary
slag heap area so as to prevent muck slope soil erosion in
maximum.
Erosion of the
construction site
Clean the topsoil at all sites; build the
intercepting ditch and drainage, to prevent
runoff into the construction site, and divert
YYMW: The topsoil cleaned should be stored for the future site
green cover; new retaining wall and water intake diversion canal
plays a role of intercepting ditch and drainage, the runoff gathered
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
the runoff to the drainage system or buffer
pool;
Restore the construction site into grassland,
woodland or farmland after the completion
of the construction;
on slopes should not enter the construction site. At the same time,
strengthen the construction site supervision in rainy season; and
timely clear the sandy soil and cushion gravel in the construction
corridor, alleviate the soil and water loss; with the construction of
gradually carried out, the revegetation work should be conducted
in the destructed area.
CKCG: construction is along the river, there is no impact to
vegetation and arable land at this stage.
YYNX: Gradually restored vegetation and forest land after
completion of the construction, so as to reduce the impact on the
environment caused by the maximum.
WSLJ: Pay attention to the excavation of soil reuse, adhere to
restoration principles at any time.
WSBQHM:Construct the drainage ditch to prevent runoff into the
construction site; timely take vegetation recovery and the original
restoration after the completion of each construction stage.
XSSZK,XSSZKYY: Leveling project area to avoid heavy
construction in heavy rain, timely remove the waste earthwork,
take stratified rolling and other measures for the backfill
earthwork; bury the field digging pipeline and clean the extra
cover soil; for the project has not been completed, the
construction site recovery, and vegetation would be implemented
at a later stage
Vegetation restoration
in affected areas
According to the National Forest Law, the
project implementing agencies will be
YYMW: The project has not been completed, the construction
site of vegetation restoration, green to be implemented in the late
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
responsible for the compensation of the
equal or greater area of the forest vegetation;
the vegetation species will be chosen for
vegetation restoration for their adaption to
local environment; maintain the growth of
the new vegetation during the operation
period; the vegetation restoration should be
in accordance with the plant growth cycle
from short to long, the vegetation coverage
should follow the principle of combination
of places and areas, give priority to the
species that have short cultivation growth
cycle and larger scale of coverage, and then
grow the appropriate planting shrubs or
trees; in the noise control section during the
operation, the vegetation recovery should
adopt the arbor and shrub with sound proof
belt as far as possible;
project construction to be implemented; but will take measures to
strengthen the protection of the surrounding affected vegetation.
CKCG: For the construction is along the river, and far away
from the forest land, there is little impact on the vegetation; the
vegetation planting will be conducted in accordance with the
original design after the project was completed.
YYNX: The landscaping and vegetation restoration in
surroundings and plants have been completed.
WSLJ: Strictly prohibit the cutting down of the surrounding
trees, and the engineering of the needed forest should be applied
in advance, so as to recover the vegetation while the construction
goes on in order to ensure the restoration of the original
appearance as far as possible.
WSBQHM: The vegetation damage caused by the construction
should be restored after the completion of the project, and at the
same time, measures should also be taken to control the impact on
the ecological environment.
XSSZK:XSSZKYY: The construction area is the mainly
mountain slopes, which is with little effect on the surrounding
environment.
Society Cultivated land
protection
If the construction site is surrounded by
arable land, the width of the green belt
should be strictly controlled.
YYMW: Occupy a small amount of forest land, but it has been
reported to the forestry sector for record, and the relevant
personnel have been compensated.
CKCG: The construction area is mainly along the beach at the
present stage, therefore, there is no influence on cultivated land.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
YYNX: The project covers an main area of mountain, wasteland,
and a little part of woodland and farmland; the construction area
of the scope of the land should be decided after the approval of the
departments of the State Land Bureau. At the same time, the
construction area should be strictly controlled. The present project
has been completed with no disputes.
WSLJ:WSBQHM: The project planning has fully considered to
minimize the use of arable land, and the occupation of farmland
should be reported to the land department for approval, and the
compensation should be discussed with local government.
XSSZK:XSSZKYY: Construction area are basically in the
mountain slopes, which do not occupy arable land but only a
small amount of forest land, these land are approved by local
departments.
Health and hygiene in
the work area
Require contractors to ensure the
environmental sanitation of the construction
site, including the quality of water supply;
Ensure personal protective equipment and
other health resources in all construction site
so as to create a safe working environment;
Require the construction site comply with
the national safety regulations;
In accordance with the "prevention, publicity
and education, mobilize the whole society to
participate in the implementation,
YYMW: Strengthen the hygiene supervision and management
in the construction site and camps, cover the boiled water
barrels to avoid pollution from dust and flies; All the workers
are equipped with the basic labor and work safety appliances
such as working suit, helmet, canvas gloves, and respirators.
The tower cranes are operated under strict process and norms,
the keep them personnel only; All the equipment and materials
are stored rationally. The access roads are not allowed to pile
sundries to endure the safety of the personnel; When the
construction of Pipeline passes the residential, commercial, or
social services, the CU should strengthen the security check
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
comprehensive management" strategy for
prevention and control of aids;
and propaganda education, strengthen construction machinery
maintenance to ensure the safety of construction staff and
adjacent surrounding staff because of narrow construction site;
For the road of temporary roadway taking-up operation
affecting pedestrian, the CU should open pedestrians safe
passage and guide with clear identification in advance; For the
road with municipal facilities of lighting, telecommunications
near the pipe trench of pipeline laying, the CU should prepare
related safety protection in advance, civilized construction; Set
the fencing and warning marks within the working scope of
Crane and excavator, and arrange inspector during the
construction to prevent irrelevant personnel or the children
enter into; Up to now, no working and safety accident has
happened.
The recent HIV/AIDS prevention campaigns are under
preparation with the support of the CPMO.
CKCG:At construction site, construction units build safety
precaution measures strictly and equip dedicated safety
protection products to constructors, attention campsite and
personal sanitation precaution, controlling disease.
WSLJ:Strengthen environmental supervision and management
in the construction plant, hot water barrier tightly sealed,
prevent dust and flies pollution; Workers are equipped with
safety helmet, mask and other basic labor health and safety
supplies; So far no labor health accidents and safety accident;
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Preparing to carry out AIDS prevention publicity activities.
XSSZK:XSSZKYY:Strengthen environmental health
propaganda, supervision and management, set up the hot water
barrier with tightly sealed stamp, keep health prevention work
of the construction camps. During the construction process
give workers some basic labor health and safety supplies; Pay
attention to safety production publicity, so far, no labor health
accidents and safety accident; Project department and
supervision department carry out AIDS prevention publicity
activities actively
Cultural heritage
protection
Protect the value-established cultural
heritage, according to national laws and
regulations, no one will be allowed to
destroy or deface, conceal or damage sites by
other means;
If an important site has been excavated, shall
immediately stop the construction and
reporting districts in the city and consult a
reasonable solution;
YYMW: Construction site has not yet found suspected
artifacts.
CKCG: There is no site or natural reserves that have the
protection value in the construction region.
