Precast Concrete in Chile Augusto Holmberg F.

Upload: vannhi

Post on 01-May-2018

227 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Precast Concrete in Chile Augusto Holmberg F.

Page 2: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

a land of natural beauty BIBM 2017

Gentileza Achisina

Page 3: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

and modern buildings BIBM 2017

Gentileza R. lagos

Page 4: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

a land of large earthquakes BIBM 2017

Page 5: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

27F Chile Earthquake

Magnitud Mw=8.8

Epicenter: Cobquecura

Depth: 35 Km

Date: 27 Feb. 2010

Time: 3:35 AM

Page 6: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Church in Curico

Page 7: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Building - Concepción

Page 8: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Non structural damage

Page 9: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Tsunami damage

Page 10: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Precast structures

Gentileza David

Campusano

BIBM 2017

Page 11: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Precast cladding panels

Page 12: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

The facts BIBM 2017

Page 13: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

1.- Extensive damage in non engineered structures Unreinforced Masonry

Adobe construction

Near 500 fatalities, most of them on adobe construction

The facts BIBM 2017

Page 14: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

1.- Extensive damage in non engineered structures Unreinforced Masonry

Adobe construction

Near 500 fatalities, most of them on adobe construction

2.- Limited damage in concrete buildings Very good performance with less than 2% of buildings damaged (9 stories and up)

4 buildings collapsed

Less than 20 people died in structures with seismic a design

Less than 40 of them had to be demolished

The facts BIBM 2017

Page 15: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

1.- Extensive damage in non engineered structures Unreinforced Masonry

Adobe construction

Near 500 fatalities, most of them on adobe construction

2.- Limited damage in concrete buildings Very good performance with less than 2% of buildings damaged (9 stories and up)

4 buildings collapsed

Less than 20 people died in structures with seismic a design

Less than 40 of them had to be demolished

3.- Limited damage in precast structures Good performance in general

Some damage mostly related to large displacement demands (bad soils)

Cinematic compatibility issues

The facts BIBM 2017

Page 16: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

1.- Extensive damage in non engineered structures Unreinforced Masonry

Adobe construction

Near 500 fatalities, most of them on adobe construction

2.- Limited damage in concrete buildings Very good performance with less than 2% of buildings damaged (9 stories and up)

4 buildings collapsed

Less than 20 people died in structures with seismic a design

Less than 40 of them had to be demolished

3.- Limited damage in precast structures Good performance in general

Some damage mostly related to large displacement demands (bad soils)

Cinematic compatibility issues

4.- Tsunami was a game changer Near 200 fatalities can be attributed to the tsunami

The facts BIBM 2017

Page 17: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

The most importante lesson BIBM 2017

Page 18: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Life safety is paramount …

The most importante lesson BIBM 2017

Page 19: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Life safety is paramount …

but is not enough

The most importante lesson BIBM 2017

Page 20: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Life safety is paramount …

but is not enough any more …

The most importante lesson BIBM 2017

Page 21: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Life safety is paramount …

but is not enough any more …

Resilience should be the goal

!!!

The most importante lesson BIBM 2017

Page 22: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Earthquake performance

Page 23: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Earthquake performance

Is it possible …?

Page 24: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Earthquake performance

Is it possible …?

We believe the answer is YES

but, more important, is our responsibility

to try and make it happen.

Page 25: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Let’s see some projects …

Page 26: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Columnas with socket foundations Jointed or rigid beam–column joint Roof bracing diaphragm (diagonals or roof beams)

Page 27: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Columnas with socket foundations Jointed or rigid beam–column joint Roof bracing diaphragm (diagonals or roof beams)

Page 28: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Centro de Distribución

Ripley

Gentileza Tensacon

Distribution center

Page 29: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Centro de Distribución

Almacenes Paris

Gentileza Tensacon

Distribution center

Page 30: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Centro de

Convenciones

Espacio Riesco

Gentileza Preansa

Convention center

Page 31: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Centro de

Convenciones

Espacio Riesco

Gentileza Preansa

Convention center

Page 32: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Cellulose factory

Precast and cast in place …

Planta Nueva Aldea.

Celulosa Arauco

Gentileza Preansa

Socket foundation over cast in place structure …

Page 33: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Cellulose factory

Speed of construction … Fire safety …

Planta Nueva Aldea.

Celulosa Arauco

Gentileza Preansa

Page 34: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Power station at Los Andes

The Place … The Road…

Sub estación Andina

Gentileza Preansa

Page 35: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Power station at Los Andes

Excavation … Erection…

Sub estación Andina

Gentileza Preansa

Page 36: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Power station at Los Andes

Erection … Ready in 4 months (summer season)…

Sub estación Andina

Gentileza Preansa

Page 37: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017

Gentileza

Ruiz Saavedra Ingenieros

Preansa

Saint George School Gym

Page 38: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Saint George School Gym

Gentileza

Ruiz Saavedra Ingenieros

Preansa

Page 39: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Edificio Vulco

Gentileza Tensocret

Seismic isolation in buildings BIBM 2017

Page 40: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017

Edificio Marina Paihue

Gentileza Tensocret

Seismic isolation in buildings

Page 41: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017

Edificio Marina Paihue

Gentileza Tensocret

Seismic isolation in buildings

Page 42: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017

Colegio en Santiago

Gentileza Momenta

Seismic isolation in a school

Page 43: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

BIBM 2017 Seismic isolated school

Colegio en Santiago

Gentileza Momenta

Page 44: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Hybrid connections building BIBM 2017

Gentileza

Patricio Bonelli

Page 45: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Hybrid connection

Page 46: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Paper factory BIBM 2017

Gentileza

Patricio Bonelli

Tensocret

Gentileza

Patricio Bonelli

Tensocret

Page 47: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Paper factory BIBM 2017

Gentileza

Patricio Bonelli

Tensocret

Page 48: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Paper factory BIBM 2017

Gentileza

Patricio Bonelli

Tensocret

Page 49: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Precast concrete construction has gained popularity

over the past decades in Chile. This has been

especially true in industrial facilities given the benefits of

this type of construction like speed of erection, low cost

and fire resistance.

From 2006 Chile has a national standard for seismic

design of non-building structures that includes provision

for precast structures. This standard has been

instrumental in the increased use of precast structures.

Final remarks BIBM 2017

Page 50: Precast Concrete in Chile - Anmeldung · Limited damage in concrete buildings ... Less than 20 people died in structures with seismic a design ... Hybrid connections building BIBM

Recent 2010 earthquake (Mw 8.8) was a severe test for Chilean

construction. The performance of precast structures designed

under the seismic code was remarkably good, with some

exceptions, mostly related to large displacements (large demands

and lack of capacity), which will be addressed in the revised edition

of the code.

Productivity pressures in construction are giving a new impulse to

precast construction and new applications are emerging in houses,

mid-rise buildings and also in heavy industrial applications and

mining operations. Lack of skilled labor is expected to have a major

impact on construction in the future leading to a more extensive

use of precast.

Final remarks BIBM 2017