Page 1: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

TRANSFORMING

city of vancouver | joint presentation from the departments of planning & development services + engineering

VANCOUVERVANCOUVER

GEORGIA & DUNSMUIR

VIADUCTS

Page 2: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

In every city’s evolution there are opportunities to correct a past planning wrong…

Page 3: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

and to advance the city’s goals and livability….

Page 4: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

Rethinking the viaducts provides an opportunity to do both.

Page 5: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

COUNCIL GOALS & PRIORITIES

Greenest City Action Plan 2020 (2011)

Transportation 2040 (2012)

Economic Action Plan (2011)

Housing and Homelessness Strategy 2012-21 (2011)

Healthy City Strategy (2012)

Vancouver Tourism Master Plan (2013)

Page 6: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

STRATHCONA

DTES

CHINATOWN

GASTOWN

NORTHEAST FALSE CREEK

SOUTHEAST FALSE CREEK

MOUNT PLEASANT

GR

AN

DV

IEW

-WO

OD

LAN

DS

Page 7: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

SCIENCEWORLD

Expo Boulevard North

Beatty

St.

Robson St.

Cooperage Way

National Ave.

Prior St.

Union St. Gor

e Av

e.

Mai

n S

t.

Que

bec

St.

Terminal Ave.

Smithe St.

Car

ral S

t. G

reen

way

Abb

ott S

t.

Cam

bie

Brid

ge

False Creek

Pacific B

oulevard

Proposed Street Network Alignment (conceptual)

CONCORD PACIFIC

CONCORD PACIFIC

CANADIAN METROPOLITAN PROPERTIES

BC PAVILION CORPORATION

AQUILINIDEVELOPMENT

7A

10

10A

10C

6B

6C 9

5B WEST

5B EAST

CONCORD PACIFIC

CONCORDPACIFIC

PROVINCE(ANDY LIVINGSTONE

PARK) PROVINCE(ANDY LIVINGSTONE PARK)

CENTRAL HEAT DISTRIBUTION LTD.

6CCITY OF

VANCOUVERCITY OF

VANCOUVER6C - UNDER THE VIADUCTS

CITY OF VANCOUVER

11

STUDY AREA LANDOWNERS

Page 8: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

IMAGINING A FUTURE WITHOUT THE VIADUCTS

Page 9: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

INCREASE PARKS & OPEN SPACE

13% INCREASE

existing and planned parks proposed changes

25.25 ACRES22.25 ACRES

Page 10: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

REPAIR MAIN STREET

BEFORE AFTER

Page 11: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

NEW HOUSING OPPORTUNITIES

Page 12: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

RECONNECT COMMUNITIES

Page 13: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

IMPROVE PEDESTRIAN & CYCLIST AMENITIES

Page 14: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

GEORGIA STREET -WATER TO WATER

Page 15: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

MAINTAIN AN ESSENTIAL STREET NETWORK

Page 16: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

PUBLIC CONSULTATION

Three Open Houses were held & attended by over 1,000 citizensStakeholder Meetings with:

Business Groups•

Representatives from Adjacent •

Communities

Council Committees•

Transportation Interests•

Northeast False Creek •

Landowners

indicated support, or strong support for the concept.

Page 17: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

FEEDBACK & CONCERNS

While most of the feedback was positive, we did hear concerns about 3 key areas:

1. PROCESS

More time was needed to absorb •information and discuss;

Ensuring alignment with other city •processes (i.e. DTES and Grandview-Woodland Area Plans, Transportation 2040);

2. TRAFFIC

Concerns were raised about impacts to •parallel streets;

A strong interest in traffic calming on •Prior/Venables

3. NEFC

Understanding impacts on adjacent •landowners; and

Potential impact for early delivery of •Creekside Park.

Page 18: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

COUNCIL KEY DIRECTIONS: JULY 2012

Commercial goods •movement

Explore east-west •arterial alternatives to Prior/Venables

Prior/Venables Street •improvements

Alignment with City •goals

Project timeline and •delivery of amenities

Page 19: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

New Road Network

ARTERIAL NETWORK

CL

AR

K

MA

IN

QU

EB

EC

TERMINAL

POWELL CORDOVA HASTINGS

HASTINGS

FIRST AVENUE

PRIOR

BROADWAY

OMI

AN

ANAI

RO

TCI

V

LAI

CR

EM

MO

C

CA

MB

IE

THURLO

W BURRA

RD

GRA

NVIL

LE

DUN

SMUIR

GEO

RGIA

SMITHEN

ELSON

EXPO

PENDER

DUNDAS

McGILL

WE

RF

NE

R

TR

EP

UR

1 Y

AW

HGI

H

YR

DN

UO

B

SW

OR

RA

N D

N2

GREAT NORTHERN WAY

BURRARD INLET

FALSE CREEK

Bur

rard

Inle

t Li

ne

ArterialCollectorBridge

LEGEND

VENABLES new PACIFIC

Page 20: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

POPULATION & JOB GROWTH vs. VEHICLE TRIPSDOWNTOWN VANCOUVER, 1996-2011 (24 HOURS)

Page 21: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

Can

ad

a L

ine

Evergreen LineMillenium LineExpo Line

Dunsmuir Viaduct: Vehicle Origins – AM peak

Source: Creative Transportation Solutiaons license plate survey data

EVERGREEN LINE & UPGRADES

Westcoast Express

Page 22: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

HOW WILL TRAFFIC CHANGE?