WSLJ:No environmental sensitive sites, such as non nature
reserves, historical and cultural relics and cultural landscape;
XSSZK:XSSZKYY:No environmental sensitive sites, such as
non nature reserves, historical and cultural relics and cultural
landscape; But the relative regulations have been formulated for
the suspected artifacts before entering the construction sites.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 5 Potential environmental influence and mitigation measure implementation during the operation period(Jul. 2016-Dec.2016)
Influencing
factors Water supply sub-components
Chengkou Gaoguan water supply project(CKGG)Yunyang Jiangkou water supply(YYJK)
Yanglu water supply(YYYN)Youyang Longtan water supply(YYLT)
impacts Mitigation measures Implementation Status
water
sewage of
water
supply
plant
Make fecal sewage,
kitchen wastewater and
washing wastewater
diffluent disposal; Make
fecal sewage, kitchen
waste sewage purification
pool treatment. Recover
the secondary energy and
use on the spot: Take
biogas slurry, biogas
residue and sludge as
agricultural fertilizer, and
digest on the spot, which
can make more efficient
management and
comprehensive utilization
of wastewater; For
washing wastewater
with light pollution, can
use simple methods such
as artificial wetland or
land infiltration
According to factory's production and living condition, to determine the method of wastewater
treatment to be mainly biochemical method. Concentrate sewage from sewage pipe network of
the factory district into the biochemical pool besides the complex building. After fermentation
oxidation treatment and reaching corresponding emission standard, the sewage emissions to the
town sewage treatment plant by the sewage pipe. Concentrate the rain of the factory district into
the drain pipe network of the factory district to outside small rivers by the drain pipe.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
processing, in order to
make sure the water
quality meet the emission
standards before waste
water discharged into
water body.
Repeated
waste
water
flows into
the river
or ground
water
Plan and construct
sewage treatment plants
in the township and
village, use the oxidation
pond, oxidation ditch to
process the life sewage in
the village with
concentrated population;
Use purification pool
combining with artificial
wetland and wastewater
infiltration land to deal
with sewage or
production for sporadic
and scattered farmers.
Gaoguan dispose sewage and rainwater by the way of rain sewage diversion; Concentrate life
wastewater, wastewater from sewage pipe network into the town sewage treatment plant for
central treatment.
Solid waste life
rubbish of
Water
supply
plant
Ensure environmental
garbage collection,
transportation and
processing life (indicating
distance and name of
garbage disposal sites)
Build a cesspit outside the door of the factory away from 50m, and the living garbage unified
storage、 transport and handling.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Sludge
from the
operation
Sludge treatment plan
includes: the collection
and storage of sludge;
Transport; Environmental
treatment sludge; Health
and safety.
The factory has a mud adjusting pool: supernatant for irrigation flowers and plants, excess flows
into the small river and discharges, sludge concentrates out to the dump after the sludge
sedimentation harden.
Ecological
problems
Water
diversion
problem
of river
basin
Under the
condition
of
downstrea
m flow
reducing
Verify the downstream
flow, manage wastewater
discharge of water supply
plant. Adjust the shunt
with downstream of the
monitoring results
through monitoring and
review, each affected
village of the downstream
hire a staff monitoring to
the downstream flow, and
the change of life (see
monitoring plan)
The amount of getting water and wastewater emission is small, the effects of flow and water
quality on downstream river are very small.
Capability
construction
The weak
Internal
monitorin
g
capability
Train by using
laboratories and facilities
of water supply factory, in
order to improve internal
monitoring ability.
The local environmental protection department makes a routine detection for wastewater quality
of the factory monthly. It can ensure testing needs. The water quality maintain: chromaticity
degrees ≤40 、COD ≤50 PPM、BOD ≤10 PPM、SS ≤10 PPM 、PH 6.5 ~ 9 、LAS ≤1 PPM 、
total coliform group≤ 3 、the total bacterial count ≤ 100 / L 、 free residual chlorine ≤0.2 PPM.
The water quality test center of water supply company tests the water quality of water samples on
time. Monitor the water quality.
The lack
of
Environmental
management training Make the environmental protection knowledge training to the worker, the main contents are as
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
environm
ental
managem
ent ability
follows: national laws and regulations, rules and regulations of the superior department;
environmental protection knowledge; the introduction of company environmental conditions and
risk features about materials; The basic knowledge of emergency plan about the environmental
accident and prevention accident; Post operation procedures of environmental protection
facilities or equipment; Typical environmental accident cases.
Environmen
tal safety
The flood
of water
source
affect
water
quality;
The
emergenc
y of water
supply
system
affect
public
safety.
Patrol and monitor water
source protected areas
within the scope of the
upstream 1000 m ~
downstream 100m
strictly; Organize
professional staff to grasp
the upstream flood at the
flood season, check
architectural structures
and equipment of the
water inlet, and prevent
the flood damage and
pollution; Compile
emergency contingency
plans of water source and
water supply, and take the
emergency exercises
regularly. When a sudden
emergencies happens, the
water plant should report
according to the plan as
1、Forbid the following activities in the drinking water source protection zones
Destruct water conservation forests, protective belt, or vegetation related to the water source
protection; Dump industrial waste, living garbage, excrement and other waste; Ships and vehicles
loading of poisonous and harmful material, oil, excrement without anti seepage, spill, leak proof
facilities pass the reserve; Use poisonous and high residue pesticide; Kill aquatic animals by
using explosives, poison; Discharge sewage into water; Engage in livestock farming or grazing in
the drinking water source protection zones; Build, rebuild and expanse the construction project
with pollution hazards to water source; Engage in tourism or other activities may pollution water.
2、Strengthen the publicity of drinking water sources protection
Water supply unit should strengthen the propaganda of drinking water sources protection,
set up warning signs for the drinking water sources reserve, and guide people to protect drinking
water sources consciously.
3、The supervision and management of the drinking water source reserves
All related functional departments in accordance with requirements and responsibility
division of《the regulations on the administration of the Chongqing drinking water sources
protection》, strengthen the supervision and management of drinking water sources reserves. The
government of town and township should cooperate with the centralized water supply unit,
establish and perfect the emergency response plan of the drinking water safety; Inspect the
centralized drinking point and the drinking water sources protection zones on a regular (not less
than twice in a month), and make a good record of inspection; It should be corrected
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
soon as possible, and
promptly take effective
treatment measures;
Strictly perform
operational procedures of
chlorine dioxide and
management systems
about the preparation
source materials of
hydrochloric acid, storage
of sodium chlorate, use
and so on; Perform CJJ58
~ 2009 other safety rules
of water supply.
immediately, if we Find the situation that may pollute or threaten the security of a water. For the
emergency or situation difficult to solve, notice the related water immediately, and report to the
municipal people's government and water conservancy, environmental protection, health and
other departments immediately, then take emergency measures to ensure the safety of drinking
water.
4、others
Has formulated the corresponding emergency measures of flood management, and the
corresponding water supply emergency plan. Supervise environment situation around the
drinking water source of the water plant on the spot by several times every quarter, to ensure the
safety of drinking water, good water quality.
