presentación de powerpoint · michiquillay awarded 50. challenges 2018 18 projects - usd 3,841...

48
PERU: INVESTMENT OPPORTUNITIES

Upload: others

Post on 17-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

PERU:INVESTMENT

OPPORTUNITIES

Page 2: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

PORTFOLIO

2018-2020

50 PROJECTS

Estimated investment:

USD 11.15 billion*

*It does not include projects whose amounts have

not yet been determined.

Telecommunications 3%USD 359

Education 3%USD 329

Transport 40%USD 4,432Salaverryawarded

Irrigation 4%USD 399

Energy 8%USD 920

Water and sanitation 9%USD 1,096

Health 10%USD 1,122

Mining 23%USD 2,500

Michiquillay awarded

50

Page 3: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

CHALLENGES 201818 PROJECTS - USD 3,841 Million

*Amount to be determined.

TRANSPORT

AMOUNT: USD 229 M

MINING

AMOUNT: USD2,500 M

o Salaverry’s Port Terminal - Awarded

o Áncash, Arequipa, Huánuco, La Libertad,

Pasco and San Martín broadband

o Titicaca WWTP

o Michiquillay Mining Project - Awarded

o Colca Mining Project*

o Jalaoca Mining Project*

o Massive Use of Natural Gas

o Carabayllo transmission line

o Trujillo Substation Compensator

ENERGY

AMOUNT: USD 490 M

TELECOMMUNICATIONS

AMOUNT: USD 359 M

WATER AND SANITATION

AMOUNT: USD 263 M

Project Portfolio2

Page 4: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

CHALLENGES 2019 - 202032 PROJECTS - USD 7,315 Million

TRANSPORT

AMOUNT: USD 4,203 M

o Huancayo – Huancavelica Railway

o Marcona’s Port Terminal

o Chimbote’s Port Terminal

o Peripheral Ring Road

o New road concessions

o Water Reinforcement of Ica

o Main Works

o Huancayo, Tambo and Chilca WWTP

o Puerto Maldonado WWTP

WATER AND SANITATION

AMOUNT: USD 832 M

EDUCATION

AMOUNT: USD 329 M

IRRIGATION

AMOUNT: USD 399 M

Project Portfolio2

*Amount to be determined.

o Integrated Gas Transport

System – South of the Country*

o Other projects

ENERGY

AMOUNT: USD 430 M

o Tingo María - Aguaytía 220 kV Link

o La Niña - Piura 500 kV Link

o Pariñas - Nueva Tumbes 220 kV Link

HEALTH

AMOUNT: USD 1,122 M

o ESSALUD Chimbote

o ESSALUD Piura

o Other projects

o Schools at risk (CER, by its Spanish initials)

o High-performance schools (COAR, by its Spanish initials)

o Other projects

Page 5: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 6: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

HUANCAYO – HUANCAVELICARAILWAY

Objective: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad

comprises the design, finance, works execution, acquisition of rolling materials,

operation and maintenance

Responsible body: Ministry of Transport and Communications

Modality: Co-financed government initiative

Investment amount (w/o. VAT): USD 235 million

Concession term: 30 years

Area of influence: Junín and Huancavelica

Maximum date to present qualification credentials: January 2019

Estimated award date: 1st Semester 2019

For futher information: www.proinversion.gob.pe/fhh

Page 7: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

LONGITUDINAL SIERRA HIGHWAY. SECTION 4

Objective: To provide for improvement and rehabilitation works (117 km), initial

periodic maintenance (503 km) and maintenance and operation of approximately

970 km of the Longitudinal Sierra Highway, a major national road connecting 12

departments across the entire Andes

Responsible body: Ministry of Transport and Communications

Modality: Co-financed government initiative

Investment amount (w/o. VAT): USD 464 million

Concession term: 25 years

Area of influence: Junín, Huancavelica, Ayacucho, Apurímac and Ica

Estimated award date: 1st Semester 2019

Page 8: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

NEW PORT TERMINAL OFSAN JUAN DE MARCONA

Objective: Design, finance, build, operate and maintain and new port terminal of

public use, providing specialize services of storage and load of concentrates of iron

