Prepare improvements & project for full scale implementation
Finalize Cost of Poor Quality
Prepare sustainability & distribute project plan
Prepare Hand-off to Process Owner
Develop Control Plan
Complete final team leader project documents
Celebrate with the Team!
3
Control Plan Checklist
Control Plan Dashboard
QI Macros◦ Run and Control Charts
Cost of Poor Quality
Project Presentation
Close Out Report
4
Phase Objectives Key Activities Possible Tools and Techniques Key Deliverables Document the problem statement and establish the charter. Demonstrate alignment with the Business metrics and strategies. Determine Customer requirements and performance standards.
▪ Select Team with Champion
▪ Develop problem statement
▪ Develop Charter ▪ Create SIPOC ▪ Address gap between VOC
and process ▪ Estimate financial benefits
▪ Problem Statements ▪ Project Charter ▪ SIPOC map ▪ COPQ or CODND ▪ Communication Plan
Develop a reliable and valid measurement system of the business process to effectively evaluate the success of meeting customer requirements.
▪ Obtain Customer requirements
▪ Create overall project plan ▪ Develop measurement
plan & compile project metrics
▪ Determine defect tracking requirements
▪ Assess baseline performance-estimate process capability
▪ Measurement Systems Analysis
▪ Process Description ▪ Project Plan & Timeline ▪ Metrics and collection plan ▪ Baseline Performance results ▪ Process capability analysis ▪ Lean Tools Assessment ▪ Measurement Systems
Analysis ▪ Process model – ‘as is’
Utilization of data techniques to gain insight into process. Divide data into groups based on key characteristics and assess the root causes of errors and poor performance. Determine where to focus efforts for improvement.
▪ Statistical tests / tools ▪ FMEA ▪ Pareto chart ▪ Correlation/Regression ▪ Fishbone Diagram ▪ Box plot ▪ Hypothesis Testing
▪ Describe findings – identify potential root causes RCA
▪ Validate findings
▪ Data relationships ▪ Validated Key Input Variables
(KPIVs) & Key Output Variables (KPOVs)
▪ Prioritize sources of variation ▪ root causes
▪ Identify & communicate potential improvements
▪ Summarize benefits & annualized financial benefits
Identify key change opportunities and proactively test for optimization. Develop implementation and communication plan including a change management approach to assist the organization in adaptation of the improvements.
▪ Design of Experiments – describe purpose & build test/ analysis strategy
▪ Evaluate and Confirm results
▪ Analyze KPIVs ▪ Create action plan for
implementation including change management and communication needs
▪ Buy-in assessment
▪ Quantified relationship between key
input and key output variables ▪ Defined process improvements
including impacts and benefits ▪ Implementation Plan ▪ Process model – ‘Should be’ ▪ Impacted Employees are Trained
Definition of optimal process settings and conditions with specified metrics. Implementation of improvements with a control plan to assess & maintain gains.
▪ Implement improvements ▪ Evaluate results ▪ Integrate & manage
improvements in work processes
▪ Complete closure activities
▪ Document process change ▪ Control plan ▪ Determine new process capability ▪ Leverage opportunities for replication ▪ Communicate results ▪ Financial audit ▪ Hand-off to process owner
1.0 Define
Opportunity
2.0 Measure
performance
3.0 Analyze
Opportunity
4.0 Improve
Performance
5.0 Control
Performance
5
Six Sigma Process Improvement Road Map
1
Migration e-Pro Process ImprovementProject Charter
Project Description Error corrections and clarification of benefits are generatingrework throughout the migration and case installationprocesses, accounting for 20% of the total number of e-Prochange transactions. It is estimated that the volume of errorand rework will grow proportionally as the number ofaccounts migrating by 1/1/2004 increases, driving aproportionate increase in cost and potentially dissatisfyingcustomers.
