0 PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT (NABARD) (NABARD) (NABARD) (NABARD) BLOCK: BLOCK: BLOCK: BLOCK: KISKO & LOHARDAGA KISKO & LOHARDAGA KISKO & LOHARDAGA KISKO & LOHARDAGA DISTRICT: LOHARDAGA DISTRICT: LOHARDAGA DISTRICT: LOHARDAGA DISTRICT: LOHARDAGA PIA PIA PIA PIA SAMRIDHI FOUNDATION SAMRIDHI FOUNDATION SAMRIDHI FOUNDATION SAMRIDHI FOUNDATION NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: LOHARDAGA LOHARDAGA LOHARDAGA LOHARDAGA- - -NABARD NABARD NABARD NABARD- - -1 1 1/ / /201 201 201 2015 5 5- - -16 16 16 16 SUBMITTED TO SUBMITTED TO SUBMITTED TO SUBMITTED TO NATIONAL BANK FOR AGRI NATIONAL BANK FOR AGRI NATIONAL BANK FOR AGRI NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT CULTURE AND RURAL DEVELOPMENT CULTURE AND RURAL DEVELOPMENT CULTURE AND RURAL DEVELOPMENT RANCHI RANCHI RANCHI RANCHI STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY- - - JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT 4 4 4 TH TH TH TH FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI- - - 834004 834004 834004 834004 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 - - - 651 651 651 651- - -2446217 2446217 2446217 2446217, 2401974 , 2401974 , 2401974 , 2401974 E E E- - -MAIL : MAIL : MAIL : MAIL : [email protected], WEB SITE: WEB SITE: WEB SITE: WEB SITE: www.jswm.nic.in

Upload: donhan

Post on 02-May-2018

238 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

0

PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)

NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT

(NABARD)(NABARD)(NABARD)(NABARD)

BLOCK: BLOCK: BLOCK: BLOCK: KISKO & LOHARDAGAKISKO & LOHARDAGAKISKO & LOHARDAGAKISKO & LOHARDAGA

DISTRICT: LOHARDAGADISTRICT: LOHARDAGADISTRICT: LOHARDAGADISTRICT: LOHARDAGA

PIAPIAPIAPIA

SAMRIDHI FOUNDATIONSAMRIDHI FOUNDATIONSAMRIDHI FOUNDATIONSAMRIDHI FOUNDATION

NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: LOHARDAGALOHARDAGALOHARDAGALOHARDAGA----NABARDNABARDNABARDNABARD----1111////2012012012015555----16161616

SUBMITTED TOSUBMITTED TOSUBMITTED TOSUBMITTED TO

NATIONAL BANK FOR AGRINATIONAL BANK FOR AGRINATIONAL BANK FOR AGRINATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTCULTURE AND RURAL DEVELOPMENTCULTURE AND RURAL DEVELOPMENTCULTURE AND RURAL DEVELOPMENT

RANCHIRANCHIRANCHIRANCHI

STATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCY---- JHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSION

DEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENT

4444THTHTHTH FLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHI---- 834004834004834004834004

TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 ---- 651651651651----2446217244621724462172446217, 2401974, 2401974, 2401974, 2401974

EEEE----MAIL : MAIL : MAIL : MAIL : [email protected], WEB SITE:WEB SITE:WEB SITE:WEB SITE: www.jswm.nic.in

Page 2: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

1

PROPOSED PROJECT LOHARDAGA-NABARD-1/2015-16

Page 3: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

2

Format for Preliminary Project Report (PPR)

I. Institutional Structures.

I. A. State Level Nodal Agencies

I. B. District Level Watershed Units

II. Selection of Watershed Projects

III. Profile of the each selected watershed project

IV. Agro-climatic condition of project area.

V. Demography & land distribution

VI. Livelihoods

VII. Expected project out comes

VIII. Mandatory certificates

IX. Status of on-going projects

X. Abstract of project proposed for sanction

Page 4: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

3

I. Institutional Structures

I. A. State Level Nodal Agencies (SLNAs):

Table-PPR 1: Details of SLNA

1 2 3 4 5 6

Sl.No. State Type of SLNA# Date of Notification Date of MoU with

DoLR Total no. of members of SLNA

1 Jharkhand

Jharkhand state Watershed Mission (No.

103/2009-10 dated 17/7/2009, Registered

Under society registration Act 21 of 1860, )

4673 Dated 20-06-09

Under Process 19 including (CEO)

Whether it is a Department /Mission/ Society/Authority/Others (pl. specify) Society (contd.)

Table-PPR 1: Details of SLNA (Contd.)

7 8

Chairperson CEO

Name Designation Name Designation Date of

Appointment Nature of

appointment Tenure (No.

of Years) Contact Ph. No./Fax/E-

Mail

Governing Body: Mr. SUDHIR

PRASAD, IAS

Development Commissioner

Mr B Nijalingappa, IFS

Chief Executive Officer State Level Nodal

Agency-Jharkhand State Watershed Mission Rural Development

Department Govt. of Jharkhand

Vide notification

no. 887 dated 22-02-2010

On deputation 3 Years

0651-2401974

[email protected],

[email protected]

Executive Committee-

Mr. ARUN, IAS

Secretary, Rural

Development # APC/ ACS/ Dev. Commissioner/ Others (pl. specify) $ Deputation/ Contract

Page 5: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

4

Table - PPR 2: Details of functionaries in the JSWM-SLNA

Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR

Sl.No Name &

Designation

Monthly

remuneration

Date of

Appointment

Nature of

appointment

Tenure

(No. of

years)

Contract Ph. No. /

E-mail

Subject of

Expertise

Qualification Experience Role

1.

Shri Madan Sengupta

Administrative Officer

40,000 26-05-2010 On Contract 1 Yr. 9431114862

[email protected]

Law &

Administration

M.Sc.

(Geology), LLB.

About 32

Years experience.

Administration, Supervision, EC

/GB Meetings organisations etc.

2.

