PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Pre-Feasibility Report of
Quartz & Feldspar Mine
LOCATION OF THE MINE
S.F.Nos. 407/1-I, 455/2, 8, 9, 10, 12, 13 & 14
Elurpatti Village,
Thottiyam Taluk,
Trichy District,
Extent: 3.01.5Ha (less than 5Ha)
Category: B2 Project
LESSEE
Tmt.I.Mani,
W/o. K.Ilangovan,
2/3, East Street,
Nallipalayam Post, Namakkal Taluk,
Namakkal District - 637003
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
1. EXECUTIVE SUMMARY The Scheme of Mining and Progressive Mine Closure Plan for Elurpatti Quartz &
Feldspar Mine is situated Elurpatti Village, Thottiyam Taluk, Trichy District, Tamilnadu
State. The mine lease has been granted in favor of Tmt.I.Mani for a period of twenty
years under proceedings No. 5253/MM6/2008, dated 07.01.2009 issued by
Commissioner and Director of Geology and Mining (Enclosed Annexure No. II). This
proposed Scheme of Mining along with Form-1 & Prefeasibility report is prepared to
submission for Environmental clearance from MoEF / SEIAA, to obtained consent for
Establishment and Consent for operation from TNPCB.
SALIENT FEATURES OF THE PROJECT
S.NO PARTICULAR DETAILS
1. Name of the Company Tmt.I.Mani
2. Type of Project Quartz & Feldspar Mine
3. Location of the Mine Survey Nos. 407/1-I, 455/2, 8, 9, 10, 12, 13 & 14
Elurpatti Village,
Thottiyam Taluk,
Trichy District,
Tamilnadu State.
4. Mining lease area 3.01.5Ha
5. Latitude 11°02.20’N
6. Longitude 78°16.12’ E
7. Topo sheet No. 58 -I/08
8. Type of land
Patta/forest/PWD
It is a Patta land - Non forest
9. Production Capacity
Descriptio
n
ROM
(Ts)
Recovera
ble
reserves
@ 60%
(Ts) of
ROM
Quartz
(40%)
Feldspa
r (60%)
Ts
Minera
l
rejects
(40%)
Ts of
ROM
Top
soil
(Ts)
Side
Burden
(Ts)
Total
waste
(MR +
SB)
Geological
reserves 165960 99576 39831 59745 66385 22812 - 66385
Mineable
Reserves 53336 32002 12801 19201 21335 22012 351101 372436
Year wise
Reserves 53336 32002 12801 19201 21335 22012 351101 372436
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
10. Life of Mine Mining lease period is twenty years.
The first Scheme of mining is prepared to submission
for a period of five years (2014 – 15 to 2018 -19).
11. Method of Mining Mining operation is proposed to be carried out by
manual opencast method and proposed benches are 3m
height and 5m width with 60º slope.
12. Ultimate depth of
Mining
The mining operation is proposed up to depth for 19m
from existing ground profile.
13. Top soil & overburden
(quantity in m3)
There is top soil proposed during this scheme period is
about 22012Ts.
14. Ground water level The depth of water table is around 35m (35m during
summer season and 30m during rainy season).
15. Nearest habitation Bharathipuram – 800m – NE
16. Nearest Town Namakkal - 23km- NW
17. Nearest Railway station Namakkal Railway station -23km – NW
18. Nearest Airport Trichy Airport - 55km - SE
19. Nearest National
Highways & State
Highways
NH-67- Karur - Trichy- 9km- Southern side.
SH25- Tiruchengode - Trichy – 380m- Northeastern
side.
20. Nearest Hospital Thottiyam - 10km- SE
21. Aerial distance to the
nearest Eco sensitive
areas, CRZ, forest, wild
life sanctuary, Interstate
boundary, critically
polluted area if the
quarry site is within
500m of these areas.
More than 500m from Eco sensitive areas, CRZ, forest,
wild life sanctuary, Interstate boundary, critically
polluted area.
22. Details of other quarries
for a radius of 500m
around the quarry site
There is no mines within the radius of 500m
23. Man power About 12 employees
24. Water requirement &
source
Total water requirement for 1.0KLD from water
vendors & existing bore well.
25. Cost of the project A. Project cost = Rs. 14,25,000/-
B. EMP cost = Rs. 4, 02,500/-
Total cost = Rs. 18,27,500/-
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
The Prefeasibility report preparing for following condition of Government of India Ministry of
Environment and Forests (No.L-11011/47/2011 –IA-II (M) Dated: 24th June, 2013)
Thalamalai Reserved forest is situated 6km away from the Northeastern side of the area.
Marachipatti lake & Elurpatti kulam is situated 1km away from the NE & SE side of the lease
area.
Kaveri River is flowing about 7km away from the Southern side of the area.
There is no Western Ghats within the radius of 15km.
There is no HACA region within the radius of 15km.
There is no interstate boundary within the radius of 15km.
There is no CRZ within the radius of 15km.
There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within the
radius of 15kms.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
The following information provided by the applicant
I have applied for Environmental Clearance to SEIAA, Tamilnadu for Quartz & Feldspar lease
for Mining of Elurpatti in S.F.Nos: 407/1-I, 455/2, 8, 9, 10, 12, 13 & 14 for over an extent of
3.01.5Ha in Elurpatti Village, Thottiyam Taluk and Trichy District.
I swear to state and confirm that within 10km area of the mine site, I have applied for
environmental clearance; none of the following is situated.
Protected areas notified under the wild life (Protection) Act, 1972
Critically polluted areas as notified by the central pollution control board constituted
Under water (Prevention and Control of Pollution) Act 1974.
Eco-Sensitive areas as notified
Interstate boundaries and international boundaries within 5km radius from the boundary of the
proposed site.
There is no mines within the radius of 500m radius from periphery of the proposed mine.
There will not be any hindrance or disturbance to the people living no enroute / nearby our mine
site while transporting the mineral our material and due to mining activities.
There is few habitation located within 500m radius from the periphery of mining area.
I swear that Afforestation will be carried out during the course of mining operation and
maintained.
The required insurance will be taken in the name of the labourers working in mine site.
Approach road belongs to me only and no other private patta roads encountered.
I will not engage any child labour in our mine site and I aware that engaging child labour is
punishable under the law.
All types of safety / protective equipment will be provided to all the labourers working in mining
area.
No permanent structures, temples etc., are located within 500m radius from the periphery of
mining area.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION
(i) Identification of project and project proponent: In case of mining project, a copy of mining
lease/letter of intent should be given
Identification of Project
Name of the Project Elurpatti Quartz & Feldspar Mine
Lease area 3.01.5Ha (Patta land) -Non forest
Location
Survey Nos. 407/1-I, 455/2, 8, 9, 10, 12, 13 & 14
Elurpatti Village, Thottiyam Taluk,
Trichy District and Tamilnadu State.
