pre qualificationeastpalaces.com/img/profile/wpprofile.pdf · 10- work completion certificate 11-...
TRANSCRIPT
PRE QUALIFICATION P.O.Box. 23532, DOHA – QATAR
TEL. :44692498 / 44692499
FAX : 44692497
Web Site : www.eastpalaces.com
E-Mail : [email protected]
Index
1- COMPANY PREVIEW
2- MANPOWER DETAILES
3- VEHICLE LIST
4- VENDOR LIST
5- CLIENTELE LIST
6- PROJECTS IN HAND
7- PROJECTS HANDED OVER
8- DETAILS OF MANPOWER
9- THE METHOD OF STATEMENT
10- WORK COMPLETION CERTIFICATE
11- APPRECIATION LETTER
12- ISO CERTIFICATE
13-GYPSUM WORK.
14- W/P SITE PHOTOS
COMPANY PREVIEW
CONTACT US
East Palaces Co. W.L.L Tel: +974-44692499 / 98
Fax: +974-44692497
P.O. Box: 23532 Doha Qatar
E-mail: [email protected]
Website: www.eastpalaces.com
Eng. Khalid Al Salmi. (General Manager)
Hotline Contact: +974-55556105
Mr. Abdul Aziz (Sales Executive)
Hotline Contact: +974-66902816
MDs' Message
With distinct pleasure, I welcome you, and I would like to introduce
East Palaces Company to you. In recent years, Qatar has undergone
tremendous changes with a whole lot of infrastructural and
developmental activities taking place. East Palaces, which was
established in 2001, has sensed this change and has been in the forefront
of this progress.
Since inception, we have expanded our scope of activities from air
conditioning works to waterproofing, trading and general services. We
are the agents for Senator brand of air conditioners and Super Plats
brand of colored decorative plasters.
I am proud to work amongst sincere, hardworking and professional
people who consist of managers, engineers, fabricators, supervisors etc.
We have a strong workforce of more than 200 people which are drawn
up from different countries.
We, at East Palaces, aim for further expansion and achievements as the
future holds good for everyone in Qatar. I would like to close my
remarks by inviting you to navigate through our user-friendly and
aesthetically-designed web pages
WATER PROOFING
This Division caters to the ever-growing requirements of the water proofing
industry. We have provided efficient and reliable solutions to the water proofing
needs of innumerable Villas and buildings. We have a well-qualified and
experienced Engineer, Technicians and Workmen to carry out all kinds of water
proofing works.
We have a range of products for the thermal insulation needs of buildings and villas,
be it for wall, roof or floor applications. The advantages of thermal insulation are
high comfort levels, increased building life and savings in energy.
Engineers
Forman's
Technicians
Masons
Workers
The Manpower of this Division is as follows:
MANPOWER DETAILS
VECHILES LIST
List Of Vehicles
s/n Description Model
1 Land Cruiser 1997
2 Chevrolet Tahoe 2012
3 Mitsubishi Lancer - Salon 2005
4 Nissan Pathfinder 2005
5 Mitsubishi DC 3 Ton 2004
6 Mitsubishi Pick up 3 Ton 2008
7 Mitsubishi Crane 1986
8 Mitsubishi DC 1 Ton 2005
9 Mitsubishi DC 1 Ton 2005
10 Mitsubishi Pick up 1 Ton 2008
11 Mitsubishi DC 1 Ton 2006
12 Mitsubishi Pick up 1 Ton 2009
13 Toyota Hi-luxe DC 2006
14 Toyota Hi-luxe 4WD - DC 2000
15 Kia DC 2006
16 Mitsubishi Bus 2004
17 Mitsubishi Bus - (Rosa) - 30 Persons 2008
18 Coaster Bus 1997
19 Coaster Bus 1998
20 GMC Bus - 45 Persons 1997
21 Toyota Bus - Haice Van 2001
22 Kisa - Shawel 2003
23 Forklift - Kumatsu 1987
24 Honda CRV 2005
25 Mitsubishi Lancer - Salon 2006
26 Daihatsu Crane 1991
28 Mitsubishi Pick up 2007
29 Nissan Bus - Van - 15 Persons 2001
30 Nissan Bus - Van - 15 Persons 2001 1996
31 Chevrolet Breakdown
VENDOR LIST
CLIENTELE LIST
PROJECT IN HAND
PROJECT HANDED OVER
The followings are some of our projects, which we did the water proofing works
For:
Qatar Development Contracting & Trading Co.