and copper, as well as the supplies of mining production

Responsible body: Ministry of Transport and Communications - National Port

Authority

Modality: Self-financed unsolicited proposal

Investment amount (w/o. VAT): USD 582 million

Concession term: 30 years

Area of influence : Regions of Ica, Ayacucho, north area of Arequipa, Apurímac

and Cusco

Estimated award date: 2nd Semester 2019

Page 9: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

INTERNATIONAL NORTH HIGHWAY Objective: To develop road infrastructure that includes the concession of the North

Pan-American Highway Sullana - Tumbes - La Paz International Bridge Detour

Sector, as well as the granting of a concession for the design, construction, operation

and maintenance of the road connecting the cities of Sullana, Talara, Los Órganos,

Máncora, Zorritos, Tumbes, Zarumilla up to the La Paz International Bridge

Responsible body: Ministry of Transport and Communications

Modality: Co-financed Unsolicited Proposal

Investment amount (w/o VAT): USD 763 million

Concession term: 25 years

Area of Influence: Tumbes and Piura

Estimated award date: To be defined

Page 10: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

PERIPHERAL RING ROAD Objective: To build a 33.2 km long beltway from “200 miles Circle” to

“Circunvalación Avenue”

Responsible body: Ministry of Transport and Communications

Modality: Co-financed Unsolicited Proposal

Investment amount (w/o. VAT): USD 2 049 million

Concession term: 30 years

Area of influence: Lima and Callao

Estimated award date: To be defined

Page 11: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 12: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

BROAD BAND FOR THE COMPREHENSIVE CONNECTIVITY AND SOCIAL DEVELOPMENT IN ÁNCASH, AREQUIPA, HUÁNUCO, LA LIBERTAD, PASCO AND SAN MARTIN

Objective: To increase access to telecommunications services, through:

(i) the expansion of broadband carrier networks to district capitals, and (ii)

providing access networks to services for the benefit of 2, 007 rural areas

Responsible body: Ministry of Transport and Communications/FITEL

Modality: Asset transfer project

Investment amount (w/o. VAT): USD 359 million

Concession term: 12 years

Area of influence: Ancash, Arequipa, Huánuco, La Libertad, Pasco and San

Martín

Estimated award date: 2nd Semester 2018

Page 13: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 14: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

COLCA MINING PROJECT Objective: Deposit of a copper - gold porphyry project spanning 14,100 hectares.

Two important mineralized zones have been identified, surrounded by other

important properties with clear mining potential. Further drilling would define the

deposit’s potential and size.

Responsible body: Ministry of Energy and Mines

Modality: Asset transfer project

Investment amount (w/o. VAT): To be determined

Concession term: To be determined

Area of influence: Apurímac department and Cusco

Maximum date to present qualification credentials: August 2018

Estimated award date: To be defined

For further information www.proinversion.gob.pe/mineras

Page 15: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

JALAOCA MINING PROJECT Objective: Cu-Au porphyry-skarn and Cu-Mo porphyry deposit. Mining area covering

a surface area of 6400 hectares. Four important mineralized zones have been

identified. The potential and size of the deposit will be defined with drilling works

Responsible body: Ministry of Energy and Mines

Modality: Asset transfer project

Investment amount (w/o. VAT): To be determined

Concession term: To be determined

Area of influence: Apurímac department

Maximum date to present qualification credentials: June 2018

Estimated award date: 2nd Semester 2018

For further information www.proinversion.gob.pe/mineras

Page 16: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 17: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

REPOWERING TO 1000 MVA OF THE CARABAYLLO - CHIMBOTE - TRUJILLO 500 KV TL AND VARIABLE REACTIVE COMPENSATOR (SVC OR SIMILAR) +400/-150 MVAR IN 500 KV TRUJILLO SUBSTATION