Topo sheet No. 58 -I/08
Project Proponent Name with Address
Tmt.I.Mani,
W/o. K.Ilangovan,
2/3, East Street,
Nallipalayam Post, Namakkal Taluk,
Namakkal District - 637003
Mobile No: 9443371462
Email id: [email protected]
In case of mining project, a copy of mining lease/letter of intent should be given
I. The Mining lease was granted under proceedings No. 5253/MM6/2008, dated
07.01.2009.
II. The Mining Plan was approved by the Regional controller of mines, Indian Bureau
of Mines, Chennai vide Letter. No: TN/TCR/Q&F/MS-1062.MDS, dated
20.05.2014.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(ii) Brief description of nature of the project
The opencast manual mining operation is proposed by the formation of benches. Three
benches are proposed on the mineral to form at 3m height and 5m width with 60º slope.
The mine is well exposed the pegmatite rocks consist of quartz and feldspar. Quartz is identified
by concoidal fracture, vitreous lusture and granular grains. Orthoclase Feldspar identified by
pinkish white in color, pearly lusture on cleavage faces. The mine lease area is 3.01.5Ha;
the life of mine is twenty years.
The total quantity of Mineable reserves of Quartz & Feldspar (60%) of ROM is about
32002Ts (12801Ts @40% of Quartz & 19201Ts @60% of Feldspar) and the total waste is about
372436Ts(21335Ts of Mineral Rejects @ 40% and 351101Ts of side Burden) is up to depth of
19m for the entire life of mine.
The proposed quantity of Quartz & Feldspar (60%) of ROM mined for during this
scheme period (as in the Scheme of mining) would be about 32002Ts (12801Ts @40% of Quartz
& 19201Ts @60% of Feldspar) and the total waste is about 372436Ts (21335Ts of Mineral
Rejects @ 40% and 351101Ts of side Burden) is up to depth of 19m for a period of next five
years.
The mineral rejects is calculated as 40% of ROM. This include fragments, chips, etc., the
mined waste would be generated and dumped over the existing mineral rejects dump situated in
the southern side of the lease applied area. Water requirement for the proposed project for
drinking purpose, dust suppression and afforestation would be around 1.0KLD which will be
taken from nearby villages.
(iii) Need for the project and its importance to the country and or region
The minerals of Quartz and Feldspar are used in various forms in various industries to
manufacture various products. Quartz shall be used in ceramics, glass manufacturing,
ferrosilicon, electric lining industries and paints. Feldspar shall be used in glass, ceramics,
abrasives and electrodes.
This project will give employment opportunities to 12 members directly and 10 members
indirectly, besides this Quartz and Feldspar is well known in the international supermarket which
will fetch a good foreign exchange to the nation.
Mineral Industries of the state of Tamilnadu provides employment opportunities for the
people of the state as well as in the specific project area. The Mining is one among the major
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
core sector industries which plays a vital process of country’s economic development and
foreign exchange.
(iv) Demand and supply gap
Quartz and Feldspar is one among the most used in various industries to manufacture
different kind of product. The demand of Quartz and Feldspar is ever growing with the growth of
ceramics, glass manufacturing, ferrosilicon, induction furnaces lining, electric lining and paint
industries.
The mineral is widely used in walls and floor tiles other ceramic product, soaps and
detergents, paints, paper, cosmetic and plastic. The requirement for the mineral is very high in
the nearby cities and towns.
(v) Imports vs indigenous production
There is no import of Quartz and Feldspar at present in India. India especially the
peninsular India (southern India) has good resource of Quartz and Feldspar and has a great
demand in the international supermarket. Indigenous Quartz and Feldspar almost shares more
than 50% requirement in the world.
(vi) Export Possibility
There are many possibilities for export the Quartz and Feldspar to foreign countries
especially to Japan, Malaysia etc., as the Indian Quartz and Feldspar is one of the mostly
important industries in the world. All the international Quartz and Feldspar players are in the
requirement for industries either domestic or exports. Hence there is a bright possibility for
export of Quartz and Feldspar most of the industries.
(vii) Domestic/Export Markets
The applicant after will fetch a good domestic market as mentioned earlier. The applicant
does not have any other mine in Tamilnadu. It is propose to sell Quartz and Feldspar to industries
and domestic markets. Quartz is mainly used in ferrosilicon, silicon carbide industries and
abrasive industry. The main use of feldspar is in ceramics and porcelain industry mainly as glaze
material. It is also used in the manufacturing of some specialized electrodes.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(viii) Employment Generation (Direct and Indirect) due to the project
It is proposed to deploy about 12 employees directly and indirectly about 10 people will
be benefited from the nearby local villages.
The above man power is adequate to meet out the production schedule and the machinery
strength envisaged in the plan and also to comply with the stationary provisions of mine safety
regulation.
It is been ensured that the labors will not be deployed less than 18 years, No Child
labors will engaged or entertained for any kind of mining operations. All the labors engaged
for mining operations will be insured till the end of life of mine.
3.0 PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent projects, if any
This is a mining project for production of mine deposit at proposed production is about
@ 60% of ROM 32002Ts (12801Ts @40% of Quartz & 19201Ts @60% of Feldspar) no other
allied actions like processing and polishing is proposed in this project.
(ii) Location (map showing general location, specific location, and project boundary & project
site layout) with coordinates
� The area is located in S.F.Nos. 407/1-I, 455/2, 8, 9, 10, 12, 13 & 14, Elurpatti
Village, Thottiyam Taluk and Trichy District.
� The entire mine lease area falls in the Patta land with lease area is exhibits slightly
undulated terrain.
� The Altitude of the area is above 135m MSL.
� The area is mentioned in GSI Topo sheet No. 58 -I/08
� The Latitude between of 11º02.20’N
� The Longitude between of 78º16.12’E on WGS 1984 datum.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
LOCATION MAP OF THE PROJECT AREA WITH CO ORDINATES
v
Location:
Village: Elurpatti
Taluk: Thottiyam
District: Trichy
Latitude : 11º02.20’N
Longitude: 78º16.12’E
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
DRAWING SHOW THE SURFACE PLAN WITH CO-ORDINATES
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
DRAWING SHOW THE ENVIRONMENTAL PLAN
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly
the environmental considerations gone into should be highlighted
The opencast Manual mining is proposed in the area for excavation of Quartz and
Feldspar with 19m depth. The mine is proposed in the applicant own patta land hence alternate
site for this project is not considered. The project is site specific.
(iv) Size or magnitude of operation
The total area of the project is about 3.01.5 Ha. It is proposed for production (60%) of
ROM is about 32002Ts (12801Ts @40% of Quartz & 19201Ts @60% of Feldspar) by open cast
manual mining by deploys jackhammer drilling and blasting, manual loading of Quartz and
Feldspar from pithead to Customer and various industries.
(v) Project description with process details (a schematic diagram/flow chart showing the
project layout, components of the project etc. should be given)
Details regarding topography, Geology of the area, Method of mining, Machineries
required and production details area given below:
Physiography
The area exhibits slightly undulated terrain. The area applied for lease is a dry land with
scattered outcrops of Quartz and feldspar. The area is sloping towards Northwest. The Altitude
of the area is above 136m above MSL. The area receives rainfall about average 800mm during the
NE monsoon period from October - December and the water table is found at 35m in dry season
and 30m in rainy season.
