preliminary route options report€¦ · woodward st welley ave kent st dobie st duke st fry st...

13
CLARENCE ST NORTHERN PRINCE ST BACON ST DOBIE ST PACIFIC HWY QUEEN ST 250 500 750 1000 1250 1500 1750 2000 0.000 TP 89.796 TP 273.280 TP 2074.770 TP VIADUCT ALUMY CREEK VIADUCT PROPOSED BRIDGE VILLIERS ST TO BE LOWERED TO PROVIDE HIGH VEHICLE CLEARANCE (5.3m) BENEATH RAILWAY RAILWAY MAIN PLAN LONGITUDINAL SECTION 0 100 HORIZONTAL SCALE 1:5000m 200 300 400 500 VERTICAL SCALE 1:1000m 0 20 40 60 80 100 PRELIMINARY ROUTE OPTION ROAD CLOSURE LEGEND - PLAN: INTERSECTION UPGRADE - TREATMENT TO BE DETERMINED EMBANKMENT CLARENCE RIVER LEGEND - LONGITUDINAL SECTION: NOTES 1. Q100 YEAR FLOOD LEVELS BASED ON WBM LOWER CLARENCE RIVER FLOOD STUDY 2004. 2. IN ADDITION TO THE INTERSECTION UPGRADES SHOWN ON THE PLAN, THE OPTION WOULD INCLUDE AN UPGRADE OF THE FOLLOWING INTERSECTIONS : - GWYDIR HWY / BENT ST - PACIFIC HWY / GWYDIR HWY - PACIFIC HWY / SPRING ST - BENT ST / THROUGH ST - FITZROY ST / CLARENCE ST - FITZROY ST / VILLIERS ST 3. INTERSECTIONS REQUIRING AN UPGRADE INCLUDE: WHERE THE ESTIMATED NUMBER OF VEHICLES APPROACHING THE INTERSECTIONS IS RELATIVELY HIGH IN 2019 AND WOULD REQUIRE INTERSECTION IMPROVEMENTS. THOSE THAT WILL REQUIRE AN UPGRADE TO ACCOMMODATE TURNING VEHICLES. REGISTRATION NUMBER DRAWING SHEET No. No. Amendment Description Initials Date This sheet may be prepared using colour and may be incomplete if copied A1 original SCALES DESIGNED REVIEWED FILE No. PRINTED DATE Arup Pty Ltd ABN 18 000 966 165 ROADS AND MARITIME SERVICES 06/12/2011 13 220422_SK6013.dwg - 0083.086.BA.2016 CLARENCE VALLEY COUNCIL MAIN ROAD 83 - SUMMERLAND WAY ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON CORRIDOR 3 - PRELIMINARY ROUTE OPTION 11 PLAN AND LONGITUDINAL SECTION A B C D E PROR - PART 2 - DRAFT 1 PROR - PARTS 1 & 2 - DRAFT 2 PROR - PARTS 1 & 2 - DRAFT 3 PROR - PARTS 1 & 2 - ISSUE PROR - FINAL - RMS NAME UPDATED REB 30/08/2011 REB 26/09/2011 REB 6/10/2011 REB 24/10/2011 REB 6/12/2011 Created using CADplot http://www.oasys-software.com/cadplot/

Upload: others

Post on 17-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

CLA

RE

NC

E S

T

NORTHERN

PR

IN

CE

S

T

BACON ST

DOBIE ST

P

A

C

IF

IC

H

W

Y

QU

EE

N S

T

250

500

750

1000

1250

1500

1750

2000

0.000 T

P

89.796 T

P

273.280 T

P

2074.770 T

P

VIADUCT

A

LU

M

Y

C

R

E

E

K

VIADUCT

PROPOSED

BRIDGE

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

RAILWAY

MAIN

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

WBM LOWER CLARENCE RIVER FLOOD

STUDY 2004.

2. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE

OF THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- PACIFIC HWY / GWYDIR HWY

- PACIFIC HWY / SPRING ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

3. INTERSECTIONS REQUIRING AN

UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH

IN 2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN

UPGRADE TO ACCOMMODATE

TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

13

220422_SK6013.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 3 - PRELIMINARY ROUTE OPTION 11

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 2: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

C

L

A

R

E

N

C

E

R

IV

E

R

BR

EIM

BA

S

T

CLA

RE

NC

E S

T

VILLIE

RS

S

T

MA

IN

PR

IN

CE

S

T

BA

CO

N S

T

OLIV

ER

ST

W

OO

DW

AR

D S

T

W

ELLE

Y A

VE

KE

NT

S

T

DO

BIE

ST

DU

KE

S

T

FR

Y S

T

McH

UG

H S

T

QU

EE

N S

T

PO

WE

LL S

T

BO

WT

ELL S

T

MA

RY

S

T

C

E

N

T

E

N

A

R

Y

D

R

M

c

C

L

A

E

R

S

L

N

P

A

C

I

F

I

C

H

W

Y

250

500

750

1000

1250

1500

1750

0.000 T

P

284.351 T

P

479.904 T

P

1071.878 T

P

1442.727 T

P

1939.105 T

P

NO

RT

HE

RN

RA

ILW

AY

PROPOSED

BRIDGE

VIADUCT

VIADUCT

VIADUCT

VILLIERS ST TO BE LOWERED

TO PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

1. Q100 YEAR FLOOD LEVELS BASED ON WBM

LOWER CLARENCE RIVER FLOOD STUDY 2004.

2. IN ADDITION TO THE INTERSECTION UPGRADES

SHOWN ON THE PLAN, THE OPTION WOULD

INCLUDE AN UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- GWYDIR HWY / BENT ST

- PACIFIC HWY / GWYDIR HWY

- PACIFIC HWY / SPRING ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

3. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

14

220422_SK6014.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 3 - PRELIMINARY ROUTE OPTION J

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 3: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

C

L

A

R

E

N

C

E

R

I

V

E

R

D

O

BIE

S

T

TU

R

F S

T

AR

TH

U

R

ST

ALIC

E S

T

D

AV

EY

A

V

E

M

AR

Y S

T

Q

U

E

E

N

S

T

PR

IN

C

E S

T

C

R

O

W

N

S

T

D

U

KE

S

T

KIR

C

H

N

ER

ST

PO

W

ELL S

T

BR

EIM

BA

S

T

C

LA

R

E

N

C

E

S

T

V

ILLIE

R

S

S

T

K

E

N

T

S

T

P

A

C

I

F

I

C

H

W

Y

H

O

O

F S

T

250

500

750

1000

1250

1500

1750

2000

2250

2500

2750

3000

3250

0.000 T

P

645.756 T

P

816.892 T

P

3414.971 T

P

A

L

U

M

Y

C

R

E

E

K

PROPOSED

BRIDGE

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

VIADUCT

BRIDGE

OVER

CREEK

BRIDGE

BRIDGE

OVER

CREEK

VIADUCT

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

LEGEND - PLAN:

OPTIONS ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD STUDY

REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY (BETWEEN

POUND ST AND BACON ST).

3. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE OF

THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- PACIFIC HWY / GWYDIR HWY

- PACIFIC HWY / SPRING ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

4. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE

TO ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

15

220422_SK6015.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 3 - PRELIMINARY ROUTE OPTION K

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 4: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

G

R

A

F

T

O

N

-

L

A

W

R

E

N

C

E

R

D

CLA

RE

NC

E S

T

PR

IN

C

E S

T

DU

KE

S

T

P

A

C

IF

IC

H

W

Y

Q

U

EE

N

S

T

TU

RF

S

T

ALIC

E S

T

M

AR

Y S

T

C

L

A

R

E

N

C

E

R

I

V

E

R

C

E

N

T

E

N

A

R

Y

D

R

I

V

E

BRIDGE

OVER

CREEK

VIADUCT

ALTERNATIVE ACCESS

TO BE PROVIDED OFF

CROWN ST.

