  • S10 Pgina 1

    PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)0401006PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)001Subpresupuesto

    MINISTERIO DE TRANSPORTES, COMUNICACIONES 30/10/2004Costo alClienteLugar PASCO - OXAPAMPA - OXAPAMPA

    Precio S/. Parcial S/.Item Descripcin Und. Metrado

    01.00.00 767,144.89OBRAS PRELIMINARES1.00MOVILIZACION Y DESMOVILIZACION GLB01.01.00 365,905.72 365,905.722.00CARTEL DE OBRA und01.02.00 1,959.52 3,919.04

    44.18TRAZO Y REPLANTEO KM01.03.00 1,288.13 56,909.58111.40ROCE Y LIMPIEZA HA01.04.00 3,055.75 340,410.55

    02.00.00 MOVIMIENTO DE TIERRAS02.01.00 15,128,347.22EXCAVACION NO CLASIFICADA PARA EXPLANACIONES

    288,717.94CORTE EN MATERIAL SUELTO m302.01.01 3.24 935,446.13378,904.13CORTE EN ROCA SUELTA m302.01.02 11.63 4,406,655.03467,716.62CORTE EN ROCA FIJA m302.01.03 20.43 9,555,450.55224,073.31PERFILADO, NIVELACION Y COMPACTACION DE LA SUBRASANTE EN ZONAS DE

    CORTEm202.02.00 1.03 230,795.51

    02.03.00 1,340,187.95TERRAPLEN91,195.93RELLENO CON MATERIAL PROPIO m302.03.01 5.58 508,873.2984,945.00RELLENO CON MATERIAL EXCEDENTE DE CORTE (MATERIAL CONSIDERADO

    EN TRASP.)m302.03.02 5.58 473,993.10

    29,764.78PREPARACION DE TERRENO EN ZONAS DE RELLENO, INVOLUCRANDO SUELO EXISTENTE

    m202.04.00 1.49 44,349.52

    26,436.99PREPARACION DE TERRENO EN ZONAS DE RELLENO, EMPLEANDO MATERIAL ADICIONADO

    m302.05.00 9.20 243,220.31

    43,594.83REMOCIN DE DERRUMBES (SOLO REFINE) m302.06.00 1.60 69,751.73

    03.00.00 6,794,304.95PAVIMENTOS90,238.57SUB BASE GRANULAR m303.01.00 24.60 2,219,868.8254,700.30BASE GRANULAR m303.02.00 38.39 2,099,944.52

    328,698.64IMPRIMACION BITUMINOSA m203.03.00 0.50 164,349.32327,075.63TRATAMIENTO SUPERFICIAL BICAPA m203.04.00 2.49 814,418.3284,146.85ASFALTO LIQUIDO RC-250 gln03.05.00 4.34 365,197.33

    215,869.91ASFALTO DILUIDO MC-30 gln03.06.00 4.59 990,842.8921,036.71KEROSENE gln03.07.00 6.64 139,683.75

    04.00.00 OBRAS DE ARTE Y DRENAJE04.01.00 5,385.38LIMPIEZA DE ALCANTARILLAS

    22.00LIMPIEZA DE ALCANTARILLAS TMC und04.01.01 244.79 5,385.38

    04.02.00 8,850.22DEMOLICION DE ALCANTARILLAS41.00REMOCIN DE ALCANTARILLAS TMC und04.02.01 178.26 7,308.66

    233.57DEMOLICION DE ESTRUCTURAS m304.02.02 6.60 1,541.56

    04.03.00 195,139.60REHABILITACION Y AMPLIACION DE ALCANTARILLAS TMC1,988.08EXCAVACION PARA ESTRUCTURAS m304.03.01 21.42 42,584.67

    93.72ALCANTARILLA TMC 36" , E=1.5 mm m04.03.02 374.02 35,053.157.37ALCANTARILLA TMC 48" , E=2.5 mm m04.03.03 549.73 4,051.51

    12.17ALCANTARILLA TMC 60", E=3.0 mm m04.03.04A 798.33 9,715.686.50ALCANTARILLA TMC=72" e=3.5MM m04.03.04B 1,052.84 6,843.46

    228.32RELLENO DE ESTRUCTURAS m304.03.05 55.34 12,635.23743.59ENCOFRADO Y DESENCOFRADO m204.03.06 30.85 22,939.75196.78CONCRETO CICLOPEO fc 175 kg/cm2 + 30% PIEDRA MEDIANA m304.03.07 207.27 40,786.59494.45ALIVIADEROS Y EMBOQUILLADO DE PIEDRA (E=0.15M) m204.03.08 41.52 20,529.56