Objective: The project consists of the design, financing, construction, operation

and maintenance of a repowering of a 500 kV transmission line section in the mid

north of the country and a Variable Reactive compensation equipment at the Trujillo

substation. These investments will reinforce the transmission system in 500 kV of

the National Interconnected Electric System (SEIN, by its Spanish initials)

Responsible body: Ministry of Energy and Mines

Modality: Self-Financed government initiative

Investment amount (w/o VAT): USD 90 million

Concession term : 30 years plus the construction period (33 months)

Area of influence: Lima, Ancash and La Libertad

Estimated award date: 2nd Semester 2018

Page 18: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

LA NIÑA – PIURA 500 KV LINK, SUBSTATIONS, LINES AND ASSOCIATED EXTENSIONS

Objective: The project is configured with a 500 kV transmission line that

connects La Niña substation with the future Piura Nueva substation with an

approximate length of 87 km. A new substation called Piura Nueva will be

constructed. In order to reinforce the transmission systems in 220 kV, the new

substation will be equipped with transforming equipment in 220 kV

Responsible body: Ministry of Energy and Mines

Modality: Self-financed government initiative

Investment amount (w/o VAT): USD 132 million

Concession term : To be determined

Area of influence: Piura

Estimated award date: 1st Semester 2019

Page 19: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

PARIÑAS - NUEVA TUMBES 220 KV LINK, SUBSTATIONS, LINES AND ASSOCIATED EXTENSIONS

Objective: The project envisages the construction of the following infrastructure:

• Transmission line in 220 kV Pariñas - Nueva Tumbes (158 km in

single-circuit line)

• Branching of transmission line in220 kV L-2280-Nueva Tumbes

• Nueva Tumbes substation

• Extension of a cell in Pariñas substation for the exit to the Nueva

Tumbes substation

Responsible body: Ministry of Energy and Mines

Modality: Self-financed government initiative

Investment amount (w/o VAT): USD 47.3 million

Concession term : To be determined

Area of Influence: Tumbes

Estimated award date: 1st Semester 2019

Page 20: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

TINGO MARÍA – AGUAYTÍA 220 KV LINK, SUBSTATIONS, LINES AND ASSOCIATED EXTENSIONS

Objective: The 220 kV transmission line Tingo María Nueva – Aguaytía

(73 km) begins in the projected Tingo María Nueva substation, located in the

District of Rupa-Rupa, Province of Leoncio Prado, Department of Huánuco and

reaches the Aguaytía Substation, property of Aguaytía Energy, located in the

District of Aguaytía, Province of Padre Abad, Department of Ucayali. These

investment will reinforce the transmission system in the eastern area of the

country

Responsible body: Ministry of Energy and Mines

Modality: Self-financed government initiative

Investment amount (w/o VAT): USD 20.4 million

Concession term : To be determined

Area of influence: Huánuco and Ucayali

Estimated award date: 1st Semester 2019

Page 21: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

NUEVA CARHUAQUERO 220 KW SUBSTATION, CHINCHA NUEVA 220/60 KV SUBSTATION, NAZCA NUEVA 220/60 KV SUBSTATION, AND VARIABLE REACTIVE COMPENSATOR (SCV OR SIMILAR) + 400 / -100 MVAR AT THE SAN JUAN 220 KV SUBSTATION.

Objective: The purpose of the projects is to grant the concession for the

design, financing, construction, operation and maintenance of Substations

(Switchyard) that will facilitate the maneuvers of the lines in the Chiclayo and

Cajamarca area in the north of the country and Ica; as well as allowing greater

reliability in the energy supply in the department of Lima

Responsible body: Ministry of Energy and Mines

Modality: Self-financed government initiative

Investment amount (w/o VAT): USD 66.02 million

Concession term : To be determined

Area of influence: Cajamarca, Lambayeque, Lima and Ica

Estimated award date: 1st Semester 2019

Page 22: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

500 KV PIURA NUEVA - FRONTERASUBSTATION TRANSMISSION LINE

Objective: The Comprehensive Peru-Ecuador Interconnection Project includes

the construction of a 500 kW Transmission Line that will link the Chorrillos

Substation in Ecuador with the La Niña Substation in Peru (The Line). The Line

includes the construction of two new midway substations: Pasaje Substation in

Ecuador and Piura Nueva Substation in Peru.