250

500

750

1000

1250

1500

1750

2000

2250

2500

2750

3000

3250

0.000 T

P

912.636 T

P

1714.903 T

P

3415.657 T

P

BRIDGE

PROPOSED

BRIDGE

BRIDGE

OVER

CREEK

ALTERNATIVE ACCESS

TO BE PROVIDED OFF

HOOF ST.

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

ROAD CLOSURE

LEGEND - PLAN:

OPTIONS ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED

ON LOWER CLARENCE RIVER

FLOOD STUDY REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE

CLEARANCE (5.3m) BENEATH

RAILWAY (BETWEEN POUND ST

AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE

UPGRADE SHOWN ON THE PLAN

TO EXTEND TO DOBIE ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN,

THE OPTION WOULD INCLUDE AN

UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

5. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

16

220422_SK6016.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 3 - PRELIMINARY ROUTE OPTION 12

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 5: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

MA

RY

S

T

Q

U

EE

N

S

T

CR

OW

N S

T

DU

KE

S

T

KIR

CH

NE

R S

T

VILLIE

RS

S

T

KE

N

T S

T

HO

OF

ST

M

O

RR

IS

O

N S

T

N

O

R

T

H

S

T

P

A

C

IF

IC

H

W

Y

EG

GIN

S LN

C

L

A

R

E

N

C

E

R

I

V

E

R

AR

TH

UR

ST

MEONA L

N

EGGINS L

N

E

L

I

Z

A

B

E

T

H

I

S

L

A

N

D

0

2

5

0

500

750

1000

1250

1500

1750

2000

2250

2500

2

7

5

0

3000

3

2

5

0

0

.0

0

0

T

P

2

5

1

.9

2

0

T

P

640.567 T

P

1016.912 T

P

1136.634 T

P

1658.198 T

P

1870.710 T

P

2

7

2

8

.

7

9

0

T

P

3044.241 T

P

PROPOSED

BRIDGE

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

VIADUCT

BRIDGE

OVER

CREEK

BRIDGE

OVER

CREEK

ALTERNATIVE ACCESS

TO BE PROVIDED OFF

KIRCHNER ST.

PR

IN

CE

S

T

Q

U

E

E

N

S

T

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

ROAD CLOSURE

LEGEND - PLAN:

OPTIONS ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD STUDY

REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY (BETWEEN

POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE

UPGRADE SHOWN ON THE PLAN TO

EXTEND TO DOBIE ST.

4. IN ADDITION TO THE

INTERSECTION UPGRADES

SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN

UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

5. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN

2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE

TO ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

17

220422_SK6017.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 3 - PRELIMINARY ROUTE OPTION L

PLAN AND LONGITUDINAL SECTION 1 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6018

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 6: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

ALIC

E S

T

DA

VE

Y

A

V

E

MA

RY

S

T

2

7

5

0

3000

3

2

5

0

3

5

0

0

3

7

5

0

2

7

2

8

.

7

9

0

T

P

3044.241 T

P

3

8

0

4

.

7

5

0

T

P

A

L

U

M

Y

C

R

E

E

K

N

O

R

T

H

S

T

T

U

R

F

S

T

Q

U

E

E

N

S

T

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD STUDY

REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY (BETWEEN

POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE

UPGRADE SHOWN ON THE PLAN TO

EXTEND TO DOBIE ST.

4. IN ADDITION TO THE

INTERSECTION UPGRADES

SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN

UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

5. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

18

220422_SK6018.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 3 - PRELIMINARY ROUTE OPTION L

PLAN AND LONGITUDINAL SECTION 2 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6017

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 7: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

CLA

RE

NC

E S

T

TU

RF

S

T

M

EO

N

A LN

VIADUCT

G

R

A

F

T

O

N

-

L

A

W

R

E

N

C

E

R

D

EG

G

IN

S LN

A

L

U

M

Y

C

R

E

E

K

0

250

500

750

1000

1250

1500

1750

2000

2250

2

5

0

0

2

7

5

0

3

0

0

0

3

2

5

0

3

5

0

0

3

6

5

2

0.000 T

P

495.272 T

P

886.040 T

P

2249.447 T

P

2

3

8

4

.