Page 23: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LOCAL COMMUNITIES

Page 24: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LOCAL COMMUNITIES

DOWNTOWN

Concern: Access to and circulation in downtown

Proposal: Maintain essential link to downtown with 2-way connection Georgia

Modifications to Georgia and Dunsmuir downtown are possible

Page 25: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LOCAL COMMUNITIES

CHINATOWN

Businesses and residents are very supportive of the opportunity to repair the gap on Main Street and to have better connections to the water.

It is expected that vehicle volumes in Chinatown will not increase with the replacement road network.

Page 26: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LOCAL COMMUNITIES

GASTOWN

Residents and businesses in Gastown are concerned with traffic volumes and speeds on Water Street.

It is expected that vehicle volumes in Gastown will not increase with the replacement road network.

Page 27: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

NORTHEAST FALSE CREEK

Concern: A desire to see reduced vehicle volumes on Quebec Street

Proposal: The proposed street network is expected to result in a 10% decrease along this corridor

Concern: Residents of 100 Block of Prior have expressed concern about impacts from the alignment of new Pacific

Proposal: There are options to mitigate these impacts through an enhanced landscaped boulevard

LOCAL COMMUNITIES

Page 28: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LOCAL COMMUNITIES

STRATHCONA

Concern: Safety on Prior/Venables Street between Gore Avenue, and desire to have this street removed from the City’s arterial and truck route network

Proposal: Traffic is expected to be reduced by 10% and average vehicle speeds will decrease

Page 29: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LOCAL COMMUNITIES

GRANDVIEW-WOODLAND

Concern: traffic in the community and Victoria Drive

Proposal: replacement road network is expected to result in a 10% decrease in traffic volumes on Prior/Venables which would extend west of Clark Drive

A more substantive decrease is anticipated once a replacement arterial to Prior/Venables is constructed along Malkin Ave or the National Ave alignment

Page 30: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

RETHINKING EAST-WEST ARTERIAL CONNECTION

Page 31: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

Since July 2012 the following measures have been implemented:

Relaxed parking restrictions 1. on north side of Prior Street (September 2012);

Installed new pedestrian signals 2. with count-down timers (October 2012); and

Improved visibility of traffic signal 3. at Campbell & Prior (January 2013).

Road Safety AuditStaff have initiated this safety review in consultation with the community.

PRIOR/VENABLES STREET IMPROVEMENTS

Page 32: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

LANDOWNER NEGOTIATIONS & PROJECT TIMING

Page 33: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

DELIVERY OF AMENITIES

Page 34: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

PLANNING AREAS

Page 35: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

Adopt a Work Program to Advance Viaducts/NEFC Planning

Adopt a Work Program to Advance Eastern Core Planning

Adopt Viaducts Guiding Principles

A.

B.

C.

REPORT RECOMMENDATIONS

Page 36: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

WORK PROGRAMS

WE ARE HERE.

NEFC/VIADUCTS PLANNING:

A. LANDOWNER AGREEMENTSB. PRELIMINARY DESIGN: C. FINANCIAL STRATEGY

PLAN IMPLEMENT

REZONINGS

DEVELOPMENT SITES

DETAILEDSTREET DESIGN

PUBLIC REALM

VIADUCTS PLAN

E.C. PLAN

EASTERN CORE PLANNING:

A. TRANSPORTATION NETWORK

B. LAND USE

VIADUCTS STUDY

NEW ROAD NETWORK

& GUIDING PRINCIPLES

�e IdeaSTEP 1.

Developing the Plans (2yrs.)

STEP 2.

Planning &Approvals and Construction (2yrs.)

STEP 3.

Council Decision:“Advance Work”

Council Decision:“Go Ahead”

WORK PROGRAMS

Page 37: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

VIADUCTS GUIDING PRINCIPLES

(June 2013)

Reconnect the Historic Communities and the

False Creek Waterfront

Expand Parks and Open Space

Repair the Urban Fabric

Explore Housing Development and Place-Making Opportunities on the City Blocks

Create a Vibrant Waterfront District

Increase Efficiency of the Street Network

Improve Connectivity between Downtown, NEFC and the Waterfront

Enhanced Pedestrian and Cyclist Movement

Develop a Fiscally Responsible Approach

Engage Residents and Stakeholders in a Meaningful Way

1.

3.

4.

2.

5.

6.

7.

8.

9.

10.

Page 38: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

EASTERN CORE DRAFT GUIDING PRINCIPLES

Retain and intensify ‘back of house’ industrial functions

Increase job capacity, with a focus on green jobs and economy

Ensure that food security and the food economy continue to have a strong presence in the Eastern Core

Create and foster a unique sense of identity

Plan for the long-term presence of rail

Celebrate and enhance arts and culture

Recognize the historic importance of the area

Identify opportunities to create new and enhanced public gathering spaces

Seek creative and/or temporary uses for underutilized land

Improve traffic circulation by introducing new streets and pedestrian/cyclist connections

Maintain an efficient network of arterial streets essential for goods movement

Consult the public and all stakeholders in a meaningful way

1.

3.

2.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Page 39: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

OTHER CITIES

Page 40: Presentation :Dunsmuir and Georgia Viaducts: 2013 Jun 25former.vancouver.ca/ctyclerk/cclerk/20130625/documents/rr1presentati… · • Business Groups • Representatives from Adjacent

A LEGACY OF GREAT CITY BUILDING CONTINUEs