Page 1: Preemption and Competition Timing

UNCONDITIONAL AND LEAD TIMES

PREEMPTION AND COMPETITION TIMING

Page 2: Preemption and Competition Timing

PURPOSE

•Define timing rules for when Preemption and Competition may be initiated• Defender Lead Time• Challenger Lead Time• Conditional Reservation Deadline

Page 3: Preemption and Competition Timing

PARKING LOT ITEMS

• New Issue BB (unresolved)• Review Conditional Reservation deadlines and verify that

conditional reservation deadlines do not violate the reservation timing table. i.e. Defender has moved into unconditional window before the deadline to respond to the competition.

• Issue 74 (unresolved)• Business practices shall be developed that specify the

minimum timing requirements to be applied to the competition for each pro forma transmission service. These requirements will include 1) minimum time prior to start of service that preemption/competition must be initiated (lead time), 2) maximum time required to complete the preemption/competition process (deadline), 3) maximum time a given defender has to exercise ROFR (match deadline), 4) business vs. calendar day, etc. Include consideration for market impacts, etc.

Page 4: Preemption and Competition Timing

DEFENDER LEAD TIME

• There are two thresholds that are used to define the Defender lead time• Conditional Reservation Deadline• Defender Scheduling Deadline

• Preemption and Competition must be concluded prior to the earlier of the two thresholds• Defender lead time is determined by counting

backward from the threshold, accounting for the longest possible time it takes for each action to occur

Page 5: Preemption and Competition Timing

DEFENDER LEAD TIME CONSIDERATIONS

• Matching Time Limit - Always 24 hours for Firm

• Challenger Confirmation Time Limit• Applies to ROFR Defenders only• Recommend 24 hours • This is consistent with the time the Defender has to evaluate the Matching request of

equal or greater duration• This will require a change to Table 4-2

• TP Evaluation• Includes AFC evaluation, Match communication, and TP processing time• Remain silent (See Table 4-2, footnote 6)

• Regional timing or disruption to TP Business Practices• TP shall have the right to account for these items in their Business Practices• See definition in 013-.2

Page 6: Preemption and Competition Timing

DEFENDER LEAD TIME EXAMPLE

• In the general case a Daily PTP TSR may not be identified as a Defender by a PTP Challenger 72 hours prior to start of service

• An additional buffer may be added at TP discretion to account for ‘Silent’ and ‘TP Right’ options

Page 7: Preemption and Competition Timing

CHALLENGER LEAD TIME

• There is one threshold that is used to define the Challenger Lead Time• Challenger Scheduling Deadline

• Preemption and Competition must be concluded prior to the Challenger scheduling deadline• Challenger Lead Time is determined by counting

backward from the threshold, accounting for the longest possible time it takes for each action to occur

Page 8: Preemption and Competition Timing

CHALLENGER LEAD TIME CONSIDERATIONS

• Challenger Confirmation Time Limit• Applies to ROFR Defenders only• This may dissolve based on Sandbox development

• TP Evaluation• Includes AFC evaluation, Match communication, and TP processing time• Remain silent (See Table 4-2, footnote 6)

• Regional timing or disruption to TP Business Practices• TP shall have the right to account for these items• See definition in 013-.2

Page 9: Preemption and Competition Timing

CHALLENGER LEAD TIME EXAMPLE

• In the general case a Daily PTP Challenger may not identify a PTP TSR 48 hours prior to the scheduling deadline

• An additional buffer may be added at TP discretion to account for ‘Silent’ and ‘TP Right’ options

Page 10: Preemption and Competition Timing

CHALLENGER LEAD TIME VS. DEFENDER LEAD TIME

Page 11: Preemption and Competition Timing

ITEMS NOT ADDRESSED

• Should the Challenger Confirmation time limit be included in the Challenger lead time?

• If a TSR is excluded from Preemption and Competition due to Defender lead time, should higher priority defenders be excluded as well?

• What is an appropriate TP evaluation time limit?

• What is the time allowed for TP communication of ROFR?

Page 12: Preemption and Competition Timing

RECOMMENDATION

1. The TP shall account for, if applicable, the Defender’s Matching time limit and the Challenger’s Confirmation time limit when determining if the Preemption and Competition process should be initiated.

2. Capacity shall not be taken from a Defender through the Preemption and Competition process after the earlier of the Defender’s conditional reservation deadline or the Defender’s scheduling deadline. Preemption and Competition shall not be initiated if the Preemption and Competition process would not conclude until after the earlier of the Defender’s conditional reservation deadline or scheduling deadline.

Page 13: Preemption and Competition Timing

RECOMMENDATION (CONT.)

3. Preemption and Competition shall not be initiated for a Challenger if the Preemption and Competition process would not conclude until after the Challenger’s scheduling deadline.

4. The Transmission Provider may include consideration for the timing requirements of any regional practices. The TP may include additional timing requirements if the Transmission Provider determines that such additional timing requirements are reasonably necessary to avoid disruption of the Transmission Provider’s business practices. Consideration and adoption of any such additional timing requirements shall be established by business practice.

Page 14: Preemption and Competition Timing

QUESTIONS?