preparation for field visits

13
Prepared by Dr. Nittana Southiseng Preparation for Field Visits 8 July 2011 15:30 – 15:45 pm

Upload: sef

Post on 12-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

Preparation for Field Visits. Prepared by Dr. Nittana Southiseng. 8 July 2011 15:30 – 15:45 pm. Six Companies ( 11-14 July 2011). Khon Kaen Province (11-12 July) Tung Hung Chiang Khon Kaen Ceramic Praepan Group Nakhonratchasima province (13-14 July) K.T.M. Metal Work Chao Din - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Preparation for Field Visits

Prepared byDr. Nittana Southiseng

Preparation for Field Visits

8 July 2011

15:30 – 15:45 pm

Page 2: Preparation for Field Visits

Six Companies(11-14 July 2011)

Khon Kaen Province (11-12 July)

1. Tung Hung Chiang

2. Khon Kaen Ceramic

3. Praepan Group

Nakhonratchasima province (13-14 July)

1. K.T.M. Metal Work

2. Chao Din

3. Ekcharoen Rice (Exseng Rice) Co., Ltd.

Page 3: Preparation for Field Visits

Company’s Profiles

See more detail in the reference

Page 4: Preparation for Field Visits

Guidelines for Field Visits

Schedule for Field Visits

Page 5: Preparation for Field Visits

Grouping

Work in group of 4 members. After visiting 6 companies, each group has to choose

one most interesting company to write a report and make a presentation.

The selection of the company is allowed for “first come first serve”.

Each group can choose the company only after visiting all 6 companies.

Page 6: Preparation for Field Visits

GroupingGroup 1:

Group 2:

Group 3:

Group 4

Page 7: Preparation for Field Visits

AssignmentNow, please prepare a 5-page (or more) report consisting of the

following format:Description of the SME cluster/EC visited Product and Services to customers, Product and Services to SME tenants,

subcontractors, etc.Value chain diagram and Strengths, Weaknesses, Opportunities and Threats

analysisProblems and Concerns RecommendationsLesson Learnt from group work (strengths and limitations)Prepare PPT for presentationBest Presentation and well-prepared report will be awarded a PRIZ! (15 mins

presentation and 5 mns for Q&A)

(Note! Your presentation and report are not limited within the guidelines above. You are encouraged to develop creative

preparation and presentation)

Page 8: Preparation for Field Visits

Job AllocationSelect main coordinator Allocating the jobs

Taking photosNoteObservationCollecting additional informationLead discussionWriting report Make presentationOthers …….

Page 9: Preparation for Field Visits

Dress & Preparation

Normal dressingComfortable shoesHat, cap (if you have)Name cards

Page 10: Preparation for Field Visits

Luggage

You can keep your packages at MI

Page 11: Preparation for Field Visits

Last but not least

Page 12: Preparation for Field Visits

BOD Setting for Field Trip

Day 1:

Day 2:

Day 3:

Day 4:

“Mood Meter, Energizing, Time keeping, Collecting Feedback, Thanks to the Field Visits”

Page 13: Preparation for Field Visits

Post Evaluation

Module 1