    04.04.00 781,387.24ALCANTARILLAS TIPO MARCO4,121.05EXCAVACION PARA ESTRUCTURAS (MAQUINARIA) m304.04.01 4.54 18,709.574,121.53ENCOFRADO Y DESENCOFRADO m204.04.02 30.85 127,149.20

    76,597.13ACERO DE REFUERZO f'y = 4200 kg/cm2 kg04.04.03 3.59 274,983.7064.30SOLADO DE CONCRETO fc 100 kg7cm2, E=0.075 m m304.04.04 15.01 965.14

    952.40CONCRETO fc 210 kg/cm2 m304.04.05 289.75 275,957.90945.27RELLENO DE ESTRUCTURAS m304.04.06 50.90 48,114.24855.19ALIVIADEROS Y EMBOQUILLADO DE PIEDRA (E=0.15M) m204.04.07 41.52 35,507.49

    04.05.00 2,702,195.46ALCANTARILLA TMC24,524.88EXCAVACION PARA ESTRUCTURAS (MAQUINARIA) m304.05.01 4.54 111,342.96

    19.96ALCANTARILLA TMC 36" , E=1.5 mm m04.05.02 374.02 7,465.44289.03ALCANTARILLA TMC 48" , E=2.5 mm m04.05.03 549.73 158,888.46742.40ALCANTARILLA TMC 60", E=3.0 mm m04.05.04 798.33 592,680.19

  • S10 Pgina 2

    PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)0401006PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)001Subpresupuesto

    MINISTERIO DE TRANSPORTES, COMUNICACIONES 30/10/2004Costo alClienteLugar PASCO - OXAPAMPA - OXAPAMPA

    Precio S/. Parcial S/.Item Descripcin Und. Metrado

    736.15ALCANTARILLA TMC=72" e=3.5MM m04.05.05 1,052.84 775,048.178,122.02ENCOFRADO Y DESENCOFRADO m204.05.06 30.85 250,564.322,355.45CONCRETO CICLOPEO fc 175 kg/cm2 + 30% PIEDRA MEDIANA m304.05.07 207.27 488,214.124,721.80ALIVIADEROS Y EMBOQUILLADO DE PIEDRA (E=0.15M) m204.05.08 41.52 196,049.142,395.73RELLENO DE ESTRUCTURAS m304.05.09 50.90 121,942.66

    04.06.00 794,664.52PONTON L = 13.00 m367.09EXCAVACION PARA ESTRUCTURAS (MAQUINARIA) m304.06.01 4.54 1,666.59550.64EXCAVACION PARA ESTRUCTURAS BAJO AGUA m304.06.02 10.19 5,611.02723.19ENCOFRADO Y DESENCOFRADO m204.06.03 30.85 22,310.4155.98ENCOFRADO Y DESENCOFRADO BAJO AGUA m204.06.04 56.68 3,172.95

    23,208.66ACERO DE REFUERZO f'y = 4200 kg/cm2 kg04.06.05 3.59 83,319.0975.27CONCRETO fc 280 kg/cm2 m304.06.06 341.67 25,717.50

    113.25CONCRETO fc 210 kg/cm2 m304.06.07 289.75 32,814.1992.12CONCRETO fc 210 kg/cm2 BAJO AGUA m304.06.08 308.55 28,423.6315.58CONCRETO fc 100 kg/cm2 m304.06.09 200.18 3,118.80

    709.16RELLENO DE ESTRUCTURAS m304.06.10 50.90 36,096.2418.60JUNTAS DE EXPANSION METALICA m04.06.11 757.73 14,093.788.00APOYO DE NEOPRENO und04.06.12 1,213.21 9,705.68

    43.00BARANDAS METALICAS m04.06.13 506.75 21,790.25150.93EXCAVACIN EN SECO m304.06.14 4.59 692.77

    2,812.87EXCAVACIN BAJO AGUA m304.06.15 10.19 28,663.1518,572.02TERRAPLEN m304.06.16 11.16 207,263.744,217.50ENROCADO m304.06.17 35.16 148,287.301,513.75FILTRO m304.06.18 80.54 121,917.43

