presentación de powerpoint - emship michael columbia, zut .pdfscope of the research: “to...

40
Master Thesis Study for implementation of Advanced Outfitting concept in COTECMAR Michael Sánchez 7 th EMship cycle: October 2016 February 2018 Supervisor: Professor Zbigniew Sekulski, West Pomeranian University of Technology, Szczecin, Poland Internship tutor: Eng. Kornel Kwiatkowski, Project Manager CRIST Shipyard, Gdynia - Poland Szczecin, January 2018

Upload: others

Post on 10-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

Master Thesis

Study for implementation of Advanced Outfitting concept in COTECMAR

Michael Sánchez 7th EMship cycle: October 2016 − February 2018

Supervisor: Professor Zbigniew Sekulski, West Pomeranian University of Technology, Szczecin, Poland Internship tutor: Eng. Kornel Kwiatkowski, Project Manager CRIST Shipyard, Gdynia - Poland

Szczecin, January 2018

Page 2: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

COTECMAR Corporation & CRIST SHIPYARD overview.

Shipyard: Mamonal plant

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 2 Defense of Master Thesis, Szczecin, January 2018

Source: Google.maps.

Source: COTECMAR

Page 3: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

COTECMAR Corporation & CRIST SHIPYARD overview.

Shipyard: Mamonal plant

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 3 Defense of Master Thesis, Szczecin, January 2018

Source: COTECMAR

Page 4: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

COTECMAR Corporation & CRIST SHIPYARD overview.

CRIST shipyard S.A.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 4 Defense of Master Thesis, Szczecin, January 2018

Source: Google.maps

Source: CRIST S.A.

Page 5: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

The Science and Technology Corporation for the Development of Maritime and River

Naval Industry Colombian Navy

OPERATED BY:

Army Navy Air Force Police

Colombia Ministry of Defense

Military Force - General Command

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 5 Defense of Master Thesis, Szczecin, January 2018

Page 6: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

GUARANTEE THE SUSTAINABLE DEVELOPMENT OF COTECMAR

Offer integral solutions to Naval industry

Satisfy the requirements of Maritime & River naval industry sector

Lead the competitiveness of the

sector

Compliance with the business plan

Optimize the logistic management

Improve the productivity

Strengthen the competitiveness and

innovation management

Guarantee the demanded production

capacity

Improve the human talent

Guarantee sustainable, opportune and safe

technological service information

CORPORATIVE

GROUS OF INTEREST

INTERNAL PROCESSES

LEARNING & GROWTH

BALANCED SCORECARD OF COTECMAR

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 6 Defense of Master Thesis, Szczecin, January 2018

Page 7: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

Strategy areas to Improve the productivity

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 7 Defense of Master Thesis, Szczecin, January 2018

Page 8: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

Strategy areas to Improve the productivity

Guarantee the demanded production

capacity

Ship design areas

Business & Commercial

processes

Acquisition and inventory

control

Construction and assembly

methods

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 8 Defense of Master Thesis, Szczecin, January 2018

Page 9: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

Strategy areas to Improve the productivity

Guarantee the demanded production

capacity

Ship and design areas

Business & Commercial

processes

Acquisition and inventory

control

Construction and assembly

methods

Group technology

Assembly technologies

Outsourcing strategy

Cross-trade contracts

Advanced outfitting

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 9 Defense of Master Thesis, Szczecin, January 2018

Page 10: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

Strategy areas to Improve the productivity

Guarantee the demanded production

capacity

Ship and design areas

Business & Commercial

processes

Acquisition and inventory

control

Construction and assembly

methods

Group technology

Assembly technologies

Outsourcing strategy

Cross-trade contracts

Advanced outfitting

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 10 Defense of Master Thesis, Szczecin, January 2018

Page 11: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

1. INTRODUCTION

Strategy areas to Improve the productivity

Guarantee the demanded production

capacity

Construction and assembly

methods

Advanced outfitting

Hypothesis for this research: “It is possible to increase the productivity of shipbuilding cycle in COTECMAR based on the implementation

of advanced outfitting concept”

Strategy currently used by the most modern shipyards in the world and allows the installation of the largest amount of equipment (machinery, pipelines, cables, etc.) in the earliest stages of construction, especially during pre-assembly and assembly of each block that compose the hull.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 11 Defense of Master Thesis, Szczecin, January 2018

Page 12: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

2. OBJECTIVE

Strategy areas to Improve the productivity

Construction and assembly

methods

Advanced outfitting How to implement it?