Shri. Narayan

Kumar Mishra Technical Expert

(Agriculture /Agril. Engineering)

50,000 29

th May,

2010 On contract 1 Yr.

9431574367, [email protected]

Watershed Management, Soil

and Water Conservation, GIS & Remote

Sensing

Master of Engineering (Ag), B Tech

(Agril. Engineering).

PGDRD, NET, GATE

12years of relevant

experiences in watershed

mgt. and development,

agriculture

dev., rural and social

dev.,

To give the technical

assistance & Monitoring &

evaluation of the projects.

3.

Shri. Anupam

Bharti Technical Expert

(Livelihood)

50,000 29.05.10 On Contract 1 Yr.

9308351370

[email protected],

Horticulture, Rural development

M Sc (horticulture)

10 years of

relevant experience in

agriculture, rural dev.,

horticulture, marketing,

retail

To give the

technical assistance &

Monitoring & evaluation of the

projects.

4.

Shri. Kaushlendra

Kumar

Techninical Expert in Capacity Building

(Water Management)

50,000 29.05.2010 On contract 1 Yr. 9431071292

[email protected]

Soil & Water

Conservation and Watershed

managemrnt

B Tech

(Agricultural Engineering ),

M Tech in

Agricultural Engineering

(Soil and Water

Conservation) and PGDRD

12 years of

working experiences in

watershed

management, soil and water conservation,

rural

development and GIS

To give the technical

assistance & Monitoring &

evaluation of the projects

5.

Shri. Lakhan Lal

Mahato GIS Expert

40,000 29-05-2010 On Contract 1 Yr. 9470335956

[email protected]

GIS & Remote

Sensing

M.Tech

(Remote Sensing)

14 years In the field of

GIS and Remote Sensing

GIS, RS and

Geodatabase management

6. Smt. Jyoti Pushpa

Finance Officer 40,000 24.08.2010 On Contract 1 Yr.

9905582591 [email protected]

Accountancy CA 13 Years Finance Management

7.

Smt. Pratibha

Kumari Accounts Officer

35,000 15.09.2010 On Contract 1 Yr. [email protected]

m Finance

M Com, MBA

in Finance

5 Yrs 6

Months

Accounts Management

8. Smt. Shyama,

Account Assistant 25,000 1

st June 2010 On Contract 1 Yr. 9472018349 Finance

M Com, MBA in Finance

8 years Accounting

9. Shri. Ajeet Kumar 25,000 26th May, On Contract 1 Yr. 9471764888/ Accounts M.com 7 years Accounting,

Page 6: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

5

Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR

Sl.No Name &

Designation

Monthly

remuneration

Date of

Appointment

Nature of

appointment

Tenure

(No. of

years)

Contract Ph. No. /

E-mail

Subject of

Expertise

Qualification Experience Role

Ravi Account Assistant

2010 [email protected] (Finance), B Com

(Account Hons)

Auditing, Taxation etc

10. Shri. Vipul Akash

Programmer 25,000

25th February, 2014

On Contract 1 Yr. 9472741901 /

[email protected] MIS Expert MCA 5 years

MIS Expert, On line MIS Entry

11.

Shri. Amrendra

Kumar DEO-cum-Assistant

15,000 29-05-2010 On Contract 1 Yr. 9431184303 /

[email protected] Database Admin. MCA About 7 Years

File dispatch and receipt

12. Tulsi Ram

DEO-cum-Assistant 15,000

13th June,

2012 On Contract 1 Yr. [email protected] computer operator BCA 8 years

Data Entry &

Assistant

13. Promod Rajak

DEO-cum-Assistant 15,000 8

th June, 2012 On Contract 1 Yr.

8539809046 [email protected]

computer operator MCA 6 years

Data Entry &

Website maintance

14. Md. M.H.Imam

DEO-cum-Assistant 15,000 6

th June, 2012 On Contract 1 Yr.

9304334055 [email protected]

computer operator M.Sc (IT),

MBA 9 Years

Data Entry & Assistant

Note: 1. Total outlay per Month for 12 SLNA-JSWM staffs under IWMP is Rs. 4.40 Lakhs

R – Recurring; NR- Non-recurring

* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.

Page 7: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

6

Table PPR-3: Details of State Level Data Cell (SLDC) functionaries

1 2 3 4 5 6 7 8 9

S. No

Total no. of the

persons

working

in the

SLNA for

IWMP

Name & Designation Qualification Experience

Work allocation Monthly remuner

ation

(Rs.)

Total budget of SLDC

(Rs. In Lakh)

Funding expected from DoLR

(Rs. In Lakh)

R NR R NR

1 1 Shri. Vinod Kumar. V. H, Project Co-ordinator

M Tech (Water Resources)

6 years Creation and updation of Geodatabase under IWMP Project using satellite data

30,000.00

2 1 Shri. Anuj Shankar, MIS State Coordinator

MCA 4 years Updation of all the thematic layer using MIS Software development

15000.00

3 3 Shri. Abdul Saqoor, Field Supervisor

M Sc (IT) 5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

4 Vishal Kumar Field Supervisor

B Sc (Fisheries), MBA, Rural Management

5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

5 Ratnesh Kumar Sharma Field Supervisor

M Sc (Math), Advance Diploma in Computer Application

6 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project

10000.00

Total 5 65,000.00

Note- 1. Payment of above experts / staffs is being paid by state budget of JSAC

2. SLDC has been established at JSAC. However it is planning to establish SLDC in the office of JSWM. R – Recurring; NR- Non-recurring

* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.

Page 8: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

7

I. B. District Level Watershed Units Table-PPR 4: Details of functionaries in the DRDA Watershed Cell*

S. No.

Name of the

District

Name of the

executing Agency#

Status of Chairman

@

Date of signing of MoU

with SLNA

Total no. of persons

working for Watershed programme

Names & Designation

Qualification Experience Work allocation

24

IWMP Districts

WCDC D.C NA 3 ( in each

district)

1. Technical Expert

Bachelor degree in the fields of agriculture/ horticulture/hydrology/soil engineering and animal husbandry with goog academic records

The candidate should have at least 5 years field / research experience in the fields of soil and water conservation/ forestry/ dry land agriculture/horticulture/ watershed management or related fields like assessment, management and mitigation of drought climatic and other associated risks, crop husbandry, crop specific technology, horticultural practices, livelihoods, animal husbandry etc

Remarks: 1. The committee will advice the district data cell for monitoring and evaluation. 2. The committee will facilitate for preparing of prospective plan 3. The committee will identify voluntary organization

2. Accountant

A serving govt. officer on deputation or a retd. Govt. officer from a finance/ accounts service

5 years experience in related work at reputed firm/organization

3. Data Entry Operator

BSc Hons (Computer Science) or BCA or PGDCA or MCA will be preferred.