No. 2 Buildings B + G + 6 at Al Mansoura & AL Najma Area.
Rivira Compound (15 Villa) Al Huhail Area.
22 Villas at the Airport Area.
3 Villas + S.Q at Al Waab Area
6 Villas at AL Duhil Area.
G + 5 Building at Bin Mohamed Area.
Union Qatar Contracting & Tracding Co.
No. (4) Buildings B + G + 6 at Al Mansoura Area.
No. (8) Villas At Rayyan al Kadeem Area.
One Building at Mushaireb Area.
Two Building at Bin Mahmoud Area
Medmac Co.
Education City al rayyav.( Foundation )
Al baytour contracting Co.
Al Reem tower at al Dafna area
National Trad. & Cont. Co.
103 Villas at Al Dafna Area (3 Complexs)
18 Villas + Club at Al Mirikh area.
Two Building at Bin Mahmoud Area
One Building at Bin Mahmoud Area
Ramco Trad. & Cont. Co.
Al Asmakh Tower – At Al Dafna Area.
Regency Tower – At Al Dafna Area.
Al Rayyan Tower at al Dafna area
Al mana & Partners Twin Tower al Dafna area
Al Darwish Eng.
Amwal Towers. at ( Foundation ) al Dafna area
Man Enterprice Co.
Al Jajera Complex – At Al Saad Area.
Al wasiel Tower At al Dafna area
Bldg & Engr. Bureau
22 villa – at markhia area
16 Villas - at markhia area
One Building at Al mansoura Area
Shk. Mansour Bin gabr Al Thani
Complex Building - At Al Saad Area.
22 Villa + Garage + H.C – At Om Zeghewa
One hotel – At Wokra area.
80 Villas at al khoor area
Al Arabia Engineering Co.
One building at khurutyat Area.
14 Villas at Al Azezyah
30 Villas at Ain Khalid area
52 villas at al gharafa area
And so many projects
Al Bayraq Construction Trad Co.
12 Villas at Abu Hamour
10 Villa at Old Airport area.
Al Nahad Construction Trad Co.
3 villas at Al Marikh area.
2 villas at Abu Hamour area.
One Palace at Al Rayyan Area
Two Building at Bin Mahmoud Area
One Building at Al Mansoura Area
And so many projects.
Al Omara Al Islamiya Construction Trad
Three buildings at Al Mansourah area
35 Villa at Al Dafna area
Al Radi Construction Trad Co.
One building at Al Saad area.
One building at Bin Omran area.
B + G + 7 Foundation at Al Saad area.
6 Villas complex + Externals at Al Duhil area.
Three public house at Al duhil Area
Al Takamul Construction Trad Co.
30 Villas at Salwa Road area.
One building at Bin Mohamed area.
Al Aali International Co.
8 Villas at Abu Hamour Area.
2 Building at Al Saad Area.
1 Building at Al Mansoura Area.
Alba Construction Trad Co.
2 Building at Al Saad area.
10 Villas at Ein Khalid Area
Al Badr Construction Trad Co.
10 public house at Abu hamour area.
2 Mosque at Al rayyan Area
Barada Construction Trad Co.
13 villas at Al Waab area.
Administration building at Abu Hamour area.
7 public house at Abu hamour
Bin Barak Cont. Co.
One villa at Shouq Waqif area.
One building at Madina Khalifa area.
3 Villas at Dahl al hamam ( Al Markheia )
Two Villa + Ext. At Al Wakra Area
One Mosque At al Wakra Area
Bo Matar Group.
12 villas at Al Duhil area.
One villa at west bay lagon area.
Girls University at west bay lagon area.
Bo Jomhoor Co.
2 Building at Al Ghrafa area.
E.M.S + H.C + External at Al Ghrafa area.
One school at Om Selal Mohamed E.M.S at Al Ghowairya Area
Eid Bin Mohamed est.
One worker camp at Industrial area.
1 building B+G+8 at al Nasser area
3 villas at abo hamour area
Three Building at Bin Mahmoud Area
G.L.C Co.