Scope of the research: “to establish and describe the general aspects that must be

considered to implement advanced outfitting concept in COTECMAR”

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 12 Defense of Master Thesis, Szczecin, January 2018

Page 13: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

4. RESEARCH METHODOLOGY & THEORETICAL FRAMEWORK

Advanced outfitting

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 13 Defense of Master Thesis, Szczecin, January 2018

Page 14: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Strategy areas to Improve the productivity

Construction and assembly

methods

Advanced outfitting How to implement it?

Scope of the research: “to establish and describe the general aspects that must be considered to implement

“advanced outfitting” in COTECMAR”

Initial assessment: What it the current level of outfitting processes in COTECMAR?

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 14 Defense of Master Thesis, Szczecin, January 2018

Page 15: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Initial assessment: What is the current level of outfitting processes in COTECMAR?

Case of study: CPV coastal patrol vessel built by COTECMAR

DIMENSIONS Length overall: 46,25 m Waterline length 43,88 m Moulded breadth: 7,09 m Depth: 4,30 m Design draft: 1,84 m Operational draft: 2,00 m

PERFORMANCE Displacement: 286,27 MT Max. speed: 20 knots Operational range: 17 days 2000 nautical miles @ 12 knots Crew capacity: 18 people Electrical plant 02 electrical groups 99 kW (123kVA) Propulsion plant MTU series 12V 4000 M70 1680kW @2000 rpm

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 15 Defense of Master Thesis, Szczecin, January 2018

Source: COTECMAR

Source: COTECMAR

Page 16: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Initial assessment: What is the current level of outfitting processes in COTECMAR?

Case of study: CPV coastal patrol vessel built by COTECMAR

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 16 Defense of Master Thesis, Szczecin, January 2018

Source: COTECMAR

Page 17: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Initial assessment: What is the current level of outfitting processes in COTECMAR?

Case of study: CPV coastal patrol vessel built by COTECMAR

Excerpt of CPV project schedule

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 17 Defense of Master Thesis, Szczecin, January 2018

Page 18: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Initial assessment: What is the current level of outfitting processes in COTECMAR?

Case of study: CPV coastal patrol vessel built by COTECMAR

Excerpt of CPV project schedule

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 18 Defense of Master Thesis, Szczecin, January 2018

Page 19: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Initial assessment: What is the current level of outfitting processes in COTECMAR?

Case of study: CPV coastal patrol vessel built by COTECMAR

Excerpt of CPV project schedule

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 19 Defense of Master Thesis, Szczecin, January 2018

Source: COTECMAR

Page 20: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Case of study: CPV coastal patrol vessel built by COTECMAR

Shipyards Classification

First Generation

Second Generation

Third Generation

Fourth Generation

Fifth Generation

Initial assessment: What is the current level of outfitting processes in COTECMAR?

A limited amount of outfitting was installed prior to launch. Steel and outfit facilities remained separated with outfitting shops generally located adjacent to an outfitting quay.

The level of outfitting prior to launch increased and there was some pre-outfitting of blocks.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 20 Defense of Master Thesis, Szczecin, January 2018

Page 21: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

*Initial assessment: What it the current level of Advanced outfitting processes in COTECMAR?

Evaluation of advanced outfitting level in COTECMAR, with reference on SWBS in CPV project.

SURVEY ABOUT ADVANCED OUTFITTING LEVELS IN COTECMAR CORPORATION’S SHIPYARD

CASE: Coastal Patrol Vessel

Present level of advanced outfitting: percentage of advanced outfitting (on-block and on-unit) in

relation with all planned outfitting activities

WORK BREAKDOWN STRUCTURE %

Sea water system 15%

Fresh water system 15%

Fuel oil system 0%

Lubrication system 0%

Ballast system 60%

Bilge system 10%

Firefighting system 15%

Sanitary system 20%

Hydraulic system 0%

Exhaust system 0%

Propulsion system (including engines) 30%

Steering gear system 0%

Gen-sets 0%

Ventilation (ducts and blowers) 0%

Air-condition (ducts and equipment) 0%

Cable trays 50%

Cables 0%

Electrics distribution panels 0%

Electronics (navigation and communication) 0%

Foundations 15%

Furniture 0%

Accommodation 0%

Combat and weapons system 0%

SWBS Code - U.S. Navy000. General Guidance and Administration100. Hull Structure200. Propulsion Plant300. Electric Plant400. Command and Surveillance500. Auxiliary Systems 600. Outfit and Furnishings700. Armament800. Integration/Engineering900. Ship Assembly and Support Service

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 21 Defense of Master Thesis, Szczecin, January 2018

CON

FINDEN

TIAL RESULTS

Page 22: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

*Initial assessment: What it the current level of Advanced outfitting processes in COTECMAR?