2 years experience in field of MIS

(contd.)

11 12

Monthly remuneration/year in each district (in Rs.)

Total Annual budget of Watershed Cell in each district (Rs. In Lakh)

R NR

1. Technical Expert - 25000 / 3 Lakh 2. Accountant - 10000/1.20 Lakh 3. DEO - 7500/0.9 Lakh

5.10 lakh 4.00 lakh

R – Recurring; NR- Non-recurring

*From column no. 2, no. of districts; from column no. 3, no. of executive agencies; from column no. 6, no. of persons working in the executive agencies of watershed programme; from column no.7, total no. of personnel engaged in the watershed cells, from column no. 11 to 13, totals for the State may be indicated at the end of the table. WCDC/ DRDA/Zilla Parishad (ZP)/ State Department (please specify)/ Any other (Please specify) @collector/CEO ZP/ CDO/ DDO/ PD/ Any other (please specify)

Page 9: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

8

II. SELECTION OF WATERSHED PROJECTS Table-PPR 5: Status of District-wise area covered under the watershed programme* (MIS Table-M(SP)2)

S. no.

Names of Districts

Total micro-watersheds in the

District

Micro-watersheds covered so far

Net watersheds to be covered

Dept. of Land Resources

Other Ministries/ Depts.

Total watersheds covered

Pre-IWMP projects (DPAP + DDP +

IWDP)

Any other watershed project

No. Area (ha.) No. Area (ha.) No. Area (ha.) No. Area (ha.) No. Area (ha.)

1 Lohardaga 195 1,47,621 12 8,070 21 11,367 33 19,437 83 89,768

Note: As per State Specific Perspective Plan (SPSP) 79 Micro-Watersheds ( Area: 38,416.00 Ha) is not available for treatment due to Urban areas,

Habitations, Mining areas, Water bodies etc.

STATUS OF IWMP PROJECTS SANCTIONED OF LOHARDAGA DISTRICT

S.No District Block Name of Project No. of Cluster

No. of MWS

Treatable Area ( in Ha)

1.

Lohardaga

Lohardaga, Senha Lohardaga-IWMP-

1/2010-11 1 6 4550.24

2. Lohardaga &

Kisko Lohardaga-IWMP-

2/2012-13 1 7 5543.43

3. Kudu & Chandwa Lohardaga-IWMP-

3/2012-13 1 8 5555.87

4. Kudu Lohardaga-IWMP-

4/2013-14 1 6 5000.0000

5. Bhandra Lohardaga-IWMP-

5/2013-14 1 6 5392.2513

Total 5 33 26,041.7913

Page 10: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

9

Table-PPR 6: Prioritized list of projects proposed for sanction during the financial year 2015-16

1 2 3 4 5 6 7 8

S. No.

District Name of the

project

No. of micro-

watersheds

proposed to

covered

Proposed project area (ha)

Type of project (Hilly/Desert/Others)

Proposed cost (Rs. In lakh)

Weight age under the criteria#

i ii iii iv v vi vii viii ix x xi xii xiii Total

1 Lohardaga NABARD 6 5430.9364 Others 1086.1873 10 10 5 10 10 5 15 7.5 10 5 5 10 00 102.5

Sources of Data: JSAC, Deptt. of IT, GoJ

# Criteria and weight age for selection of watershed

S No.

Criteria Maximum score

Ranges & scores

i Poverty index(%of poor to population)

10 Above 80% (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20% (2.5)

ii % of SC/ST population 10 More than 40% (10) 20 to 40 % (5) Less than 20% (3)

iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)

Actual wages are equal to or higher than minimum wages (0)

iv % of small and marginal farmers

10 More than 80% (10) 50 to 80% (5) Less than 50 (3)

v Ground water status 15 Over exploited (15) Critical (10) Sub critical (5) Safe (0)

vi Moisture index/ DPAP/DDP Block

10 -66.7 & below (10) DDP Block

-33.3 to -66.6 (5) DPAP Block

0 to -33.2 (0) Non DPAP/DDP Block

vii Area under assured irrigation

15 Less than 10% (15) 10 to 20% (10) 20 to 30% (5) Above 30% (Reject)

viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0)

ix Degraded land 15 High – above 20% (15) Medium – 10 to 20 % (10) Low – less than 10 % of TGA (5)

x Productivity potential of the land

10 Lands with low production & where productivity can be significantly enhanced with reasonable efforts

Land with moderate production & where productivity can be enhanced with reasonable efforts (5)

Lands with high production & where productivity can be marginally enhanced with reasonable efforts

Page 11: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

10

S No.