Geology of the area
The area was surveyed in detail to prepare a Geological map in the scale 1:1000 showing
the various formations and attitude of the deposit. Thin cover of gravelly reddish soil to a
thickness of 1m
The physical attitude of the band is given below:
Strike length (m) - 190
Width (m) - 20
Strike direction - N750E S750W
Dip amount - 700
dip towards NE
Colour of Quartz is white, massive in form, hardness 7.0, specific gravity 2.6, absence of
cleavage; streak is white, vitreous in luster.
Colour of Feldspar is pink, massive in form, hardness 6, specific gravity 2.6, two sets of
cleavage; streak is white, sub-vitreous in luster.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Major geological disturbances are totally absent in this area. Recovery of minerals is
estimated as 90% of the total excavation of the ore body.
Method of Mining:
Mining would be carried out by the opencast method of working. Since the daily rate of
production is very limited, no heavy earth moving machinery is required. The Mining operation
would be done in a systematic way by forming benches with all safety aspects as stipulated in the
Mines Act, Mines Rules and Metalliferous Mines Regulations. Machineries like Jackhammer
drilling, tractor mounted compressors and blasting by developing the benches at 3m height and
5m width. The drilling is carried out with jackhammer of small diameter (30-32mm) at shallow
depth and blasted with class 2 slurry explosives with charge ratio as 0.7 to 0.9. The mine would
be operated with manual laborers with one shift only.
Open Cast Working
It is proposed to carry out mining operation by manual open cast method.
It is proposed to start mining of Quartz and Feldspar from RL 135.0m to RL 116.0m in
the northern side of the lease area starting from west and progress towards eastern side.
The existing pit dimension is 100m x 40m x 19m (d).
The topsoil occurs during this scheme period is about 22012Ts and topsoil has preserved
all along the 7.5m boundary barrier.
In quartz and feldspar deposit, the bench is 3m width and 5m height with 60º slope.
Proper footpaths will be provided between benches for easy accessibility of men to the
lower level of the mine. A safety distance of 7.5m will be maintained from the boundary barrier
and 50mts safety distance will be maintained for nearby patta lands.
Mining- Opencast manual Method
Blasting Drilling
Quartz & Feldspar
Manual Loading and transportation to
the needy industries
SCHEMATIC DIAGRAM OF THE MINING PROCESS
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Machinery Required:
I. Drilling Machine:
S.No Type Nos
1. Tractor mounted
compressor
1
2. Portable Compressor 2
II. Loading
S.No Type
1. Loading of minerals by Manually
III. Transport Equipment:
S.No Type Nos
1. Comet Tipper 1
Manpower requirement:
The tentative man power required for the proposed Quartz & Feldspar mine shall be as
follows.
DESIGNATION NO’S
EXISTING MANPOWER
Geologist (full time) 1
Mining Engineer (Part time) 1
Mine Surveyor (full time) 1
Mines Office clerk (full time) 1
SKILLED LABOUR
Mate /Supervisor 1
SEMI SKILLED
Driver 1
UN-SKILLED
labours 6
TOTAL 12
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Year wise development and production details for the present scheme period:
The year wise (2014-15 to 2018-19) quantum of work proposed and the details of
estimation of production quantity and generation of waste are furnished below:
Year ROM
(Ts)
Mineral
rejects (40%)
Ts of ROM
Topsoil Side
Burden
Ts
Total Waste (Mineral
Rejects @ 40% +
Side Burden)
2014-15 10296 4118 11914 167614 171733
2015-16 9672 3869 10098 101930 105799
2016-17 9095 3638 54756 58394
2017-18 14742 5897 19718 25615
2018-19 9532 3813 7082 10895
Total 53336 21335 22012 351101 372436
(vi) Raw material required along with estimated quantity, likely source, marketing area of final
products, Mode of transport of raw Material and Finished Products
This is a mine project for exploiting Quartz and Feldspar; hence, there is no requirement
for raw material. These Quarts and Feldspar will be transported directly by industries to various
destinations as per the customer requirement.
Uses:
Quartz is widely used in many large-scale applications related to abrasives, foundry
materials, ceramics and cements. Feldspar is a common raw material used in glass making and
ceramics. In glassmaking, alumina from feldspar improves product hardness, durability and
resistance to chemical corrosion.
(vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined
No optimization/Recycling and Reuse envisaged in the proposed Quartz and Feldspar
mine.
(viii) Availability of water its source, Energy/power requirement and source should be given
This Mining project does not require huge water for the project. The total water
requirement in the mine will be around 1.0 KLD for drinking, sprinkling and afforestation.
Potable drinking water will be brought from private suppliers; the rain water will be collected
and used for the Green belt development.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Purpose Quantity Sources
Drinking &
Domestic purpose
0.2 KLD Packaged drinking water will be brought from
nearby approved water vendors.
Dust suppression 0.4 KLD From existing borehole on nearby mine
Green belt 0.4 KLD From existing borehole on nearby mine
Total 1.0KLD
Energy
Diesel (HSD) will be used for mining machineries, Jackhammer compressors and
Tippers. About 200 liters per day diesel will be brought from nearby diesel pumps.
No power is required for the project except for mine office and lighting during the night.
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
Top soil:
There is no top soil present during this scheme period.
Overburden/Waste:
Proposed generation of wastes for next five years:
Year ROM (Ts) Mineral rejects (40%) Ts
2014-15 10296 4118
2015-16 9672 3869
2016-17 9095 3638
2017-18 14742 5897
2018-19 9532 3813
Total 53336 21335
Disposal:
The mineral rejects is proposed to be dumped over the existing mineral rejects dump
situated in the Southern side of the lease area with dump dimension is 120m46mx6.6m (h). The
waste dump will be maintained at the angle of 30º slopes.
It is proposed to backfill when the mine reaches the ultimate pit limit or at the end of the
life of mine.
Waste water:
There will not be any process effluent generation from the mine lease area. Domestic
effluent from the mine office is discharged in septic tank and soak pit. There is no toxic effluent
expected to generate in the form of solid liquid and gases and the no requirement of treatment of
waste.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(x) Schematic representations of the feasibility drawing which give information of EIA purpose
4.0 SITE ANALYSIS
(i) Connectivity
Mode Description
Road connectivity
1. The existing village road available in the mine area. This
road leads to connect Tiruchengode-Namakkal-Trichy
Highway road at a distance about 380m on Northeastern
side of the area.
2. The Nearest National Highway (NH-67) Karur - Trichy-
9km- Southern side.
3. The Nearest State Highway (SH25) Tiruchengode - Trichy
– 380m- Northeastern side.
Railway station &
Railway line
1. Namakkal Railway station - 23km – NW side.
2. Railway line is Karur - Trichy – 9km – S side.
Air port 1. Nearest Airport is Trichy -55km –SE side.