5、The classification of the water quality accident and emergency treatment measures
⑴ General water quality incidents
Due to heavy rains, the source water contains a large number of sediment and suspended
matter, and cause the source water turbidity increased. It can achieve satisfactory results by
adjusting the quantity water purifier reasonablely. When the high algae content of source water is
high in the high algal period, the processing difficulty is big, if the water after precipitation and
delivery is hard to standard, the water plant should add chlorine in the source water immediately,
and raise the amount of chlorine appropriately, improve the pre-chlorine effect.
When the source water quality is abnormal, and its pollutants exceeds the standard, but after a
normal processing of water plant, the source water quality can standard, the laboratory of the
water plant should be on duty for 24 hours, strengthen the frequency of water quality detection.
⑵ Larger water quality incidents
When unknown cause deterioration of water quality, pollutants exceeds the standard badly,
and waterborne disease outbreak happen, the first head of receiving the report or finding source
water quality problems should report to the general manager immediately, report to the relevant
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
departments at the same time. The central lab should strengthen the monitoring of water quality,
increase the inspection frequency and projects, and find out the reason together with relevant
departments as soon as possible. Water plants should raise the amount of chlorine at the same
time, and increase the antivirus effect. Take necessary and special treatment measures to ensure
the standard of effluent water quality. If the water quality is not up to standard and really
necessary to stop water supply, which should be subject to approval of the competent
departments of water supply and inform the units and individuals of using water until the water
plant recover water supply after the water quality standard.
⑶ Major water quality incidents
When sudden chemical pollution accident of the source water quality occurs, the first head of
receiving the report should report to the general manager immediately, report to the relevant
departments at the same time. The central lab should know kinds of pollutants, packing, quantity
and the scene of the accident and so on together with relevant departments quickly. Strengthen to
test the effluent water quality, and the monitoring of the source water quality should collect water
samples from inspection near the polluted section along the upstream of the source water or in
the upstream section of collecting water intake. It can take biological monitoring measures at the
same time. If the biological monitoring is abnormal and chemical testing exceeds the standard,
should stop water supply immediately, and inform the public to stop using water through the
media until the water plant recover water supply after the water quality standard.
⑷ Emergency response
Enter into a state of emergency, each department should be in place immediately, and take all
effective measures to prevent the worsening. General water quality incidents, the waterworks lab
should report to the factory director and central lab, and ensure normal water supply by the
factory director commanding on-site. Larger water quality incidents, report to company general
manager immediately, and listen to the command of general manager, waterworks and laboratory
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
go all out, and find out the reason to as soon as possible, study countermeasures and take
measures in conjunction with relevant departments, and report the occurrence and treatment
situation of the accident to the superior leadership timely. Major water quality incidents, the
waterworks director should arrive at the spot immediately after receiving the report, ask for
information, report to the relevant departments quickly, request higher level of emergency plan,
and take necessary emergency measures under the command of superior leadership. The polluted
situation of water bodies should be reported to the relevant department.
6、Emergency plans of the waterworks water supply accident
⑴ Cutting off water for general accident
a、The fault of power supply line: It can cause sudden temporary cutting off water, but it can
return to power in a short period of time.
b、The fault of electric control or pump equipment: It can cause sudden short cutting off water,
but it can return to power in a short period of time.
c、The fault of adding chlorine system: It may result in effluent water quality for more than 3
NEU, but it can be repaired in the short time.
⑴ Information notice: After the operating personnel finding the fault, take measures according to
the procedures, prevent accident expanding, and report to the operating monitor immediately. The
monitor of operation judge the fault type timely, report to the waterworks director promptly and
inform the mechanical and electrical maintenance personnel.
⑴ Urgent maintenance measures: The mechanical and electrical maintenance personnel find out
the cause of the problem and handle in time after arriving at the spot. After completing the work,
evacuate safety protection facilities, and return to water supply. Make the maintenance
information feedback to the plant director after returning to water supply.
Repair responsibility person: the mechanical and electrical maintenance monitor.
⑵ Cutting off water for serious accident
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
a、The fault of power supply line: It can cause sudden cutting off water, but it can be repaired
within 12 hours.
b、The fault of electric control or pump equipment: It can cause sudden cutting off water, but it
can be repaired within 12 hours.
⑴ Information notice: After the fault happening, the operating personnel take measures
according to the procedures, prevent accident expanding, and report to the plant director
immediately. The director should arrive at the spot after receiving report immediately, diagnose
accident level, and report the situation of the fault to the company general manager timely.
⑴Urgent maintenance measures: The plant director organize and command on the spot, analysis
the cause of the problem cohere with production and technical personnel, formulate emergency
plan, organize repair. After completing the work, evacuate safety protection facilities, and return
to water supply. Make the maintenance information feedback to the company general manager
after returning to water supply.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 4 and table 5 show that all the mitigation measures of Gaoguan、 Longtan、
Mawang、Jiangkou、Yanglu and Nixi water supply sub-component and Wuling shan-Baitao
road sub-component; Highway Sub-project in Tuxiang Town, Hongtu Village, the highway of
Caotang Town, Qinglong Town of Fengjie Country; Water Service Sub-project in Baiquan
Village, the highway of Hongmiao Village, Longjing Village of Wushan Country; Highway
Sub-project in Meijiang of Xiushan Country to the highway of Zhongling Village, Zhongling
Village to Shi Zikou Tunnel, Shi Zikou Tunnel to Yun’ai. Have been implemented efficiently
and the site environmental management and the water source protection are working well.
According to investigation and monitoring of environmental supervision staff:
Downstream receiving waters of Longtan 、Mawang、Gaoguan water supply sub-component
and Wuling shan-Baitao road sub-component; Highway Sub-project in Tuxiang Town,
Hongtu Village, the highway of Caotang Town, Qinglong Town of Fengjie Country; Water
Service Sub-project in Baiquan Village, the highway of Hongmiao Village, Longjing Village
of Wushan Country; Highway Sub-project in Meijiang of Xiushan Country to the highway of
Zhongling Village, Zhongling Village to Shi Zikou Tunnel, Shi Zikou Tunnel to Yun’ai. Meet
the Ⅲ water quality standard, and downstream receiving waters of Yunyang Jiangkou, Yanglu
and Nixi water supply sub-component meet the Ⅱ water quality standard; there is little
impact of the above project on nearby environment sensitive by taking corresponding
measures, so there is no noise nuisance phenomenon. Up to now, there is no complaints;
Through nearby backfilling and using the abandoned debris of the above project excavation,
which makes full use of the waste stone and concave ground, also prevents the environmental
impact and ecological destruction for the alternate runoff field, reduces the load of town
existing abandon slag field. All are coincidence with the requirements of water and soil
conservation “Adjust measures to local conditions, comprehensive prevention and control,
practical and beautiful” of Work Requirements of Development Projects of Soil and Water
Conservation (GB50433-2008). At the same time, the engineering construction of above
projects has no adverse impact on surrounding environment and the social various aspects by
taking appropriate measures.
2.5 Monitoring Results
2.5.1External Monitoring
On March 28, 2012, the external environment monitoring contract of ADB loan on
Chongqing urban-rural planning infrastructure construction demonstration project was signed.
External independent environmental monitoring unit is Chongqing Huijiang environmental
protection engineering Co., LTD.