3 Villas at Al Duhil area.
7 villas at AL Wakra Area.
One villa at Al Ghrafa area.
3 Public house at AL Wakra are.
One Villa at Al Waab area.
Integration Construction Trad. Co.
30 villas at Mamourah area
G + 3 Billas at Bin Mohamed area.
55 villas at Al Ghrafa area.
Labour camp at Industrial area.
Mohd. Youssef Kaffod & Sons
G + 7 at Al Rayan Street
G + 6 at AL Mansourah area.
G + 5 at Najma street
One villa at west bay area.
G + 2 at Old Airport area.
G + 7 at AL Mansourah area.
G + 8 at Al Mamourah area.
4 villas at Old Airport area.
One building foundation at Mushireb
G + 6 Mushireb
And So many projects
Red Line co.
Complex house building at AL SAAD area
G + 7 foundation at Al saad area.
Hotel at al wakra area
1 building at al mansoura area
22 Villas at Al Gharrafa Area
One Hotel At Al Salata Area
One Hotel At Al wAkra Area
24 Villa at Zegowa Area
49 Villa at Abu Hamour Area
Third Dimension
2 Villas AL Mamourah area.
16 villa at al gharafa area
2 building at bin mahmoud area
United construction co Al sharq hotel at ras abo abboud
Bab ishtar Construction & Trad. Co
1 building at om ghuilina
20 Villas at al waab area
8 Villas at New Salata
Al Ein Market At Salwa road
Marco Construction. Co
13 villa at al gharafa area
1 building at om ghwilina area
1 building at rass abo aboud
Bitak Construction Dev. Co 1 building foundation at new Doha
10 villas at old airport
1 building at al sad area
6 Villa At Al Azizia Area
8 Villa At Al Waab Area
2 Building At Al Saad Area
1 Building At Al Nasser Area
2 Buildings At C Ring Road
Al ofoq trading & cont. Co 1 building at al sad area
6 villa at al gharrafa area
Athar trading & cont. Co 1 building foundation at old ghanem area
2 villa at al dafna area
Al Andalusia trading & cont. Co 1 building foundation at om ghuilina
8 villa at al ein khaled area
G+2 building at bin omran
Al wajba palace at al rayyan area
12 Villa At Zegwa Area
1Villa At Zegwa Area
2 Labor Camp At Industrial Area
Two Building At Al Sad Area
Saif al Arab trading & cont. Co
Palace + externals at al rawda area
4 villas at merikh area
Conserve trading & cont. Co 6 villa at al dafna area
14 villa at ein khalid area
Al Mikhlafy trading & cont. Co
Majles + external at al duhil area
5 villa + externals at al duhil area
Premium trading & cont. Co 6 villa + externals at al azizia area
United architecture cont. Co
40 villa + externals+ club at abo hamour area
Doha Qatar trading & cont. Co 4 villa at ein khalid area
1 villa at ein khalid area
8 villa at new salata area
1 mosque + accommodation at al mamoura area
Doha development trading & cont. Co
2 villa at al wakra area
5 villa + externals at al mamoura area
1 Building " Drug Control Office " at al shahanya Area
I Building at Bani Omran Area
M&N trading & cont. Co
2 villa + externals at al khorityyat area
4 villa + externals at al Khissa area
Al wehda groop trading & cont. Co
1 villa at al Nasserya area
6 villa + externals at al waab area
Mecca cont. Co
1 building foundation al Helel area
2 buildings at al Najma area
Sinai carpets . Co
Al jedah Market at Bin mahmoud area
Qatar world trading & cont. Co
2 villa at al mamoura area
3 villa + externals at Abo Hamour area
1 palace at Al Rayyan area
Gulf Stars trading & cont. Co
2 Villa – At Al Dafna area
3 Vill + externals + Gured room – At Al Dafna area
2 Building – At om Ghoilina Area
Wills trading & cont. C 16 Villa At Al Nasserya Area
Commitment trading & cont. Co
15 Vills At Al Maamoura Area
8 Villa At Abo Hamour Area
Amalco Co.
2 Building At Old airport Area
Aian Co.
9 Villa At Al merikh Area
1 Building At Al Saad Area
2 Villa At Al merikh Area
1 Villa + Ext At Al Wakra Area
Al Raied CO.