(ii) Land Form, Land use and Land ownership
Land form:
The lease applied area is characterized by slightly undulated terrain. The area is sloping
towards Northwest. Lease area is dry land and gets rainfall about average 800mm during the NE
monsoon period from October - December.
Form – 1
Along with Pre-feasibility Report
&
Scheme of Mining plan with Annexure
To Submit SEIAA
Final Presentation
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Land use:
The lease applied area is dry land with scattered outcrops of Quartz and Feldspar.
The area does not fall in forest land. There are no water courses flowing through the applied
lease area. There is no vegetation/plantation in this area. Some thorny bushes and shrubs are
observed.
The conceptual land use pattern is as follows:
Description Present Area
(Ha)
Area to be reclaimed at
the end of present MS
period (Ha)
(2014-15 to 2018-19)
Area to be reclaimed &
rehabilitated the end of
life of mine (Ha)
Mining (Quarry) 0.39.0 0.94.0 1.33.0
Waste dump 0.86.2 0.06.0 0.92.2
Office & infrastructure - 0.01.0 0.01.0
Processing plant - - -
Mineral stack processing
yard
0.07.5 - 0.07.5
Sub grade mineral stacks - - -
Mine roads 0.02.0 0.02.0 0.04.0
Green belt - 0.33.5 0.33.5
Un utilized area 1.66.8 0.30.3 0.30.3
Total 3.01.5 1.66.8 3.01.5
Land Ownership:
The proposed mine lease area is 3.01.5Ha. It is patta land, registered in the name of the
lessee; vide patta No. 2813 & 3252. (Refer Annexure No. IV).
(iii) Topography (along with map)
The area exhibits slightly undulated terrain. The area applied for lease is a dry land with
scattered outcrops of Quartz and feldspar. The area is sloping towards Northwest. The Altitude
of the area is above 136m above MSL. The area receives rainfall about average 800mm during the
NE monsoon period from October - December and the water table is found at 35m in dry season
and 30m in rainy season.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
GOOGLE IMAGE SHOWING THE LEASE BOUNDARY AREA
For Elurpatti Quartz & Feldspar Mine
Location:
Village: Elurpatti
Taluk: Thottiyam
District: Trichy
Topo sheet No: 58 -I/08
Latitude : 11°02.20’N
Longitude: 78°16.12’ E
Lease area
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(iv) Existing land use pattern (agriculture, no n-agriculture, forest, water bodies (including
area under CRZ), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the
HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification
should be given.
The lease area exhibits slightly undulated terrain. The region experiences semi – humid
climate and there is scanty growth of vegetation in and around the lease area (seasonal vegetation
is mostly practiced).
� Thalamalai Reserved forest is situated 6km away from the Northeastern side of the area.
� Marachipatti lake & Elurpatti kulam is situated 1km away from the NE & SE side of the
lease area.
� Kaveri River is flowing about 7km away from the Southern side of the area.
� There is no Western Ghats region within the radius of 15km.
� There is no HACA region within the radius of 15km.
� There is no interstate boundary within the radius of 15km.
� There is no CRZ within the radius of 15km.
� There are no Bird sanctuaries, wild life sanctuaries and National park as Act 1972, within
the radius of 15kms.
� There are no mines within the radius of 500m.
(v) Existing Infrastructure
The Quartz and Feldspar project requires infrastructure like (Mine office, Labours shed,
Toilet and Rest shelter) for mining shall made developed by the applicant after the grant of lease.
Water for drinking purpose be supplied form the approved water vendors. A small water
tank is also proposed which will be used for water sprinkling, plantation etc.
(vi) Soil Classification
The topsoil proposed during this scheme period. The removed topsoil is spread along the
boundaries for afforestation purpose.
(vii) Climatic data form secondary sources
The area exhibits a subtropical climate and the temperature goes up to 43°C in summer
and falls down to 26°C in October to December. The wind direction is NE – SW and vice –
versa.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(viii) Social infrastructure available
There is no social infrastructure within the radius of 1Km like schools, universities,
hospitals, prisons and community housing etc.
5. PLANNING BRIEF
(i) Planning Concept (type of industries, facilities, transportation etc) Town and Country
Planning/Development authority Classification
The total area of the project is about 3.01.5 Ha. Open cast manual mining by deploys
jackhammer drilling and blasting, manual loading from pithead to various industries.
The project land is devoid of vegetation and lies in the backward town of Trichy District.
There are no specific industries or factories in and around the project area. The proposed
production is around 32002Ts @ 60% of ROM (12801Ts @40% of Quartz & 19201Ts @60% of
Feldspar during this scheme period of next five years. Plenty of labors are available in the nearby
villages. Facilities such as power, Transportation and commodities infrastructure facilities are
locally available near the project site with Thottiyam 9km in Southeastern side.
Transportation
The mine Quartz and Feldspar are transported from mine head to customer destination by
tippers. The mode of transport of the Quartz and Feldspar produces and transported by various
industries.
Quartz is an important industrial mineral which finds use in glass making, ceramic
industry and in electronic industry either domestic or export. Feldspar, if it is potash-bearing
variety, finds use in ceramic and fertilizer industry.
(ii) Population projection
There are few villages located in the 5km radius of mine site and approximate distance
and population are given below.
S.
No Name of the Village
Approximate Distance &
Direction from lease area
Approximate
population
1. Bharathipuram 300m -NE 300
2. Servaikkaranpatti 3km -NW 1000
3. Marachippatti 2km-SE 2000
4. Pudurkozhichangampatti 3km-SW 800
Basic human welfare Amenities such as Health Center, Schools, Communication
Facilities, and Commercial Centers etc are available at Thottiyam located at a distance of 9kms
from the Southeastern side of the mining area.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(iii) Land use planning (breakup along with green belt etc0.)
During this scheme period, it proposed to plant 10 Neem saplings in the eastern boundary
of the lease area.
Year
Area to be
covered
(sq.m)
No of
saplings
Type of
saplings Location status
2014-15 700 40
Neem
7.5m safety
distance on
the eastern
side
Achieved
2015-16 700 40 Proposed
2016-17 700 40 Proposed
2017-18 700 40 Proposed
2018-19 700 40 Proposed
(iv) Assessment of Infrastructure Demand (Physical & Social)
Physical infrastructure:
� The existing road facilities are already available which shall be used and maintained.
� The labors requirement is drawn from the nearest villages. The labors will be brought by
jeeps and vans to the mine site.
� Medical facilities are available near the project site, Government and private hospitals
and other basic amenities and infrastructure facilities like communication center, school
supermarket, bus stand are also available in Thottiyam at a distance of 9kms (SE).
� This mining project will provide employment for about 12 persons directly.
Social infrastructure:
� Periodical Medical checkup program for all the workers and first- aid fox with necessary
equipment will be provided.
� Training for workers regarding occupational hazards.
� Safety equipment like dust mask, shoes, gloves, helmet etc.,
(v) Amenities/Facilities
The simple methods adopted and the limited scale of activities involved in Quartz and
Feldspar mining does not require High Tension Electric Power supply or huge worship facilities.