This semiyearly annual report shows the external monitoring for the construction
site and adjacent surroundings of the water supply sub-component of Gaoguan Town
of Chengkou County, Longtan Town of Youyang County, Mawang Town, Jiangkou
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Town of Yunyang County, Yanglu Town and NIxi Town, as well as the road
subproject of Chengguan Second road of Chengkou County, Wulingshan-Baitao of
Fuling diostrict, Fengjie Tuxiang, Hongtu Caotang, Qinglong Town,
Meijiang-Zhongling in Xiushan, Zhongling-Shizikou, Shizikou tunnel,
Shizikou-Yun’ai, Wushan Baiquan and Hongmiao Town. Table 6-Table 14 shows the
external monitoring result for the surrounding environment and their brief analysis for
each subproject.
Table 6 External monitoring result of surface water environment of Chengkou
Gaoguan water supply sub-component in trial operation period
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monit
oring
time
and
freque
ncy
Ran
ge
valu
e
Average
value
water
supply
sub-co
mponen
t of
Gaogua
n Town
of
Chengk
ou
County
pH section
at the
downstr
eam of
sewage
outlets
of Yudu
river
that the
waste
water
dischar
ged into
once
on
Oct.27
2016,
and
each
has
one
sample
/ 7.00 6~9
All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
Meet the Ⅱ
water quality
standard of
《 the surface
water
environment
quality
standards 》
(GB3838-2002)
, the water
environment
quality is better.
COD / 12 ≤20
NH3-N / 0.08 ≤1.0
BOD5 / 0.20 ≤4
Petrole
um
type
/
0.02
≤0.05
Monitoring unit: Chengkou county environmental monitoring station; central city (monitoring)
[2016]WT No. 32
Note:pH is dimensionless.
Table 7 External monitoring result of sewage water of Chengkou Gaoguan water
supply sub-component in trial operation stage
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
Standard
situation,
overweight
ratio,
further
Monito
ring
Monito
ring
Monit
oring
Ran
ge
Avera
ge
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
param
eter
sampli
ng site
time
and
freque
ncy
valu
e
value monito
ring
mitigation
measures and
cost estimates
water
supply
sub-co
mponen
t of
Gaogua
n Town
of
Chengk
ou
County
SS
Externa
l outlet
of
sewage
water in
plant
once
on
Oct .2
7,
2016,
each
has a
sample
/ 11 ≤70 All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
Meet the Ⅰ
water quality
standard of
《 Standard of
sewage
comprehensive
discharge 》
(GB8978-1996)
, the water
environment
quality is better.
COD / 50 ≤100
NH3-N / 7 ≤15
BOD5 / 11 ≤20
Petrole
um
type /
3
≤5
Monitoring unit: Chengkou county environmental monitoring station; central city (monitoring)
[2016]WT No. 33
Table 8 External Environment Monitoring Results for Noise of Chengkou Gaoguan
Water supply sub-component in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Chengk
ou
Gaogua
n water
supply
sub-co
mponen
t
day
Gaogau
n
Prelimi
nary
school
Oct. 27-28,
2016, two
days,once
in the day
and night
/ 53.5 ≤60
All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
Meet the Ⅰ
water quality
standard of
《 Standard of
sewage
comprehensive
discharge 》
(GB8978-1996)
, the water
environment
quality is better.
night / 42.3 ≤50
Monitoring unit: Chengkou county environmental monitoring station; central city (monitoring) [2016]WT
No. 34
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 9 External Environment Monitoring Results for surface water environment of
Youyang Longtan Water supply sub-component in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monit
oring
time
and
freque
ncy
Ran
ge
valu
e
Aver
age
value
Youyan
g
Longta
n water
supply
sub-co
mpone
nt
pH Section
of
downst
ream in
200m
away
from
dischar
ge of
constru
ction
wastew
ater
into
Long
tan
rivers
Oct.13
.
2016,
once,
each
one
sampl
e
/ 7.00 6~9
All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
( trial
operati
on
period)
Meet the Ⅲ
water quality
standard of
《 the surface
water
environment
quality
standards 》
(GB3838-2002)
, the water
environment
quality is better.
COD / 16.7 ≤20
NH3-N / 0.43 ≤1.0
BOD5 / 3.23
≤4
Petrole
um
type
/
0.03
≤0.05
Monitoring unit:Qianjiang district environmental monitoring station; Qianjiang city (monitoring)
[2016]WT No. 87
Note: 1. pH is dimensionless.
2. Entrust the Qianjiang district environmental monitoring station to monitor the Mawang
and Longtan project. The following monitoring report of Youyang project is the same as the
reports above.
Table 10 External Environment Monitoring Results for Waste Water of Youyang
Longtan Water Supply Project in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:dB, A) standard
Engine
ering
activiti
es
during
monito
Standard
situation,
overweight
ratio,
further
mitigation
Monito
ring
param
Monito
ring
sampli
Monit
oring
time
Ran
ge
valu
Avera
ge
value
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
eter ng site and
freque
ncy
e ring measures and
cost estimates
The
You
yang
Long
tan
water
supply
sub-co
mpone
nt
SS
Externa
l outlet
of
sewage
water in
plant
once
on Oct
13,
2016,
each
has a
sample
/ 11 ≤70 All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
( trial
operati
on
period)
Meet
theⅡstandards of
《 the standards
for acoustic
environmental
quality 》
(GB3096-2008) ,
the sound
environment
quality of the
project is good.
COD / 50 ≤100
NH3-N / 7 ≤15
BOD5 / 11 ≤20
Petrole
um
type
/
3
≤5
Monitoring unit:Qianjiang district environmental monitoring station; Qianjiang city (monitoring)
[2016]WT No. 87
Table 11 External Environment Monitoring Results for Noise Environment of Youyang
Longtan Water supply sub-component in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
The
You
yang
Ma
wang
water
supply
sub-co
mpone
nt
day
villager
s point
nearby
Oct 13 ~14,
2016, two
days, once
each day
and night
/ 50.7 ≤60
All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
Meet the II
acoustic quality
standard of
(GB3096-2008) ,
the acoustic
environment
quality is better. night / 42.3 ≤50
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
( trial
operati
on
period)
Monitoring unit:Qianjiang district environmental monitoring station; Qianjiang city (monitoring)
[2016]WT No. 87
Table 12 External Environment Monitoring Results for surface water environment of
Yunyang Jiangkou Water supply sub-component in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monit
oring
time
and
freque
ncy
Ran
ge
valu
e
Aver
age
value
The
Yun
yang
Jiang
kou
water
supply
sub-co
mpone
nt
pH in
200m
away
from
dischar
ge of
constru
ction
wastew
ater
into
Tuan
tan
rivers
15
Nov
2016,
one
day,
one
sampl
e
every
day
/ 7.32 6~9 All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
( trial
operati
on
period)
Meet the Ⅱ
water quality
standard of
《 the surface
water
environment
quality
standards 》(GB3838-2002)
, the water
environment
quality is better.
COD / 10.2 ≤15
NH3-N / 0.27 ≤0.5
BOD5 / 1.14 ≤3
Petrole
um
type
/ 0.02 ≤0.05
Monitoring unit: Yunyang district environmental monitoring station; Yunyang city (monitoring)
[2016]WT No.78
Note:PH is dimensionless.
