Presentation for:
Agency Project Advisory Group (APAG) Meeting#3
December 9, 2015
1
I-4 Poinciana Parkway ConnectorProject Development and Environment (PD&E) Study
Project Number: 433693-2-22-01ETDM Number: 13957
Today’s Agenda
2
• Welcome and Introductions• Activities since last APAG MeetingPublic Involvement and agency coordinationAlternative Corridor Evaluation (ACE) Report
• Corridors Recommended for further evaluation in the PD&E
• Next Steps• Questions / Comments
Purpose of the Agency Project Advisory Group (APAG)
3
• Consists of a Diverse Group of Project Stakeholders Regulatory Agencies Local Government Environmental Community / Citizens
• Helps to identify issues / opportunities early in the study process
• Assists in the development of concepts • Opportunity for input on corridor refinements and
additional corridors that should be evaluated
Recap of Project Activities
4
• ETAT Webinar (August 21, 2013)• ETDM Programming Screen #13957 (September – November
2013)• APAG#1 (October 30, 2013)• Kickoff Public Meetings (Purpose and Need) (December 2013)• USFWS and USACE coordination (April 23, 2014)• ETAT Review of Methodology Memorandum (MM) for Alternative
Corridor Evaluation (ACE) (June to July 2014)• FWC coordination (November 4, 2013)• APAG#2 (December 10, 2014)• Polk TPO (May 2015)• Corridor Public Meeting (June 2, 2015) • USFWS and USACE coordination (August 2015)• ETAT Review of Draft ACE Report
(30 days - November 23, 2015 to December 22, 2015)
U.S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (USACE), Florida Fish & Wildlife Commission (FWC), Transportation Planning Organization (TPO)
Osceola County Expressway AuthorityOCX Master Plan
FDOT DISTRICT FIVE
NortheastConnector Expwy
Southport Connector
I-4 Poinciana Parkway Connector
Osceola Pkwy Extension
PoincianaParkway
Cypress Parkway
5
I-4 Poinciana Parkway Connector Study Area
6
• Osceola and Polk Counties
• FDOT Districts 1 and 5• MetroPlan Orlando’s
2040 Long Range Transportation Plan
• Polk TPO• Other related studies
Poin
cian
a Bl
vd
Poinciana Parkway
Extension of ErnieCaldwell Blvd
6
I-4 Poinciana Parkway Connector Study Area
7
• Osceola and Polk Counties
• FDOT Districts 1 and 5• MetroPlan Orlando’s
2040 Long Range Transportation Plan
• Polk TPO• Other related studies
Poin
cian
a Bl
vd
I-4 BTU StudyWith Managed
Lanes
Poinciana Parkway
Central Polk Parkway
SouthportConnector
PD&E Study
Cypress Parkway
Extension of ErnieCaldwell Blvd
7
Project Need
8
Poinciana
Under Construction
The purpose of the project is to:
Enhance roadway connection from I-4 to Poinciana Pkwy
Improve overall traffic operations
Expand regional system linkage
Other objectives of the project include:
Support economic development
Consistency with local and regional plans
Enhance evacuation
Study Process
9
Alternative Corridor Evaluation (ACE)
Public Meeting #1December 10 &12, 2013
Public Meeting #3
Start StudyJuly 2013
Purpose and Need
Alternatives
Public Meeting #2June 2, 2015
Corridors
Draft Environmental Document
Final Environmental Document
Public HearingAgency / Public
Review & Comment
PD&E Study
Alternative Corridor Evaluation
10
• Various data collected • Initial traffic forecasts• Six project corridors developed• Two Public Meetings –
December 2013 and June 2014• Two Agency Project Advisory
Group meetings – December 2013 and December 2014
• Small group, stakeholder and agency meetings
• Corridor evaluation and recommendations
Data collection
Identify corridor constraints
Develop potential corridors
Receive public input
Identify viable corridors for further analysis
FUTURETRANSIT
Engineering Considerations
11
• Typical Section Options Consistent with OCX Master Plan typical
section width Proposed 4 lanes are expandable to 6 lanes
• Design Speed (70 mph)• Corridor width 425 feet
• Facility Type Controlled Access Limited Access Toll Facility
• Design Criteria• Access Management• Interchanges
400’ Typical Section from OCX Master Plan
Corridors Evaluated
1. I-4/World Drive 2. I-4/SR 4293. I-4/CR 5324. I-4/CR 545. Central Polk
Pkwy/Ernie Caldwell
6. Central Polk Pkwy/Cypress Pkwy
1212
Future Traffic Projections
• Traffic volumes forecast for 2045
• Annual Average Daily Traffic (AADT)
• Corridors 1-4 high traffic demand
• Corridors 5 & 6 low traffic demand
13
75,800
69,000
59,800
72,000
34,300
31,500
13
Purpose & Need Evaluation
14
Engineering Considerations
15
Evaluation Summary
19
LOWMEDIUM
HIGH
Public and Agency Input
17
• What we’ve heard: Desire to get to I-4 Regional
connectivity via SR 429
Minimize environmental impacts
Corridors 1 & 2B are too impactful
Corridor 4 too many residential impacts
Corridor 6 does not enhance connection to I-4
14
Recommendations
18
Recommended Corridors prior to Public Meeting held June 2015
Corridor 4 Existing corridor Fewer impacts to
wetlands and wildlife habitat
High residential impacts No existing I-4
interchange
Recommendations
19
Corridor Name
SatisfiesPurpose and
Need Objectives
0 – Fails7 – Best
Environmentally Damaging Ranking1 – Highest Impact 7 – Lowest Impact
Engineering Cost Ranking1 – Highest7 – Lowest
Recommended for Further
Study?
1 World Drive 4 1 3
2A S.R. 429 7 3 1
2B S.R. 429 5 2 2
3 C.R. 532 7 7 6
4 C.R. 54 3 6 5
5 Ernie Caldwell 1 4 7
6 Cypress Pkwy 0 5 4
Recommended Corridors in ACER
Corridor 2A Connects to existing I-
4/SR 429 interchange Impacts FGT substation Higher cost
Corridor 3 Existing I-4 interchange Existing corridor Fewer impacts to
wetlands and wildlife habitat
Near Reunion and Championsgate
High non-residential impacts
FDOT Recommendations (Revised)
20
Alternative Corridor Evaluation (ACE) Report
21
• Submitted to Environmental Technical Advisory Team (ETAT) on November 23, 2015
• Review is anticipated to end December 22, 2015 (30 days)
Opportunity for input & Upcoming Meetings
22
• Alternatives Public Meeting• Public Hearing• Small Group Meetings• Agency Meetings• Newsletter Updates• Project Website• i4poincianaconnector.com
Project Schedule
23
Next Steps
24
• ETAT completes review of ACE Report• Revise ACE Report based on comments• FHWA concurs on recommended corridors for further
evaluation• Class of Action by FHWA
Environmental Assessment / Environmental Impact Statement• Design Traffic • Initial Alternatives Development• PD&E-level Engineering and Environmental Analyses• Alternatives Public Meeting
Spring/Summer 2016 – Poinciana• Interchange Justification/Modification Report
Contact information
25
Amy Sirmans, PEFDOT Project Manager
Phone: (386) 943-5404 Toll Free: 1-800-780-7102
Email: [email protected]: www.i4PoincianaConnector.com
Written comments and questions can be mailed to:I-4 Poinciana PD&E Study
Attention: Amy SirmansFlorida Department of Transportation
719 S. Woodland Blvd., MS1-501Deland, FL 32720
I-4 Poinciana Parkway ConnectorProject Development and Environment (PD&E) Study
Questions