presentation instalaciones special mep facilities

Upload: consul-honorario-georgia

Post on 05-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    1/80

     

    COMPANY

    PROFILE

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    2/80

    Our strategy for the future is to achieve and maintain a clear leadership

    position in all the activities, through our services quality, our market shareand our high profitability.

    b

    Our Group has already more than 68 years of experience and our humanresources comprise an extensive network of 180 Branch Offices in Spain and

    48 abroad, with 17,102 highly skilled professionals.

    Our matrix organization is formed by specialized Business Head Offices thatsupport our services-activities of engineering, construction, operation,installation and maintenance  of the industrial facilities and powerinfrastructures, and which allows us to undertake any project with totalefficiency and capability anywhere in the world.

    COBRA Group:

    C/Cardenal Marcelo Spínola, 10

    28016 Madrid

    Tel 91 456 95 00

    http://www.presentationpoint.de/http://www.presentationpoint.de/http://www.presentationpoint.de/http://www.presentationpoint.de/http://www.presentationpoint.de/http://www.presentationpoint.de/

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    3/80

    Main Group’s Subsidiaries 

    A total of 180 Branch Offices are distributed throughout the national territory in order to carry out theactivities of each Business Area. 

    • ANDASOL-1, S.A.

    • ATIL-COBRA, S.A.• CALIFORNIA SUN POWER LLC

    • CATALANA DE TREBALLS PUBLICS, S.A.

    • CENTRAL TÉRMICA DE MEJILLONES, S.A.

    • COBRA CONCESIONES, S.L.

    • COBRA GESTIÓN DE INFRAESTRUCTURAS, S.L.

    • COBRA INFRAESTRUCTURAS HIDRÁULICAS, S.A

    •COBRA INGENIERÍA DE MONTAJES, S.A.

    • COBRA INSTALACIONES Y SERVICIOS, S.A.

    • COBRA INVERSIONES Y GESTIÓN, S.L.

    • COBRA SERVICIOS AUXILIARES, S.A.

    • COBRA SISTEMAS DE SEGURIDAD, S.A.

    • COBRA SISTEMAS Y REDES, S.A.

    • COBRA UDISPORT

    •DEPURADORAS DEL BAJO ARAGÓN

    • ENERGÍA Y RECURSOS AMBIENTALES, S.A.

    • GEROVITAE LA GUANCHA, S.A.

    • GLOBAL SPA, S.L.• HUMICLIMA, S.A.

    • HIDRAULICA DE MENDRE, S.A.

    • IBEROAMERICANA DE HIDROCARBUROS, S.A.

    • INFRAESTRUCTURAS ENERGÉTICAS ARAGONESAS, S.L.

    • INJAR, S.A.

    • MENCLI, SAU

    • MONCOBRA, S.A.• PROCME, S.A.

    • SERVICIOS Y OBRAS COMUNITARIAS, S.A.

    • TECNOTEL CLIMA, S.L.

    • TEDRA AUSTRALIA

    • OPADE, S.A.

    • SERPISTA, S.A.

    •TECNICAS DE DESALINIZACIÓN DE AGUAS, S.A.

    • URBAENERGÍA, S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    4/80

    STAFF EVOLUTION (No. of Employees)

    Human Resources

    COBRA’s Human Resources are distributed on a wide network formed by 200 Branch Offices in Spain and other 60abroad. A total of 8,438 employees are working in countries of America, Europe, Africa, Asia and Oceania.

    2321,068

    797

    2,916

    1,101

    10,988

    Management

    Engineers

    Graduated

    Technicians

    Administratives

    Other

    7,344 7,5798,184

    8,6399,973

    12,01312,275

    12,84713,887

    16,17717,102

    0

    2.000

    4.000

    6.000

    8.000

    10.000

    12.000

    14.000

    16.000

    18.000

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    5/80

    Annual Turnover (Dec, 2011)

    (M €)

    AUXILIARY SERVICES

    INSTALLATIONS &

    MAINTENANCE

    INTEGRATED PROJECTS

    Europe16.5%

    OECDMembers

    47.6%

    Others35.9%

    2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Estim. 2012

    1,2511,377

    1,5951,733

    2,131

    2,7983,120

    3,514

    3,866 3,903

    4,238

    National

    45.9

    Export

    54.1

    39.5%13.9%

    46.6%

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    6/80

    International Markets 

    In 1978 Cobra group appeared on the international scene, in Saudi Arabia with the construction ofOHV Line for an Oil Company. Immediately, new contracts in Libya, United Arab Emirates and Omanwere awarded.