Start Date April 1, 2003
Completion DateScheduled to be completed by September 5, 2003
Baseline Metrics For 1/1/03 migrated accounts:National Accounts- Average number of change transactions: 14.3, of which
2.9 are due to error and rework- Average hours of rework: 309 hoursRegional Accounts- Average number of change transactions: 8.0, of which
1.6 are due to error and rework- Average hours of rework: 137 hours
Primary Metrics 1. Total e-Pro change transactions2. Percentage of change transactions due to error and
benefits clarification3. Average rework hours per error and benefits clarification
Secondary Metrics none
Goal Reduce error and rework in the migration process by 50%starting with 1/1/04 migrating accounts
Customer Customer migration survey results
Financial CODND (Cost of Doing Nothing Differently)4
th Qtr 2003: $500K
Year 2004: $2.5M
Ben
efits
Internal Productivity Estimated cycle time reduction of 18,868 hours (assuming195 accounts migrating 1/1/04).
Define April 1 – April 21, 2003
Plan Projects & Metrics April 14 – April 18, 2003
Baseline Project April 21 – May 2
Consider Lean Tools May12 – May 16, 2003
MSA May 19 – June 2, 2003
Wisdom of the Org. June 2 – June 6, 2003
Passive Analysis June 9 – June 20, 2003
Proactive Testing June 23 – August 4, 2003
Ph
as
e M
ilesto
nes
Control August 4 – September 5, 2003
SUPPLIER INPUT PROCESS OUTPUT CUSTOMER
Sales
Client / Policy HolderHR BenefitsCoordinator
Client Consultant
Third Party BenefitsVendor
Member
GO Decision
Policy Renewal Date
Summary of Benefits
AdministrativeRequirements
AccountOrganizational
Structure
Detail Benefits
Account DataLoaded in System
Member andDependentEligibilityInformationLoaded in System
Member ID Card
Client / PolicyHolder
Third Party BenefitsVendor
Member andDependent
Providers
Claim
Call
1. Conduct migration analysis
2. Complete account profile
3. Load account structure in system
4. Set up and validate account benefits in system
5. Produce account eligibility record
6. Load account data in product claim engines
0Subgroup 10 20 30 40
0
10
20
30
Ind
ivid
ua
l V
alu
e
Mean=10.98
UCL=26.81
LCL=-4.854
0
10
20
Mo
vin
g R
an
ge
1
R=5.952
UCL=19.45
LCL=0
Total e-Pro Change Transactions by Account from Sep 2002 thru Mar 2003Conduct
Analysis
Create Implementation
Guide
Expert Team
Meeting
Draft
EPRO
Draft
e-
PRO
Release e-PRO
Record
e-
PRO
Impl.
Guid
e
Update
EPRO
OK For
Release
to Vendor
Track
Systems
Loads
IMPLEMENTATION
ERW
From
Eligibilit
y
GO
Decisio
n
SALE
S
Set Up Client ID in
End State
Structure
Request
Codes
STRUCTURE
Complete
Structure
Inspection/Verify
with e-PRO
Get
Underwriting
Approval
Yes
No OK? Yes
No
Go back to
Rates
Structur
e in
CDB
No
Yes
Release
ATC
To Vendor
OK?
Review
Draft e-
PRORequest/Receive
Codes
Enrollmen
t File
CLIENT /CUSTOMERClient
Input
To Sales
Run Legislative
Tool
Check vs. e-
PRO
e-PRO
Redo?
Yes
No
YesOK?
Review
Draft
e-PROCreate
Codes
Legislative Tool
Review
BPC &
Class
Codes
To
Structure
BENEFITS
TS
ID Claim
Scenarios
Load Data into
Downstream
Systems
OK?Yes
No
Data
Engines
Loaded
(e.g ATC,
DocGen,
etc)
Test Scenarios
Check vs. e-
PRO
OK?No
Yes
Fix Claim
Errors
No
No
VOB
Yes
EPRO
Rework
CDB
From
Vendor
Member
cancelle
d
in
Legacy
Reformat
Client
Eligibility DataReview
Draft
EPRO
ELIGIBILITY
Receive Enrollment
Data
Match &
Merge
Load data in
CEO
Are
errors
resolve
d?