The mining work is restricted to one general shift during day time only. Machinery repair works
are attended at Thottiyam town (9km- SE) and minor repairs are carried out by the company’s
staff at the mining site itself.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Potable drinking water is available from the nearby community wells and can be
transported to the work site in tippers. Mine office, storeroom, toilet and first-aid room will be
provided on permanent structures within the lease applied area.
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing area)
There is no industrial or processing area proposed within the lease area.
(ii) Residential area (Non processing area)
Local person will be given priority for employment. Few houses are situated within the
radius of 500m.
(iii) Green Belt
7.5m safety distance on the eastern side is selected for Green belt development by
planting and maintaining native species of Neem saplings. It is proposed to plant 40plants per
year. The total area for the proposed for Green belt is around 0.33.5Ha out of 3.01.5Ha.
(iv) Social infrastructure
This proposed Quartz and Feldspar mine will fetch employment for about 12 people
directly and 8 peoples will be indirectly beneficed, shopkeepers, Hotels, Machineries Transport
Contractors etc., the lease ensure to share all responsible for special benefits like water, health
care, Education benefits, and promotion of socio cultural activities of the nearby villages.
(v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.,)
Mode Description
Road connectivity
1. The existing village road available in the mine area. This
road leads to connect Tiruchengode-Namakkal-Trichy
Highway road at a distance about 380m on Northeastern
side of the area.
2. The Nearest National Highway (NH-67) Karur - Trichy-
9km- Southern side.
3. The Nearest State Highway (SH25) Tiruchengode - Trichy
– 380m- Northeastern side.
Railway station &
Railway line
1. Namakkal Railway station - 23km – NW side.
2. Railway line is Karur - Trichy – 9km – S side.
Air port 1. Nearest Airport is Trichy -55km –SE side.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(vi) Drinking Water management (Source & Supply of water)
This proposed mining project does not require huge water either for beneficiation or
processing. Water requirement for mining activity is 1.0KLD. Water required for drinking and
domestic consumption for labors is around 0.2KLD. The Packaged drinking water will be
brought from approved water vendors nearby village. The domestic waste water generated will
be sent to septic tanks followed by soak pits.
(vii) Sewerage System
Toilets will be constructed as permanent structure within the area and sewage will be
discharged once in three months. The sewage waste will be collected in soak pit and the sludge
will be discharged.
(viii) Industrial Waste Management
No industrial waste will be generated from the project.
(ix) Solid Waste Management
Mineral rejects:
The proposed Quartz & feldspar mine anticipated waste during the present scheme period
(next five years) is about 21335Ts (40% rejects).
Disposal:
The mineral rejects is proposed to be dumped over the existing mineral rejects dump
situated in the southern side of the lease area and will be backfilled at the end of the mine.
Dump Dimension:
Life of project Direction Dimension
Existing & Proposed Mineral reject dump
(Present scheme Period)
Southern 120mx46mx6.6m (h)
Proposed topsoil dump (Present scheme
Period)
North, west &
South boundary
475mx7.5mx3m (h)
Proposed Side burden dump (Present
scheme Period)
Eastern 107mx42mx 30m (h)
Proposed Mineral reject dump (End of the
life of mine)
Southern 120mx46mx6.6m (h)
Proposed topsoil dump (End of the life of
mine)
North, west &
South boundary
475mx7.5mx3m (h)
Proposed side burden dump (End of the
life of mine)
Eastern 107mx42mx 30m (h)
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(x) Power Requirement & Supply / source
The proposed Quartz & feldspar mine does not require any power supply for the mining
operation. It is proposed to operate in day time only from 9 Am to 5Pm with 1 Hour lunch
interval between 1Pm to 2Pm. The domestic consumption for the lights at the night is only for
the century room, mines office etc,
7. REHABILITATION AND RESETTLEMENT (R & R PLAN)
(i) Policy to be adopted (Central/State) in respect of the project affected persons including home
oustees, land oustees and landless laborers (a brief outline to be given)
There is no Rehabilitation and resettlement is involved. The deployed labours will be
insured as per the Government norms till the end of the life of the mine. Periodical medical test
will be conducted for the labors to monitor the occupational disease. The salaries and benefits
will be paid as specified by the instruction given by the labor enforcement officers.
8. PROJECT SCHEDULE & COST ESTIMATES
(i) Likely date of start of construction and likely date of completion (Time schedule for the
project to be given)
The Quartz & feldspar mining project is likely to get commenced after the execution of
mine lease. The lease will get expired 20years after the execution of lease deed. The proposed
production is about (60%) 32002Ts of ROM (12801Ts @40% of Quartz & 19201Ts @60% of
Feldspar) for during this Scheme period next five years.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
(ii) Estimated project cost along with analysis in terms of economic viability of the project :
A. Project cost Land cost = Rs. 6, 03,000/-
Labour shed = Rs. 1, 00,000/-
First aid room & Accessories = Rs. 50,000/-
Sanitary facilities = Rs. 75,000/-
Machinery to be used = Rs. 5, 00,000/-
Fencing cost = Rs. 1, 00,000/-
Total cost = Rs. 14, 28,000/-
B. EMP Estimation:
Afforestation cost (outside of the mine area) = Rs. 12,500/-
Air quality sampling = Rs. 15,000/-
Water quality sampling = Rs. 8,500/-
Noise Monitoring = Rs. 9,000/-
Ground vibration test = Rs. 7,500/-
Total EMP Estimation cost = Rs. 52,500/-
(II). Expenditure and maintenance:
Drinking water facility for the labors = Rs. 1, 00,000/-
Sanitary arrangement = Rs. 1, 00,000/-
Safety kits = Rs. 50,000/-
Water sprinkling = Rs. 1, 00,000/-
Total Expenditure and maintenance cost = Rs. 3, 50,000/-
Grand Total (I + II) = Rs. 4, 02,500/-
The Project cost:
A. Project cost = Rs. 14,25,000/-
B. EMP cost = Rs. 4,02,500/-
Total cost = Rs. 18, 27,500/-
� The total project cost including EMP cost (A+B) is about Rs. 18,27,500/-- (Rupees
Eighteen lakhs twenty seven thousand five hundred only)
� The total EMP cost is about Rs. 4,02,500/- (Rupees Four lakhs two thousand five
hundred only)
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
Population Benefit
The applicant ensures to take social responsibilities like providing School Note books,
Uniforms to the Students below poverty level beside if the villages require any borehole for
public use the applicant ensure to do so.
The applicant will also take part and contribute the native cultural activities in the nearby
villages. During summer seasons packaged drinking water will be kept will be kept in the village
for public and for tress passers. The applicant will involve and contribute all the socio cultural
allocation in and around the area. The budget provisions and allocation for all the above
activities will be around Rs. 1, 00,000/- for during this scheme period.
Mine Closure Plan:
Steps proposed for phased restoration, reclamation of already mined out areas:
� The proposal for the project is existing Quartz & Feldspar mine.
� After the exploitation of Quartz & Feldspar mine reaches its ultimate pit limit, the pit will
be partially backfilled and partially act as a good storage of water.