Table 13 External Environment Monitoring Results for Waste Water of Yunyang
Jiangkou Water Supply Project in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
Standard
situation,
overweight
ratio,
further
Monito
ring
Monito
ring
Monit
oring
Ran
ge
Avera
ge
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
param
eter
sampli
ng site
time
and
freque
ncy
valu
e
value monito
ring
mitigation
measures and
cost estimates
The
Yun
yang
Jiang
kou
water
supply
sub-co
mpone
nt
SS
Externa
l outlet
of
sewage
water in
plant
15
Nov
2016,
one
day,
one
sampl
e
every
day
/ 11 ≤70 All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
plant
( trial
operati
on
period)
Meet the I
standard of
Sewage water
Discharge
Standard
(GB8978-1996),
the water
environment
quality is better.
COD / 50 ≤100
NH3-N / 7 ≤15
BOD5 / 11 ≤20
Petrole
um
type
/
3
≤5
Monitoring unit: Yunyang district environmental monitoring station; Yunyang city (monitoring)
[2016]WT No.78
Table 14 External Environment Monitoring Results for Noise of Yunyang Jiangkou
Water Supply Project in Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
The
Yun
yang
Jiang
kou
water
supply
sub-co
mpone
nt
day
villager
s point
nearby
15-16 Nov,
2016, two
days,once
in the day
and night
/ 48.0 ≤60
All the
equipm
ents
have
operate
d
smoothl
y in the
water
supply
Meet
theⅠstandards of
《the standards
for acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 40.2 ≤50
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
plant
( trial
operati
on
period)
Monitoring unit:Yunyang district environmental monitoring station; Yunyang city (monitoring) [2016]WT
No.78
Table 15 External Environment Monitoring Results for Noise of Wuling shan-Baitao
road Sub-component in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
The Fu
ling
Wuling
shan-B
aitao
road
Sub-co
mpone
nt
day
villager
s point
nearby
Oct 18-19
2016, two
days,once
in the day
and night
/ 58.6 ≤60
Trial
operati
on
period
Meet the 4a
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 45.9 ≤50
Monitoring unit:Fuling district environmental monitoring station; Fuling city (monitoring) [2016]WT
No.69
Table 16 External Environment Monitoring Results for Noise of Fengjie Caotang
Ouying road Sub-component in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Fengji
e
Caotan
g
Ouyin
g road
Sub-co
mpone
nt
day Near
the
village
commit
tee of
the
Ouying
village
Oct.22-23,
2016, once
in day and
night each
/ 50 ≤60
Trial
operati
on
period
Meet the II
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 40 ≤50
Monitoring unit:Fengjie district environmental monitoring station; Fengjie city (monitoring) [2016]WT
No.89
Table 17 External Environment Monitoring Results for surface water environment of
Chengkou Chengguan Water supply sub-component in Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monit
oring
time
and
freque
ncy
Ran
ge
valu
e
Aver
age
value
Cheng
kou
Cheng
guan
Water
supply
sub-co
mpone
nt
pH Section
of
downst
ream in
200m
away
from
dischar
ge of
constru
ction
wastew
ater
Oct
13,201
6 ,
once
sample
each
/ 7.64 6~9
Smooth
constru
ction
Meet the III
water quality
standard of
《 the surface
water
environment
quality
standards 》(GB3838-2002)
, the water
environment
quality is better.
COD / 16.7 ≤20
NH3-N / 0.69 ≤1.0
BOD5 / 3.23
≤4
Petrole
um
type
/
0.04
≤0.05
Monitoring unit:Chengkou district environmental monitoring station; Chengkou city (monitoring)
[2016]WT No.35
Note:pH is dimensionless.
Table 18 External Environment Monitoring Results for Noise environment of Chengkou
Chengguan Water supply sub-component in Construction Phase
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Table
17
Extern
al
Enviro
nment
Monito
ring
Results
for
surface
water
enviro
nment
of
Cheng
kou
Cheng
guan
Water
supply
sub-co
mpone
nt in
Constr
uction
Phase
day
villager
s point
nearby
Oct.
14-15,2016
, once in
day and
night each
/ 54.7 ≤60
Peak
constru
ction
period
Meet the II
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 42.3 ≤50
Monitoring unit:Chengkou district environmental monitoring station; Chengkou city (monitoring)
[2016]WT No.35
Table 19 External Environment Monitoring Results for Surface Water environment of
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Youyang Mawang Water supply Sub-component in Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standard
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monit
oring
time
and
freque
ncy
Ran
ge
valu
e
Aver
age
value
Extern
al
Enviro
nment
Monito
ring
Results
for
Surfac
e
Water
environ
ment of
Youyan
g
Mawan
g
Water
supply
Sub-co
mpone
nt
pH
Section
of
downst
ream in
200m
away
from
dischar
ge of
constru
ction
wastew
ater
Oct13,
2016,
each
has
once
sample
/ 7.50 6~9
Smooth
constru
ction
Meet the Ⅲ
water quality
standard of
《 the surface
water
environment
quality
standards 》(GB3838-2002)
, the water
environment
COD / 16.2 ≤20
NH3-N / 0.65 ≤1.0
BOD5 / 3.43 ≤4
Petrole
um
type
/
0.03
≤0.05
Monitoring unit:Qianjiang district environmental monitoring station; Qianjiang city (monitoring)
[2016]WT No.88
Note:pH is dimensionless.
Table 20 External Environment Monitoring Results for Noise environment of Youyang
Mawang Water supply Sub-component in Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
Standard
situation,
overweight
ratio,
further
Monito
ring
Monito
ring
Monitorin
g time and
Range
value
Aver
age
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
param
eter
sampli
ng site
frequency value monito
ring
mitigation
measures and
cost estimates
Monito
ring
Results
for
Surfac
e
Water
environ
ment of
Youyan
g
Mawan
g
Water
supply
Sub-co
mpone
nt
day
Village
rs
living
point
nearby
the
diversi
on
tunnel
and
constru
ction
road
Oct 13-14,
2016, two
days,once
in the day
and night
/ 55.3 ≤60
Constru
ction
clearan
ce
period
Meet
theⅡstandards of
《the standards
for acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 40.3 ≤50
Monitoring unit:Qianjiang district environmental monitoring station; Qianjiang city (monitoring)
[2016]WT No.91
Table 21 External Environment Monitoring Results for Surface Water Environment of
Yanglu Water Supply Sub-component in the Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monitorin
g
sampling
site
Monit
oring
time
and
freque
ncy
Range
value
Avera
ge
value
The
Yun
yang
Yanglu
water
supply
pH Section
of
downstrea
m in
200m
away
Nov
10,
2016,
one
day,
one
/ 7.36 6~9
Trial
operati
on
Meet the Ⅱ
water quality
standard of
《 the surface
water
environment
quality
standards 》
COD / 13.4 ≤15
NH3-N / 0.37 ≤0.5
BOD5 / 2.08 ≤3
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
sub-co
mpone
nt
Petrole
um
type
from
discharge
of
constructi
on
wastewate
r into
Hanjiagou
rivers
sample
every
day
/ 0.02 ≤0.05
(GB3838-2002)
, the water
environment
quality is better.