6

0

2

T

P

2

5

1

8

.

3

3

8

T

P

2

7

7

7

.2

5

1

T

P

3

6

5

2

.

4

4

7

T

P

QU

EE

N S

T

MA

RY

S

T

ARTHUR ST

ALIC

E S

T

BRIDGE

BRIDGE

OVER

CREEK

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

PROPOSED

BRIDGE

BRIDGE

OVER

CREEK

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

ROAD CLOSURE

LEGEND - PLAN:

OPTIONS ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM

2004).

2. VILLIERS ST TO BE LOWERED TO PROVIDE HIGH

VEHICLE CLEARANCE (5.3m) BENEATH RAILWAY

(BETWEEN POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE UPGRADE

SHOWN ON THE PLAN TO EXTEND TO DOBIE ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE

OF THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

5. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN 2019

AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

19

220422_SK6019.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION 14

PLAN AND LONGITUDINAL SECTION

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 8: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

0

250

500

750

1000

1250

1500

1750

2000

2250

2

5

0

0

2

7

5

0

3

0

0

0

0.000 T

P

2168.388 T

P

2

4

7

0

.4

7

6

T

P

V

ILLIE

R

S

S

T

N

O

R

T

H

S

T

K

IR

C

H

N

E

R

S

T

C

R

O

W

N

S

T

MEONA LN

Q

U

E

E

N

S

T

EGGINS LN

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

ROAD CLOSURE

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED

ON LOWER CLARENCE RIVER FLOOD

STUDY REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY (BETWEEN

POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE

UPGRADE SHOWN ON THE PLAN TO

EXTEND TO DOBIE ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN,

THE OPTION WOULD INCLUDE AN

UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

- PACIFIC HWY / CENTENARY DRIVE

5. INTERSECTIONS REQUIRING AN

UPGRADE INCLUDE:

• WHERE THE ESTIMATED

NUMBER OF VEHICLES

APPROACHING THE

INTERSECTIONS IS RELATIVELY

HIGH IN 2019 AND WOULD

REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN

UPGRADE TO ACCOMMODATE

TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

20

220422_SK6020.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION 20

PLAN AND LONGITUDINAL SECTION 1 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6021

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 9: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO PROVIDE HIGH

VEHICLE CLEARANCE (5.3m) BENEATH RAILWAY

(BETWEEN POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE UPGRADE SHOWN

ON THE PLAN TO EXTEND TO DOBIE ST.

4. IN ADDITION TO THE INTERSECTION UPGRADES

SHOWN ON THE PLAN, THE OPTION WOULD INCLUDE

AN UPGRADE OF THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

- PACIFIC HWY / CENTENARY DRIVE

5. INTERSECTIONS REQUIRING AN UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER OF VEHICLES

APPROACHING THE INTERSECTIONS IS

RELATIVELY HIGH IN 2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE TO

ACCOMMODATE TURNING VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

21

220422_SK6021.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION 20

PLAN AND LONGITUDINAL SECTION 2 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6020

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 10: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

E

L

I

Z

A

B

E

T

H

I

S

L

A

N

D

0

2

5

0

5

0

0

7

5

0

1

0

0

0

1

2

5

0

1500

1

7

5

0

2

0

0

0

2

2

5

0

2

5

0

0

2

7

5

0

3

0

0

0

0

.0

0

0

T

P

1

1

8

3

.9

7

5

T

P

2

2

9

7

.

