KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEVILLERS & ASSOCIÉS | OFF THE GRID KALININGRAD NEW CITY CENTER MORE INTENSITY & BETTER GREEN

Upload: -

Post on 06-Apr-2016

216 views

Category:

Documents


0 download

DESCRIPTION

Presentation by Christian Devillers and Magali Volkwein (Devillers et Associes, the 2nd prize winners of the open international architectural and urban planning competition "Korolevskaya Gora and Its Surroundings"

TRANSCRIPT

Page 1: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

KALININGRAD NEW CITy CENTERmoRE INTENsITy & bETTER GREEN

Page 2: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT KoNIGsbERG 13TH CENTuRy > 1940

Page 3: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT DuALITy Is THE PRoToTyPE FoR KöNIGsbERG”

“Duality is the prototype for Konigsberg”. “Two centres, two cathedrals, two names, two “K” (Kant and Kalinin, Kant and Koch, Kleist-writer and Kleist general), two railway stations, two lakes, two towers (Dohna and Wrangler), two rivers, two meanings».

Ivann Chechot, art historian, expert on the culture of Eastern Prussia

Page 4: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT CuRRENT sITuATIoN : A DIsCoNNECTED VoID

The hisTorical hearT of The ciTy is characTerised by Two main sTrucTural issues. •  firstly, a transport network which prioritizes traffic and transits through with “urban highways” cutting the site into pieces of poor

accessibility. •  secondly, the site has the particular characteristic of being a void in the physical center of Kaliningrad with large undefined open spaces,

dramatically under-utilising the site’s potentials

Page 5: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

•  to re-structure the road network at the scale of the city to preserve a pedestrian-friendly heart

•  to re-connect the different urban pieces together and with the surrounding districts by prioritising public transports and pedestrian connections

•  to re-model districts with contemporary massing whilst recreating the qualities of the intense urban fabric and recreate the site’s historical physical charac-teristics

•  to re-program the site around seven key historical sites of distinct dualilties and identities as prototypes of Kaliningrad’s public spaces

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT 4 sTRuCTuRAL INTERVENTIoNs : RE-sTRuCTuRING,RE-CoNNECTING, RE-moDELLING & RE-PRoGRAmmING

Page 6: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

•  completion of the city center’s ring road to remove transit traffic

•  downgrading of the existing moscow prospect and leninsky prospect into urban boulevard of 2x2 lanes with side parking, tram lines and traffic lights

•  deflection of moscow Prospect before it enters the heart of the city to connect at grade to the level of leninsky prospect, enabling the re-connection of the upper city with the lower city/riverfront and liberat-ing land for development to re-create a functioning new altstadt district

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-sTRuCTuRING THE RoAD NETWoRK 1

Page 7: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

Калининград

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-sTRuCTuRING THE RoAD NETWoRK

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?

реймс, Франция

Page 8: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

P

P

P

PWorld OceanStock Exchange

New Alstadt

Kant Island

Fach

wer

k

Fachwerk

Kant

Islan

d

Stoc

k Ex.

Wes

t Alst

adt

Castl

e Sq

.

Castle Sq.

Old Street

New Alstadt

Central

Lower

Lake

University

New

Alsta

dt

to S

tadi

um

Cat

hedr

al

Spor

ts H

all

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-sTRuCTuRING THE RoAD NETWoRK

Page 9: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-sTRuCTuRING THE RoAD NETWoRK : THE NEW EAsTERN mosKoW PRosPECT

Page 10: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

SEA

STADIUM

•  prioritise public transport to create a pedestrian friendly zone•  launch new tram lines and stations to serve the heart of the city

from all directions integrated with major public parking around site•  introduce a new marina in new altstadt with water taxis to serve

the river inc. ocean world & world cup stadium

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH PubLIC TRANsPoRT // RE- CoNNECTING WITH NEW bRIDGEs AND uPGRADEs

•  construction of the three new pedestrian bridges to re-connect the Kant island with the city, 2 in the historical location, 1 new to connect with the existing sports hall and future ocean world

•  enlargement of the elevated bridge of leninsky Prospect for wider pedestrian walkways

2

Page 11: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH PubLIC TRANsPoRT

12 m

7 m11,5 m 11,5 m5 m 5 m

6 m6 m 8 m8 m

12 m

7 m11,5 m 11,5 m5 m 5 m

6 m6 m 8 m8 m

/ View from leninsKy ProsPecT

Page 12: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH NEW bRIDGEs / THE LENINsKy PRosPECT bRIDGE : DoN’T DEmoLIsH IT, uPDGRADE IT !

> REF . ENLARGING THE PoNT NATIoNAL IN PARIs

Page 13: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH NEW bRIDGEs AND uPGRADEs > REF . ENLARGING THE PoNT NATIoNAL IN PARIs

Page 14: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT CoNNECTING THE IsLAND To THE WEsT RIVER bANK ? > REF . bobIGNy FooTPATH, PARIs, FRANCE

Page 15: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

•  creation of a dense fabric to re-create the quality of the historical layout, whilst respecting contemporary forms and norms. This re-created density and massing allow to better define the public spaces and intensify its uses, as well as support the economic activities of a town centre.

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by bRINGING A NEW DENsITy 3

•  seven historical places

•  new districts

•  densification of of existing district

•  urban regeneration

Page 16: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

•  mixed-use residential Plot

•  Predominantly retail

•  non-residential mixed-use •  (offices, cultural, community facilities,...)

funcTional sTrucTure layouT

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by bRINGING A NEW DENsITy

Page 17: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by bRINGING A NEW DENsITy

Page 18: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

future expansion

future re-

development

zone

future re-development zone

future re-development zone

Cathedral

Museum

future expansion

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A THE CREATIoN oF A «KoNIGsbERG PATH»

modernmedieVal

Page 19: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

parking

•  reinforcement of the upper plateau with a clear line of topography with stairs/ramps

•  preservation of the views to the lower city through view corridors

•  framing of the “gora” and replacement it back at the heart of the city by deflection of moscow prospect

•  usage of the difference of level at the bottom of the “gora” for parking fully integrated within the new developable plots of new alstadt.