Responsible body: Ministry of Energy and Mines

Modality: Co-financed government initiative

Investment amount (w/o VAT): USD 144 million

Concession term : To be determined

Area of influence: Tumbes and Piura

Estimated award date: 2nd Semester 2019

Page 23: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

MODERNIZATION OF ELECTRONOROESTE S.A., A PUBLIC REGIONAL UTILITY COMPANY .

Objective: Management revamping of ELECTRONOROESTE S.A., through

the acquisition of new shares in order to provide a better service to customers

in its area of influence. ELECTRONOROESTE S.A. is the company in charge

of the distribution and commercialization of electric energy within the area of its

concessions in the regions of Piura and Tumbes. Servicing over 405,586

clients.

Responsible body: Ministry of Energy and Mines

Modality: Unsolicited Proposal – Asset transfer project and / or under the

framework of D. Leg. 674

Investment amount (w/o VAT): To be determined

Area of influence: Tumbes and Piura

Estimated award date: 2nd Semester 2019

Page 24: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

NEW LA PLANICIE SUBSTATION Objective: The New Substation Project La Planicie is intended to satisfy the

electricity demand of the urban area of the city of Lima, providing greater safety

to the energy supply.

Responsible body: Ministry of Energy and Mines

Modality: Self-financed government initiative

Investment amount (w/o VAT): USD 20 million

Concession term : To be determined

Area of influence: Lima

Estimated award date: To be defined

Page 25: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 26: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

WIDE-SCALE USE OF NATURAL GAS. CENTRAL AND SOUTHERN PERU

Objective: To design, finance, build, operate and maintain natural gas

distribution pipeline networks in seven (7) regions of Peru´s Center and South,

and their transfer to the Peruvian State at the end of the concession period

Responsible body: Ministry of Energy and Mines

Modality: Self-financed government initiative

Investment amount (w/o VAT): USD 400 million

Concession term: 32 years

Area of Influence: Ucayali, Junín, Huancavelica, Ayacucho, Apurímac,

Cusco and Puno

Estimated award date: 2nd Semester 2018

Page 27: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 28: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

WASTEWATER TREATMENT SYSTEM. LAKE TITICACA BASIN

Objective: To design a solution for the treatment and final disposal of municipal

wastewater in the Lake Titicaca basin, in Puno.

Responsible body: Ministry of Housing, Construction and Sanitation

Modality: Co-financed unsolicited proposal

Investment amount (w/o VAT): USD 263 million

Concession term: 30 years

Area of influence: Puno

Estimated award date: 2nd Semester of 2018

For further information www.proinversion.gob.pe/titicaca

Page 29: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

HEADWATERS AND PIPELINE WORKS FOR LIMA´S POTABLE WATER SUPPLY

Objective: Design, financing, construction, operation and maintenance of the following new works:

o Expansion of Pomacocha and Huallacocha

Bajo dams (approx. 90 MMC);

o Trans-Andean tunnel (10 km);

o Potable water plant Huachipa II (5 m3/s);

o Complementary reservoirs (137 000 m3)

o South Branch (40 km) including

7 reservoirs

Responsible body: Ministry of Housing, Construction and Sanitation

Modality: Self-financed government initiative

Estimated investment: USD 720 million

Concession term: 30 years

Area of influence: Junín and Lima

Estimated award date: 1st Semester of 2019

o Interconnections lines (90km)

o O&M of the existing following works:

o Huachipa Intake

o Huachipa Plant (5m3/s)

o North Branch (27 km)

including 4 reservoirs

Page 30: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

PUERTO MALDONADO WASTEWATER TREATMENT PLANT

Objective: Financing, construction, operation and maintenance of:

i) WWTP Chapajal of 234,71 L/s type RAFA + trickling filters

ii) Installation of 9 primary wastewater pipes

iii) Construction of 6 pumping chambers with their corresponding supply line

iv) Effluents will be discharged into Tambopata river

Responsible body: Ministry of Housing, Construction and Sanitation

Modality: Co-financed government initiative

Investment amount (w/o. VAT): USD 22.5 million

Concession term: To be determined

Area of influence: The city of Puerto Maldonado, District and Province of

Tambopata located in the Region of Madre de Dios.

