preliminary · 2016. 4. 21. · 2 preliminary issue 24/03/2015 3 preliminary issue 1/04/2015 p p p....

4

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Preliminary · 2016. 4. 21. · 2 Preliminary Issue 24/03/2015 3 Preliminary Issue 1/04/2015 P P P. UP A200 3 A200 2 32.25 m² SEMINAR 3/ FUTURE STAFF WORKSPACE L1.05 45.65 m² WET
Page 2: Preliminary · 2016. 4. 21. · 2 Preliminary Issue 24/03/2015 3 Preliminary Issue 1/04/2015 P P P. UP A200 3 A200 2 32.25 m² SEMINAR 3/ FUTURE STAFF WORKSPACE L1.05 45.65 m² WET
Page 3: Preliminary · 2016. 4. 21. · 2 Preliminary Issue 24/03/2015 3 Preliminary Issue 1/04/2015 P P P. UP A200 3 A200 2 32.25 m² SEMINAR 3/ FUTURE STAFF WORKSPACE L1.05 45.65 m² WET

UP

UP

D

A200

3

A200

2

20.32 m²

MALEAMENITIES

G.01

119.08 m²

FOOD TECH.G.03

49.28 m²

CANTEENG.07

90.38 m²

SCIENCE 1G.11

90.38 m²

SCIENCE 2G.13

41.26 m²

STAFFWORKSPACE

G.14

COLLABORATIONSPACE 1

G.19

14.63 m²

ENTRYG.17

CIRCULATIONG.16

57.16 m²

SCIENCECLASSG.12

14.4 m²

PANTRYG.04

41.04 m²

DINING BG.06

7.21 m²

COOLSTORE

G.08

6.05 m²

UNISEX DIS.WCG.09

40.58 m²

DINING AG.05

A200

1

1A201

1A201

2A201

2A201

LINE OF BALCONY OVER

15.82 m²

SEMINAR 1G.10

F

C

D

1

2

3

4

5

A

A

6 7 8 11

13

13

12

129 10

ENTRY VOIDG.15

LIFT

BULKHEAD OVER

BULKHE

AD OVE

R

192

6332

10563

11516

9894

192

13621

2384

11551

12844

192

7493

68°

192 6332 3064 8556 8218 8556 5760 6105

192

192

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

LINE O

F ROOF

OVER

LINE OF ROOF OVER

LINE OF

LEVEL 1 OVER

SERVERY W

INDOW

SERVICESG.21

A200

4

A200

5A200

6

A200

7

LINE O

F ROOF O

VER

EXISTING B

RICK HOUSE

77.88°

EXISTING B

RICK H

OUSE

4458

6712

STAIR 2

STAIR 1

DISPLAY

20.33 m²

FEMALEAMENITIES

G.02

CLEANERG.23

58.18 m²

ENTRYLOBBY

G.20

1500

WATER

TANK

WATER

TANK

TR1

TR1

DF1

DF1

8A200

9A200

10A200

11A200

PREPARATIONROOMG.28

2 SIDED

FUME

CPBD

FULL HEIGHT CUPBOARD

STUDEN

T S

PACE

STUDEN

T S

PACE

OVERHEAD C

UPBOARD

OVERHEAD C

UPBOARD

OVERHEAD C

UPBOARD

OVERHEAD C

UPBOARD

WB WB

DEMO

WB

7.21 m²

DRY STOREG.29

SERVERY W

INDOW

LOW BENCHLOW BENCH

STANDARD BENCH

STANDARD BENCH STANDARD BENCH

STANDARD BENCH

12728

4412

7516

800

920920

FULL HEIGHT

PANTRY CUPBOARD

O/H SH

ELF

FR1

FR

FR

2no. BAIN MARIE

FR

DW

PREP

BENCH

MW MW

FRYER

FR

FR2

DWWM

EXHAUST OVER

1800

1500

O/H S

HELF

CASH

CASH

DEMO

DEMO

DEMO

O/H SHELF O/H SHELF

28 STUDENTS28 STUDENTS

28 STUDENTS

F1

A1

LINE O

F ROOF

OVER

LINE O

F C

ANOPY O

VER

LINE O

F C

ANOPY O

VER

LOOSE FURNITURE TO BE PROCURED BY SCHOOL

BUILDER TO ALLOW TO CO(ORDINATE AND PROGRAM

INSTALLATION OF FURNITURE.

PROVIDE ADEQUATE SECURITY UNTIL PRACTICAL

COMPLETION AND DURING DEFECT RECTIFICATION WORKS

LOOSE FURNITURE NOTES

4/26 commercial road fortitude valley brisbane qld 4000t: (07) 3839 5600 f: (07) 3839 5622e: [email protected]

3/577 little bourke street melbourne vic 3000t: (03) 9221 0999 f: (03) 9221 0998e: [email protected]

1/156 Clarence Street sydney nsw 2000t: (02) 9247 9422 f: (02) 9247 9433e: [email protected]

www.graypuksand.com.au

brisbane

melbourne

sydney

website

project title

address

drawing title

project number

drawing number revision

scale @ A1 approved

Contractors to use Architectural drawings for set out.Contractors to check and verify all Dimensions on Site prior toConstruction/Fabrication.Figured Dimensions take precedence over Scaled Dimensions.Any discrepancies should be immediately referred to the Architect.All work to comply with N.C.C. Statutory Authorities and relevantAustralian Standards.

