Helical and Hydraulic Piers
![Page 3: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/3.jpg)
ICC-ES (Formerly ICBO)
• PFC – 5996 (Issued March 1, 2004)
• ICC Evaluation Service, Inc.• National Evaluation Service, Inc. • BOCAI Evaluation Services• ICBO Evaluation Service, Inc.• SBCCI Public Service Testing and Evaluation
Services, Inc.
• Division: 02 – Site Construction• Section: 02465 – Bored Piles
![Page 4: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/4.jpg)
Topics Discussed
• Pre-Construction Piles
• Caisson Replacement
![Page 5: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/5.jpg)
Helical Piers - Shaft
![Page 6: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/6.jpg)
Helical Piers - Connections
![Page 7: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/7.jpg)
Push Pier
![Page 8: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/8.jpg)
Push Pier - Components
Bracket
Expansion Ring / Soil Plug
Hydraulic Cylinders
Driving Head
Guide Sleeve
![Page 9: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/9.jpg)
Pre-construction Piles
![Page 10: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/10.jpg)
Pre-construction Piles
![Page 11: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/11.jpg)
Case Studies
![Page 12: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/12.jpg)
• Apache Gold CasinoBecause of known soil issues and existing structures experiencing settlement issues the engineers recommended that all new structures on this property be constructed with a deep foundation system using helical piles with grade beams.
It was anticipated that a pile depth of 45’ would be needed to reach solid strata but in some locations a depth of up to 63’ was needed before reaching solid strata.
![Page 13: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/13.jpg)
Apache Gold CasinoWhen the required depth was reached the piles were cut off 4” above the bottom of the grade beam trench and the pile caps were installed. It is now ready for the rebar to be tied to the pile caps and the grade beams to be poured.
![Page 14: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/14.jpg)
Aqua Tots Swimming Pool Addition
This new build out required the addition of a swimming pool inside the existing structure. The challenge was how to support the load bearing wall and interior column during excavation for the pool.
![Page 15: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/15.jpg)
Aqua Tots Swimming Pool Addition
The solution was to install 7 hydraulic piers on the exterior wall footing and 4 helical piles to carry the load of the column footing.
![Page 16: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/16.jpg)
Manufacturing Renovation
This structure was being remodeled to accommodate the addition of new heavy equipment. It was determined that to support the additional load a 16” slab with a deep foundation system would be required. Helical piers were selected as the best solution.
![Page 17: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/17.jpg)
Manufacturing RenovationHelical pile being installed
Click on picture to start movie clip
![Page 18: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/18.jpg)
Manufacturing Renovation100 Helical piles were installed in a pattern to carry the load of the new heavy equipment and not conflict with the new plumbing that had been installed.
![Page 19: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/19.jpg)
Caisson Replacement
![Page 20: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/20.jpg)
Hotel Indigo ScottsdaleThe hotel was adding a balcony to expand the bar area. The original design called for caissons to be installed to carry the load of the columns that would support the structure.
The steel cages had been delivered to the site but when the drill rig arrived they found that there was not enough room to get the drill in.
![Page 21: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/21.jpg)
Hotel Indigo ScottsdaleArizona Ram Jack was contacted to help provide a solution. Our in house engineer worked with the engineer of record to design a system using helical piers to replace the caissons.
![Page 22: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/22.jpg)
Hotel Indigo Scottsdale
The small equipment needed to install the helical piles was able to get into the tight areas by the building and around the pool.
![Page 23: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/23.jpg)
Caisson ReplacementAfter the piles had been installed and cut to the required height from the bottom of the footing the pier caps were attached . The area is now ready for the rebar cage to be attached and the concrete poured.
![Page 24: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/24.jpg)
Caisson ReplacementWith the footings poured the columns were installed and the structural is up and ready for the deck. Once again Arizona Ram Jack was able to provide a better solution
![Page 25: Pre Construction Piles Caisson Replacement](https://reader033.vdocuments.net/reader033/viewer/2022061221/54bf33524a7959c94e8b4602/html5/thumbnails/25.jpg)
Questions?