    Today, the COBRA group is present in five continents.

    Permanent Branch Offices in 22 countries, allowing us to better offer our wide range ofservices .

    Execution of large projects: EPC, BOT, Concessions, etc. anywhere in the world.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    7/80

     

    BUSINESS AREAS 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    8/80

     

    INSTALLATIONS &

    MAINTENANCE 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    9/80

    Annual Turnover

    Evolution and Distribution (Dec, 2011)

    (M €)

    INSTALLATIONS

    48.2%

    MAINTENANCE

    12.8%

    ENGINEERING0.4%

    MECHANICAL WORKS

    19.9%

    AIR CONDITIONING

    14.7%

    AIRPORTS

    3.9%

    2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Estim 2012

    320376

    402451

    579616

    680 639

    536543

    613

    NATIONAL

    76.2%

    EXPORT

    23.8%

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    10/80

    COBRA Group offers an integral solution for the industry and building sectors

    (Communication networks, Surveillance & Control Systems, as well as all type

    of electromechanical works).

    ELECTRICAL

    INSTALLATIONS

    Industrial Installations

    Instrumentation & Control

    Building works

    Public Sector

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    11/80

    ALL TYPES OF INSTALLATIONS RELATED TO POWER AND CONTROL

    FACILITIES FOR THE DIFFERENT AREAS OF THE INDUSTRY SECTOR:

    Iron and Steel Industry

    Automotive Industry

    Food Industry

    Power Industry

    Industrial

    Installations 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    12/80

     

    Local Networks Data

    Audiovisual & Communication Systems

    Remote Control, Video-surveillance

    Intrusion and robberies Security Systems

    Toll and Access Control

    Instrumentation and

    Control 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    13/80

     

    Lighting & Power Supply

    Communications and Local Networks

    Fire Protection System

    Plumbing works

    Electromechanical Works

    Thermal and Acoustical Insulation

    Building Sector  

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    14/80

     

    Roads and Highways Lighting Systems

    Bus and Railways Terminals Lighting

    Airports Electrical Infrastructures

    Beaconing Systems

    Public Sector  

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    15/80

     

    Switchgears

    Generating Sets

    Connection panels

    Illumination, electricity rate & emergency installations

    Miscellaneous 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    16/80

    Moncobra, COBRA Group’s  Subsidiary, is a contracting company specialized

    in assembly and erection works with a large participation in relevant energy

    projects.

    MECHANICAL

    WORKS

    Heavy Structures assembly

    Industrial sector

    Maintenance and Operation Assistance

    EPC Contracts

    http://www.esi2.us.es/~lhmnlc03/puentes.jpghttp://www.azo-group.com/aplicacion/turbinas%20de%20vapor/gif/turbinas-de-vapor.jpghttp://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gifhttp://www.erenovable.net/blog/wp-content/uploads/2008/10/turbinapelton04.jpg

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    17/80

     

    Singular structures assembly

    Ship-building and off-shore construction

    Electrical Power Plants

    Entertainment Centers

    Pipelines and Pumping Stations

    Heavy Structures 

    http://www.esi2.us.es/~lhmnlc03/puentes.jpghttp://www.azo-group.com/aplicacion/turbinas%20de%20vapor/gif/turbinas-de-vapor.jpghttp://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    18/80

     