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by REINFoRCING THE «GoRA» 3

Page 20: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by REINFoRCING THE «GoRA»

Page 21: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by REINFoRCING THE «GoRA»

Page 22: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

future expansion

future re-

development

zone

future re-development zone

future re-development zone

Cathedral

Museum

future expansion

i

Kaliningrad KÖnigsberg

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by REINFoRCING THE «GoRA»

Page 23: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by REINFoRCING THE «GoRA»

Page 24: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE-moDELLING by REINFoRCING THE «GoRA»

Page 25: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

•  mental re-connection of the lower lake, the house of soviets, new alstadt and the cathedral through a formal central linear public space with a high-quality paving and a unique identity to encourage visitors to discover the higher and the lower city.

•  The square goes on the boulevard in a shared surface to arrive in a belvedere on the lower lake.

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING THE mAIN NATuRAL sPACEs THRouGH THE CITy CENTER WITH A mAKoR LINEAR CENTRAL squARE 4

Page 26: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING THE mAIN NATuRAL sPACEs THRouGH THE CITy CENTER WITH A mAKoR LINEAR CENTRAL squARE

Page 27: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING TWo mAjoR GREEN ANs LEIsuRE sPACEs : LE LAKE AND THE RIVER

Page 28: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

future expansion

future re-

development

zone

future re-development zone

future re-development zone

Cathedral

Museum

future expansion

PriVacy communicaTion

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT THE LAKE : A CENTRAL PRomENADE by THE LoWER LAKE WITH CAFE AND DECKs

Page 29: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT THE LAKE : A CENTRAL PRomENADE by THE LoWER LAKE WITH CAFE AND DECKs

Page 30: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

future expansion

future re-

development

zone

future re-development zone

future re-development zone

Cathedral

Museum

future expansion

ThinKing acTion

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT THE KANT IsLAND Is THE GREEN HEART oF THE CITy - A HIDING PLACE FoR IN-DEPTH REFLExIoN AND ACTIVE FuN

Page 31: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT KANT IsLAND : A mAjoR KANT musEum > REF. THE HombRouICHT FouNDATIoN

Page 32: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT LENINsKy PRosPECT bRIDGE: DoN’T DEmoLIsH IT, uPGRADE IT!

Page 33: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING THE mAIN NATuRAL sPACEs THRouGH THE CITy CENTER WITH A mAKoR LINEAR CENTRAL squARE

Page 34: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE

Page 35: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

future expansion

future re-

development

zone

future re-development zone

future re-development zone

Cathedral

Museum

future expansion

formal informal

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE

Page 36: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE : >> REF boRDEAux GINKo

Page 37: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE : >> REF boRDEAux GINKo

Page 38: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE > REF. GRENobLE CAsERNE boNNE

Page 39: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE : >> REF boRDEAux GINKo

Page 40: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

RE-INTERPRETING THE PAsT, To INTENsIFy THE PREsENT RE- CoNNECTING WITH A mAjoR LINEAR CENTRAL squARE > REF. LyoN / NANTEs / HAmbuRG

Page 41: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

KALININGRAD NEW CITy CENTERmoRE INTENsITy & bETTER GREEN

PHAsING PRoPosAL

Page 42: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

SEA

STADIUM

2018(ЧемпионаT fifa)

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?

Page 43: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

SEA

STADIUM

2022

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?

•  construction and opening up of the new “circle by-pass”

•  transforamtion of the lininski, shevchenko ans east ans west moskovski Prospect into urban boulevard reducing to 50% the space dedi-cated to car trafic so as to increase, pedestrian use, cycling, buses, and safer tramway stations

•  modification of the moskovski Prospect alignment and transforming the section across new alstadt into a shared local street.

•  construction of a new neighboorhood on the east side of the new north-south road

Page 44: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

SEA

STADIUM

•  upgrade of the leninski bridge

•  installation of the museum island project on the Kant island

•  consctruction of the neighbourhood new alstadt

•  opening up of the new lower lake Promenade

2024 (300-летний юбилей Канта)

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?

Page 45: Presentation from Devillers et Associes, Kaliningrad, 18/11/2014

KALININGRAD CITY CENTER COMPETITION | HEART OF THE CITY DEvILLERs & AssOCIés | OFF THE GRID

•  construction of the west riverfront district

•  regeneration of the stock exchange square

•  rehabilitation of the university area

•  opening of the castle square

•  after the decision on the fate of the house of soviets upgrading or if not possible demoli-tion

SEA

STADIUM

2028

ROCADE 2 X 3 LINESURBAN BOULEVARD 2X2 LINESURBAN BOULEVARD 2X1 LINES

En gros le problème vient de la dé�nition des couleurs :Est ce que le vert c’est du 2x 1 ou du 2x2Si c’est du 2x1 on pense que c’est peu réaliste, vu le tissu existant tout le long des voies concernées et la nature des infras existan-tes en 3x3On propose donc d’apaiser comme sur leur schéma mais en 2 x2 bien aménagé et en 2x1 ponctuellement avec une plus large place donné au piéton, au cycles et au stationnement et aux alignements d’arbres sur les boulevards(du coup l’élargissement du pont est une option)

?