Criteria Maximum score

Ranges & scores

(10) (0)

xi Contiguity to another watershed that has already been developed/treated

10 Contiguous to previously treated watershed & contiguity within the micro watersheds in the project (10)

Contiguity with in the micro watersheds in the project but non contiguous to previously treated watershed (5)

Neither contiguous to previously treated watershed nor contiguity within the micro watersheds in the

project (0)

xii Cluster approach in the

plains (more than one contiguous micro-watersheds in the project)

15 Above 6 micro-

watersheds in cluster (15)

4 to 6 micro watersheds in

cluster (10)

2 to 4 micro watersheds

in cluster (5)

xiii Cluster approach in the hills (More than one contiguous micro- watersheds in the project)

15 Above 5 micro-watersheds in cluster (15)

3 to 5 micro watersheds in cluster (10)

2 to 3 micro watersheds in cluster (5)

Total 150 150 90 41 2.5

Page 12: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

11

III) PROJECT WISE PROFILE OF THE SELECTED WATERSHED PROJECT

Table PPR-7: Project at a Glance (Summary)

1 Name of the State JHARKHAND

2 Name & type# (Hilly/ Desert/ Others) of project

OTHERS

3 Name of the District LOHARDAGA

4 Name of the Blocks KISKO & LOHARDAGA

5 Name of Gram Panchayats

BAGRO BETHOT HISRI JORI KHARKI

MANHO NIGINI PAKHAR PARHEPAT RORAD

6

Names & Census

Code of Villages

covered

S.No VILLAGE NAME CENSUS CODE

S.No VILLAGE NAME CENSUS CODE

1 Anandpur 02634000 16 Huahar 02633700

2 Bagru 02630800 17 Jori 02642800

3 Bamandiha 02643200 18 Kaimo 02644800

4 Banjarkisko 02642700 19 Kekrang 02631200

5 Banpur 02631000 20 Kharki 02633300

6 Barnag 02633200 21 Kisko 02633900

7 Bethat 02634400 22 Kocha 02633100

8 Bhusar 02630900 23 Lawagain 02634200

9 Bitlaung 02633400 24 Nigni 02643300

10 Burgaon 02642600 25 Pakhar 02631300

11 Chanpi 02630700 26 Parhepat 02633800

12 Chhechhranawadih 02633600 27 Patgachha 02634100

13 Datma 02631100 28 Saheda 02642900

14 Hesapiri 02634300 29 Semardih 02633500

15 Hisri 02630400 30 Waina 02643000

7

Names & Census

Code of micro-

watersheds

Sl. No. Micro

watershed Code

Geographical Area of the

Village

Proposed Area to be

treated

Budget (Proposed

Area x 0.20) Remarks

1 4H1F3c3a 790.5762 679.5587 135.9117 Proposed Area to be treated =

PF/Others+ Rainfed+

Per.Pasture+ Cult.WL

2 4H1F3c3b 832.7328 723.3461 144.6692

3 4H1F3c3c 1023.5491 925.2602 185.052

4 4H1F3c3d 1007.9579 877.3708 175.4742

5 4H1F3c3e 634.8538 553.3546 110.6709

6 4H1F3c3f 1893.4975 1672.0460 334.4092

GRAND TOTAL 6183.1673 5430.9364 1086.187

8 Four major reasons � IAP District ( District is affected by Left Wing Extremist (LWE)

Page 13: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

12

for selection of watershed

� Erosion prone area

� Poor human development index

� Improper utilization of Natural Resources

9 Area of the Project (ha.) 6183.1673

10 Area proposed to be treated (ha.) 5430.9364

11 Project cost (Rs. In Lakhs) 1086.187

12 Name & Address of proposed PIA

SAMRIDHI FOUNDATIONSAMRIDHI FOUNDATIONSAMRIDHI FOUNDATIONSAMRIDHI FOUNDATION

13 Any other (please specify)

-

Page 14: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

13

Table – PPR 8: Details of previously identified DPAP /DDP areas proposed under IWMP (ha.) during the financial year 2015-16

1 2 3 4 5 6 7 8 9 10 11 12

S. No.

Names of Districts

Name of the

project proposed

Name of Block

Type of District (DPAP/ DDP

/IWDP/IAP)

Area of District (ha.)

No. of IWMP projects

sanctioned in the District

Area of sanctioned Projects (in

Ha)

Net area to be

covered

Area of the proposed project

Area proposed to be

covered by

schemes other

than DoLR

Net balance area

1. Lohardaga NABARD KISKO &

LOHARDAGA IWDP 1,50,160.49 5 26,041.7913 97,838.00 5430.9364 NA 66365.27

Page 15: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

14

Table – PPR 9: Land Use pattern to the project*

DISTRICT: LOHARDAGA, BLOCK: KISKO & LOHARDAGA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographical

Area of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

1 4H1F3c3a 790.5762 Bagru 59.5293 0.0000 0.0000 0.0000 24.5834 21.7514 2.8320 0.0000 33.8721 1.0738 55.6235 11.1247

Bamandiha 125.7079 0.0000 0.0000 0.0000 100.4387 90.8568 9.5818 1.1015 19.4677 4.7000 111.4260 22.2852

Bethat 238.2248 0.0000 0.0000 0.0000 198.1723 179.2666 18.9056 2.2074 31.4103 6.4348 212.8843 42.57686

Burgaon 0.0200 0.0000 0.0000 0.0000 0.0200 0.0177 0.0023 0.0000 0.0000 0.0000 0.0177 0.00354

Kaimo 61.9963 0.0000 0.0000 0.0000 51.2689 45.8703 5.3986 0.0000 3.8939 6.8335 49.7642 9.95284

Nigni 112.4387 0.0000 0.0000 0.0000 111.3263 100.7058 10.6205 1.1124 0.0000 0.0000 101.8182 20.36364

Waina 192.6593 0.0000 0.0000 0.0000 139.7303 126.4000 13.3303 1.1402 20.4846 31.3042 148.0248 29.60496

Total 790.5762 0.0000 0.0000 0.0000 625.5399 564.8686 60.6712 5.5615 109.1286 50.3463 679.5587 135.91174

2 4H1F3c3b 832.7328 Bagru 377.5007 152.7697 0.0000 152.7697 189.2583 171.2031 18.0552 1.1904 0.0000 34.2823 325.1632 65.03264

Bethat 111.4341 0.0000 0.0000 0.0000 109.2644 98.8406 10.4238 1.1102 1.0595 0.0000 101.0103 20.20206

Bhusar 203.6981 78.1217 0.0000 78.1217 105.8588 95.7599 10.0989 1.1065 0.0000 18.6111 174.9880 34.9976

Hesapiri 98.3474 0.0000 0.0000 0.0000 98.3474 87.9914 10.3560 0.0000 0.0000 0.0000 87.9914 17.59828

Hisri 3.1073 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3.1073 0.0000 0