� Before closure the mine, a parapet wall will be constructed to prevent inadvertent entry of
cattle and human beings.
� After closure of mine, the pit will be allowed to collect seepage and rain water. This will
help to charge the nearby agricultural wells.
Measures to be under taken on mine closure as per Act & Rules:
Measure will be taken as per Act & Rules.
Mitigation measure to be undertaken for safety and restoration / reclamation of the already mined
out area:
� Drilling will be carrying out by wet drilling to control the dust into the air.
� Minimum blasting will be carrying out on limited scale.
� Mist spray on haul road will be proposed to prevent the dust propagation into the air.
� The plantation will be carried out on the safety barriers to prevent Noise, besides wet
drilling will be practiced to prevent dust.
� All the machineries will be maintained in good conditions as per RTO and TNPCB
Norms to prevent Noise, Smoke and vibration.
� Machineries will be periodically maintained by experienced mechanic to minimize noise,
Smoke and ground vibration.
PRE FEASIBILITY REPORT OF ELURPATTI QUARTZ & FELDSPAR MINE I.MANI
UNDER EIA NOTIFICATION 2006
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people
including tribal population, if any, in the area.
There are few tribal populations in and around the area about 12 personals directly will
be benefited by these projects, besides the government. Will get good revenue by taxes,
seigniorage fees etc., and if the applicants find the suitable export market the Government will
have a good foreign exchange to the nation.
The socio- Economic conditions of the village and distance will enhance due to the
project, hence, the project should be allowed after considering all the parameters. The detail
furnished in this scheme of mining is based on information provided by the State Government
and the lessee. By considering the merit of the project the permission may be granted.
Date : 30.05.2016
Place : Trichy
1. Signature of the proponent
I.Mani
2. Signature of the Recognized qualified person
Dr. P. Thangaraju, M.Sc., M.M.E.A, Ph.D.,
RQP/MAS/206/2007/A
Base Line Studies is Prepared for
Elurpatti
Quartz & Feldspar Mine
BBBAAASSSEEE LLLIIINNNEEE SSSTTTUUUDDDIIIEEESSS
The base line a study is prepared for Elurpatti Quartz & Feldspar Mine. Base line
studies provide a base data for regular Environmental Monitoring and Environmental Impact
Assessment (EIA).
The international Association for Impact Assessment (IAIA) defines the base line studies
as the process of identifying, predicting, evaluating and mitigating the Bio physical, Social and
other relevant effect of development proposals prior to major decision has been taken and
commitment mode.
Hence the baseline study provides a bench mark for carrying out environmental Impact
assessment due to the course of mining activities. The purpose of these studies is to evaluate the
benefited and adverse effect of developing activities on the neighborhood environment and the
area where the mining is proposed to carry out.
Tmt.I.Mani have applied for Quartz & Feldspar Mine lease for over an extent of 3.01.5Ha
in S.F.No.407/1-I, 455/2, 8, 9, 10, 12, 13 & 14 of Elurpatti, Thottiyam Taluk and Trichy District.
The area proposed for mining for the present mining period is about 0.94.0Ha which is below
25% of the total area applied for lease; hence the impact assessment due to mining may be
considerably low.
As per the Gazette notification 2006 the proposed project falls under B2 Category.
The area proposed for mining is a fresh area and there are no factories, industries within
the radius of 1Km hence the atmospheric air is quite fresh. The area exhibits slightly undulated
terrain which is devoid of vegetation and Agriculture. In some small patches small agricultural
activities are been carried out by drift irrigation some thorny bushes and wild gars are found in
the area with scanty Palm trees (Borassus falabellifer). Tridax procumbens and Lucus aspera are
some of the common species along with Julia flora trees. The density of these about 20% to 40%
in the area and the remaining area is dry barren land.
The rest of the workforce is employed in agriculture, mining, raising livestock,
manufacturing, construction, trade and commerce. There is little agricultural activity in the town
on account of weather and irrigation facilities and the town has a set of mining industries within
the town limits.
The project in this area will fetch a quit considerable employment to nearby village which
in turn enhance the earning source of the nearby villages. The comprehensive base line studies
and standards constitute of collecting data on Ambient Air quality, Dust fall rate, Water quality,
Soil analyze, Noise level and Ground vibration study in the area proposed for mining along with
Flora and Fauna statistics.
The Methodology adopted in this project is based on the basic principles of capitalization
identification analysis and preparation of action plan to Mitigate negate or adverse impact.
Baseline studies adverse the significant environmental Issue and also provide necessary
information pertaining to the Environmental Attributes in the project area. Monitoring and
evaluating the effect of the works environment factors on health of people working on Quartz &
Feldspar Mine.
Collection and analysis of Baseline Environmental Data.
Baseline Environmental Data plays a key role in the EIA procedure as it provides the
important information on the Environmental parameters which are likes to be affected due to the
Quartz & Feldspar Mining activities.
Physiography
The area exhibits slightly undulated terrain. The area applied for lease is a dry land with
scattered outcrops of Quartz and feldspar. The area is sloping towards Northwest. The Altitude
of the area is above 135m above MSL. The area receives rainfall about average 800mm during the
NE monsoon period from October - December and the water table is found at 35m in dry season
and 30m in rainy season.
Geology of the area
The rock formation in the area is of metamorphic crystalline varieties of Achaean age. The
chief rock types found in the area are granite-gneisses and pegmatite. Pegmatite out crops are
clearly noticed in the area. The area is covered by thin layer of topsoil to a depth of about 1.0m.
These are three pegmatites band running northeast-southwest direction with vertical dip.
The area is devoid of major geological disturbances.
The general geological sequence of the rock in the lease area is:-
Structural settings of the area:
Order of super position:-
Top soil
Pegmatite (Quartz + Feldspar)
Granite – Gneisses
The pegmatite bands are intrude in to Granite – gneisses.
The area was surveyed in detail to prepare a Geologist map in the scale 1:1000 showing the
various formations and attitude of the deposit. Thin cover of gravelly reddish soil to a thickness of
1m.
The physical attitudes of the bands are given below:
Strike length (m) - 190
Width (m) - 20
Strike direction - N75oW – S75oE
Dip amount - 70o dip towards NE
Vegetation
The lease area is almost flat terrain, Quartz & Feldspar exposes in the lease area and it is
strewn with boulders of various sizes ranging from a few cm to one to half mater in diameter.
Except some small bushes there are no other trees in the applied area. Crops are only seasonal
cultivation with lift irrigation is practiced. The main crops being millet, paddy, pulses etc. are
grown as seasonal crops. There is no Forest or Animal Sanctuaries near the area. There is no thick
vegetation.
General approach to Environment
The Environmental besides data comprise of the features present of the site area its
includes environmental features such as forest area, conservation area, water bodies, industries,
wild life and fauna place of historic and importance etc.,
The data collected to cover the following.
1. Air environment 2. Noise Environment 3. Water environment 4. Ecology (Biological and Cultural Environment) 5. Physical Environment.
