NFPA 1142
Pre-burn Plans Pre-burn Plans
- House Layout
- Fireground Layout
- Hazard Mitigation - Permits
Minimum Total Gals Required Minimum Total Gals Required Minimum GPM For Flow Minimum GPM For Flow
-Water Calculations: Water Calculations:
![Page 2: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/2.jpg)
NFPA 1142
Fireground LayoutFireground Layout
Truck Placement Command
Rehab Parking
Water Supply Fuel Reserve
Staging EMS
Entry/Exit Exposures
![Page 3: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/3.jpg)
NFPA 1142 Fireground LayoutFireground Layout Water Supply
NFPA 1403, 4.2.23.3NFPA 1403, 4.2.23.3* Separate sources shall be utilized for the supply of attack lines and backup lines in order to preclude the loss of both water supply sources at the same time.
![Page 4: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/4.jpg)
NFPA 1142
Fireground LayoutFireground Layout Water Supply A.4.2.23.3A.4.2.23.3
Reliability should be considered when determining what constitutes valid separate sources. The intent of this paragraph is to prevent the simultaneous loss of both attack lines and backup lines in the event of a pump or water supply failure. Where a public water supply system is used, two pumpers on two different hydrants should be used. Two pumpers drafting from the same pond or river also are appropriate, provided the source contains sufficient usable water.
![Page 5: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/5.jpg)
NFPA 1142
Fireground LayoutFireground Layout
![Page 6: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/6.jpg)
NFPA 1142
Better Example:
![Page 7: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/7.jpg)
NFPA 1142
On All Drawings:On All Drawings:
• ‘‘Not to ScaleNot to Scale’
• Indicate NorthIndicate North
Not to Scale
N
![Page 8: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/8.jpg)
NFPA 1142 Hazards
Remove all Screens
Fill in/block- off all wells and cisterns
![Page 9: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/9.jpg)
NFPA 1142
![Page 10: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/10.jpg)
NFPA 1142
Hazards
![Page 11: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/11.jpg)
NFPA 1142 Hazards
Remove obvious hazards
![Page 12: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/12.jpg)
NFPA 1142
Hazards
Build steps Or
Do not use the exit
![Page 13: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/13.jpg)
NFPA 1142
Building LayoutBuilding Layout
FLOOR / ROOM / HALLWAY LAYOUT
FUEL LOADSVENTILATION
EVACUATION POINTS
![Page 14: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/14.jpg)
NFPA 1142
Building Building LayoutLayout
Show allShow allmeasurements to measurements to ensure no void ensure no void spaces! spaces!
![Page 15: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/15.jpg)
NFPA 1142 Hazards
![Page 16: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/16.jpg)
NFPA 1142 Hazards
![Page 17: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/17.jpg)
NFPA 1142 Hazards
![Page 18: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/18.jpg)
NFPA 1142
![Page 19: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/19.jpg)
NFPA 1142 Hazards
Closed Vessel
![Page 20: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/20.jpg)
NFPA 1142 Hazards
![Page 21: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/21.jpg)
NFPA 1142 Hazards
![Page 22: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/22.jpg)
NFPA 1142 Hazards
![Page 23: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/23.jpg)
NFPA 1142 Hazards
![Page 24: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/24.jpg)
NFPA 1142 Hazards
![Page 25: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/25.jpg)
NFPA 1142 Hazards
![Page 26: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/26.jpg)
NFPA 1142 Hazards
![Page 27: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/27.jpg)
NFPA 1142 Hazards
![Page 28: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/28.jpg)
NFPA 1142 Hazards
![Page 29: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/29.jpg)
NFPA 1142 Hazards
![Page 30: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/30.jpg)
NFPA 1142 Hazards
![Page 31: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/31.jpg)
NFPA 1142 Hazards
![Page 32: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/32.jpg)
NFPA 1142 Hazards
Disconnect all utilities
![Page 33: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/33.jpg)
NFPA 1142
Hazards
![Page 34: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/34.jpg)
NFPA 1142 Ventilation
![Page 35: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/35.jpg)
NFPA 1142 Ventilation
![Page 36: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/36.jpg)
NFPA 1142 Ventilation
Removing the gable ends allows a great view of the attic conditions from outside in addition to increasing overall ventilation
![Page 37: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/37.jpg)
NFPA 1142
Ventilation
![Page 38: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/38.jpg)
NFPA 1142
Ventilation
![Page 39: Pre-burn Plans](https://reader036.vdocuments.net/reader036/viewer/2022081516/56813b7d550346895da496dd/html5/thumbnails/39.jpg)
NFPA 1142
Ventilation
Multiple roofs – multiple holes!