1

6

9

T

P

PA

CIF

IC

H

WY

N

O

R

T

H

S

T

E

G

G

I

N

S

L

N

Q

U

E

E

N

S

T

M

E

O

N

A

L

N

E

G

G

I

N

S

L

N

VIADUCT

BRIDGE OVER

CREEK

PROPOSED

BRIDGE

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

ROAD CLOSURE

LEGEND - PLAN:

OPTIONS ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION:

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD STUDY

REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY (BETWEEN

POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE

UPGRADE SHOWN ON THE PLAN TO

EXTEND TO DOBIE ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE

OF THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

5. INTERSECTIONS REQUIRING AN

UPGRADE INCLUDE:

• WHERE THE ESTIMATED NUMBER

OF VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY

HIGH IN 2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN

UPGRADE TO ACCOMMODATE

TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

22

220422_SK6022.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION 21

PLAN AND LONGITUDINAL SECTION 1 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6023

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 11: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

GR

AF

TO

N-LA

WR

EN

CE

R

D

Q

U

E

E

N

S

T

M

A

R

Y

S

T

A

R

T

H

U

R

S

T

A

L

I

C

E

S

T

T

U

R

F

S

T

H

O

O

F

S

T

ALU

MY

C

RE

EK

BRIDGE

3000

3250

3500

3750

3813.854 T

P

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD STUDY

REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO PROVIDE

HIGH VEHICLE CLEARANCE (5.3m) BENEATH

RAILWAY (BETWEEN POUND ST AND BACON

ST).

3. HEAVY VEHICLE ACCESS ROUTE UPGRADE

SHOWN ON THE PLAN TO EXTEND TO DOBIE

ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE OF

THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

5. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN

2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN

UPGRADE TO ACCOMMODATE TURNING

VEHICLES.

NOTES

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

23

220422_SK6023.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION 21

PLAN AND LONGITUDINAL SECTION 2 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6022

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 12: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

Q

U

E

E

N

S

T

C

R

O

W

N

S

T

D

U

KE

S

T

KIR

C

H

N

ER

S

T

V

ILLIE

R

S

S

T

M

O

R

R

IS

O

N

S

T

P

A

C

IF

IC

H

W

Y

EG

GIN

S LN

C

L

A

R

E

N

C

E

R

I

V

E

R

E

L

I

Z

A

B

E

T

H

I

S

L

A

N

D

PR

IN

C

E S

T

N

O

R

T

H

S

T

250

500

750

1000

1250

1500

1

7

5

0

2

0

0

0

2

2

5

0

2

5

0

0

2

7

5

0

3

0

0

0

0.000 T

P

846.482 T

P

2

3

5

4

.5

2

8

T

P

VOLKERS

PARK

GREAT

MARLOW

VIADUCT

OPTION ALIGNMENT AS

SHOWN IN JUNE 2011

COMMUNITY UPDATE

PROPOSED

BRIDGE

BRIDGE

OVER

CREEK

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

PRELIMINARY ROUTE OPTION

HEAVY VEHICLE ACCESS ROUTE UPGRADE

ROAD CLOSURE

LEGEND - PLAN:

OPTIONS ALIGNMENT AS SHOWN IN

JUNE 2011 COMMUNITY UPDATE

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

EMBANKMENT

CLARENCE RIVER

LEGEND - LONGITUDINAL SECTION: NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON

LOWER CLARENCE RIVER FLOOD

STUDY REVIEW (WBM 2004).

2. VILLIERS ST TO BE LOWERED TO

PROVIDE HIGH VEHICLE CLEARANCE

(5.3m) BENEATH RAILWAY (BETWEEN

POUND ST AND BACON ST).

3. HEAVY VEHICLE ACCESS ROUTE

UPGRADE SHOWN ON THE PLAN TO

EXTEND TO DOBIE ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN,

THE OPTION WOULD INCLUDE AN

UPGRADE OF THE FOLLOWING

INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

- PACIFIC HWY / CENTENARY DRIVE

5. INTERSECTIONS REQUIRING AN

UPGRADE INCLUDE:

• WHERE THE ESTIMATED

NUMBER OF VEHICLES

APPROACHING THE

INTERSECTIONS IS RELATIVELY

HIGH IN 2019 AND WOULD

REQUIRE INTERSECTION

IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN

UPGRADE TO ACCOMMODATE

TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

24

220422_SK6024.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION M

PLAN AND LONGITUDINAL SECTION 1 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6025