Air Environment
Air environment is responsible for the health of human beings, animals, wild life and vegetation. Air pollutants emitted by project and non point source are transported dispersed or concentrated by meteorological and topographical conditions. The atmosphere is dynamic system which absolute range of solid, Liquid or gases from both Natural and Manmade source. There substances travel through the air disappear and reveal among themselves and also with other substances both physically and chemically which result in air pollution. The Quartz and Feldspar propose to mine is non toxic which does not emit any
undesirable pollutants in the form of solid liquid or gas. The dust emitted during the
transportation of vehicles the drilling will be carried out in wet condition to prevent dust into air
and the haul roads will be periodically sprinkled with mist water spray to prevent dust into the
atmosphere. The area in and around is quit fresh and the impact an air environment will always
be under controlled and will be monitored. No processing or beneficiation is proposed except
mining hence the impact an air will be controlled monitored and mitigated.
The ambient air quality within the study area on both core and buffer zone forms the
baseline information. The air quality monitoring points selected based on the Meteorological
conditions, topography of the study area and likely impact boundary location of the ambient air
quality monitoring stations was selected on the basis of wind pattern.
The ambient Air quality monitoring stations are shown in the map. Four major pollutions were consideration significantly.
I. Particle matter - PM II. Suspended Particle Matter - SPM
III. Sulphur dioxide - SO2 IV. Nitrogen dioxide - NO2
Respectively the overall of emission we identified the direction of the wind in the majority observed time was predominantly Northeast to Southwest direction and vice-versa. The Air quality monitoring data is enclosed as Annexure No-I.
S.
No Test Parameters Unit Protocol Results CPCB
Standards 1 Particulate matter
(PM10) (Size less than 10µm)
µg/m3 IS 5182 Part 23-2006 42.0 100
2 Suspended particulate matter (SPM)
µg/m3 IS 5182 part 4-1999 (Reaff 2010)
32.2 60
3 Sulphur dioxide SO2 µg/m3 IS 5182 part 2-2001 (Reaff 2006)
4.0 80
4 Nitrogen Dioxide NO2 µg/m3 IS 5182 Part 6-2006 5.2 80
Noise Environment
Sound/Noise can be defined as atmospheric or airborne vibration perceptible to the ear.
Noise is usually unwanted or undesired sound. Sound loud enough to be harmful is called noise
without regard to its other characteristics hence noise has a significant impact on the quality of
life and in that sense it is a health problem in accordance with the (WHO) definition of health.
Impact of noise on environment depends on various factors such as intensity distance
from the source type of exposure and nature (Impulse or continuous), the type of activities
movement of machineries, traffic density etc., hence it is to measure the levels so as to adjust the
environment Impact and undertake amendment measures if warranted.
Standard precession noise level meter were used for the purpose. The readings in the
form of instantaneous sound measures levels were taken in the time brackets of two hours in
order to here carry out assessment of noise level in the area.
There are no heavy industries nearby; the noise level of the area will be as same as the
regional level. More over the noise level measurements does not rise for this area since class 2
slurry explosives will be used for mining and the machineries to be used shall hydraulic types, it
does not create much noise except the compressor, drilling. The traffic density in the area is very
little. The average noise level in that area is less then 90dB (A) in and around 1Km radius.
This noise level survey was carried out as per MOEF norms i.e., 1.5m above the ground
level and 2mts away from the noise emit source. At present the noise is only through the
movement of Vehicles in that area. No other significant noise emitting source found.
S.No Location Results
dB (A) CPCB Standard
Limit 1 Project site – Centre area 43.2 70*
2 Project Site SW corner 42.1 70*
3 Project site SE Corner 41.3 70* 4 Project site NE Corner 41.5 70*
Ground vibration studies
Hence the vibration source are only through the movement of vehicles where the
frequency is also very less. Hence the vibration is well below the standard permissible by
MOEF. Displacement, Velocity and acceleration of the three kinematics descriptions which are
to be studies to describe ground motion. The peak particle velocity is the more referred since the
area is virgin there is no significant measured velocity found in the area.
Water Environment
Geo Physical investigation was carried out by signal stacking resistivity meter 3 profiling
was carried out in the area applied for lease and 15 Vertical electrical sounding was carried out
to find out the lateral variation and vertical in homogeneity’s it was observed that the water table
is found to be 35mts below ground level and the same was correlated with the wells found at a
distance of 800mts SW of the area. The water quality monitoring data is enclosed as Annexure
No-II.
Test Protocol Results Limits as per IS 10500 :
2012 Acceptable
Limit
Permissible
limit in the
absence of
alternate Colour IS : 3025 part : 4-1983
(Reaff : 2006) 10 Hazen 5 15
Odour IS : 3025 part : 5-1983 (Reaff : 2006)
Agreeable Agreeable Agreeable
pH at 250C IS : 3025 part : 11-1983 (Reaff : 2006)
7.4 6.5 – 8.5 No relaxation
Total Dissolved solids
IS : 3025 part : 16-1984 (Reaff : 2006)
1355mg/l 500 mg/l 2000mg/l
Aluminium as Al
IS : 3025 part 2:2004 (Reaff : 2009)
BDL (DL:0.004 mg/l)
0.04 mg/l
0.2 mg/l
Barium as Ba IS : 3025 Part 2:2004 (Reaff : 2009)
0.27 mg/l 0.7mg /l No relaxation
Boran as B IS : 3025 Part 2:2004 (Reaff : 2009)
BDL (DL: 0.1 mg/l)
0.4mg /l 1.0mg/l
Calcium as Ca IS: 3025 Part 2: 2004 (Reaff : 2009)
160 mg/l 70mg/l 200mg/l
Chloride as Cl IS : 3025 Part 32-1988 (Reaff . 2009)
479mg/l 250mg/l 1000mg/l
Copper as Cu IS: 3025 part 2: 2004 (Reaff : 2009)
BDL (DL:0.01 mg/l)
0.05mg/l 1.5mg/l
Fluoride as F IS : 3025 Part 60: 2008 0.72 mg/l 1.0mg/l 1.5mg/l
METHODOLOGY AND DATA ACQUISITION:
Electric Resistivity Method is well established for delineating lateral as well vertical
discontinuities in the resistive structure of the Earth’s subsurface. The present study makes use of
vertical electric sounding (VES) to delineate the Vertical Resistivity structure at depth.
Schlumberger electrode set up was employed for making sounding measurements. Since it is
least influenced by lateral in homogeneities and is capable of providing higher depth of
investigation. This is four electrodes collinear set up where in the outer electrodes send current
into the ground and the inner electrodes measure the potential difference.
The present study utilizes maximum current electrode separation AB/2. The data from
this survey are commonly arranged and contoured in the farm of Pseudo-section that gives an
approximate of the subsurface resistivity. This technique is used for the inversion of
Schlumberger VES data to predict the layer parameter namely layer resistivity and Geo electric
layer thickness. The main goal of the present study is to search the vertical in homogeneities that
is consistent with the measured data.