Fix Errors
YesNo Cancel
Member in
Legacy
Create
ERW
ERW
Eligibility
In CED
VENDO
R(ID
CARDS)
ID
Card
s
From
Benefit
s
Get
Underwriting
Approval
ERW To
Implementatio
n
ERW To
Implementatio
n
Create Client IDClient
ID
To
Structure,
Benefits,
and
Eligibility
Migration
Structure
Mapping Job
Aid
GO
Decision
To
Structure,
Benefits,
and
Eligibility
e-PRO
Rework
EPRO
Rework?
SMT linking
legacy
structure to
end state
To
Eligibility
CAIP
Processes shaded in green are specific to
migration
Processes out of scope, but critical to
Employer Services
Employer Services functional areas
OUT OF SCOPE
PROCESS STEPS
Production
Migration
Support
Cancel
Legacy
Structure
Elig.
Rework
e-Pro
Rework
Rework Loops highlighted in Red
10
100
50
0
Contracting
T4
-T1
PMHS
Overpayment
Process Data / Materials
PeopleTechnology
Ÿ Auth / Referral Info missing/incomplete/incorrect
Ÿ OI Info missing/incomplete/incorrect
Ÿ Member Eligibility Info missing/incomplete/
incorrect
Ÿ Benefit Info missing/incomplete/incorrect
Ÿ Provider Fee Schedule Info missing/incomplete/
incorrect
Ÿ Provider/Vendor TIN/SSN Info missing/
incomplete/incorrect
Ÿ Additional Information Necessary to Process
Claim
Ÿ Transaction/Codeset data excluded at gateway
Ÿ Standard Operating Procedures (SOPs)
Ÿ Claim Audit Process >$5K
Ÿ Second/Third Party Internal Review
(Medical Management, Claim Benefit
Build)
Ÿ iTrack - drives usage of paper reports to
sort older claims
Ÿ Skill Level of Processor
Ÿ Accessiblity of Site Coach/Training Staff
Ÿ Aggressive Productivity goals conflict with low
quality requirements
Ÿ Rushed Training Schedule
Ÿ Lack of up-training / reinforcement training
Ÿ Best Practice / Skill Training not conducted
Ÿ OJT training on SOP usage
Ÿ System Error During Processing
Ÿ Data Fallout
Ÿ Aurhorization Mis-Match
Ÿ System Restrictions - LPI Manual Calc
Ÿ Data Set Up Issues (eligibility, provider, benefits)
Ÿ Timeliness of Batch Processing
Ÿ Bank Acct Set-Up Delays
Ÿ Customer Touchpoints Delays
Ÿ Inappropriate assignment or missing hold codes
Ÿ Provider Mis-Match
Ÿ Transaction Limitations on data collected at
gateway
Manual Adjudication &
PMHS Provider Selection
- Manual
End
Manually check
provider/ vendor
on claim system
Check provider
data and claim
data against iView
image
Mismatch?Manually try to find
correct data
Found data
Correct data &
verify COB
Service request to
appropriate area
YES
NO
YES
iTrack
Verify in claim
screen and follow
COB Checklist
Attempt to
adjudicate claim
NO
Claim processed
Hold codes that
require further
research
NO
Re-open the claim
YES
Process will
depend on Hold
Code & SOP/ Job
Aid
CIRF
Attempt to resolve
all Hold Codes at a
line level
Resolve service
requests
Adjudicate claim
(manual or
systematic)
End
ID Task Name
1 DEFINE PHASE
12 MEASURE PHASE
13 Plan Project and Metrics
22 Baseline the Project
23 Select KPOV metric to track process output
24 Estimate process capability/performance at the 30,000-foot-level
25 Categorical failures
26 Create pareto chart
27 Rescope project to a large Pareto category
28 Repeat Baseline the Project steps 23 through 27
29 Non categorical failures
30 Revise estimate for COPQ/CODND
31 Project status update w ith executive sponsor
32 Consider Lean Tools
39 Conduct Measurement Systems Analysis (MSA)
40 Ensure data integrity
41 Perform Gauge R&R
42 Improve gauge
