prefabricated cabin wet unitsejintec.co.kr/server/data/file/catalogs_company/... · 2021. 1....

15
PREFABRICATED CABIN WET UNIT Revision Date : Jan.2021 SEJIN Technical Industries Co., Ltd. 15, Eogokgongdan 5-gil, Yangsan-si, Gyeongnam(50591), Korea. Tel. +82-55-782-1180 Fax. +82-55-782-1001 E-Mail : [email protected] www.sejintec.co.kr Head office / Factory / Warehouse

Upload: others

Post on 17-Feb-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

  • PREFABRICATED CABINWET UNIT

    Revision Date : Jan.2021

    SEJIN Technical Industries Co., Ltd.

    15, Eogokgongdan 5-gil, Yangsan-si, Gyeongnam(50591), Korea.Tel. +82-55-782-1180 Fax. +82-55-782-1001E-Mail : [email protected]

    Head office / Factory / Warehouse

  • Challenge towards the TopCraftsmen to the world’s finest ships and Offshore Modules.Leading company in the maritime field in Korea since 1988.

    CONTENTS

    P. 05P. 07

    PREFABRICATEDCABIN

    NORSOK STANDARDCABIN LAYOUT

    P. 19

    REFERENCE

    REFERENCE

    P. 25

    QHSE

    QHSE

    P. 27

    CONTACT US

    CONTACT US

    0201SEJIN Head office in Yangsan, Korea

    P. 11P. 13

    PREFABRICATEDWET UNIT

    BATHTUB UNITSHOWER UNIT

    P. 15

    PREFABRICATIONPROCESS

    PREFABRICATIONPROCESS

    P. 17

    INSTALLATION

    INSTALLATION

  • Bathtub Type

    0403

    UPOLSTERY

    WINDOW CURTAIN

    FURNITURE

    BED CURTAIN

    DOOR BLADE

    WALL PANEL

    CEILING PANEL

    FLOOR FINISH

    PREFABRICATED CABIN SEJIN produces top quality Prefabricated Cabins which satisfy the NORSOK Standard.It also has excellent sound absorption and protection stability, so it has a large share in domestic and overseas markets. SEJIN manufactures and produces the highest quality Prefabricated Cabins for our customers.

    Complying to the NORSOK Standard

    Prefabricated Cabin Wet Unit

    EDDA ACCOMMODATION VESSELCABIN

    IMO CERTIFIEDMATERIALS FIRE RETARDANT

    SOUNDREDUCTION

    THERMAL

  • To satisfy NORSOK StandardsSEJIN is producing top quality Prefabricated Cabins that satisfy NORSOK Standards.SEJIN manufactures and produces the best quality Cabins and for delivery to customers.

    PREFABRICATED WET UNIT

    FURNITURE, EQUIPMENTAND ACCESSORIES

    C-002

    (ARCHITECTURALCOMPONENTSAND EQUIPMENT)

    C-002

    (ARCHITECTURAL COMPONENTS AND EQUIPMENT)

    ARTICLENORSOK STANDARDITEM

    17.2

    17.3

    17.11

    20.1

    FLOOR

    GENERAL REQUIREMENTS

    WALL

    FLOOR ELECTRICAL HEAT

    WORKINGENVIRONMENTREQUIREMENTS

    S-002

    (WORKING ENVIRONMENT)5.5.3

    OTHER ACOUSTIC REQUIREMENTS

    EASY TO CLEAN, WITHOUT COMPLICATED JUNCTIONS AND RECESSES OR NICHES.DUST TRAPS ARE AVOIDED.

    SEAMLESS AND GENTLE RADIUS WALL PANEL.

    SHALL BE POSSIBLE TO REPLACE DAMAGED CABLES EASILY DURING THE OPERATIONAL PHASE WITHOUT DISMANTLING THE BATHROOM UNIT.

    WALL PANEL (CABIN TO CABIN)R’w 45dB = Rw 45dB + 5dB [C002] + 3dB [S002]

    DOOR (CABIN TO CORRIDOR)R’w 40dB = Rw 40dB + 5dB [C002] + 3dB [S002]West Mira Project / 1-man Unit cabin

    T HERMAL- Delivers outstanding insulation performance.

    N OISE- Provides quality product that meets the noise standards.

    F IRE- Excellent product that passed through FIRE TEST.

    Provides stability that satisfies NORSOK Standard

    NORSOK

    TOTAL MOHO NORD PROJECT2 MEN CABIN

    05 06

    NORSOK STANDARDPREFABRICATED CABIN NORSOK STANDARD CABIN LAYOUT

    FABRICATED AS ONE WATERTIGHT JOINT LESS UNIT OF STAINLESS STEEL, ALUMINIUM OR OTHER NON-CORRO-SIVE MATERIAL.