Estimated award date: 2nd Semester of 2019

Page 31: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

WASTEWATER TREATMENT PLANT OF HUANCAYO, EL TAMBO AND CHILCA

Objective: To propose a new layout of 6 collectors, the construction of 4

wastewater pumping stations and a 80 700 m3/H wastewater treatment plant

(WWTP) with an average flow of reused water. It will provide a proper wastewater

treatment through bacterial beds, meeting the requirements set forth in the current

regulations

Responsible body: Ministry of Housing, Construction and Sanitation

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 90 million

Concession term: To be determined

Area of influence: Junín

Estimated award date: 1st Semester of 2019

Page 32: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 33: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: The projects consist of the design, construction, equipment,

operation and maintenance of supplementary services (gray coats) of Highly

Specialized Hospitals for the Social Security System of Peru (ESSALUD); one

will be located in the department of Piura and the other in Ancash

Responsible body: ESSALUD

Modality: Co-financed government initiative

Investment Amount (w/o VAT): USD 254 million

Concession term: 17 years (operation and maintenance)

Area of influence: Piura and Chimbote

Estimated award date: 2nd Semester 2019

TWO NEW HIGH COMPLEXITY HOSPITAL (ESSALUD)

Page 34: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: Private initiative to provide collection services, transportation,

treatment and disposal of hospital solid waste from the health facilities of the

MINSA in Lima Metropolitana (375 health facilities of which 352 are category I,

5 category II and 18 category III ). It includes the construction, operation and

maintenance of facilities for the treatment of bio-contaminated and special

solid waste.

Responsible body: Ministry of Health

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 36 million

Concession term: 20 years

Area of influence: Lima Metropolitana

Estimated award date: 2nd Semester 2019

SOLID HOSPITAL WASTE MANAGEMENT. MINISTRY OF HEALTH

Page 35: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: The project consists in improving the provision of health services of

the Hipolito Unanue National Hospital, located in the district of El Agustino

(Lima), for this the project proposes the construction of a new hospital and the

integral equipment, as well as the maintenance and the operation of general

services (non-hospital – gray coats).

Responsible body: Ministry of Health

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 250.20 million

Concession term: 18 years (includes period of construction, equipment,

operation and maintenance –gray coats)

Area of influence: Lima Metropolitana

Estimated award date: 1st Semester 2020

HIPÓLITO UNANUE NATIONAL HOSPITAL

Page 36: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: The project consists of improving the provision of health services at

Hospital of Huaycan, located in the district of Ate Vitarte (Lima), for which the

project proposes the construction of a new hospital and the intervention in

health facilities of the first level of health. attention and integral equipment, as

well as maintenance and operation of general services (non-hospital – gray

coats).

Responsible body: Ministry of Health

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 119.60 million

Concession term: 20 years (includes period of construction, equipment,

operation and maintenance – gray coats)

Area of influence: Lima Metropolitana

Estimated award date: 1st Semester 2020

HUAYCÁN HOSPITAL

Page 37: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: The Project is aimed at closing the infrastructure gap and the

population access gap to specialized health services, through the

construction and integral equipment as well as the maintenance and

operation of the general services of a new hospital of high complexity located

in the district of Piura and the improvement of the hospital located in Sullana.

Responsible body: Regional Government of Piura

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 160 million

Concession term: 25 years (includes period of construction, equipment,

operation and maintenance – gray coats)

Area of influence: Piura

Estimated award date: 2nd Semester 2019

SPECIALIZED HEALTH SERVICES IN PIURA DISTRICT HOSPITAL. RESIZING OF HEALTH SERVICES AT SULLANA LEVEL III SUPPORT HOSPITAL

Page 38: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: The Project contemplates the design and construction of a new

hospital and the integral equipment, as well as the maintenance and operation

of the general services (non-hospital – gray coats).