4 Villa + Ext At Al Wakra Area
2 Villa At Al Wakra Area
Villa + Ext + G. Room At Al Wakra Area
THE METHOD OF STATMENT
The Method of statement
For laying the Under Ground membrane waterproofing.
For the raft and the retaining walls
(1) For the raft foundation.
A. To clean the blinding surfaces and to be sure it’s dry and with smooth surface..
B. To apply the primer bituminous coat approved one. C. To start laying the first layer of the membrane the lower surface should be
heated with a propane torch, taking in consideration the orientation to adjacent rolls should be laid, each overlapping the one next to it by l0cms on the side and 15cms at the ends. And all taking care not to change the orientation of each roll.
D. Reverse the process until each has been re-rolled. E. There will be at the parameter extra 30cm membrane from the edges of the
raft for the retaining walls. F. Making inspection for the completed work by the consultant and main
contractor. G. To start laying the second layer of the membrane in according with point No
C, D, E, & F. in the other direction. H. The main contractor to make the screed protection layer 7cm for the water
proofing membrane. Taking in consideration our attached sketch.
(2) For the retaining walls.
A. To be sure that surface is clean smooth and dry and there are no any holes or other problems in the concrete surface.
B. To apply the primmer bituminous coat (Derma Primmer) C. To start laying the overlap which exist at the blinding of the raft through
angle filter. Please refer to our attached section. D. To start laying the first layer of the membrane, with the existing over lap.
The lower surface should be heated with a propane torch, taking in consideration the orientation to adjacent roll should than be laid, each overlapping the one next to it by 10cm on the side and 15cms at the ends. And all taking care not to change the orientation of each roll.
E. Reverse the process until each has been re-rolled. F. Making inspection for completion of 1st layer. G. To start laying the second layer of the membrane with the existing over lap
and to the walls, the lower surface should be heated with a propane torch and in according with the method (D).
H. To make inspection by the consultant for the completion of the second layer. I. Start layer of the bituminous protection board. J. To make inspection for completion of the above.
The Method of Statement "Underground
Structures Waterproofing System"
Our method of making the water proofing roof type inverted system it's as following;
1) Cleaning the existing surface of sloped screed from any slurry and dust.
2) Painting the existing screed surface by the approved Bitumen Primer.
3) Laying the approved waterproofing membrane at the painted surface.
4) Making a water leaking test for the complete surface for 48 hours against any leakage and make inspection.
5) Laying the approved types of thermal insulation sheet. the Extruded Polystyrene sheet (5cm) with 32-35 Kg/m³ density
6) Upon getting the approvals, start laying the approval type of separation layer.
7) Laying the membrane water proofing one layer as Skirting with 20-30 cm height all around the parapet setting at grove. with a mastic sealant inside this grove.
That is our method of statement issuing you for our full complying for any instruction and assisting for any clarification.
The Method of Statement "Roof System"
Our method of making the water proofing roof type inverted system it's as following;
1) Cleaning the existing surface of sloped screed from any slurry and dust.
2) Painting the existing screed surface by the approved Bitumen Primer.
3) Laying the approved waterproofing membrane at the painted surface.
4) Making a water leaking test for the complete surface for 48 hours against any leakage and make inspection.
5) Laying the approved types of thermal insulation sheet. the Extruded Polystyrene sheet (5cm) with 32-35 Kg/m³ density
6) Upon getting the approvals, start laying the approval type of separation layer.
7) Laying the membrane water proofing one layer as Skirting with 20-30 cm height all around the parapet setting at grove. with a mastic sealant inside this grove.
That is our method of statement issuing you for our full complying for any instruction and assisting for any clarification.
The Method of Statement "Wet Area"
Our method of statement of making the water proofing system for the wet area it's as following;
1) Cleaning the existing smooth surface from any slurry and dust. 2) Applying the Bitumen primer to the surface. The approved type. 3) Laying the approved waterproofing membrane at the painted
surface. 4) Making a water leaking test by filling water and keep it for 48
hours. 5) Making inspection and get it approved.
.
That is our method of statement issuing you for our full complying for any instruction and clarification.
