prepared by ir. subagiyo loekito indonesia participant settlement and spatial planning office...

18
Prepared by Ir. SUBAGIYO LOEKITO Ir. SUBAGIYO LOEKITO Indonesia Participant Indonesia Participant Settlement and Spatial Planning Office Settlement and Spatial Planning Office Central Java Province August 2003 August 2003 Country Country REPORT REPORT

Upload: kristian-flowers

Post on 29-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Prepared by Ir. SUBAGIYO LOEKITOIr. SUBAGIYO LOEKITO

Indonesia ParticipantIndonesia Participant

Settlement and Spatial Planning Settlement and Spatial Planning OfficeOffice

Central Java Province

August 2003August 2003

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

CountryCountry REPORTREPORTSSettlement andettlement and SSpatial patial PPlanninglanning

OOffice ffice

Functions:1. Technical policies on settlement and Spatial Planning1. Technical policies on settlement and Spatial Planning2. Planning and Programming, assistance, monitoring, 2. Planning and Programming, assistance, monitoring, evaluation, and reporting of Settlement and Spatial evaluation, and reporting of Settlement and Spatial PlanningPlanning3. Coordination, facilitation, mediation, evaluation and 3. Coordination, facilitation, mediation, evaluation and control on settlement development and spatial control on settlement development and spatial planning planning 4. Facilitation on settlement infrastructure 4. Facilitation on settlement infrastructure developmentdevelopment5. Administration and management5. Administration and management

CountryCountry REPORTREPORTCentral Java ProvinceCentral Java Province

IIndonesiandonesia

Planning Sub Division

Development Area Sub Division

Infrastructure Management

Sub Division

Building Development

Sub Division

Technical Assistance

Sub Division

Housing Improvement

Sub Division

Drainage Sub Division

Building Management

Sub Division

Monitoring and Evaluation

Sub Division

Self Supporting Housing

Sub Division

Solid Waste Sub Division

Guidance Construction

Service Sub Div.

Program Sub Division

Building Plan Sub Division

Water Supply Sub Division

Supervision Construction

Service Sub Div.

Spatial Planning Division

HousingDivision

Settlement Infrastructure

Division

Building Construction service Division

Testing and Information

Construction Bureau

ChairmanVice Chairman *)

Administration Division

Administration Section

Testing Section

Information Section

Official Sub Division

Financial Sub Division

General Sub Division

1 Metropolitan City – Semarang: more than 1.000.000 inh1 Metropolitan City – Semarang: more than 1.000.000 inhabitant abitant 1 Big City (500.001 – 1000.000 inhabitants);1 Big City (500.001 – 1000.000 inhabitants);29 Medium Cities (100.001 – 500.000 inhabitants);29 Medium Cities (100.001 – 500.000 inhabitants);70 Small Cities (30.001 – 100.000 inhabitants);70 Small Cities (30.001 – 100.000 inhabitants);140 Cities of capital of district (20.001-30.000 inhabitant140 Cities of capital of district (20.001-30.000 inhabitants); s); 200 the capitol of district (less than 20.000 inhabitants). It200 the capitol of district (less than 20.000 inhabitants). Its physically not yet urbanizes physically not yet urbanize

CCitiesities

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

• The average of population growth of Central Java Province The average of population growth of Central Java Province is 1.5% per year and higher in Semarang is 1.5% per year and higher in Semarang • Back log housing is about one million in 2002 Back log housing is about one million in 2002 • Economic growth in 2002 is about 4%Economic growth in 2002 is about 4%• Metropolitan and Big City already crowdedMetropolitan and Big City already crowded

PProspect of The New Town Programrospect of The New Town Program

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

Puri AnjasmoroPuri Anjasmoro

BanyumanikBanyumanik

TelogosariTelogosari

Location of New Town aLocation of New Town and High Scale Settlemennd High Scale Settlement in Semarangt in Semarang

SSemarang Metropolitanemarang Metropolitan

CountryCountry REPORTREPORT

IIndonesiandonesia

Central Java ProvinceCentral Java Province

Bukit Semarang BaruBukit Semarang Baru

TThe New Townhe New Town

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

Industrial Zone

Housing Zone

Housing Zone

Housing Zone

Commercial area

Lake

New Semarang Mountain/ Bukit Semarang Baru.

It’s Located at West Side Of Semarang

Ke

Boj

a

Ke S

MG

UUrban renewalrban renewal

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

Old City Semarang

UUrban renewalrban renewal

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

canal

Post OfficeMandiri Bank Building

Colonial Bank, It’s PTP XVII Building

Mberok Area

UUrban renewalrban renewal

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

Agus

Sal

im S

treet

Pekojan

Blenduk Church

Commercial Area

Conservation area

Semarang Old City

1. Support city tourism1. Support city tourism

2. Improve the environment quality 2. Improve the environment quality

3. Raise the economic activity3. Raise the economic activity

CChance for the future of Urban hance for the future of Urban

renewalrenewal

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

High tideHigh tideLocal flood / high tide becomes a serious problem in SeLocal flood / high tide becomes a serious problem in Semarang because it covers very large area (27.2Km2) espmarang because it covers very large area (27.2Km2) especially at the north area.ecially at the north area.caused by rising of the sea level because of global warmicaused by rising of the sea level because of global warming and land declineng and land decline

IIssues ssues and countermeasuresand countermeasures

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia Continue ….