    Cement Industry

    Pharmaceutical & Food Industry

    Chemical & Petrochemical Industry

    Iron & Steel Industry

    Storage Tanks

    Cellulose, Paper and Derivatives Industry

    Automotive & Transformation Industry

    Industrial

    Sector  

    http://www.esi2.us.es/~lhmnlc03/puentes.jpghttp://www.azo-group.com/aplicacion/turbinas%20de%20vapor/gif/turbinas-de-vapor.jpghttp://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    19/80

     

    Continuous Maintenance works

    Dismantling Works

    Combustible reloading

    Operation & Maintenance of Power Plants

    Maintenance &

    Operating Assistance 

    http://www.esi2.us.es/~lhmnlc03/puentes.jpghttp://www.azo-group.com/aplicacion/turbinas%20de%20vapor/gif/turbinas-de-vapor.jpghttp://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    20/80

     

    Mini-hydro power plants

    Co-generation power plants

    Biomass energy application

    Special energy sources

    Turnkey

    Projects 

    http://www.esi2.us.es/~lhmnlc03/puentes.jpghttp://www.azo-group.com/aplicacion/turbinas%20de%20vapor/gif/turbinas-de-vapor.jpghttp://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    21/80

    This activity, until now developed by  Atil-Cobra, is already complemented by a

    new specialized subsidiary, Humiclima, more involved in “Large Facilities”.

    AIR-CONDITIONING

    Air Management Systems

    Maintenance & Automation

    Hotels & Resorts Equipment

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    22/80

     

    Pressurization

    Ventilation & Extraction

    Fluid Mechanical Systems

    Fire Protection Systems

    Sanitary Systems

    Industrial Cooling Systems

    Air Management

    Systems 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    23/80

     

    Preventive & Corrective Maintenance

    Facilities Supervision and Control

    Pipelines and Integral Maintenance

    Building Management

    Maintenance &

    Automation 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    24/80

     

    Air-Conditioning

    Air-Cooling

    Refrigerating Appliances

    Hotels & Resorts

    Equipment 

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    25/80

    Maintenance activity is consolidated by a large service diversification carried out

    for different sectors.

    MAINTENANCE

    Building sector

    Industry sector

    Infrastructures

    Other services

    http://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.construible.es/images/empresas/instalacion468.gifhttp://www.totgas.com/2002_0824_080344AA.JPGhttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gifhttp://www.totgas.com/2002_0824_080344AA.JPG

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    26/80

     

    Combustible reloading

    Plumbing

    Fire Protection Systems

    Electricity

    Communications

    Civil Works

    Building

    Maintenance 

    http://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.construible.es/images/empresas/instalacion468.gifhttp://www.totgas.com/2002_0824_080344AA.JPGhttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    27/80

     

    Chemical, Petrochemical and Refinery Industry

    Iron, Steel and Metallurgy Industry

    Cellulose, Paper and Derivatives

    Cement and Mining

    Automotive Production

    Pharmaceutical Industry

    Food Industry

    Shipbuilding

    Electronics

    Industrial

    Sector  

    http://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.construible.es/images/empresas/instalacion468.gifhttp://www.totgas.com/2002_0824_080344AA.JPGhttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    28/80

     

    Electrical Facilities

    Power Transformation and Distribution infrastructures

    Electromechanical works

    Infrastructures

    Maintenance 

    http://www.avep.es/control/editor/userimages/electricidad.jpghttp://www.construible.es/images/empresas/instalacion468.gifhttp://www.totgas.com/2002_0824_080344AA.JPGhttp://www.clubciclistaferrol.com/ccferrol/Imagenes/navedentro1.gif

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    29/80

    INTRADEL, Cobra Group’s  Subsidiary, is an Engineering & Consultancy Company

    with more than 30 years experience in Studies and Projects activities.

