Preparing for the onsite visit
Stage 1Manufacturer = Nestle
Group 1 Group 2
Package Net Quantity 165 g 8g ???
Production hourly rate 2500 per hour 2500 per hour
Calculate Tolerable Deficiency ? ?
Calculate T1 error of product under test ? ?
Calculate T2 error of product under test ? ?
Calculate No. samples to select ? ?
No. of T1 permitted in inspection lot ? ?
Preparing for the onsite visit
Stage 2
Demonstrate computer system
with rice exercise
Preparing for the onsite visit
Stage 3 - Equipment check sheet
• Appropriate Scale • Computer or hard copy of data capture sheet• Stopwatch• Protective equipment
Preparing for the onsite visit
Stage 4 - Assign tasks Group 1 Group 2Sample collectors Sample collectors Time keeper Time Keeper Perform Weighing Perform Weighing Computer data entry Computer data entry Manual data entry Manual Data entry