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-

software.com/cadplot/

Page 13: Preliminary Route Options Report€¦ · woodward st welley ave kent st dobie st duke st fry st mchugh st queen st powell st bowtell st mary st centenary dr mcclaers ln pacific hwy

AR

TH

U

R

S

T

ALIC

E S

T

D

AV

EY

M

AR

Y S

T

Q

U

E

E

N

S

T

M

O

R

R

IS

O

N

S

T

A

V

E

TU

R

F S

T

N

O

R

T

H

S

T

3

0

0

0

3

2

5

0

3

5

0

0

3

7

5

0

3

8

9

4

.4

2

0

T

P

VOLKERS

PARK

A

L

U

M

Y

C

R

E

E

K

BRIDGE

PLAN

LONGITUDINAL SECTION

0 100

HORIZONTAL SCALE 1:5000m

200 300 400 500

VERTICAL SCALE 1:1000m

0 20 40 60 80 100

EMBANKMENT

LEGEND - LONGITUDINAL SECTION:

PRELIMINARY ROUTE OPTION

LEGEND - PLAN:

INTERSECTION UPGRADE -

TREATMENT TO BE DETERMINED

NOTES

1. Q100 YEAR FLOOD LEVELS BASED ON LOWER

CLARENCE RIVER FLOOD STUDY REVIEW

(WBM 2004).

2. VILLIERS ST TO BE LOWERED TO PROVIDE

HIGH VEHICLE CLEARANCE (5.3m) BENEATH

RAILWAY (BETWEEN POUND ST AND BACON

ST).

3. HEAVY VEHICLE ACCESS ROUTE UPGRADE

SHOWN ON THE PLAN TO EXTEND TO DOBIE

ST.

4. IN ADDITION TO THE INTERSECTION

UPGRADES SHOWN ON THE PLAN, THE

OPTION WOULD INCLUDE AN UPGRADE OF

THE FOLLOWING INTERSECTIONS :

- GWYDIR HWY / BENT ST

- BENT ST / THROUGH ST

- FITZROY ST / CLARENCE ST

- FITZROY ST / VILLIERS ST

- PACIFIC HWY / CENTENARY DRIVE

5. INTERSECTIONS REQUIRING AN UPGRADE

INCLUDE:

• WHERE THE ESTIMATED NUMBER OF

VEHICLES APPROACHING THE

INTERSECTIONS IS RELATIVELY HIGH IN

2019 AND WOULD REQUIRE

INTERSECTION IMPROVEMENTS.

• THOSE THAT WILL REQUIRE AN UPGRADE

TO ACCOMMODATE TURNING VEHICLES.

REGISTRATION NUMBER

DRAWING SHEET No.

No. Amendment Description Initials Date

This sheet may be prepared using colour and may be incomplete if copiedA1 original

SCALES

DESIGNED

REVIEWED

FILE No. PRINTED DATE

Arup Pty Ltd

ABN 18 000 966 165

ROADS AND MARITIME SERVICES

06/12/2011

25

220422_SK6025.dwg

-

0083.086.BA.2016

CLARENCE VALLEY COUNCIL

MAIN ROAD 83 - SUMMERLAND WAY

ADDITIONAL CROSSING OF THE CLARENCE RIVER AT GRAFTON

CORRIDOR 4 - PRELIMINARY ROUTE OPTION M

PLAN AND LONGITUDINAL SECTION 2 OF 2

A

B

C

D

E

PROR - PART 2 - DRAFT 1

PROR - PARTS 1 & 2 - DRAFT 2

PROR - PARTS 1 & 2 - DRAFT 3

PROR - PARTS 1 & 2 - ISSUE

PROR - FINAL - RMS NAME UPDATED

REB

30/08/2011

REB 26/09/2011

REB 6/10/2011

REB 24/10/2011

REB 6/12/2011

220422_S

K6024

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

D

RG

Created using CADplot http://www.oasys-