Monitoring unit: Yunyang district environmental monitoring station; Yunyang city (monitoring)
[2016]WT No.77
Note:pH is dimensionless.
Table 22 External Environment Monitoring Results for Noise Environment of Yanglu
Water Supply Sub-component in the Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
The
Yun
yang
Yanglu
water
supply
sub-co
mpone
nt
day near
the
Village
rs
living
point
Nov 10-11,
2016, two
days,once
in the day
and night
/ 50.2 ≤55
Trial
operati
on
Meet
theⅠstandards of
《the standards
for acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 40.5 ≤45
Monitoring unit:Yunyang district environmental monitoring station; Yunyang city (monitoring) [2016]WT
No.78
Table 23 External Environment Monitoring Results for Surface Water of Nixi Water
Supply Sub-component in the Processing Installation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standa
rd
Engine
ering
activiti
es
during
Standard
situation,
overweight
ratio,
further
Monito
ring
Monitori
ng
Monit
oring
Range
value
Avera
ge
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
param
eter
sampling
site
time
and
freque
ncy
value monito
ring
mitigation
measures and
cost estimates
The
Yun
yang
Nixi
water
supply
sub-co
mpone
nt
pH Section
of
downstrea
m in
200m
away
from
discharge
of
constructi
on
wastewate
r into
Daqiaogo
u rivers
Nov
20,
2014,
one
day,
one
sample
every
day
/ 7.35 6~9
Process
installat
ion
Meet the Ⅱ
water quality
standard of
《 the surface
water
environment
quality
standards 》(GB3838-2002)
, the water
environment
quality is better.
COD / 12.8 ≤15
NH3-N / 0.40 ≤0.5
BOD5 / 2.27 ≤3
Petrole
um
type
/ 0.02 ≤0.05
Monitoring unit:Yunyang district environmental monitoring station; Yunyang city (monitoring)
[2016]WT No.83
Monitoring unit: Yunyang environmental monitoring stations;
Yunyang environment (monitoring) [2014] WT No.014.
Note:pH is dimensionless.
Table 24 External Environment Monitoring Results for Noise of Nixi Water Supply
Sub-component in the Processing Installation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
The
Yun
yang
Nixi
water
supply
sub-co
mpone
day near
the
Village
rs
living
point
Nov 20-21
2014, two
days,once
in the day
and night
/ 49.2 ≤60
Process
installat
ion
Meet
theⅠstandards of
《the standards
for acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
night / 40.0 ≤50
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
nt project is good.
Monitoring unit:Yunyang district environmental monitoring station; Yunyang city (monitoring) [2016]WT
No.84
Table 25 External Environment Monitoring Results for Surface Water of Fengjie
Tuxiang Road Sub-project in the Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Fengjie
Tuxian
g Road
Sub-pr
oject
Day near
the
Village
rs
living
point
Dec, 7-8,
2016, two
days,once
in the day
and night
/ 50 ≤60
Trial
operati
on
Meet the II
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
Night / 43 ≤50
Monitoring unit:Fengjie district environmental monitoring station; Fengjie city (monitoring) [2016]WT
No.85
Table 26 External Environment Monitoring Results for Noise of Fengjie Qinglong Road
Sub-project in the Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Fengjie
Qinglo
ng
Road
Sub-pr
oject
Day near
the
Village
rs
living
point
Dec 7-8,
2016, two
days,once
in the day
and night
/ 55 ≤60
Trial
operati
on
Meet the II
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 45 ≤50
Monitoring unit:Fengjie district environmental monitoring station; Fengjie city (monitoring) [2016]WT
No.91
Table 27 External Environment Monitoring Results for Noise of Xiushan Meijiang to
Zhongling Road Sub-project in the Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Xiusha
n
Meijian
g to
Zhongl
ing
Road
Sub-pr
oject
day
near
the
Village
rs
living
point
Nov
27-28016,
two days,
once in the
day and
night
/ 60 ≤60
Trial
operati
on
Meet the I
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008),
the construction
2008),the noise in
the place where
the project is
located is over the
standard in the
daytime, the
construction unit
is required to pay
attention to the
use of the related
machinery and
equipment, the
acostic
environment is
good during the
night for the
construction is
night / 45 ≤50
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
stopped.
Monitoring unit:Xiushan district environmental monitoring station; Xiushan city (monitoring) [2016]WT
No.56
Table 28 External Environment Monitoring Results for Noise of Xiushan Shi Zikou
Tunnel Road Sub-project in the Trial Operation Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Table
32
Externa
l
Environ
ment
Monito
ring
Results
for
Noise
of
Xiusha
n Shi
Zikou
Tunnel
Road
Sub-pro
ject in
the
Constru
ction
Phase
day
near
the
Village
rs
living
point
Oct.23-24,
2016, two
days,once
in the day
and night
/ 51 ≤60
Trial
operati
on
Meet the I
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 45 ≤50
Monitoring unit:Xiushan district environmental monitoring station; Xiushan city (monitoring) [2016]WT
No.57
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Table 29 External Environment Monitoring Results for Surface Water of Xiushan Shi
Zikou Tunnel Road Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monitorin
g
sampling
site
Monit
oring
time
and
freque
ncy
Range
value
Avera
ge
value
Xiusha
n Shi
Zikou
Tunnel
Road
Sub-pr
oject
pH Section
of
downstrea
m in
200m
away
from
discharge
of
constructi
on
wastewate
r
Oct.23
2016,
once,
one
sampel
each
/ 7 6~9
Smooth
constru
ction
Meet the 2 water
quality standard
of 《the surface
water
environment
quality
standards 》(GB3838-2002)
, the water
environment
quality is better.
COD / 14 ≤15
NH3-N / 0.45 ≤0.5
BOD5 / 3 ≤3
Petrole
um type
/ 0.03 ≤0.05
Monitoring unit:Xiushan district environmental monitoring station; Xiushan city (monitoring) [2016]WT
No.58
Note:pH is dimensionless.
Table 30 External Environment Monitoring Results for Noise of Xiushan Shi Zikou
Tunnel Road Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Xiusha
n Shi
Zikou
Tunnel
Road
Sub-pr
oject
Day near
the
Village
rs
living
point
Oct.23-24,2
016, two
days, once
in day and
night
/ 55 ≤60
Peak
constru
ction
period
Meet the 1
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 40 ≤50
Monitoring unit:Xiushan district environmental monitoring station; Xiushan city (monitoring) [2016]WT
No.59
Table 31 External Environment Monitoring Results for Surface Water of Xiushan Shi
Zikou to Yun’ai Road Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monitorin
g
sampling
site
Monit
oring
time
and
freque
ncy
Range
value
Avera
ge
value
Xiusha
n Shi
Zikou
to
Yun’ai
Road
Sub-pr
oject
pH Section
of
downstrea
m in
200m
away
from
discharge
of
constructi
on
wastewate
r into
Wujiangri
ver
Oct.23,
2016,
once,
one
sampel
e each
/ 7.5 6~9
Smooth
constru
ction
Meet the 2 water
quality standard
of 《the surface
water
environment
quality
standards 》(GB3838-2002)
, the water
environment
quality is better.