revision

1 : 100

F:\Pro

ject F

iles\2014

\114130\Dra

wings\Revit\114130 A

l Siraat College.rvt

1/04/2015 4

:00:30 P

M

P 3

Al Siraat College SpecialistTechnology Building

45 Harvest Home Road,Epping North, VIC

Ground Floor Finishes &Furniture Plan

114130 MF

A105

Preliminary

revision description date

1 Preliminary Issue 26/02/2015

2 Preliminary Issue 24/03/2015

3 Preliminary Issue 1/04/2015

P

P

P

Page 4: Preliminary · 2016. 4. 21. · 2 Preliminary Issue 24/03/2015 3 Preliminary Issue 1/04/2015 P P P. UP A200 3 A200 2 32.25 m² SEMINAR 3/ FUTURE STAFF WORKSPACE L1.05 45.65 m² WET

UP

A200

3

A200

2

32.25 m²

SEMINAR 3/FUTURESTAFF

WORKSPACEL1.05

45.65 m²

WET AREA 2L1.12

60.55 m²

VIS. COMM�BL1.04

86.46 m²

ROBOTICSL1.02

16.55 m²

EQUIPMENTSTOREL1.03

35.17 m²

SEMINAR 2L1.01

103.42 m²

3D ART/FABRICS/

PRINTL1.06

87.13 m²

PLASTICSL1.07

85.6 m²

CERAMICSL1.09

49.38 m²

CIRCULATIONL1.10

6.93 m²

WORK INPROGRESS

STOREL1.08

88.17 m²

BREAKOUTL1.11

16.33 m²

COLLABORATIONL1.13

A200

1

1A201

1A201

2A201

2A201

41.44 m²

EXTERNALDECKL1.15

(OPTIONAL)

F F

C

D

1

2

3

4

5

A

A

6 7 8 11

13

13

12

129 10

VOID BELOW

VOID BELOW

1.87 m²

SERVICESL1.14

4.41 m²

LIFTG.22

192

192

6332

10563

11516

9894

192

13621

7493

192

12844

11551

192 6332 3064 8556 8218 8556 5760 6105

A200

4

A200

5A200

6

A200

7

68°

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

LINE OF

ROOF

OVER

LINE O

F ROOF

OVER

LINE OF ROOF OVER

EXISTING B

RICK HOUSE

77.88°

EXISTING B

RICK H

OUSE

STAIR 1

STAIR 2

4458

6712

10A200

11A200

14.29 m²

EQUIPMENT(TEACHER)

L1.18

6.37 m²

KILN ROOML1.19

29.2 m²

EQUIPMENT(STUDENT)

L1.20

LOW BENCH

STANDARD BENCH

LOW BENCH

HEAVY DUTY BENCH

OVEN

CHANGE RM

FULL C

UPD

IRONING CUPB

PRINTING PRESS

WB

LOW BENCHLOW BENCH

POTTERY

WHEELS

VACUUMHEATER

DUST

DUST

BELT

SANDERDISC

BELT

SANDERDISC

DRILL

DRILL

SCROLL S

AW

TABLE SAW

BAND S

AW

HEATER

6.93 m²

WORK INPROGRESS

STOREL1.21

BENCH

F1

FENCE/ GATE

PB

PB

LCD

PB

PB

15.29 m²

QUIET/MEDIAL1.23

15.29 m²

MEDIA/ VCECORDINATOR

L1.24

A1

1200

60.27 m²

VIS COMM�AL1.25

9612

4.35 m²

COMMSL1.26

LINE O

F C

ANOPY B

ELOW

LINE O

F C

ANOPY B

ELOW

LOOSE FURNITURE TO BE PROCURED BY SCHOOL

BUILDER TO ALLOW TO CO&ORDINATE AND PROGRAM

INSTALLATION OF FURNITURE.

PROVIDE ADEQUATE SECURITY UNTIL PRACTICAL

COMPLETION AND DURING DEFECT RECTIFICATION WORKS

LOOSE FURNITURE NOTES

4/26 commercial road fortitude valley brisbane qld 4000t: (07) 3839 5600 f: (07) 3839 5622e: [email protected]

3/577 little bourke street melbourne vic 3000t: (03) 9221 0999 f: (03) 9221 0998e: [email protected]

1/156 Clarence Street sydney nsw 2000t: (02) 9247 9422 f: (02) 9247 9433e: [email protected]

www.graypuksand.com.au

brisbane

melbourne

sydney

website

project title

address

drawing title

project number

drawing number revision

scale @ A1 approved

Contractors to use Architectural drawings for set out.Contractors to check and verify all Dimensions on Site prior toConstruction/Fabrication.Figured Dimensions take precedence over Scaled Dimensions.Any discrepancies should be immediately referred to the Architect.All work to comply with N.C.C. Statutory Authorities and relevantAustralian Standards.

revision

1 : 100

F:\Pro

ject F

iles\2014

\114130\Dra

wings\Revit\114130 A

l Siraat College.rvt

1/04/2015 4

:01:25 P

M

P 3

Al Siraat College SpecialistTechnology Building

45 Harvest Home Road,Epping North, VIC

Level 1 Finishes & FurniturePlan

114130 MF

A113

Preliminary

revision description date

1 Preliminary Issue 26/02/2015

2 Preliminary Issue 24/03/2015

3 Preliminary Issue 1/04/2015

P

P

P