The Method of Statement For" waterproofing the Isolated
footing and Boundary wall footing by Bitumen Rubberized
Emulsion "
Our method of statement of making the water proofing system for the isolated footing and Boundary it's as following;
1) Cleaning the surface from any dust and slurry before starting Applying and it must be dry.
2) Applying one coat of AIM Rubberized Bitumen Emulsion 3510.
3) Applying another coat of AIM Rubberized Bitumen Emulsion 3510. If Required to Reatch DFT of 0.72mm after getting the first coat dray and inspected and making inspection.
4) Covering the painted service by polythen sheet 1000kg /m3
before starting the back filling to protect the applying surface.
That is our method of statement issuing you for our full complying for any instruction and clarification
The Method of Statement for "Membrane Self
Adhesive 1.5mm"
Our method of making the water proofing system it's as following;
The Floors:-
8) The concrete surface of blinding must be properly floated finish clean and free from any avoid, honeycomb, laitance, coarse aggregates and sharp unevenness and from any traces of muster or curing compound to be removed, and must be completely dry.
9) Apply one coat of primer D-41 solvent based Bituminous allow the primer to dry overnight.
10) Start applying the layer of self-adhesive membrane by removing the release film by peeling back not more than 30cm at a time. Start to unroll the Adesobeit membrane keeping the adhesive side face-down on the primed surface. Press down the membrane by hand, and by special hand roller if required the minimum end lap should be 150mm.
11) Protecting the layer of self-adhesive laying by protection board and polythen sheet and screed of 3-6cm thick before laying any Reinforcement to the top of it.
For Wall:- 1. The concrete surface of blinding must be properly floated finish clean and
free from any avoid, honeycomb, laitance, coarse aggregates and sharp unevenness and from any traces of muster or curing compound to be removed, and must be completely dry.
2. Apply one coat of primer D-41 solvent based Bituminous allow the primer to dry overnight.
3. Start applying the layer of self-adhesive membrane by removing the release film by peeling back not more than 30cm at a time. Start to unroll the Adesobeit membrane keeping the adhesive side face-down on the primed surface. Press down the membrane by hand, and by special hand roller if Required the minimum end lap should be 150mm.
4. Protecting the layer of self-adhesive laying by protection board and polythen sheet and screed of 3-6cm thick before laying any Reinforcement to the top of it.
5. Applying protection board and stick it to the Applied self Adhesive
That is our method of statement issuing you for our full complying for any instruction and assisting for any clarification.
WORK COMPLETION
CERTIFICATE
APPRECIATION LETTER
ISO CERTIFICATE
GYPSUM WORKS
We are also trader and contractor for Interior Gypsum works with a team of well- trained
and well-motivated employees so that we can provide our clients with highest Quality of
service that they deserve.
The brand we deal is ABS Gypsum, Turkey who is the manufacturers for new eco- friendly
construction materials.
Advantages of ABS Gypsum Boards:
- Higher resistance and fire resistance through fiber reinforcement.
- Quick, clean and dry separation wall, production of suspended ceilings and coating
possibility.
- Possibility of high flexibility with regard to planning and application.
- Convenience for mechanic and electrical installations.
- Possibility to achieve high noise and heat isolation
- Possibility to increase the fire resistance in buildings
- Possibility to achieve separation walls that are light and earthquake resistant.
- Light
- Can be painted
Types of ABS Gypsum Boards:
1. (R) Normal Plasterboard
2. (WR) Water- Resistant Plasterboard
3. (FR) Fire- Resistant Plasterboard
4. (WR+ FR) Water and Fire- Resistant Plaster boards
5. and all the related accessories.
Application Areas:
In Internal area of building as separation walls in the construction of suspended ceilings as
dry plaster (it will be applied with methods such as adhesion, in construction, stapled wall
enveloping).
Projects Handed Over:
Villa for for Mr. Mesfer Hemaid Mohammad Al Shahwani
Al Thakira Area- Proposed (B+G+1st+Ph), Qatar
Al Kateam Restaurant
Mid- Mac, Doha- Qatar
American International Contracting INC. (AICI Al Udeid Air Base- Qatar
Aama Trading and Distribution Co. Shahaniya : Doha -Qatar
SITE PHOTO
W/P SITE PHOTO
SWITCH OFF