COD / 13 ≤15
NH3-N / 0.38 ≤0.5
BOD5 / 2.36 ≤3
Petrole
um
type
/ 0.03 ≤0.05
Monitoring unit:Xiushan district environmental monitoring station; Xiushan city (monitoring) [2016]WT
No.60
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Note:pH is dimensionless.
Table 32 External Environment Monitoring Results for Noise of Xiushan Shi Zikou to
Yun’ai Road Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Xiusha
n Shi
Zikou
to
Yun’ai
Road
Sub-pr
oject
day near
the
Village
rs
living
point
Oct.23-24,
2016, once
in day and
night each
/ 50 ≤55
Peak
constru
ction
period
Meet the 1
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 45 ≤45
Monitoring unit:Xiushan district environmental monitoring station; Xiushan city (monitoring) [2016]WT
No.61
Table 33 External Environment Monitoring Results for Surface Water of Wushan
Baiquan and Hongmiao Village Road Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monitorin
g
sampling
site
Monit
oring
time
and
freque
ncy
Range
value
Avera
ge
value
Wusha
n
Baiqua
n and
Hongm
pH Section
of
downstrea
m in
200m
Nov18,
2016,
once,
once
sample
/ 7 6~9
Smooth
constru
ction
Section of
downstream in
200m away from
discharge of
construction
wastewater into
COD / 18 ≤20
NH3-N / 0.95 ≤1.0
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
iao
Village
Sub-pr
oject
BOD5 away
from
discharge
of
constructi
on
wastewate
r
each / 3 ≤4 Wujiang river
Petrole
um
type
/ 0.04 ≤0.05
Monitoring unit:Wushan district environmental monitoring station; Wushan city (monitoring) [2016]WT
No.79
Note:pH is dimensionless.
Table 36 External Environment Monitoring Results for Noise of Wushan Baiquan and
Hongmiao Village Road Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Wusha
n
Baiqua
n and
Hongm
iao
Village
Road
Sub-pr
oject
day
near
the
Village
rs
living
point
Nov18-19,
2016,once
in day and
night
/ 55 ≤60
Peak
constru
ction
period
Meet the 2
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 50 ≤55
Monitoring unit:Wushan district environmental monitoring station; Wushan city (monitoring) [2016]WT
No.79
Table 35 External Environment Monitoring Results for Surface Water of Wushan
Longjing Water Supply Sub-project in the Construction Phase
Sub-co
mpone
nt
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
Standard
situation,
overweight
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
name
Monito
ring
param
eter
Monitorin
g
sampling
site
Monit
oring
time
and
freque
ncy
Range
value
Avera
ge
value
es
during
monito
ring
ratio,
further
mitigation
measures and
cost estimates
Wusha
n
Longji
ng
Water
Supply
Sub-pr
oject
pH Section
of
downstrea
m in
200m
away
from
discharge
of
constructi
on
wastewate
r
Nov 18
2016
once,
one
sample
each
/ 6.9 6~9
Smooth
constru
ction
Meet the 3 water
quality standard
of 《the surface
water
environment
quality
standards 》
(GB3838-2002)
, the water
environment
quality is better.
COD / 20 ≤20
NH3-N / 0.85 ≤1.0
BOD5 / 3 ≤4
Petrole
um
type / 0.03 ≤0.05
Monitoring unit:Wushan district environmental monitoring station; Wushan city (monitoring) [2016]WT
No.80
Note:pH is dimensionless.
Table 36 External Environment Monitoring Results for Noise of Wushan Longjing
Water Supply Sub-project in the Construction Phase
Sub-co
mpone
nt
name
Monitoring details
Monitoring
values (unit
:mg/L)
Standar
d
Engine
ering
activiti
es
during
monito
ring
Standard
situation,
overweight
ratio,
further
mitigation
measures and
cost estimates
Monito
ring
param
eter
Monito
ring
sampli
ng site
Monitorin
g time and
frequency
Range
value
Aver
age
value
Wusha
n
Longji
ng
Water
Supply
Sub-pr
oject
day near
the
Village
rs
living
point
Nov.18-19,
2016, two
days,once
in the day
and night
/ 60 ≤60
Peak
constru
ction
period
Meet the 1
standards of《the
standards for
acoustic
environmental
quality》(GB3096-2008) ,
the sound
environment
quality of the
project is good.
night / 50 ≤55
Monitoring unit:Wushan district environmental monitoring station; Wushan city (monitoring) [2016]WT
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
No.80
From the table 6 to table 36, the environmental quality of surface water and noise
near the construction site is consistent with baseline values, and can meet the requirements of
environmental standards of the relevant function area. The performance of the pollution
slowdown measures from environmental management plan laying down is good, and the
influence of construction of all sub-projects on environment is very small. In addition,
prevention measures of health and disease of construction site from the environmental
management plan are implemented basically, and construction workers and the public of
surrounding are in good health.
2.5.2 Internal monitoring
The internal monitoring of the implementation and effect of the mitigation
measures is cleared up according to contents completed by the construction unit; table
37 shows the brief description of the internal monitoring.
Table 37 details for internal monitoring of mitigation measures and their effects
Period of the
project
Items for the
main
construction
Potential
environmental
impact
Details for internal
monitoring of
mitigation measures and
their effects
Responsible
party
Construction
earth-rock
excavation
Impact on the
ecological
environment
around the
construction site
CU paid special attention
on protecting the
ecological environment
when doing earth-rock
excavation.
The construction measure
they take is to build
gravity retaining wall,
which is benefit for both
safe construction and
ecological environment
such as the soil and
vegetation.
YYLT 、
YYMW :
Chongqing
Longhui Co.,
Ltd.
CKGG :
Chongqing
ChengKou
water supply
company.
YYJK : The
second Co.,
Ltd. of
Chongqing
Construction
of civil work
structure
Dust impact on
the environment
around the
CU has chosen
commercial concrete to
construct, hence there’s
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Period of the
project
Items for the
main
construction
Potential
environmental
impact
Details for internal
monitoring of
mitigation measures and
their effects
Responsible
party
construction site nearly no dust around the
construction site except
some self-mixing sands.
Reducing dust in the
construction site by
covering and blocking.
Reduce the dust pollution
by setting the dust cover
for the mixer and
implementing closed,
semi-closed construction.
Reduce the dust
pollution by covering and
blocking ,strictly
controlling the
transportation vehicle
speed, avoiding the
construction under the
high winds and other
measures to reduce dust
pollution.
Jiangong
group.
YYYL 、
YYNX :
Chongqing
Zhonghang
Co., Ltd.
FLWLS-BT:
Chongqing
Chuandong
road &bridge
engineering
Co., Ltd.
WSBQHM:C
hongqing
Jiaxin
construction
Co., Ltd.
WSLJ:
Chongqing
Chengjian
Holdings(Bloc
) Co., Ltd.
XSMJZL:Ch
ongqing
Huangpu
construction(B
loc) Co., Ltd.
XSZLSZK:
Sichuan Jinhai
construction
Co., Ltd.