    OWNER TYPE CLASS SHIPYARD

    WEIDONG FERRY(KOREA) RO-PAX KR

    HYUNDAI MIPO DOCKYARD CO., LTD. (KOREA) 134 SET

    EDDA(KOREA) ACCOMM VESSEL

    DNV.GLCOMF V(1)

    HYUNDAI HEAVY IND. CO., LTD.(KOREA) 406 SET

    MAERSK DRILLING(DENMARK) JACK-UP RIG

    DNV.GL(NORSOK)

    DAEWOO SHIPBUILDING & MARINEENGINEERING CO., LTD. (KOREA) 180 SET

    TOTAL(FRANCE) FPU BV

    HYUNDAI SAMHO HEAVY IND. CO., LTD.(KOREA) 225 SET

    SEADRILL(NORWAY) SEMI-RIG

    DNV.GL(NORSOK)

    HYUNDAI SAMHO HEAVY IND. CO., LTD.(KOREA) 150 SET

    FRED OLSEN(NORWAY) SEMI-RIG

    DNV.GL(NORSOK)

    HYUNDAI HEAVY IND. CO., LTD.(KOREA) 140 SET

    SLP (UK)NEXEN(UK)FIXED

    PLATFORM DNV.GL 70 SET

    Quantity of SET

    Updated on JAN.2021 REFERENCE

    TOTAL 1,305 SET

  • 07 08

    CABIN LAYOUT

    TYPICAL DRAWINGNORSOK CABIN TYPE

    CREW CABIN TYPE

    PASSENGER CABIN TYPE

    4500

    4250

    2100

    4040

    1990

    4185

    2250

    4180

    46503535

    4160

    4175

    4945

    1 MAN

    CREW CLASS

    RO-PAX CRUISE

    OFFICE CLASS CAPTAIN CLASS

    TYPICAL CONSTRUCTION

    TYPICAL SECTION BETWEENCABIN AND WET UNIT

    TYPICAL SECTION BETWEENCABIN AND LOBBY

    CEILING PANEL

    CABIN

    CEILING PANEL

    DETAIL "A"

    10

    CLE

    AR O

    PENI

    NG H

    EIG

    HT

    : 205

    0

    10

    25

    2 MAN

    LAYOUT PLAN

    25 30 25

    25

    (FR

    OM

    FLO

    OR

    )10

    00

    25

    100

    75

    CORRIDOR SIDETOILET SIDE

    SEALING

    SECTION "D - D"

    DETAIL "B"

    DETAIL "A"

    DETAIL "C"

    TOILET SIDE

    CABIN SIDE

    PREFABRICATED CABIN NORSOK STANDARD CABIN LAYOUT

  • Shower Unit

    Bathtub Unit

    1009

    IMO CERTIFIEDMATERIALS

    FIRE RETARDANT

    PREFABRICATED WET UNITThink of the Wet Unit with fine details and beautiful designs.

    WEIDONG FERRY RO-PAXWET UNIT

    HYGIENICSOUNDREDUCTION

  • 1211

    BATHTUB UNIT

    ACCESSORIESISOMETRIC PERSPECTIVE

    ENGINEERING DRAWINGPERSPECTIVE

    PREFABRICATED WET UNIT BATHUB UNIT SHOWER UNIT

    FAUCETSHOWER PIPE

    SINGLE HOOK TOILET BRUSH HOLDER

    ROLL HOLDER

    SPARE ROLL HOLDER

    TOOTHBRUSH TUMBLER

    SOAP DISH

    GRAB BAR

    BATH TOWEL HOLDER

    TYPE-A (1500X1900) TYPE-B (1600X2000)

    DOUBLE TOWEL HOLDER

    SHOWER MIXER

    LOTION DISPENSER

    1600

    2000

    1500

    1900

  • 1413

    SHOWER UNIT

    ACCESSORIES

    ISOMETRIC PERSPECTIVE

    ENGINEERING DRAWINGPERSPECTIVE

    PREFABRICATED WET UNIT BATHUB UNIT SHOWER UNIT

    TYPE-A (1350X1650)

    TYPE-D (1210X2030) TYPE-E (1038X2060)

    TYPE-B (1200X1800) TYPE-C (1600X1700)

    GRAB BAR ROLL HOLDER TOOTHBRUSH TUMBLER

    SHOWER MIXER SHOWER HEAD FAUCET SOAP DISH BATH TOWEL HOLDER

    TOILET BRUSH HOLDER

    1650

    1350

    1800

    1200

    1700

    1600

    1210

    2030

    1038

    2060

  • WORK PROCEDURE

    Locatethe wet unit

    A

    Assemble the wall,ceiling panel, and cabin door

    B

    Installthe furniture

    C

    Install the electricalequipment and cables

    D

    Inspectionand test

    E

    Packing

    F

    Move to storage

    G

    A B C D E F G

    WORK PROCEDURE OF PREFABRICATION

    WORK FLOW

    Storage and LoadingSTORAGE

    LOADING

    Suggested storage method for SEJIN Prefabircated Cabins- To be stored indoors, i.e. warehouse- To be stored in a dry and clean environment- To be stored above floor level at least 150 mm- To be stored by area or cabin number for ease of access or by delivery schedule.