43 Project status update w ith executive sponsor
44 Wisdom of the Organization
55 ANALYZE PHASE
56 Use visualization of data techniques to gain insight to processes
57 Conduct inferential statistical tests and confidence interval calculations on individual KPOVs
58 Conduct appropriate sample size calculations
59 Conduct hypothesis tests
60 Describe statistical f indings to others using visualization of data techniques
61 Implement agreed-to process improvement findings
62 Project status update w ith executive sponsor
63 IMPROVE PHASE
65 d13 d
18 d
18 d
18 d
20 d
20 d
20 d
23 d
23 d
23 d
27 d
76 d33 d
69 d38 d
38 d
40 d
43 d
69 d48 d
61 d48 d
53 d
60 d53 d
60 d53 d
60 d53 d
60 d53 d
53 d
58 d
62 d
63 d
02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 05
March April May June July August September Octob
PMHS
# of Audits
7,321
04/05/2003
# $'s
Under 300 4% Under 1,030,680$
Over 676 9% Over 2,303,562$
No $ Error 914 12% No $ Error -$
No Error 5,431 74% No Error -$
7,321 3,334,243$
A)SEVERITY B)OCCURRENCE
Probability
C)DETECTION
Probability
RISK
PRIORITY
NUMBER ACTION TO IMPROVE
Rate 1-10 Rate 1-10 Rate 1-10 RPN
10=Most
Severe
10=Highest
Probability
10=Lowest
Probability AxBxC A B C
Provider Mis-Match 10 8 9 720
Provider Data Incorrect/Incomplete 9 8 9 648
Data Fallout 9 6 10 540
Data Set Up Issues 9 6 10 540
Provider Fee Schedule Unclear 9 6 9 486
OI Information Needed 9 6 6 324
System Restrictions 6 6 9 324
Hold Codes 9 3 10 270
FAILURE MODE
Process Name: PMHS Claim Processing
Date: 6/30/2003 Revision Level: 3
REVISED VALUES
0Subgroup 10 20 30 40
0
10
20
30
In
div
idu
al
Valu
e
Mean=10.98
UCL=26.81
LCL=-4.854
0
10
20
Mo
vin
g R
an
ge
1
R=5.952
UCL=19.45
LCL=0
Total e-Pro Change Transactions by Account from Sep 2002 thru Mar 2003
Gage R&R http://www.aiag.org/ Part Number http://www.qimacros.com/free-lean-six-sigma-tips/aiag-msa-gage-r&r.html
Average & Range Method 1 2 3 4 5 6 7 8 9 10 Sum
Appraiser 1 Trial 1 0.65 1 3.250
Enter your data here-> Trial2 0.6 1
Trial3
Trial4
Trial 5
Total 1.25 2
Average-Appraiser 10.625 1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Range1 0.05 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Appraiser 2 Trial 1 0.55 1.05 3.100
Enter your data here-> Trial2 0.55 0.95
Trial3
Trial4
Trial 5
Total 1.1 2
Average-Appraiser 20.55 1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Range2 0 0.1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Appraiser Trial 1
Enter your data here-> Trial2
Trial3
Trial4
Trial 5
Total
Average-Appraiser 3#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Range3 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
EV (Equipment Variation)0.0332 Equipment Variation (EV)
%EV 11.3% 39.9% # Parts #Trials #Ops % of Total Variation (TV)
AV: (Appraiser Variation)0.02066 2 2 2 Appraiser Variation(AV)
%AV 7.0% 24.8% % of Total Variation (TV)
R&R (Gage Capability) 0.0391 Repeatability and Reproducibility (R&R)
%R&R 13.3% 47.0% NDC 11 % of Total Variation (TV)
PV (Part Variation) 0.2917 Part Variation (PV)
%PV 99.1% 350% % of Total Variation (TV)
Skewness0.41Stdev1.670.20Max6.20
Eliminate the error condition◦ The best approach◦ Usually a form of Corrective Action (5-Whys)
Detect the error when it happensInspection
◦ Keep the defect from reaching the customer◦ The problem – you made an error!