XSSZKYY:
China Railway
the
seventeenth
Bureau group
the first
project Co.,
Mechanical
construction
and
transportation
Noise impact
around the
construction site
There are no acoustic
environmental sensitive
points such as hospitals,
schools, residential areas
near the construction site;
the machineries and
equipment of Longtan
water supply civil work
construction are low noise
equipment, and the
mountains on both side
have reduced the noise, so
no complains have
aroused till now.
Machinery equipment is
low noise equipment in
the Gaoguan water civil
engineering, and don't
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Period of the
project
Items for the
main
construction
Potential
environmental
impact
Details for internal
monitoring of
mitigation measures and
their effects
Responsible
party
work for noise during
schooling and residents
having a rest, so there is
no noise nuisance
phenomenon. Up to now,
there is no complaint.
Implement closed,
semi-closed construction
by installing strong noise
equipment such as mixer,
vacuum pump, sawing
machine in the barrack;
Use high-quality low
noise equipment, and
strengthen maintenance
and management for
construction machinery, to
ensure that the equipment
is in good working
condition of low noise,
high efficiency. There is
no noise nuisance
phenomenon. Up to now,
there is no complaint.
Avoid high noise
equipment used
simultaneously; The
construction of equipment
with big noise, strong
impact and accompanied
the strong vibration
schedule during the day;
If there is a residential
area within 200 m on the
construction site, stop
noise-generating
construction work
between 22:00 and 06:00.
There is no noise nuisance
Ltd.
FJTX: Jiangxi
Zhongheng
construction
group Co.,
Ltd.
FEHTCT:
Fujian road
harbor (Bloc)
Co., Ltd.
FJQL:
Chongqing
Shili highway
development
Co., Ltd.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Period of the
project
Items for the
main
construction
Potential
environmental
impact
Details for internal
monitoring of
mitigation measures and
their effects
Responsible
party
phenomenon. Up to now,
there is no complaint.
Wastewater
Impact on the
downstream
river
The wastewater from
construction was treated
by the grift chamber, and
only very little water was
discharged. It is infiltrated
by soil before entering
into the downstream river.
Since this water is not
polluted, the impact on
the water quality of the
downstream river is
negligible.
The waste soil
and stone
treatment
The water and
soil erosion of
the spoil ground
Water Supply
Sub-component: The
excavation is filled in-situ
as much as possible. The
remaining excavation is
used for site leveling;
therefore, there is little
ecological impact.
Road Sub-component:
Setting abandon soil field
and the abandon soil field
takes comprehensive soil
and water conservation
measures according to the
principles of block before
abandon.
Vibration
Reservoir 、 the
dam and civil
building
CU has strictly restricted
the access of the
heavy-duty vehicles and
equipment; Using no
blasting operations; The
subgrade compaction
gives priority to with
static pressure, and
reduces the vibration by
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
Period of the
project
Items for the
main
construction
Potential
environmental
impact
Details for internal
monitoring of
mitigation measures and
their effects
Responsible
party
increasing the rolling pass
and reducing vibration
compaction thickness.
There are no adverse
effects on the safety of
civil buildings along.
2.6 Training records and public consultation
(1) Capacity building and training
There is no relevant training in this stage.
(2) Public consultation
According to the requirement of ADB on public consultation of large-scale construction
activities, a brief on the publicity of every sub-component is listed in table 38 during
construction period。
Table 38 Summary of public consultation
Sub-component
Scopes of
the public
consultati
on
Public survey
form and
symposium
Site inspection and
symposium
Response to the
public feedback
Chengkou Gaoguan,
Youyang Longtan 、
Mawang , Yunyang
Jiangkou 、 Yanglu 、
Nixi water supply
sub-component;Chengk
ou Chengguan second
road, Fuling
Wulingshan-Baitao
raod, Xiushan
Meijiang-Zhongling
road, Xiushan
Zhongling-Shizikou
road, Shizikou Tunnel
road, Shizkou-Yun’ai
road, Fengjie Tuxiang
road, Hongtu,Caotang
road, Qinglong Town
road
sub-component;Zhongli
the public
of
influence
scope of
all
sub-comp
onents in
the
constructi
on period
and
operation
period
All
sub-compone
nts have taken
the public of
eia and the
public
consultation
Under the
guidance of
the local
environmental
protection
bureau
Conclusion:
Support the
The project is under
construction, the public
concerns were collected
through the hotlines.
(CKGG :
023-59220695;
YYLT,YYMW :
13594906371;
YYJK,YYYL、YYNX:13038381163
FLWLS-BT:
13709472031)
WSBQHW,WSLJ :
18996649008
XSMLZL,XSZLSZK,X
According to the
public opinion, the
dams of Yanglu
and Nixi water
supply
sub-component
involve change, it
can continue the
construction after
the related change
determined.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
ng-Shizikou road,
Shizkou Tunnel road,
Shizikou road, Wushan
Baiquan road,
Hongmiao road and
Wushan Longjing
water supply
sub-component
construction
and operation
of all
sub-compone
nt;
SSZKSD,XSSZKYY:1
3330398718
FJTX,FJHTCT,FJQL:1
3436227388
3 Conclusion
The main construction work of the water supply sub-coponent of Chengkou Gaoguan,
Yunyang Jiangkou, Yunyang yanglu and Youyang Longtan, the road sub-component
of Fuling Wuling to Baitao, Fengjie Hongtu, Caotang, Fengjie Tuxiang, Fengjie
Qinglong, Xiushan Meijiang to Zhongling, Zhongling to Shizikou has been completed,
the vegetation engineering has been gradually finished. Each sub-component has been
into trial operation period, and the operation status is normal. Yunyang Nixi water
supply sub-component has been in a period of processing installation, and there are
professional personnel responsible for its operation and management, during the
process, the environmental protection measures are fully implemented. The
environmental management plan formulated in the construction period of the
Chengkou Chengguan second road, Youyang Mawang, Shizikou tunnel,
Shizikou-Yun’ai, Wushan Longjing Baiquan, Hongmiao road sub-project has been
also basically implemented, which is mainly for:
All sub-components have a complete environmental management institution for the
follow-up environmental management:
The EMP listed in the special causes of the contract and the mitigation measures for the
adverse environmental impacts have been implemented well and have yielded good effects.
There is no disorder dumping or emissions of wastewater and solid waste, no construction
dust and soot or ambient noise in the construction camps and sites. The construction site and
the surrounding environment quality are generally satisfying. There is little impact of the
above project on nearby environment sensitive by taking corresponding measures, so there is
no noise nuisance phenomenon. Up to now, there are no complaints;
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office
There was a public consultation during the early project period on all subcomponents.
The results show that the public support the implementation of all subcomponents and hope to
benefit as soon as possible.
The construction unit, supervision unit and the owners have formulated a follow up
system and implementation programs for the mitigation measures to be improved, so as to
implement the environmental protection of all subcomponents smoothly and further in the
next stage.
Summary Environmental Monitoring Report for ADB loan on Chongqing Urban-Rural
Infrastructure Development Demonstration Project(2016.12)
Chongqing ADB Project Management Office