    04.07.00 1,554,437.84BADENES5,085.30EXCAVACION PARA ESTRUCTURAS (MAQUINARIA) m304.07.01 4.54 23,087.26

    395.18EXCAVACIN PARA ESTRUCTURAS (MANUAL) m304.07.02 21.42 8,464.761,424.94BASE e=0.20m m304.07.03 34.46 49,103.431,798.90ENCOFRADO Y DESENCOFRADO m204.07.04 30.85 55,496.07

    119,982.53ACERO DE REFUERZO f'y = 4200 kg/cm2 kg04.07.05 3.59 430,737.281,713.93CONCRETO fc 245 kg/cm2 m304.07.06 308.15 528,147.531,311.50JUNTA ASFALTICA LONGITUDINAL m04.07.07 27.87 36,551.514,340.00ALIVIADEROS Y EMBOQUILLADO DE PIEDRA (E=0.30M) m204.07.08 39.50 171,430.002,000.00ENROCADO CON MORTERO m304.07.09 125.71 251,420.00

    04.08.00 3,367,675.81CUNETAS REVESTIDAS DE CONCRETO48,182.58CUNETAS TRIANGULARES m04.08.01 68.21 3,286,533.78

    436.00CUNETAS RECTANGULARES m04.08.02 119.40 52,058.40436.00TAPA CUNETA DE 0.80m x 1.00m x 0.10m und04.08.03 42.43 18,499.48123.00TAPA DE CUNETA DE 1.50m x 1.00m x 0.10m und04.08.04 86.05 10,584.15

    04.09.00 41,531.59ZANJAS DE DRENAJE423.52EXCAVACION PARA ESTRUCTURAS m304.09.01 21.42 9,071.80162.60ACOMODO DE PIEDRAS DIAM=2" y 8" m304.09.02 72.72 11,824.27948.50GEOTEXTIL m204.09.03 5.11 4,846.84563.68MAMPOSTERA DE PIEDRA (E=0.15 M) m204.09.04 28.01 15,788.68

    04.10 186,393.34ZANJAS LATERAL Y DE CORONACION6,033.10EXCAVACION PARA ESTRUCTURAS m304.10.01 21.42 129,229.001,940.20MAMPOSTERA DE PIEDRA (E=0.15 M) m204.10.02 28.01 54,345.00

    621.00ZANJA LATERAL (TIERRA) m304.10.03 4.54 2,819.3404.11.00 46,077.35BAJADAS

    360.38EXCAVACION PARA ESTRUCTURAS m304.11.01 21.42 7,719.341,369.44MAMPOSTERA DE PIEDRA (E=0.15 M) m204.11.02 28.01 38,358.01

    04.12.00 16,508.81RAPIDAS141.40EXCAVACION PARA ESTRUCTURAS m304.12.01 21.42 3,028.7922.01CONCRETO CICLOPEO fc 140 kg/cm2 + 30% PM m304.12.02 191.10 4,206.1190.34ENCOFRADO Y DESENCOFRADO m204.12.03 30.85 2,786.9915.00MAMPOSTERA DE PIEDRA (E=0.15 M) m204.12.04 28.01 420.15

  • S10 Pgina 3

    PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)0401006PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)001Subpresupuesto

    MINISTERIO DE TRANSPORTES, COMUNICACIONES 30/10/2004Costo alClienteLugar PASCO - OXAPAMPA - OXAPAMPA

    Precio S/. Parcial S/.Item Descripcin Und. Metrado

    119.19RELLENO DE ESTRUCTURAS m304.12.05 50.90 6,066.7704.13.00 5,267,716.95MUROS

    24,009.18EXCAVACION PARA ESTRUCTURAS (MAQUINARIA) m304.13.01 4.54 109,001.6879.10EXCAVACIN PARA ESTRUCTURAS (MANUAL) m304.13.02 21.42 1,694.32

    33,458.86ENCOFRADO Y DESENCOFRADO m204.13.03 30.85 1,032,205.8315,871.41ACERO DE REFUERZO f'y = 4200 kg/cm2 kg04.13.04 7.08 112,369.58

    9.45SOLADO DE CONCRETO fc 100 kg/cm2, E=0.075 M m304.13.05 15.01 141.84276.83CONCRETO fc 210 kg/cm2 m304.13.06 289.75 80,211.49