SPC (Statistical Process Control)◦ Requires monitoring and training to be effective◦ Rules have to be enforced to be effective
SOPs (Standard Operating Procedures)◦ Must be followed to be effective◦ Requires constant updating
Warning Signals◦ Almost worthless – they will be ignored after a time
Pg 6
Mitigation◦ Reduce the effect of the error
Detection◦ The error has already occurred but it is discovered before it gets
to the next step (or customer!)
Replacement◦ Substituting a more reliable process
Visual Methods◦ Making the process easier to “see”◦ Example – color codes labels designating the age of the material◦ Example – Markers on the legs of the shelving to keep the material
from being stacked too high
POKA-YOKE◦ The BEST concept◦ Elimination of the possibility of an error
Pg 7
As part of an improvement project, you should error proof the process as much as possible!
Poka-Yoke◦ Changing the process so that the error in question
cannot occur
Examples:◦ The bar above the entrance to the parking garage (not
foolproof!)◦ Automatic door locks◦ Flash drive cannot be inserted upside down◦ Tether on the gas cap to keep you from leaving it◦ The hole near the top of the sink to keep water from
running over◦ The automatic golf ball trap on the last hole of the putt-
putt course to keep you from walking away with the ball after the round
Pg 8
A run chart with Control Limits added which are based on the variation of the data◦ Similar to a run chart in that they display data in
“time” order
◦ Control Limits (+/- 3s) contain 99+% of all the data contained in a normally distributed distribution
Control Limits ARE NOT Specification Limits◦ Specification limits are set by the customer
◦ Control Limits are determine by the process
Establishing a measurement baseline◦ Measure phase!
Detecting special causes of variation in the process◦ Items requiring corrective action (quality assurance)
Ensuring process stability◦ Tracking a process over a period of time
Monitoring a process over time◦ Maintaining our improvements until they are ingrained in
the culture
Confirming the impact of process improvement activities◦ If we make an improvement, we would WANT the chart
to show the change
VariableData?
RationalSubgroups?
X & MR chart
%Defective or
Defects?
SubgroupSize >8?
Easy to Compute
sigma?
X-bar & R chart X-bar & S chart
ConstantSampleSize?
ConstantSampleSize?
p-chart
np- or p-chart
u-chart
c- or u-chart
Yes
Yes
Yes YesYes
Yes
No
NoNo
No
Defects
% Defective
No No
You are monitoring your drive time in the file Drive Time and want to see if you are in control◦ Highlight column A
◦ Control Charts (SPC) > XmR Individuals
◦ Click “OK” on the titles
You are interested in the proportion of speeders on your way to work; you collect data on the first 100 cars that you pass or pass you◦ Highlight columns C and D
◦ Control Charts (SPC) > np
◦ Click “OK” on the titles
Drive Time
UCL 36.7364
CL 32.0584
LCL 27.3803
25.820
27.820
29.820
31.820
33.820
35.820
37.820
39.820
1 4 7
10
13
16
19
22
25
28
31
34
37
40
43
46
49
52
55
58
61
64
67
70
73
76
79
82
85
88
91
94
97
100
Dri
ve T
ime
Period
X Drive Time
Observations?