Evaluation of advanced outfitting level in COTECMAR, with reference on outfitting groups in CPV project.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 22 Defense of Master Thesis, Szczecin, January 2018

CON

FINDEN

TIAL RESU

LTS

CON

FINDEN

TIAL RESU

LTS

CON

FINDEN

TIAL RESU

LTS

CON

FINDEN

TIAL RESULTS

Page 23: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

*Initial assessment: What it the current level of Advanced outfitting processes in COTECMAR?

The report presents the findings of the 2014 US Naval Shipbuilding and Repair Industry Benchmarking study carried out by First Marine International (FMI)

Source: 2014 US Naval Shipbuilding and Repair - Industry Benchmarking. London, United Kingdom: First Marine International Co.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 23 Defense of Master Thesis, Szczecin, January 2018

Page 24: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Strategy areas to Improve the productivity

Construction and assembly

methods

Advanced outfitting How to implement it?

Scope of the research: “to establish and describe the general aspects that must be considered to implement

“advanced outfitting” in COTECMAR”

Initial assessment: What it the current level of outfitting processes in COTECMAR?. Answer: CONFIDENTIAL

*Initial assessment: What it the current level of Advanced outfitting processes in COTECMAR?

Answer: CONDIFENTIAL

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 24 Defense of Master Thesis, Szczecin, January 2018

Page 25: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Source: AVEVA Corp.

Strategic areas of shipbuilding projects

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 25 Defense of Master Thesis, Szczecin, January 2018

Page 26: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Source: AVEVA Corp.

Aspects related to layout optimization & ship production aspects

Strategic areas of shipbuilding projects

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 26 Defense of Master Thesis, Szczecin, January 2018

Page 27: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Source: AVEVA Corp.

Design & Engineering aspects

Strategic areas of shipbuilding projects

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 27 Defense of Master Thesis, Szczecin, January 2018

Page 28: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Source: AVEVA Corp.

Project management aspects

Strategic areas of shipbuilding projects

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 28 Defense of Master Thesis, Szczecin, January 2018

Page 29: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Source: AVEVA Corp.

Logistics & acquisition aspect

Strategic areas of shipbuilding projects

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 29 Defense of Master Thesis, Szczecin, January 2018

Page 30: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Advanced outfitting

Project management

& Planning

Purchasing &

Acquisitions

Design & Engineering

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Strategic areas of shipbuilding projects

Layout optimization.

Design and Engineering

Project management

Ship production

Logistics and acquisition

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 31 Defense of Master Thesis, Szczecin, January 2018

Page 31: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Strategic areas of shipbuilding projects

Layout optimization.

Design and Engineering

Project management

Ship production

Logistics and acquisition

• Warehouses

• Workshops

• Outfitting assembly areas

• Lifting capacity

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 32 Defense of Master Thesis, Szczecin, January 2018

Page 32: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Strategic areas of shipbuilding projects

Layout optimization.

Design and Engineering

Project management

Ship production

Logistics and acquisition

• Higher level of technical and design information flow.

• Shipyard facilities limits (cooperation with production areas)

• Machinery and piping modules.

• Pre-fabricated modules

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 33 Defense of Master Thesis, Szczecin, January 2018

Page 33: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Strategic areas of shipbuilding projects

Layout optimization.

Design and Engineering

Project management

Ship production

Logistics and acquisition

• Integration: hull construction & outfitting activities.

• Schedule and planning.

• New shipbuilding strategy

• Outfitting planning

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 34 Defense of Master Thesis, Szczecin, January 2018

Page 34: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Strategic areas of shipbuilding projects

Layout optimization.

Design and Engineering

Project management

Ship production

Logistics and acquisition

• Working conditions.

• Assembly technics.

• Sequences: Pipes, cable trays, ducting for HVAC.

• Protection of equipment or components

• Scaffoldings system

• Training (improve skills)

• Effective dimensional control.

• Testing processes.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 35 Defense of Master Thesis, Szczecin, January 2018

Page 35: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Solution of the problem: What are the most important aspects necessary to implement

“Advanced outfitting” concept in COTECMAR?

Strategic areas of shipbuilding projects

Layout optimization.

Design and Engineering

Project management

Ship production

Logistics and acquisition

• High level of purchase and acquisition system.

• Shipbuilding procurement processes and purchase orders.

• Integration with shipbuilding & design department.

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 36 Defense of Master Thesis, Szczecin, January 2018

Page 36: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Strategy areas to Improve the productivity

Construction and assembly

methods

Advanced outfitting How to implement it?