Lawagain 38.6451 0.0000 0.0000 0.0000 38.6451 34.1932 4.4519 0.0000 0.0000 0.0000 34.1932 6.83864

Total 832.7328 230.8914 0.0000 230.8914 541.3740 487.9881 53.3859 3.4071 1.0595 56.0007 723.3461 144.66922

3 4H1F3c3c 1023.5491 Anandpur 18.6126 0.0000 0.0000 0.0000 18.6126 16.4684 2.1442 0.0000 0.0000 0.0000 16.4684 3.29368

Banpur 192.6648 90.4940 0.0000 90.4940 97.1448 86.9154 10.2293 0.0000 0.0000 5.0260 177.4095 35.4819

Bhusar 482.9640 305.0275 0.0000 305.0275 138.0556 124.8851 13.1705 1.1398 0.0000 38.7410 431.0525 86.2105

Chanpi 0.0160 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0160 0.0000 0

Kekrang 192.7367 178.0358 0.0000 178.0358 1.9161 1.6954 0.2207 0.0000 0.5094 12.2754 180.2406 36.04812

Lawagain 11.4359 0.0000 0.0000 0.0000 11.4359 10.1185 1.3174 0.0000 0.0000 0.0000 10.1185 2.0237

Patgachha 102.1569 0.0000 0.0000 0.0000 102.1569 92.4111 9.7458 0.0000 0.0000 0.0000 92.4111 18.48222

Semardih 22.9621 17.5596 0.0000 17.5596 0.0000 0.0000 0.0000 0.0000 0.0000 5.4025 17.5596 3.51192

Total 1023.5491 591.1170 0.0000 591.1170 369.3220 332.4940 36.8280 1.1398 0.5094 61.4609 925.2602 185.05204

4 4H1F3c3d 1007.9579 Anandpur 60.3069 0.0000 0.0000 0.0000 46.9244 41.5187 5.4057 0.0000 4.3492 9.0333 45.8679 9.17358

Bamandiha 12.5033 0.0000 0.0000 0.0000 12.5033 11.0629 1.4404 0.0000 0.0000 0.0000 11.0629 2.21258

Banpur 185.9689 61.1789 0.0000 61.1789 110.1201 99.6146 10.5055 1.1112 11.8459 1.7128 173.7506 34.75012

Page 16: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

15

DISTRICT: LOHARDAGA, BLOCK: KISKO & LOHARDAGA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographical

Area of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Bethat 123.9789 0.0000 0.0000 0.0000 122.8555 111.1351 11.7204 1.1234 0.0000 0.0000 112.2585 22.4517

Datma 103.9951 57.3518 0.0000 57.3518 46.6433 41.2700 5.3733 0.0000 0.0000 0.0000 98.6218 19.72436

Hesapiri 121.3758 0.0000 0.0000 0.0000 120.2545 108.7822 11.4723 1.1213 0.0000 0.0000 109.9035 21.9807

Jori 37.5567 0.0000 0.0000 0.0000 31.1823 27.5901 3.5922 0.0000 0.0000 6.3744 27.5901 5.51802

Kekrang 3.3291 3.3291 0.0000 3.3291 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3.3291 0.66582

Lawagain 134.2490 0.0000 0.0000 0.0000 132.0609 119.4623 12.5986 1.1331 1.0417 0.0132 121.6371 24.32742

Patgachha 2.2479 0.0000 0.0000 0.0000 2.2479 1.9890 0.2590 0.0000 0.0000 0.0000 1.9890 0.3978

Saheda 203.7553 0.0000 0.0000 0.0000 159.9880 144.7251 15.2629 1.1614 11.5661 31.0398 157.4527 31.49054

Semardih 2.5620 2.5620 0.0000 2.5620 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.5620 0.5124

Waina 16.1290 0.0000 0.0000 0.0000 12.8227 11.3455 1.4772 0.0000 0.0000 3.3063 11.3455 2.2691

Total 1007.9579 124.4218 0.0000 124.4218 797.6029 718.4956 79.1073 5.6504 28.8030 51.4798 877.3708 175.47416

5 4H1F3c3e 634.8538 Anandpur 154.2385 0.0000 0.0000 0.0000 134.0244 121.2384 12.7859 1.1354 6.5591 12.5197 128.9330 25.7866

Banpur 0.4003 0.0000 0.0000 0.0000 0.4003 0.3542 0.0461 0.0000 0.0000 0.0000 0.3542 0.07084

Chhechhranawadih 52.5220 1.7474 0.0000 1.7474 50.5218 45.2019 5.3199 0.0000 0.2167 0.0361 47.1660 7.0749

Datma 225.7369 40.3731 0.0000 40.3731 143.8874 130.1605 13.7269 1.1456 31.6480 8.6829 203.3272 40.66544

Huahar 18.5855 0.0000 0.0000 0.0000 9.5667 8.4647 1.1021 0.0000 0.0000 9.0188 8.4647 1.69294

Jori 18.8344 0.0000 0.0000 0.0000 18.8344 16.6647 2.1697 0.0000 0.0000 0.0000 16.6647 3.33294

Parhepat 129.2587 0.0000 0.0000 0.0000 112.1041 101.4094 10.6947 1.1134 11.1863 4.8550 113.7090 22.7418

Semardih 35.2773 30.5524 0.0000 30.5524 4.6994 4.1581 0.5414 0.0000 0.0255 0.0000 34.7360 6.9472

Total 634.8538 72.6728 0.0000 72.6728 474.0385 427.6518 46.3868 3.3944 49.6356 35.1124 553.3546 110.67092

6 4H1F3c3f 1893.4975 Banjarkisko 20.1351 0.0000 0.0000 0.0000 15.4307 13.6531 1.7776 0.0000 2.0509 2.6535 15.7040 3.1408

Barnag 162.6154 61.7654 0.0000 61.7654 67.1597 60.0877 7.0719 0.0000 27.0139 6.6765 148.8670 29.7734

Bitlaung 121.1315 0.0000 0.0000 0.0000 106.8451 96.6521 10.1930 1.1079 9.6893 3.4891 107.4494 21.48988