Polder and Water Pump systemPolder and Water Pump systemSemarang Drainage system divided into two main drain systSemarang Drainage system divided into two main drain systems, Canals and city drainage that operated by pump and gems, Canals and city drainage that operated by pump and gravitation system.ravitation system.• There are two main canals, first is Banjir Kanal Barat (West Main Canal) and There are two main canals, first is Banjir Kanal Barat (West Main Canal) and

the second is Banjir Kanal Timur (East Main Canal).the second is Banjir Kanal Timur (East Main Canal).

IIssues ssues and countermeasuresand countermeasures

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia Continue ….

Efforts to reduce local flood areaEfforts to reduce local flood area• Plan to build Jatibarang damPlan to build Jatibarang dam• Rivers and canals normalization Rivers and canals normalization • Heightening the dikes and inspection roadsHeightening the dikes and inspection roads• Build pump stations and polder systemBuild pump stations and polder system

……IIssues ssues and countermeasuresand countermeasures

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

IIndonesiandonesia

•Law Number 16/1985 about Multistory HousingLaw Number 16/1985 about Multistory Housing•Law Number 4/ 1992 about Housing and SettlementLaw Number 4/ 1992 about Housing and Settlement•Law Number 24/ 1992 about Spatial PlanningLaw Number 24/ 1992 about Spatial Planning•Law Number 18/ 2002 about Building Law Number 18/ 2002 about Building •President Decree Number 32/ 1992 about Conservation AreaPresident Decree Number 32/ 1992 about Conservation Area•Government Regulation Number 4/ 1986 about Multistory Housing Government Regulation Number 4/ 1986 about Multistory Housing •Government Regulation Number 80/ 1999 about Ready Build Area Government Regulation Number 80/ 1999 about Ready Build Area •Government Regulation Number 69/ 1996 about Public Participation in Spatial Government Regulation Number 69/ 1996 about Public Participation in Spatial

PlanningPlanning•Ministry Regulation of Home Affair Number 2/ 1987 about Guidance of City Ministry Regulation of Home Affair Number 2/ 1987 about Guidance of City

PlanningPlanning•Ministry Decree of Public Work Number 640/ KPTS/ 1986 about Standard of City Ministry Decree of Public Work Number 640/ KPTS/ 1986 about Standard of City

Planning Planning •Ministry Decree of Public Work Number 20/ KPTS/ 1986 about Simple Housing Ministry Decree of Public Work Number 20/ KPTS/ 1986 about Simple Housing •Ministry Decree Home Affair Number 58/ 1988 Technical guidance for Ministry Ministry Decree Home Affair Number 58/ 1988 Technical guidance for Ministry

Regulation Regulation of Home Affair Number 2/ 1987of Home Affair Number 2/ 1987•Ministry Decree of Home Affair Number 4/ 1996 about Urban land Use Ministry Decree of Home Affair Number 4/ 1996 about Urban land Use

ChangingChanging•Governor Decree Number 10/ 1998 About Planning of Spatial Road Governor Decree Number 10/ 1998 About Planning of Spatial Road •Governor Decree Number 11/1998 About Standard of Site Planning on Governor Decree Number 11/1998 About Standard of Site Planning on

Settlement AreaSettlement Area

LLaws and Regulationsaws and RegulationsCountryCountry

REPORTREPORTCentral Java ProvinceCentral Java Province

PProblems that hinder developmentroblems that hinder development

1. Spatial planning is not yet being a part of 1. Spatial planning is not yet being a part of development plan. development plan. 2. Spatial planning should be guidance for all 2. Spatial planning should be guidance for all institutions to make a decision in development. institutions to make a decision in development.3. Limitation of good quality of human resources 3. Limitation of good quality of human resources Weakness of law enforcement Weakness of law enforcement4. Squatters and slum areas are rapidly growth in 4. Squatters and slum areas are rapidly growth in the the city center. city center.

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

CCountermeasuresountermeasures

1. To complete spatial planning into detail plan and 1. To complete spatial planning into detail plan and

operation operation

procedure procedure

2. To build the institution establish 2. To build the institution establish ..

3. Training, comparative study, increase the level of 3. Training, comparative study, increase the level of

education education

and addition the quality personal. and addition the quality personal.

4. Character building 4. Character building

5. Urban renewal, resettlement, and New Town 5. Urban renewal, resettlement, and New Town

developmentdevelopment

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia

““Making the Spatial Planning as Making the Spatial Planning as a Development Tool” a Development Tool”

VVisionision

CountryCountry REPORTREPORT

Central Java ProvinceCentral Java Province

IIndonesiandonesia