    ENGINEERING

    Electrical and electromechanical projects

    Substations Projects

    Passengers Transportation Systems

    Telecommunications Projects

    Environmental Projects

    Power Co-generation

    https://www.dst.usb.ve/Decanatos/Pre-grado/Electrica/images/cie-Yudith.jpg

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    30/80

     

    Consultancy – Feasibility Projects

    Basic and As-building Engineering

    Technical Specification and Manuals

    Material Inspection, Testing and Final Reception

    Quality Control

    Programming and Site Technical Assistance

    Works Supervision and Control

    Health and Safety Reports

    Standardization Reports

    Testing and Commissioning

    Programs and Schedules

    Digitalization and Drawings

    https://www.dst.usb.ve/Decanatos/Pre-grado/Electrica/images/cie-Yudith.jpg

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    31/80

    HOTELSHOTELS

    REFERENCESREFERENCES

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    32/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel LE MÉRIDIENOrán, Argelia

      CLIENT

    OBRASCON HUARTE LAIN (OHL)

      AMOUNT

    10.900.000 - €

      DEADLINE

    2009

      SCOPE OF WORKS

    Cooling System Building Management System Water and Sewerage Heating System Solar Energy Gas and Diesel Facilities

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    33/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel OSUNAMadrid

      CLIENT

    CORPORACION HISPANOHOTELERA

      AMOUNT

    172.000 - €

      DEADLINE

    2009

      SCOP OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    34/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    2ª Phase REAL MADRID YOUNGPLAYERS RESIDENCEValdebebas, Madrid

      CLIENT

    BEGAR CONSTRUCCIONES YCONTRATAS S.A.

      AMOUNT

    940.000 - €

      DEADLINE

    2008

      SCOPE OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    35/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel JUAN DE AUSTRIAMadrid

      CLIENT

    M. F. TURISCONTROL S.L.

      AMOUNT

    290.000 - €

      DEADLINE

    2007

      SCOPE OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    36/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Rehab. Hoteles VINCCI COSTAGOLF , en Chiclana de la Frontera,(Cádiz) y en La Rábida, (Sevilla).

    CLIENT

    VINCCI HOTELES COSTA GOLFS.A.

      AMOUNT

    824.000 - €

      DEADLINE

    2007

      SCOPE OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    37/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel GRAN PEÑAGran Via 2, Madrid

    CLIENT

    CORPORACION HISPANOHOTELERA

      AMOUNT

    543.000 - €

      DEADLINE

    2007

      SCOPE OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    38/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Propiedad Sirenis Hotel en RivieraMaya (México)

      CLIENT

    Sirenis Hotel

      AMOUNT

    5.000.000 - €

      DEADLINE

    2006

      SCOPE OF WORKS

    Electrical Facilities Transformer Stations Low Voltage Network Medium Voltage Network

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    39/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel VINCCIGran Vía 66, Madrid

      CLIENT

    VINCCI HOTELES COSTA GOLFS.A.

      AMOUNT

    1.598.000 - €

      DEADLINE

    2006

      SCOPE OF WORKS

    Heating and Cooling Mechanical Facilities Electrical Facilities

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    40/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel BARCELÓAvda. Manoteras 20, Madrid

      CLIENT

    METROVACESA

      AMOUNT

    1.098.000 - €

      DEADLINE

    2006

      SCOPE OF WORKS

    Heating and Cooling Protection Against Fire Plumbing

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    41/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel MARIA ELENA PALACE

    Madrid

      CLIENT

    CORPORACIÓN HISPANOHOTELERA

      AMOUNT

    1.225.000 €

      DEADLINE

    2004

      SCOPE OF WORKS

    Heating

      Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    42/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel ALDIANA TROPICAL

    Motril, Granada

      CLIENT

    FALSTACEN

      AMOUNT

    1.830.000 €

      DEADLINE

    2004

      SCOPE OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    43/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel CENTER

    Valencia

      CLIENT

    FERROVIAL- AGROMAN

      AMOUNT

    409.000 €

      DEADLINE

    2004

      SCOPE OF WORKS

    Heating and Cooling

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    44/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel LAS LOMAS

    Cartagena, Murcia

      CLIENT

    INMOGOLF

      AMOUNT

    764.000 €

      DEADLINE

    2003

      SCOPE OF WORKS

    Heating and Cooling/Ventilation

    Protection Against Fire

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    45/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel Sirenis Cocotal Resort, enMacao - República Dominicana

