presentation

8

Click here to load reader

Upload: internet-research

Post on 14-Jun-2015

531 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation

MTN Ghana : The Development and Implementation of a National Broadband Strategy for GhanaSESSION 2: National Bandwidth Cost

Page 2: Presentation

Presentation Outline

MTN’s Fibre Network

Capacity Pricing in the market

Challenges

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.

Page 2

Page 3: Presentation

MTN GhanaMTN’s Fibre NetworkNational network

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.

Page 3

Page 4: Presentation

MTN GhanaMTN’s Fibre NetworkAccra network

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.

Page 4

Page 5: Presentation

MTN GhanaMTN’s Fibre NetworkKumasi network

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.

Page 5

Page 6: Presentation

MTN GhanaCapacity Pricing in the market

Origin Destination (Client)Total Monthly

Recurring ChargeIncluding Last Mile

Installation fees per project

ACCRA Kumasi $ 1,900 $ 2,000

ACCRA Cape Coast $ 1,450 $ 2,000

ACCRA Aflao $ 1,700 $ 2,000

ACCRA Kofridua $ 1,100 $ 2,000

ACCRA HO $ 1,600 $ 2,000

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.

Page 6

ACCRA HO $ 1,600 $ 2,000

ACCRA Sunyani $ 2,550 $ 2,000

ACCRA Takoradi $ 1,750 $ 2,000

ACCRA WA $ 3,850 $ 2,000

ACCRA Bolgatanga $ 4,200 $ 2,000

ACCRA Tamale $ 3,300 $ 2,000

ACCRA Busua $ 1,950 $ 2,000

ACCRA Tarkwa $ 1,900 $ 2,000

ACCRA Bibiani $ 2,200 $ 2,000

ACCRA Tema $ 850 $ 2,000

ACCRA Accra ** $ 800 $ 2,000

ACCRA Accra (Local Loop - 1E1) *** $ 700 $ 2,000

Page 7: Presentation

MTN GhanaChallenges

• Multiple and continuous Fibre cuts present massive QOS and availability challenges,

• Preventative maintenance isn’t enough

• Education of communities on the significance of the infrastructure

• Communication to filter down to operators from Metropolitan assemblies regarding construction in the vicinity of our ROW’s

• Soil erosion

• Building ring protection is costly, but seems to not be enough

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.

Page 7

• Improving legislation to respect our ROW’s,

• Customs on imported equipment for fibre expansion necessarily escalate pricing,

Page 8: Presentation

Thank You!

MTN CM approach v6MTN Group 2009 BP© 2008 Mobile Telephone Networks. All rights reserved.