PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION (PPVC) PPVC LIFTING BEST PRACTICES

Upload: others

Post on 22-Jan-2020

17 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION (PPVC)

PPVC LIFTING BEST PRACTICES

Page 2: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

INTRODUCTION

• Established in 1952

• Originally focused on Construction

• Currently present in nearly 90

countries

• Workforce >115,000 worldwide

• Bouygues is listed in Euronext’s

Eurolist (Compartment A) and

included in the CAC 40 Index

• Currently Bouygues has 5 major

divisions and many subsidiaries

• Incorporated in Singapore on 19 June 1992

• Registered with BCA as a General Contractor

• Certified to ISO9001, ISO14001, OHSAS18001

Management Systems

• Main business areas are Building Construction and

Associated Infrastructure, and Civil Engineering Works

• Company Representative: Mr. Julien Esch - MD

• Address: 10 Hoe Chiang Road, #23-01 Keppel Towers

Singapore 089315

BOUYGUES BATIMENT INTERNATIONAL

International Building Division

Construct ion Telecom Media

TRANSPORT

Page 3: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

CERTIFICATIONS

Page 4: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

DSPL PPVC PROJECTS

CROWNE PLAZA HOTEL EXTENSION

(STEEL PPVC)

WOODLANDS CARE HOME

(HYBRID PPVC)

Page 5: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

DSPL PPVC PROJECTS

World’s First

High-rise Residential PPVC

CLEMENT CANOPY

(CONCRETE PPVC)

Page 6: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC

WHAT IS PPVC

PPVC means a construction method whereby free-standing volumetric modules(complete with finishes for walls, floors and ceilings) are constructed and assembled inan accredited fabrication facility, in accordance with any accredited fabrication method,and then installed in a building under building works.

PRECAST FIT OUT PREFINISHED

Page 7: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

CHARACTERISTICS OF PPVC SYSTEM

RC Walls– Comprises 90mm thick walls located on two long sides of modules

Floor slab –Comprises 130mm thick RC floor slabs spanning across the shorter span of modules on beams.

Balcony and AC

Ledge- Balcony/AC slab will be cantilever

Ceiling – RC ceiling flat slab of 70mm thick is provided

This PPVC system

developed by

Dragages

Singapore is

particularly

suited for

building projects

as it provides

robustness on the

structure and

enhanced durability.

6 SIDED RC PPVC MODULE

Page 8: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

CONCRETE PPVC

CLEMENT CANOPY

Page 9: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

Page 10: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

• 1866 modules

• Modules weigh between 18

tons and 32 tons

• 2 towers & 40 storeys high

REQUIREMENTS

PPVC LIFTING BEST PRACTICES

Page 11: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

• Documentation

(MS, Lifting Plan, RA)

• Plant & Equipment

• Competent Team

KEY FOCUS AREAS

Page 12: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

• PPVC Mobilisation and Installation

• Loading and Unloading of PPVC

RISK ASSESSMENT

Page 13: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

• PPVC Mobilization and Installation

• MS for Erection and Assembly of PPVC Carcass

METHOD STATEMENT

Page 14: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

LIFTING PLAN

• To ensure safe

lifting of PPVC

Modules

• Prepare and curb

risks associated

with lifting

• To ensure lifting

procedures are

informed to

relevant persons

Page 15: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

Gantry Crane

• 2 nos 30 ton

• 2 nos 20 ton (synchronized)

• Production Capacity

➢12 days per module

FIT OUT FACTORY

Page 16: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

PPVC STORAGE ON SITE

PPVC is stored

such that Crane

Operators can

fully see the load

without

obstruction while

lifting

Page 17: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

HIGH-CAPACITY TOWER CRANES (LIEBHERR)

• Brought in from Germany

specifically for the Canopy

Project

• SWL: 40 ton

• First time to use these types

of cranes for residential

projects due to PPVC

technology

• MOM type-approved

crane

• More expensive but is safer

to use especially for lifting

at higher heights

Page 18: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

HIGH-CAPACITY TOWER CRANES

(LIEBHERR)

• Easier to erect and

dismantle due to

monoblock design

• Lighter weight

compared to other

cranes of the same

capacity

• Hammer-head type

which is the fastest

type of tower crane

• Higher end crane

due to newer

technical equipment

Page 19: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

HIGH-CAPACITY TOWER CRANES

(LIEBHERR)

• Micro-move function for precise

positioning and speed ideal for

PPVC Installation

• Electronic Monitoring System

(EMS) allows to precisely delimit

the working area

Page 20: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

HIGH-CAPACITY TOWER CRANES

(LIEBHERR)

• Data logger function

Page 21: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

SELF-BALANCING LIFTING FRAME

A special lifting

frame was

designed, approved

and fabricated

specifically to

ensure safety during

the lifting and

installation of the

heavy modules

Page 22: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

• Each wire rope SWL is 5T

• Each pulley SWL 8T

SELF-BALANCING LIFTING FRAME

Page 23: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

SELF-BALANCING LIFTING FRAME

• Daily Inspection by Lifting Supervisor

• Monthly Inspection by Method Manager

• Magnetic Particle Inspection – 6 months

• Steel Wires are replaced by each 7 floor

lifting of module installation.

PPVC LIFTING BEST PRACTICES

Page 24: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

Balanced Lift – Evenly spread load enables a balanced lifting.

Less manpower – Maximum of 2 riggers are enough to secure all the 12lifting hooks. (In conventional method tedious rigging work involved to balancethe load evenly by using additional chain blocks in all the hooking points).

Time saved – Easy to hook and faster. Ready to use.

Productivity- Improvement in the productivity and more modules are lifted.

Quality – High quality assured without any damage.

Compact storage - Does not occupy much space when not in use. Can bestored over an existing module.

Recycle and reuse - Can be detached and transferred to other similarprojects.

Zero Incidents - Ensures a complete safety during a lifting process.

ADVANTAGES OF SELF-BALANCING LIFTING FRAME

Page 25: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

DESIGNATED LIFTING TEAM

Page 26: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING BEST PRACTICES

ACHIEVEMENT

• Zero Lifting Incidents

• Zero Breakdown

• Schedule Faster

• More Safe Working Condition

• Employees Morale increased

• Zero Material Damages

Page 27: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

PPVC LIFTING VIDEO

PPVC LIFTING BEST PRACTICES

Page 28: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower
Page 29: PREFABRICATED PRE-FINISHED VOLUMETRIC CONSTRUCTION … · 2019-01-28 · PPVC LIFTING BEST PRACTICES Balanced Lift –Evenly spread load enables a balanced lifting. Less manpower

OUR SAFETY PLEDGE