      CLIENT

    MATURSA

      AMOUNT

    1.262.125 - €

      DEADLINE

    2001

      SCOPE OF WORKS

    Electrical Facilities Substation Transformer Stations Low Voltage Networks Lighting System Low Voltage Switchboards

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    46/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel HESPERIA

    Pº Castellana, nº 53 - Madrid

      CLIENT

    LUZ PALACIO

      AMOUNT

    1.238.085 €

      DEADLINE

    2001

      SCOPE OF WORKS

    Low Voltage Electrical Facilities

    Medium Voltage ElectricalFacilities

    Weak current and Special

    Facilities

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    47/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel Jandia - Playa de Fuerteventura

      CLIENT

    JANDIA

      AMOUNT

    637.072 - €

      DEADLINE

    2000

      SCOPE OF WORKS

    Electrical Facilities

    Weak current and SpecialFacilities

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    48/80

    COBRA INSTALACIONES Y SERVICIOS S.A.COBRA INSTALACIONES Y SERVICIOS S.A.

      DESCRIPTION

    Hotel Riu Atlántico Isla Canela -Huelva

      CLIENT

    PRYCOMSA

      AMOUNT

    2.494.720 €

      DEADLINE

    2000

      SCOPE OF WORKS

    Electrical Facilities

    Weak Current and SpecialFacilities

    HVAC

    ProtectionAgainst Fire

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    49/80

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    50/80

       

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    51/80

    SCOPE

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Transformation Centers

    Medium Voltage Grid

    Low voltage distribution Fire Detection

    Communication

    Voice data

    Megaphone

    CLIENT

    JOINT VENTURE ACS – 

    CONSTRUCCIONES

    SAN JOSÉ

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    52/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

    SCOPE

    Transformation Centers

    Low voltage distribution

    CLIENT

    DRAGADOS

    AMOUNT

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    53/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Transformation Centers

    Medium Voltage Grid ow vo tage str ut on

    Fire Detection

    Communication

    Voice data

    Megaphone

    CLIENT

    AMOUNT

    COBRA – TECM – MONRABAL

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    54/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    55/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Individual rooms: The new Hospital La Fe has 1,000 beds and single rooms, more c

     patients and escorts.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    56/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Patient-oriented Building: The building is much more spacious and bright, with a total o

    offers greater comfort for patients and offers leisure spaces and services open to the com

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    57/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

      ,

    inpatient.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    58/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    59/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    60/80

    SCOPE

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Transformation Centers

      Medium Voltage Grid

      Fire Detection

      Communication

      o ce ata

      Megaphone

    CLIENT

    JOINT VENTURE HOSPITAL SON

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    61/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

    The Hospital Universitario Son Espases occupies a floor space of over 172 square m

    two and half times more than the Hospital Universitario Son Dureta), has a capacity

    , , , ,

    consultations ...

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    62/80

    HOSPITAL PUERT

    SCOPE

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Transformation Centers

    Power Generator 

    Switching and distribution center  General Protection Center with Transformer 

    Distribution General lines

    Fire Detection, Communication, Access Control

    Voice Data

    Megaphone

    CLIENT

    AMOUNT

    JOINT VENTURE DRAGADOS-SACYR-BOVIS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    63/80

    HOSPITAL PUER

    The hos ital has an area of 165 000 m². It has four floors and a low surface area. Your d

    COBRA INSTALACIONES Y SERVICIOS S.A.

    horizontal, modern and functional, surrounded by greenery and vials for users. The diffwith a central corridor, where are located the administrative units of services.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    64/80

    HOSPITAL PUER

    COBRA INSTALACIONES Y SERVICIOS S.A.

    e u ng as s nc areas o : osp a za on, consu a ons, enera erv ces, an Research, Teaching and Administration. It also has an auditorium with capacity for 400underground parking spaces and a surface of 450 seats, and a heliport.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    65/80

    HOSPITAL PUE

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    66/80

    HOSPITA

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Transformation Center 

    Power 

    g t ng

    CLIENT

     NECSO

    AMOUNT

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    67/80

    HOSPITA

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    68/80

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    69/80

    HOSPITA

    COBRA INSTALACIONES Y SERVICIOS S.A.

