presentation 1

24
1. Vincent TCH 0320285 2. Ang Averllen 0321444 3. Wong Qin Kai 0320024 4. Yeo Kai Wen 0319844 5. Trace Gew Yee 0320269 6. Tan You Liang 0320215 Presented By Tutor : Miss Noorul Iffa Mohd. Nayan & Miss Ann See Peng ARCHITORTURE Architecture

Upload: ang-averllen

Post on 16-Jul-2015

69 views

Category:

Education


0 download

TRANSCRIPT

1. Vincent TCH ! 0320285!

2. Ang Averllen ! 0321444!

3. Wong Qin Kai! 0320024!

4. Yeo Kai Wen! 0319844!

5. Trace Gew Yee! 0320269!

6. Tan You Liang ! 0320215!

!

Presented By

Tutor : Miss Noorul Iffa Mohd. Nayan

& Miss Ann See Peng

ARCH

ITORTUR

E

Architecture

Architect ? WHO???

A person who designs building, supervises and administrates construction

GENERAL INFORMATION

- Licensed and Qualified profession

- Transforming Vision into Reality

- Construction Guider

- Make sure everything is serviceable, safe, economical and suit

the needs of people

ARCHITECT ARCHITECT ARCHITECT ARCHITECT ARCHITECT

DURING! CONSTRUCTION !!!!!

BEFORE CONSTRUCTION!

!!!!!

!!!!!!!

CONSULTATION

PRELIMINARY IDEA

EXECUTION PHASE

HAND-OVER

AFTER !CONSTRUCTION

DESIGN

BEFORE CONSTRUCTION

Initial discussion with clients to understand the need and requirement

Ar show them their port-folios

Give opinion to client about the project

Ar do their own Feasibility Study

suitable materials used, setback, cost

Sketches

CONSULTATION

SKETCHES

- Sketches done by architect to show client about the conceptual idea

PRELIMINARY IDEA

Feasibility Study Sketching Might be changed

according to client’s need

Do a Schematic Design to show

how the construction looks

like

shows Preliminary Designs to

clients

Option on design for client to

choose

All in diagram, graphic and

sketches, not an architectural drawing yet

Responsible to make any

changes before finalise it

PRELIMINARY IDEA

Architect changes sketches into schematic &

architectural drawing

Consult Structural

Engineer and QS for more

information

share schematic drawing with

other professions

DESIGN DEVELOPMENT

WORKING DRAWING

Shows client the overall

view of building

Subject to change

according to client’s

need !!!!!!

BUT NOT THE

DESIGN

DESIGN DEVELOPMENT

MEET THE REQUIREMENT OF EACH GROUP

SUBMISSION DRAWING

SUBMISSION DRAWING

SUBMISSION DRAWING

APPROVED

DURING CONSTRUCTION

CONSTRUCTION

Execution Phase

CONSTRUCTION DRAWING (CD)

1. Architects have to make sure the codes used in CD meets state, city and local code in construction.

2. As a reference to begin construction.

3. This might be the final drawing if there’s no changes of the design or structure of building.

CONSTRUCTION EXECUTION PHASE

Monitor the progress on site regular intervals

make sure construction of the building runs smoothly

-review drawings, datas and samples for general

conformance to the design intent.

Report to Client about the progress of the work

- provide supplemental documents to clarify

design intent for the contractor.

Review then accept or reject the contractor's application payment.

!

AFTER CONSTRUCTION

HAND-OVER

1.Pre-handover Meeting, must attend by project team and contractor. !

2.Copies of Building Manual & Health and Safety File are discussed and approved. !

3.Certificate of Practical Completion.!

4.12 months of Defect Liability Period should start.

HAND-OVER

The Differences between Architect & Landscape Architect and Interior Architect

-Designs and arranges land forms and develops outdoor spaces.

-Design things such as residential area, public parks, playground, garden, college campuses.

-create decorative layouts plans.

-Specialise in designing & building interiors for safety, functionality and aesthetic.

Landscape Architect Interior Architect

Interrelationship between Ar and other professions

Builders Quantity Surveyor Engineers

Architect gives !instruction to the !builder.

Architect design !project & make ! materials choice

Communicate ideas !through Blueprint & !Technical drawing

QS judgement and !regarding the !choice & estimate !the budget

Builder moves !quickly & efficiently !with the critical !decision

Deals with the running costs of a construction project, materials & contractors

Responsibility is to !ensure the design !is safe & meet all !the building codes

Resources

1. ming3d.com http://ming3d.com/show_entry.php?menuname=Projects&submenuid=15&submenuname=Architecture&submenulayout=gallery < 17 AUG 2014> !2. www.architecturecourse.org http://www.architecturecourses.org/designahouse < 19 AUG 2014 > !3. ottawa.ca http://www.architecturecourses.org/designahouse < 19 AUG 2014 > !4. www.keywordpicture.com http://www.keywordpictures.com/keyword/site+plan/ < 21 AUG 2014> !5. quinlo2003.wordpress.com http://quinlo2003.wordpress.com <22 AUG 2014 > !6. www.gla.ac.uk http://www.gla.ac.uk/services/estates/policiesproceduresregulations/capitalprojectguide/constructionhandover/ <26AUG2014> !7. www.oxforddictonaries.com www.oxforddictionaries.com/definition/english/architect < 26 AUG 2014 > !11.www.studentscholarships.org www.studentscholarships.org/salary/556/architects/php 12.www.irs.gov www.irs.gov/Business/Small-Buisnesses-&26-Self-Employed/Architects-and-Landscape-Architects-Audit-Techinique-Guide#_Toc172