    13,785.89CONCRETO CICLOPEO fc 175 kg/cm2 + 30% PM, PARA MUROS m304.13.07 209.09 2,882,491.7410,909.47RELLENO DE ESTRUCTURAS m304.13.08 50.90 555,292.023,587.36FILTRO m304.13.09 80.54 288,925.975,137.05DREN PVC 4" m04.13.10 14.89 76,490.673,317.70LLORADORES PVC 4" m04.13.11 14.89 49,400.55

    11,467.97GEOTEXTIL m204.13.12 5.11 58,601.33366.80MATERIAL IMPERMEABLE m304.13.13 50.24 18,428.0370.02ENROCADO m304.13.14 35.16 2,461.90

    04.14.00 1,108,816.56DEFENSA RIBEREA22,236.04EXCAVACION PARA ENROCADOS m304.14.01 5.17 114,960.3316,529.01EXCAVACION PARA ESTRUCTURAS BAJO AGUA m304.14.02 6.19 102,314.571,382.45CONFORMACION DE TALUD m304.14.03 4.62 6,386.92

    19,248.90ENROCADO m304.14.04 35.16 676,791.322,587.08FILTRO m304.14.05 80.54 208,363.42

    04.15.00 1,019,113.71GAVIONES32,939.29EXCAVACION PARA GAVIONES m304.15.01 5.91 194,671.205,217.00GAVIONES m304.15.02 158.03 824,442.51

    05.00.00 187,083.54SEALIZACIN45.00POSTES KILOMETRICOS und05.01.00 85.25 3,836.25

    302.00SEAL PREVENTIVA (0.75 m x 0.75 m) und05.02.00 514.49 155,375.9843.00SEAL REGLAMENTARIA und05.03.00 648.17 27,871.31

    05.04.00 586,085.84SEALES INFORMATIVAS68.41PANEL INFORMATIVO m205.04.01 424.96 29,071.51

    369.70ESTRUCTURA DE SOPORTE TUB. 3" m05.04.02 131.37 48,567.4938.00CIMENTACION Y MONTAJE SEAL INFORMATIVA und05.04.03 538.22 20,452.36

    2,265.54GUARDAVIAS (Incluye Terminal) m05.05.00 145.88 330,496.98617.00POSTES DELINEADORES und05.06.00 85.06 52,482.02

    12,606.90DEMARCACION EN EL PAVIMENTO m205.07.00 8.33 105,015.4806.00.00 842,018.38MEDIO AMBIENTE

    1,097,834.87ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m306.01.00 0.71 779,462.7649,446.67RESTAURACION DE CANTERAS m206.02.00 0.43 21,262.07

    23.39REVEGETALIZACION HA06.03.00 1,165.56 27,262.454,720.00RESTAURACION DE AREA AFECTADA POR CAMPAMENTO m206.04.00 1.90 8,968.001,225.00RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y

    CHANCADORAm206.05.00 1.62 1,984.50

    600.00RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS m206.06.00 2.10 1,260.005.00SELLADO DE LETRINAS und06.07.00 363.72 1,818.60

    07.00.00 11,227,240.34TRANSPORTES219,051.26TRANSPORTE DE MATERIALES GRANULARES PARA D 1.00 KM M3K07.02.00 0.90 3,218,254.391,121,706.92TRANSPORTE DE ESCOMBROS PARA D 1.00 KM M3K07.04.00 0.90 657,549.19204,157.53TRANSPORTE DE MATERIAL PARA RELLENO D = 1.00 KM M3K07.06.00 0.90 1,063,629.8208.00.00 601,340.48VARIOS

    1.00MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL GLB08.01.00 601,340.48 601,340.48Costo Directo 54,569,647.97Gastos Generales 13.35% 7,285,048.00Utilidad 10.00% 5,456,964.80

  • S10 Pgina 4

    PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)0401006PresupuestoCARRETERA PUENTE PAUCARTAMBO - OXAPAMPA (PROVIAS NACIONAL)001Subpresupuesto

    MINISTERIO DE TRANSPORTES, COMUNICACIONES 30/10/2004Costo alClienteLugar PASCO - OXAPAMPA - OXAPAMPA

    Precio S/. Parcial S/.Item Descripcin Und. Metrado

    -----------------------Sub-Total 67,311,660.77

    IGV 19.00% 12,789,215.55-------------------------

    TOTAL PRESUPUESTO 80,100,876.32

    SON : OCHENTA MILLONES CIEN MIL OCHOCIENTOS SETENTISEIS Y 32/100 NUEVOS SOLES