Chhechhranawadih 9.2064 0.2877 0.0000 0.2877 8.6418 7.6462 0.9955 0.0000 0.2769 0.0000 8.2108 1.2316

Datma 2.1132 2.1132 0.0000 2.1132 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1132 0.42264

Huahar 19.3516 0.0000 0.0000 0.0000 18.0028 15.9288 2.0739 0.0000 0.0000 1.3488 15.9288 3.18576

Jori 0.9862 0.0000 0.0000 0.0000 0.9120 0.8069 0.1051 0.0000 0.0742 0.0000 0.8812 0.17624

Kharki 120.1158 0.0000 0.0000 0.0000 54.0742 48.3802 5.6940 0.0000 51.0519 14.9898 99.4320 19.8864

Kisko 72.7553 0.0000 0.0000 0.0000 42.6907 37.7727 4.9180 0.0000 0.8723 29.1922 38.6451 7.72902

Page 17: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

16

DISTRICT: LOHARDAGA, BLOCK: KISKO & LOHARDAGA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl.

No.

Micro

Watershed

Code

Area of the

Micro

Watershed

Village

Name

Geographical

Area of the

Village

(Full/Part)

Forest

Area

(7+8)

RF PF/

Others

Agricultural

Land in use

(10+11)

Rainfed Irrigated

Land

Permanent

Pasture

Wasteland Proposed

Area to be

treated

(7+8+10+

12+13)

Budget

(Proposed

Area X 0.20)

(Rs.in Lakh) Cultivable

Non

Cultivable

Kocha 30.8934 19.9469 0.0000 19.9469 10.9465 9.6854 1.2610 0.0000 0.0000 0.0000 29.6323 5.92646

Pakhar 233.6612 159.0479 0.0000 159.0479 32.8352 29.0525 3.7826 0.0000 20.7201 21.0580 208.8206 41.76412

Parhepat 432.8546 0.0000 0.0000 0.0000 390.4469 357.0637 33.3832 2.9876 0.0003 39.4199 360.0515 72.0103

Semardih 667.6779 416.9184 0.0000 416.9184 160.4542 145.1469 15.3073 1.1612 73.0835 16.0605 636.3100 127.262

Total 1893.4975 660.0795 0.0000 660.0795 908.4396 821.8763 86.5632 5.2567 184.8335 134.8883 1672.0460 334.4092

Grand Total 6183.1673 1679.1825 0.0000 1679.1825 3716.3169 3353.3745 362.9424 24.4099 373.9695 389.2885 5430.9364 1086.1873

Source of data: JSAC, Department of IT, Govt. of Jharkhand.

Page 18: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

17

IV. AGRO – CLIMATIC CONDITION Briefly describe the agro- climatic condition of project area including the Agro-climatic zone of project area, soil types, rainfall, major crops, etc.

Table – PPR 10: Details of Agro – climatic condition*

1 2 3 4 5 6 7 8 9

S. No.

Name of the Project

Name of the Agro-climatic zone

covers project area Area in ha

Names of the villages

Major soil types

Topography

Average rainfall in

mm (preceding 5

years average)

Major crops

a) Type b) Area in

ha a) Name

b) Area in ha

1. NABARD CENTRAL AND NORTH ESTERN

PLETAU

6183.1673 Detailed enclosed in Table PPR-7

Sandy loam 6183.1673 Undulating

with moderate

slop

1240 mm

Paddy 3200

Rabi 850

Vegetable 350

Others 250

TOTAL 4650

Page 19: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

18

Table – PPR 11: Details of flood and drought in the project area*

1 2 3 4 5

Sl. No. Particulars Villages

Periodicity

Not affected Annual

Any other (please specify)

1 Flood No. of villages ---- ----- ----------

Name(s) of villages ----- ----- ---------

2 Drought

No. of villages All 30 Villages --------- --------------

Name(s) of villages Detailed enclosed in Table PPR-7

------- Affected

Table – PPR 12: Details of soil erosion in the project area

1 2 3 4 5

Cause Type of erosion Area affected (ha) Run off (mm/year) Average soil loss

(Tonnes/ ha/ year)

Water erosion

a Sheet 980

992 mm/year 48.15 b Rill 280

c Gully 55

Sub - Total 1315

Wind erosion N.A NA

Total

Note: Consider 62% of Rain fall is under Run off though Project Area Run off is around 1250 mm as per Isohytal map.

Page 20: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

19

V. DEMOGRAPHY AND LAND DISTRIBUTION Growth in population during the last three census’, per capita availability of land, sex ratio, population age group in the project area, literacy level, migration, workforce available in different sectors of the economy, demography of SC, ST, BPL and landless families in the project area in the last ten years, etc.

Demography and Land Distribution

Population

Sl. No.

