Page 1: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

Pre-Submittal Conference:

DB 102227 – Hayden Lawn Remediation

The meeting will begin shortly. Thank you for your patience.

Page 2: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

Design-Build RFQ Pre-Submittal MeetingMarch 17, 2020

ASU Tempe Campus

Hayden Lawn Remediation

Page 3: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

Arizona State University Purchasing – [email protected]

• Welcome to Participants – Registering Your Attendance• Why Zoom?• Virtual Tour Link: https://tours.asu.edu/tempe/hayden-library• Project Site• Existing Drawings• Design Criteria• Design/Build Services• Project Challenges• Schedule• Questions?

AGENDA

Page 4: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROJECT SITEAbove Hayden 89, Northwest corner of Orange Mall and Cady Mall, looking southwest

Page 5: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROJECT SITEAbove Hayden 89, Northwest corner of Orange Mall and Cady Mall, looking north

Page 6: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROJECT SITEAbove Hayden 89, Northwest corner of Orange Mall and Cady Mall, looking north

Page 7: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROJECT SITEAbove Hayden 89, Northwest corner of Orange Mall and Cady Mall, looking east

Page 8: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROJECT SITEAbove Hayden 89, Northwest corner of Orange Mall and Cady Mall, looking west

Page 9: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

EXISTING DRAWINGSSITE PLAN – PROJECT EXTENTS

Page 10: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

EXISTING DRAWINGSSITE PLAN – WEIGHT RESTRICTION AREA

Page 11: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

BUILDING SECTIONSEXISTING DRAWINGS

Page 12: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

SECTION DETAIL AT LANTERNEXISTING DRAWINGS

Page 13: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

SECTION DETAIL AT SOUTH ENDEXISTING DRAWINGS

Page 14: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

DESIGN CRITERIA

• Protect Concourse Level below• Remove the lantern structure• Strip off grass, remove sidewalks, soil (stockpile?), and irrigation

system• Remove existing waterproof membrane, rigid insulation and second

waterproof membrane• Fill-in existing lantern opening• Install new waterproof membrane, rigid insulation, and second

waterproof membrane• Install soil, irrigation system, sidewalks, and sod• Irrigate sod until established

Page 15: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

• Review Owner’s existing program and validate the project cost

and size assumptions

• Design services – schematic design through construction

documents

• Cost estimating and project scheduling

• Development of the guaranteed maximum price

• Construction services

DESIGN-BUILD SERVICES

Page 16: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROJECT CHALLENGES

• Limited Space for Site Logistics

• Coordination with ASU

• Work Above an Occupied Space

• Weight Restrictions on Existing Roof

Page 17: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

PROPOSED SCHEDULE

• Deadline for Inquires – 5 pm, March 23, 2020

• Submittals Due – 3pm, March 30, 2020

• Design-Build Selection – April 2020

• Design to Begin – April 2020

• Construction Start – July 2020

• Substantial Completion – November 2020

Page 18: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

ESTIMATED BUDGET

• Estimated Construction Budget: $ 4,270,000

• Total Project Budget: $ 6,100,000

Page 19: Pre-Submittal Conference: DB 102227 – Hayden Lawn …Design services – schematic design through construction documents • Cost estimating and project scheduling • Development

Thank You. All questions are to be submitted via email by 5pm, March 23, 2020, to [email protected]