UCL 20.1482
CL 14.0000
LCL 7.8518
0.000
5.000
10.000
15.000
20.000
25.000
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Defe
cti
ve
Trials
Defective np Chart
Observations?
What is a Process Control Strategy?◦ Real-time monitoring of
output metrics following implementation (SPC)
Why?◦ Quantify the impact of process improvements
◦ Provide real-time notification if protocol compliance drifts below targets
◦ Identify additional opportunities for process improvement
15
What is a Control Plan?
‘Keep Score’ - Establish process measures that enable:
◦ Real Time, Immediate Feedback
◦ Pilot: Daily/Shift Feedback
◦ Long Term: Daily/Weekly Feedback
Establish regular meetings (daily/weekly) to review pilot process performance
16
17
Insert Control Plan
Terms defined on next slide…
Terms defined on next slide…
Control 1 – Control Plan Template
18
19
Control Plan Template
Project Title: Printing & Binder Preparation
Process Owner: Jim Smith
Metric Target
Value
Control Limits Data Source/
Location
Collected
By:
Sample Size/ Frequency Collection Method Review Frequency
Process Defect Reduction 15% 20% Project Docs Jim Per Project
Audit Project within 3 business
days of completion Per Project
Customer Satisfaction 95% 75% Customer Survey Maggie Per Project
Live Survey within 10 business
days of project completion Per Project
Compliance to Team Prep Role 100% <93% Project Docs Lou Per Project
Audit Project within 3 business
days of completion Per Project
Printing Partner Process Compliance 100% 99% Print Order Docs Maggie Per Project
Audit Project within 3 business
days of completion Per Project
Printing Partner Defect Free Yield 100% 99% Print Order Docs Maggie Per Project
Audit Project within 3 business
days of completion Per Project
Binder Restocking Process Defect Free
Yield 95% <95% Binder Prep Room Paul Daily Inspections Walk through Inspection Daily
20
Insert Control Plan
Note that all Metrics impacted by the implementation should be monitored as part of the control plan.
Out of Spec Product◦ Contain and/or quarantine the product
◦ Investigate and correct using Root Cause analysis
◦ Confirm fixes with additional SPC
Out of Control Conditions◦ Note point on the chart
◦ Investigate special cause and take corrective action
◦ Confirm fixes with additional SPC
If fixes do not work – escalate to leadership
In Spec (customer specs) Out of Spec (customer specs)
In Control (SPC) OK Contain or Quarantine Output
Out of Control (SPC) ProblemShut down and review
Capabilities, FMEA, Controls, etc.
Champion Control Phase Checklist
24
Control 2 – Tollgate and Approval
Control Phase Comment
What are your deliverables for this phase? Summarize the findings.
Deadlines and responsibilities have been determined?
Training has been initiated/completed with the staff and workforce?
What error-proofing opportunities did you find?
What process controls are being implemented to ensure we "sustain the gains"?
Have you finished your Control Plans?
Has your FMEA been finalized?
Who should take responsibility for maintaining the process after your team has completed the project? Are these people
fully aware of this and have they agreed?
Is there a plan to revisit this process in the future to ensure the new capability level is maintained? What new
measurements are in place?
What is the expected improvement in terms of cost reduction? Has finance been communicated with?
Have you met with the Process Owner and Champion to ensure the turnover of the project goes smoothly?
What new tools have you used in this phase and where they helpful?
When do you plan to have your final presentation completed?
What lessons have been learned on this project and what opportunities exist for leveraging the improvements?
Do you have any ideas for follow-up projects?
Are you satisfied with the level of cooperation and support you received on this project? What could be done different in
the future to better support the next project?
Have you obtained the signatures from leadership to close out the project?
Project Team Control Phase Checklist
25
Control Tollgate Approval
Champion Approval Signature/Date:
Tollgate review approved unconditionally:
Tollgate review approved with the following contingencies:
Tollgate review dis-approved, list issues for resolution:
26