Scope of the research: “to establish and describe the general aspects that must be considered to implement

“advanced outfitting” in COTECMAR”

Initial assessment: What it the current level of outfitting processes in COTECMAR?. Answer: CONFIDENTIAL

*Initial assessment: What it the current level of Advanced outfitting processes in COTECMAR?

Answer: CONFIDENTIAL

Solution of the problem: What are the most important aspects necessary to implement “Advanced outfitting”

concept in COTECMAR? Answer: Strategic areas of shipbuilding projects aspects

Final assessment: What is the impact of implementing Advanced Outfitting Concept in

COTECMAR?

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 37 Defense of Master Thesis, Szczecin, January 2018

Page 37: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

COST-BENEFIT ANALYSIS BASED ON CPV PROJECT

Final assessment: What is the impact of implementing Advanced Outfitting Concept in

COTECMAR?

% 𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜 𝑜𝑜𝑡𝑡𝑡𝑡𝑡𝑡 𝑜𝑜ℎ𝑡𝑡𝑜𝑜 𝑐𝑐𝑡𝑡𝑜𝑜 𝑏𝑏𝑏𝑏 𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑏𝑏𝑜𝑜 𝑡𝑡𝑡𝑡 𝑡𝑡𝑜𝑜𝑎𝑎𝑡𝑡𝑜𝑜𝑐𝑐𝑏𝑏𝑜𝑜 𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜 = 𝐶𝐶 = (𝐵𝐵−𝐴𝐴)100

𝑂𝑂𝑜𝑜.𝑏𝑏𝑏𝑏𝑜𝑜𝑐𝑐𝑡𝑡 𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜 𝑐𝑐𝑜𝑜𝑡𝑡𝑜𝑜 𝑡𝑡𝑡𝑡𝑎𝑎𝑜𝑜𝑜𝑜𝑜𝑜𝑡𝑡 = 𝐶𝐶 ∗ �𝑂𝑂𝑂𝑂𝑜𝑜 − 𝑂𝑂𝐵𝐵𝑜𝑜� ∗ 𝐷𝐷 ∗ 𝐸𝐸

𝑂𝑂𝑜𝑜.𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜 𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜 𝑐𝑐𝑜𝑜𝑡𝑡𝑜𝑜 𝑡𝑡𝑡𝑡𝑎𝑎𝑜𝑜𝑜𝑜𝑜𝑜𝑡𝑡 = 𝐶𝐶 ∗ �𝑂𝑂𝑂𝑂𝑜𝑜 − 𝑂𝑂𝑂𝑂𝑜𝑜� ∗ 𝐷𝐷 ∗ 𝐸𝐸

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 38 Defense of Master Thesis, Szczecin, January 2018

CON

FINDEN

TIAL RESU

LTS

Page 38: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

5. RESULTS OF RESEARCH

Strategy areas to Improve the productivity

Construction and assembly

methods

Advanced outfitting How to implement it?

Scope of the research: “to establish and describe the general aspects that must be considered to implement

“advanced outfitting” in COTECMAR”

Initial assessment: What it the current level of outfitting processes in COTECMAR?. Answer: CONDIFENTIAL

*Initial assessment: What it the current level of Advanced outfitting processes in COTECMAR?

Answer: CONFIDENTIAL

Solution of the problem: What are the most important aspects necessary to implement “Advanced outfitting”

concept in COTECMAR? Answer: Strategic areas of shipbuilding projects aspects

Final assessment: What is the impact of implementing Advanced Outfitting Concept in COTECMAR?

Answer: Positive impact

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 39 Defense of Master Thesis, Szczecin, January 2018

Page 39: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

6. CONCLUSIONS

Strategy areas to Improve the productivity

Construction and assembly

methods

Advanced outfitting Implementation

REDUCTION OF CONSTRUCTION TIME

BETTER PRODUCTION ENVIRONMENT

IMPROVE THE QUALITY OF FINAL PRODUCTS

REDUCTION OF COSTS

BETTER SHIP LIFE CYCLE COST

OPTIMIZATION OF PRODUCTIVITY IN COTECMAR

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 40 Defense of Master Thesis, Szczecin, January 2018

Page 40: Presentación de PowerPoint - EMSHIP Michael Columbia, ZUT .pdfScope of the research: “to establish and ... with reference on SWBS in CPV project. SURVEY ABOUT ADVANCED OUTFITTING

6. CONCLUSIONS & RECOMMENDATIONS

Michael Sanchez Blanco , 7th Emship cycle: 2016-2018 41 Defense of Master Thesis, Szczecin, January 2018