Name of Village No. of HH

Total Male Female SC ST Others Sex Ratio Total Male Female Total Male Female

1 Anandpur 254 1378 719 659 6 4 2 729 383 346 643

985

2 Bagru 443 2260 1141 1119 40 18 22 1844 913 931 376

3 Bamandiha 207 1202 673 529 0 0 0 955 537 418 247

4 Banjarkisko 162 767 383 384 0 0 0 538 268 270 229

5 Banpur 90 543 268 275 0 0 0 510 250 260 33

6 Barnag 91 410 194 216 19 8 11 348 164 184 43

7 Bethat 337 1803 896 907 43 23 20 1149 569 580 611

8 Bhusar 117 649 325 324 0 0 0 621 307 314 28

9 Bitlaung 6 45 23 22 0 0 0 8 5 3 37

10 Burgaon 59 313 159 154 4 2 2 251 126 125 58

11 Chanpi 51 305 149 156 0 0 0 305 149 156 0

12 Chhechhranawadih 30 142 78 64 0 0 0 142 78 64 0

13 Datma 81 460 226 234 55 29 26 404 197 207 1

14 Hesapiri 29 186 103 83 0 0 0 122 69 53 64

15 Hisri 584 3151 1556 1595 22 11 11 778 385 393 2351

16 Huahar 46 251 123 128 0 0 0 150 78 72 101

17 Jori 299 1712 867 845 118 61 57 813 412 401 781

18 Kaimo 232 1322 668 654 0 0 0 983 500 483 339

19 Kekrang 95 424 208 216 0 0 0 424 208 216 0

20 Kharki 120 709 351 358 0 0 0 403 200 203 306

21 Kisko 321 1909 1113 796 69 39 30 984 608 376 856

22 Kocha 89 465 244 221 196 106 90 201 104 97 68

23 Lawagain 38 177 97 80 0 0 0 149 85 64 28

24 Nigni 577 3055 1522 1533 299 152 147 1016 498 518 1740

25 Pakhar 349 1789 962 827 0 0 0 1768 941 827 21

26 Parhepat 523 2881 1457 1424 197 100 97 1525 780 745 1159

27 Patgachha 111 556 268 288 0 0 0 356 172 184 200

28 Saheda 109 557 267 290 0 0 0 493 240 253 64

29 Semardih 134 615 303 312 0 0 0 464 221 243 151

30 Waina 236 1244 625 619 0 0 0 698 349 349 546

GRAND TOTAL 5820 31280 15968 15312 1068 553 515 19131 9796 9335 11081 958

Sources of Data: Census 2001

Page 21: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

20

VI. LIVELIHOODS Briefly describe the existing livelihoods, raw material available, possible livelihood interventions, scope for capacity building etc. in the project area

Table – PPR 13: Summary of livelihoods

1 2 3 4 5 6

S. No.

Names of the villages

Existing livelihood activities

Possible livelihood interventions under the project

Current status of migration (No. of

people)

Main reasons for migration

1. Detailed enclosed in Table PPR-7

Cultivation, collection

of fire wood, Making

Pattal, Poultry,

Employment from

NREGA, P.N.G.S.Y &

other Govt.

development activities.

Scientific agricultural practices will

improved the land yield, Cash crop will be

grown, Production of fruit & vegetables

will increase, Fodder stock will be

available for bovines, Dairy farms will be

opened, Training programmes will make

villagers skilldful, Agro-farm forestry will

make villagers self dependent in food

grains, fuel & small timber requirement.

M.F.P. will also increase & will increase

the earning of the villagers

1450

Unemployment, Erratic monsoon, Rainfed farming, non avaibility of competitive market, low agriculturea yield etc.

Page 22: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

21

VII. EXPECTED PROJECT OUTCOMES

VII. (i). Expected employment related outcomes:

Table – PPR 14: Employment generation

1 2 3 4

SI. NO

Wage Employment Self Employment

Man days No of beneficiaries No of Beneficiaries

Name of Village SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

1 Anandpur 15 1823 1608 1648 5093 2 292 257 264 815 2 255 225 231 713

2. Bagru 100 4610 940 2798 8448 16 738 150 448 1352 14 645 132 392 1183

3. Bamandiha 0 2388 618 1323 4328 0 382 99 212 692 0 334 86 185 606

4. Banjarkisko 0 1345 573 960 2878 0 215 92 154 460 0 188 80 134 403

5. Banpur 0 1275 83 688 2045 0 204 13 110 327 0 179 12 96 286

6. Barnag 48 870 108 540 1565 8 139 17 86 250 7 122 15 76 219

7. Bethat 108 2873 1528 2268 6775 17 460 244 363 1084 15 402 214 317 949

8. Bhusar 0 1553 70 810 2433 0 248 11 130 389 0 217 10 113 341

9. Bitlaung 0 20 93 55 168 0 3 15 9 27 0 3 13 8 23

10. Burgaon 10 628 145 385 1168 2 100 23 62 187 1 88 20 54 163

11. Chanpi 0 763 0 390 1153 0 122 0 62 184 0 107 0 55 161

12. Chhechhranawadih

0 355 0 160 515 0 57 0 26 82 0 50 0 22 72

13. Datma 138 1010 3 585 1735 22 162 0 94 278 19 141 0 82 243

14. Hesapiri 0 305 160 208 673 0 49 26 33 108 0 43 22 29 94

15. Hisri 55 1945 5878 3988 11865 9 311 940 638 1898 8 272 823 558 1661

16. Huahar 0 375 253 320 948 0 60 40 51 152 0 53 35 45 133

17. Jori 295 2033 1953 2113 6393 47 325 312 338 1023 41 285 273 296 895

18. Kaimo 0 2458 848 1635 4940 0 393 136 262 790 0 344 119 229 692

19. Kekrang 0 1060 0 540 1600 0 170 0 86 256 0 148 0 76 224

20. Kharki 0 1008 765 895 2668 0 161 122 143 427 0 141 107 125 373

21. Kisko 173 2460 2140 1990 6763 28 394 342 318 1082 24 344 300 279 947

22. Kocha 490 503 170 553 1715 78 80 27 88 274 69 70 24 77 240

23. Lawagain 0 373 70 200 643 0 60 11 32 103 0 52 10 28 90

24. Nigni 748 2540 4350 3833 11470 120 406 696 613 1835 105

356 609 537 1606

25. Pakhar 0 4420 53 2068 6540 0 707 8 331 1046 0 619 7 289 916

26. Parhepat 493 3813 2898 3560 10763 79 610 464 570 1722 69 534 406 498 1507

27. Patgachha 0 890 500 720 2110 0 142 80 115 338 0 125 70 101 295

28. Saheda 0 1233 160 725 2118 0 197 26 116 339 0 173 22 102 296

Page 23: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

22

1 2 3 4

SI. NO

Wage Employment Self Employment

Man days No of beneficiaries No of Beneficiaries

Name of Village SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total

29. Semardih 0 1160 378 780 2318 0 186 60 125 371 0 162 53 109 324

30. Waina 0 1745 1365 1548 4658 0 279 218 248 745 0 244 191 217 652

TOTAL 2673 47834 27710 38286 116489 428 7652 4429 6127 18636 374 6696 3878 5360 16307

Page 24: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

23

Table – PPR 15: Details of migration from project area

1 2 3 4 5 6

Sl. No.