Responsible body: Ministry of Health

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 186 million

Concession term: 18 years (includes period of construction, equipment,

operation and maintenance)

Area of influence: Lima Metropolitana

Estimated award date: 1st Semester 2020

CAYETANOHEREDIA HOSPITAL

Page 39: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: The Project consists of designing, building, maintaining and

operating the Central Military Hospital; and arises due to the need for

members of the Army to have a state-of-the-art hospital considering the most

innovative topics in certifications such as LEED 2009, leadership in energy

and sustainable design.

Responsible body: Ministry of Defense

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 116 million

Concession term: 30 years (includes period of construction, equipment,

operation and maintenance –gray coats)

Area of influence: Lima

Estimated award date: 2nd Semester 2020

NEW ARMY HOSPITAL

Page 40: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 41: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: Concession for the construction, equipment, operation of

complementary services and maintenance of infrastructure, furniture and

equipment of 14 educational institutions.

Responsible body: Ministry of Education

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 85 million

Concession term: 25 years

Area of influence: Districts of Ate and San Juan de Lurigancho in Lima

Estimated award date: 1st Semester 2020

SCHOOL FACILITIES AT RISK: ATE

- SAN JUAN DE LURIGANCHO

Page 42: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: Concession for the construction, equipment, operation of

complementary services and maintenance of infrastructure, furniture and

equipment of 9 educational institutions.

Responsible body: Ministry of Education

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 60.84 million

Concession term: 25 years

Area of influence: Districts of Comas and San Martin de Porres in Lima

Estimated award date: 1st Semester 2020

SCHOOL FACILITIES AT RISK:

COMAS – SAN MARTÍN DE

PORRES

Page 43: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: Concession for the construction, equipment, operation of

complementary services and maintenance of infrastructure, furniture and

equipment of 5 educational institutions.

Responsible body: Ministry of Education

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 17 million

Concession term: 19 years

Area of influence: District of Villa María del Triunfo in Lima

Estimated award date: 1st Semester 2020

SCHOOL FACILITIES AT RISK :

VILLA MARÍA DEL TRIUNFO

Page 44: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: Concession for the construction, equipment, operation of

complementary services and maintenance of infrastructure, furniture and

equipment of 13 educational institutions.

Responsible body: Ministry of Education

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 80 million

Concession term: 20 years

Area of influence: Districts of Villa El Salvador and San Juan de Miraflores in

Lima

Estimated award date: 1st Semester 2020

SCHOOL FACILITIES AT RISK :

LIMA METROPOLITANA

Page 45: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: 21-year concession for the construction, implementation,

maintenance and operation of 4 high-performance schools (COAR) in the regions

of Junín, Pasco, Huancavelica and Cusco.

Responsible body: Ministry of Education

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 86 million

Concession term: 21 years

Area of influence: Junin, Pasco, Huancavelica and Cusco.

Estimated award date: 1st Semester 2020

HIGH-PERFORMANCE SCHOOLS :

CENTER REGION

Page 46: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500
Page 47: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500

Objective: Concession for a period of 20 years, including building a dam on the

Carhuancho River, the Carhuancho-Choclococha canal, a dam on the Ica River,

and the Pisco-Pampas River to Villacurí diversion to irrigate the Ica Valley, and

the Lanchas and Villacurí pampas.

Responsible body: Ministry of Agriculture

Modality: Co-financed Unsolicited Proposal

Investment Amount (w/o VAT): USD 399 million

Area of influence: Ica

Estimated award date: 1st Semester 2020

WATERWORKS. ICA VALLEY

Page 48: Presentación de PowerPoint · Michiquillay awarded 50. CHALLENGES 2018 18 PROJECTS - USD 3,841 Million *Amount to be determined. TRANSPORT AMOUNT: USD 229 M MINING AMOUNT: USD2,500