    Using proper lifting device, i.e. folk-lift truck, to transfer SEJIN prefabricated cabin. A proper fork-lift truck with long flat forks.The forks should be long enough to extend at least 50mm over the other end of the cabin once the cabin is lifted onto the forklift truck. Fasten the prefabricated cabin onto the truck with belt or robe to stabilize the unit. Do not climb on to the top of the unit during fastening.

    15 16

    PREFABRICATION PROCESSPREFABRICATION PROCESS PREFABRICATION PROCESS

  • Storage01

    Loading02

    Clean the site before Assemble

    Clean the site where assemble will occur. Make sure enough space andheight are reserved for free movement. Remove all unnecessary objectsfrom the site before cabin installation.The following works are be finished before installation:(Insulation, Main cable installation, Duct, Plumbing, and Window opening)Mark the cabin position exactly.

    03

    Moving Cabin on to Right Position05

    Fixing on to Deck06

    Connection of the Technical System07

    Use a transportation device to move cabin to desired location.

    During transportation, special care should be taken to supportthe cabin and prevent collision with other objects.Make sure that the cabin is positioned correctly and check with windows.

    Make window opening and window box can be installed.

    The piping and the e lect ical connection sha l l be made in the service

    Finish work & Inspection of Cabin08P lace carpet or viny l on the floor. (include skirt)Furniture p lacement, door adjustment and c leaning of the cab in. Inspect each cabin with the customer according to the FAT procedure

    Lifting04Remove the S.Q tube pallet before lifting.Clear the lifting site to ensure safe lifting operation.The prefabricated cabin shall be lifted by means of special lifting device maintaining balance throughout.The lifting shall be carried out with caution and safety considerations.

    Suggested storage methods for SEJIN Prefabricated Cabins

    - To be stored indoors, i.e. warehouse- To be stored in a dry and deen environment- To be stored aboce floor level at least 150mm- To be stored by area or cabin number for ease of access or by delivery schedule.

    Using proper lifting device, i.e. folk-lift truck, to transfer SEJIN prefabricated cabin.A proper fork-lift truck with long flat forks.The forks should be long enough tp extend at least 50mm overthe other end of the cabin once the cabin is lifted onto the forklift truck.Fasten the prefabricated cabin on to the truck with belt or robe to stabilize the unit. Do not climb on to the top of the unit during fastening.

    Lay temporary support to start work.The position of cabin can be adjusted using steel adjustment device.Tack welding to steel deck.Fill in fire sealant between deck and cabin base frame to satisfyB-Class construction standards.

    17 18

    INSTALLATIONINSTALLATION INSTALLATION

  • REFERENCE Reference

    REFERENCE

    2019

    EDDAACCOMMODATION VESSEL

    RULE &REGULATIONSHIP YARD

    DELIVERY

    SHIP TYPE

    SHIP OWNER EDDA ACCOMMODATION

    DNV.GL COMFORT CLASS V(1)HHI

    MAY-2016

    ACCOMMODATION VESSEL

    CLASS DNV.GL

    RULE

    MAERSK JACK-UP RIG Standard

    RULE &REGULATIONSHIP YARD

    DELIVERY

    SHIP TYPE

    SHIP OWNER MAERSK

    NORSOK STANDARD

    DSME

    JUN-2016

    JACK-UP RIG

    CLASS DNV.GL

  • REFERENCE Reference

    MOHO NORD

    RULE &REGULATIONSHIP YARD

    DELIVERY

    SHIP TYPE

    SHIP OWNER TOTAL

    SOLAS STANDARDS

    HSHI

    AUG-2015

    FPU

    CLASS BV

    RULE

    WEST MIRA Standard

    RULE &REGULATIONSHIP YARD

    DELIVERY

    SHIP TYPE

    SHIP OWNER SEA DRILL

    NORSOK

    HSHI

    APL-2015

    SEMI-RIG

    CLASS DNV.GL

    REFERENCE

    2221

  • 2423

    REFERENCE Reference

    REFERENCE

    RULE

    GOLDEN EAGLE

    RULE &REGULATIONSHIP YARD

    DELIVERY

    SHIP TYPE

    SHIP OWNER NEXEN

    UKOOA

    SLP (UK)

    FEB-2013

    FIXED PLATFOM

    CLASS DNV.GL

    RULE

    BOLLSTA DOLPHIN

    RULE &REGULATIONSHIP YARD

    DELIVERY

    SHIP TYPE

    SHIP OWNER FRED OLSEN

    NORSOK

    HHI

    MAR-2015

    SEMI-RIG

    CLASS DNV.GL

    Standard

  • OHSAS 45001 : 20182625

    ISO 14001 : 2015

    ISO 9001 : 2015

  • Supporting everywhere in the world

    2827

    Ideal Locations for Global MarineBusiness Operation

    Republic of Korea

    Malaysia

    China

    IndiaSingapore

    Indonesia

    Greece

    Nigeria

    Denmark

    France

    UKAmerica

    CONTACT US