Names of villages No. of persons migrating No. of days per year of

migration Major reason(s) for

migrating Expected reduction in no. Of

persons migrating

1 Detailed enclosed in

Table PPR- 9 1450

60 days – 120 days

Unemployment, Erratic monsoon,

Rainfed farming, Non availability of

competitive market, Less dignity of labor

1050

Page 25: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

24

VII. (ii). Water related outcomes:

Table – PPR 16: Details of average ground water table depth in the project areas (in meters)

1 2 3 4 5 6

Sl. No. Names of villages

Sources Pre – Project level Expected post – project level Remarks

Detailed

enclosed in

Table PPR-7

Open wells 6.35 M 2.65 M

Bore wells 30 M- 65 M 20.M – 45 M

Others (specify)

Table – PPR 17: Status of Drinking water

1 2 3 4 5

S. No.

Names of the Villages

Availability of drinking water (No. of months in a year) Quality of drinking water Comments

Pre- project Expected Post - Project Pre- project Expected Post - Project

1 Detailed enclosed in Table PPR-7

6-9 10 to 12 Insanities Safe drinking water -----

Page 26: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

25

VII. (i). Expected employment related outcomes:

Table – PPR 18: Major crops grown and their productivity in the project area

1 2 3 4

S. No. Name of the

Crop

Current status Expected post project status

Area in ha Productivity (Quintal/

ha.) Area (ha.)

Productivity (Quintal/ ha.)

1 Kharif, Cereal, Pulses

3200 18.50 3800 22.50

2 Rabi Wheat Pulses and oilseed

850 10.25 1050 12.50

3 Zaid/ Other season vegetable

350 7.75 500 11.25

III. MANDATt.*

NAME OF OFFICER (IN CAPITAL LETTERS)

DESIGNATION

*Letter of Authority from Secretary of the concerned Department, authorizing the concerned officer to sign the above undertaking, should be enclosed

with PPR.

Page 27: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

26

VIII. MANDATORY CERTIFICATION

“It is certified that the State Government of will abide by the following mandatory conditions laid down by DoLR

1 The area of the proposed projects are not covered under assured irrigation

2 The area of the proposed project is not covered or overlapping with any other watershed projects sanctioned by the cnetal govt./ state govt./ autonomous bodies & others

3 The State must sign all the mandatory MoUs before implementing the project

4 The timeframes and milestones of the projects will be followed

5 The Budget requested for must follows the criteria laid down in the Common Guidelines, 2008

6 The State must release matching State Share within 15 days from release of each installment of central funds.

7 Purchase of vehicles and other equipments are not permitted and nor is construction of buildings allowed. Only purchase of computers and related software is permitted

8 Savings, If any, in each component of the project cost can be utilized only for activities in the Watershed works

9 The WCDC will have one Member exclusively responsible for monitoring

10 All work will be evaluated after each phase of completion. Fund release will depend on favourable reports received from evaluators

11 Evaluators must include only institutions and agencies and not individuals.

12 The State and DRDA cell will furnish monitoring reports and periodical reports as desired by DoLR

13 Composition of the WDT must be clearly spelt out and the team members must be fully in place at the time of signing of the MoU of contract between the PIA and DRDA Cell

14 That DRDA shall release the funds to the PIAs and the watershed committees within 15 days of receipt of the funds

15 The Watershed Committee must be a registered society under the Societies Registration Act, 1860

16 At least one of the WDT Members must be a Woman

17 The Gram Sabhas of the proposed project areas have passed resolutions for people’s contribution towards WDF

18 Resource-use agreement on the principles of equity and sustainability must be worked out among the User

Page 28: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

27

Groups prior to the concerned work being undertaken

19 The DPR must give detailed justification for the proposed project duration

20 No PIA will start project work within three months of the receipt of first installment by DWDU/ agency or else it can come under the purview of foreclosure

21 The State will not undertake unnecessary foreclosure of the projects. In the event of foreclosure, the State will refund the amount and furnish all necessary defalcation, misappropriation, mis- utilization, deliberate negligence and laxity which has caused foreclosure of the project.

Date:

Signature of officer authorized by State Govt.*

NAME OF OFFICER (IN CAPITAL LETTERS)

DESIGNATION

* Letter of Authority from Secretary of the concerned Department, authorizing the concerned officer to sign the above undertaking, should be enclosed with

PPR.

Page 29: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

28

X. STATUS OF ON-GOING PROJECTS (DPAP / DDP/ IWDP)

Table – PPR 19: Details of pending UCs : State wise*

1 2 3 4 5 6 7 8 9 10 11

S. no.

District Project Installment No.

Financial year of

release of fund

Amount released (Rs. In Lakhs)

Amount utilized (Rs. In Lakhs)

Submission of UC Date of submission

of UC Reasons for not submitting/delayed submission of

UC

Pending UC

Due date

Amount (Rs, in Lakhs)

Date Amount (Rs, in Lakhs)

Period Amount (Rs, in Lakhs

1 Lohardaga DPAP ----- ----- ----- ----- N.A.

Table -PPR 20: Details of Unspent balance as on 31.03.2012

S.No. DISTRICT Name of the

Project

Total Cost (Rs. In

Lakh)

Total funds Released (Rs. In Lakh) Unspent Balance

(Rs. In Lakhs) DoLR State

1 Lohardaga DPAP ------- ------- ------- ------

Page 30: PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures

29

X. ABSTRACT OF PROJECTS PROPOSED FOR SANCTION DURING FINANCIAL YEAR 2015-16

1 Number of districts to be covered under the present proposal

1

2 No. of Watersheds projects proposed to be taken up under NABARD

Hilly / desert Others

01

3 Total Area to be covered (ha) 6183.1673

Total area to be covered under proposed projects ( ha.) (a) Hilly & Desert areas#

b). Others 5430.9364

4 Total cost of the proposed Watershed projects (Rs. In lakhs)

(a) Hilly & Desert areas#

(b) Others Total

1086.1873 Lakh

5 First installment required from central funds for the proposed watershed projects.

217.2375 Lakh

******************************************************************************************************************************