For a Schlumberger among the Apparent resistivity can be calculated as follows
ρa = G∆V
I
∆V = potential difference between receiving electrodes
G = Geometric Factor.
Rocks show wide variation in resistivity ranging from 10-8 more than 10+14 ohmmeter.
On a broad classification, one can group the rocks falling in the range of 10-8 to 1 ohmmeter as
good conductors. 1 to 106 ohmmeter as intermediate conductors and 106 to 1012 ohmmeter as
more as poor conductor. The resistivity of rocks and subsurface lithology, which is mostly
dependent on its porosity and the pore fluid resistivity is defined by Archie’s Law,
ρr = Fρw = a Ømρw
ρr = Resistivity of Rocks
ρw = Resistivity of water in pores of rock
F = Formation Factor
Ø = Fractional pore volume
A = Constants with values ranging from 0.5 to 2.5
SURVEY LAYOUT:
The layout for a resistivity survey depends on the choice of the current and potential
electrode arrangement, which is called electrode array. Here the present study is considered with
Schlumberger array. In which the distance may be used for current electrode separation while
potential electrode separation is kept on third to one fifth of the same. One interesting aspect in
VES is the principle of reciprocity, which permits interchange of the potential and current
electrode without any effect on the measured apparent resistivity.
EQUIPMENT:
The field equipment deployed for the study is in a deep resistivity meter with a model of
SSR – MP – AT. This Signal stacking Resistivity meter is a high quality data acquisition system
incorporating several innovation features for Earth resistivity. In the presence of random earth
Noises the signal to nose ration can be enhanced by √N where N is the number of stacked
readings. This SSR meter in which running averages of measurements [1, (1+2)/2, (1+2+3)/3 …
(1+2...+16/16)] up to the chosen stacks are displayed and the final average is stored
automatically, in memory utilizing the principles of stacking to achieve the benefit of high
signals to noise ratio. Based on these above significations the signal stacking resistivity meter
was used for (VES) Vertical Electric Resistivity Sounding.
MEASUREMENTS:
Measurements of ground Resistivity is essentially done by sending a current through two
electrodes called current electrodes (C1& C2) and measuring the resulting potential by two other
electrodes called potential electrode (P1& P2). The amount of current required to be sent into the
ground depends on the contact resistance at the current electrode, the ground resistivity and the
depth of interest (Here 1000feet).
DATA PRESENTATION:
The field data obtained from a Vertical Electrical Resistivity Sounding is conventionally
plotted on a paper with the help of slum software. (A computer aided diagram).
GEOPHYSICAL DATA INTERPRETATION
The geophysical data’s was obtained to study the lateral variations, vertical in
homogeneities in the sub – surface with respect to the availability of groundwater. From the
interpreted data, it has inferred that the area has moderate groundwater potential in the
investigated area.
There are no streams, water bodies or water course within the radius of 500mts and the
rainfall in the area is poor varying for maximum 50 days in a year. The average rainfall is about
800mm as recorded by the meteorological department in the last three years. In some areas of the
District there was no Rainfall recorded for the last 3years. The underground water is portable
without any adverse health effects. There are no boreholes or open wells in the project area
hence the water collected in the area for analysis.
In summer the water drains and the well will be in dry condition. The quality of the water
from well has been analyzed for records. The Quartz & Feldspar Mining does not require any
water for its operation. No beneficiation or processing is proposed in the project. The water
required is only for drinking and domestic purpose for which the water will be brought out from
authorized water vendors from the nearby towns.
As water is very vital natural resource and most essential for the survival of human beings, the
same will be consumed only after carrying out scientific studies and will be allowed if it is
within the prescribed standards.
Soil Analysis
As mentioned earlier the area applied for lease is exhibits slightly undulated terrain. The
soil is the main unit for the eco system because of the dependence of flora and fauna. As the soil
is acidic there are no thick flora noticed except some common species which are native of the
terrain.
The mining activities may have impact on soil. The soil samples were called in 50mts
grid fashion by average and after coning and quartering the same was send to laboratory for
investigation. The following sources are obtained from Agricultural department.
The soil analysis report is as below
S.No Test parameters Method Results
1 PH @250C Is 2720 part 26 (Reaff:2011) 7.1
2 Conductivity @250C Is 14767 : 2000 (Reaff : 2010) 345µmhos/Cm
3 Moisture content Is 2720 part 2: 1973 (Reaff : 2010) 6.2%
4 Organic matter Is 2720 part 22: 1972 (Reaff : 2010) 0.31%
Climate
The rain fall data of Trichy region in a year is 800mm. Temperature falls between 43°C -
26°C. Rainy season three months in a year from October to December. Temperature is Maximum
during May – July in a year.
Flora and fauna in and around the area
The Quartz & Feldspar mining projects like this which involves very limited operations
like secondary drilling and blasting, Conservation of Flora and Fauna along with ecology does
not have significant impact of the overall eco system. A detail study related to flora and fauna
was carefully observed physically by environmental engineers, Botanist and zoologist. The
following table shows the flora and Fauna available at the region.
List of Faunas
S.No Common Name Scientific name
1. Goat Capra hircus
2. rat Rattus norvegicus
3. Crow Corvus splenders
4. Squirrel Rodentia scrurus,
5. Ant Hymenopterous formicida,
6. Cat Felsis catus
7. Cow Bos taurus indicus
S.No Common Name Botanical name Pictures
1 Neem Azadirachata indica
2 Ground nut Arachis hypogaea
3 Mango Mangifera indica
4 Coconut Cocos nucifera
5 Maize Zea Mays
6 Sappathikali Opuntia dillenii
7 Gingelly Sesamum Indicum
Conclusion
The base line studies relents no hazardous levels of dust and noise and prevailing at the
project area. A well implemented environmental Management plan as discussed in the mining
plan will help in mitigation the adverse effects due to mining activities.
The project is a small operation were limited activities are being carried on the noise
creating device will be only jack hammer drilling which will always be mitigated in wet
condition to prevent noise and dust in the air. The movement of vehicles is very minimal. The
entire vehicle used will be periodically maintained by well experienced mechanic and kept under
TNPCB standards, emission testing will be carried out periodically and water will be sprinkled
periodically to prevent dust into air. The small quantity of non humus rich surface soil will be
removed and preserved in the boundary barrier to facilitate the Afforestation.
Blasting will be used for only losing effect and not shattering effect hence the fly rock
problem will not arise. The flora in the area is only small bushes as much of the area is exhibits
slightly undulated terrain. No trees are proposed to uproot for the project and Infect Trees will be
planted on boundary barrier which will act as acoustic sound barriers. Environmental care and
attitude of preventing environment is inducted to the proponent and advice to carry out and
mitigate the minor impacts due to mining. Appropriate persons are advice to get employed to
protect the Environment and Ecology of the area.
Date : 30.05.2016 Place : Trichy
1. Signature of the applicant with Name and Full Address
I.Mani
2. Signature of the Recognized qualified person
Dr. P. Thangaraju, M.Sc., M.M.E.A, Ph.D., RQP/MAS/206/2007/A