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    70/80

    HOSPITAL INCA PA

    COBRA INSTALACIONES Y SERVICIOS S.A.

    SCOPE

    Transformation Centers

    Medium Voltage Grid Low voltage distribution

    Fire Detection

    Communication

    Voice data

    Megaphone

    CLIENT

    DRAGADOS – MELCHOR MASCARO

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    71/80

    HOSPITAL MATERN

    COBRA INSTALACIONES Y SERVICIOS S.A.

    SCOPE

    Transformation Center 

    Power  Lighting

    CLIENT

    JOINT VENTURE HOSPITAL

    O´DONNELL

    AMOUNT

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    72/80

    HOSPITAL MATERN

    COBRA INSTALACIONES Y SERVICIOS S.A.

    Integrated in one building two different hospitals, Maternity and Children's Hospita

     peculiarities. Internal circulations are divided, but share some health care areas. Ent

    .

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    73/80

    HOSPITAL MATERN

    COBRA INSTALACIONES Y SERVICIOS S.A.

    The interior of the building offers a warm and tidy,

    nothing to do with the rest of the hospitals in the capital

    an mos o e res o pa n . ac oor o e new

    hospital are illuminated from 8 courtyards, making

    natural light on art spaces and hallways of the building.

    The exterior looks and metallic glass, offering a hygienic

    and sophisticated image away from hospital standards. A

    u ng w ou an are a esp e s apparen

    simplicity who gets to please take a moment to observe

    more closely

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    74/80

    REFERENCIAS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    75/80

    REFERENCIAS

    Filial Instalaciones

    WorksWorks ReferencesReferences

    FerialFerial BuildingsBuildings

    CommercialCommercial WarehousesWarehouses

    FebruaryFebruary 20132013

    REFERENCIAS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    76/80

    REFERENCIAS

    Filial Instalaciones

      DESCRIPTION

    Madrid Ferial Arena Ampliation.Electrical and Especials Facilities.Domes 12 and 14.

      CLIENT

    IFEMA

      AMOUNT

    7.399.505,88 €.

      DEADLINE

    2008

      SCOPE OF WORKS

    New Pavilions 12 and 14, bothincluding: Electrical facilities Smoke detection systems Estructured cable Public address and

    communications Electronic communications

    REFERENCIAS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    77/80

    REFERENCIAS

    Filial Instalaciones

      DESCRIPTION

    Ciudad de las Artes y de las Ciencias deValencia

      CLIENT

    C.A.C., S.A.

      AMOUNT

    5.500.000 €UTE PARQUE OCEANOGRÁFICO

      DEADLINE

    2004

      SCOPE OF WORKS

    Subterranean line Medium Voltage,distribution centers and transformationcenters.

    Main distribution Switchboards, Buildingsswitchboards, Secondary and TerciarySwitchboards.

    Infraestructures and Feeding lines. External and Internal Lighting.

    Weak current facilities: communications,public address, access control, etc..

    REFERENCIAS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    78/80

    REFERENCIAS

    Filial Instalaciones

      DESCRIPTION

    New Ferial Domes/Buildings at Bilbao

      CLIENT

    BILBAO EXHIBITION CENTRE.

      AMOUNT

    100 - M €Total amount of full works. JVCA withInabensa, Cymi, Axima, Ikusi y Amenabar 

      DEADLINE

    2004

      SCOPE OF WORKSTotal enclosure area consists in 6 domes of78.000 sq.m, plus 18.000 sqm of additionalservices. HVAC Facilities Electrical Facilities Transformer centers (Medium Voltage) UPS Systems

    Optical fiber  Public address systems, telephony facilities,

    etc… Security and access control systems Personal Identification systems.

    REFERENCIAS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    79/80

    REFERENCIAS

    Filial Instalaciones

      DESCRIPTION

    King Juan Carlos I Park, Ampliation - Phase II.

      CLIENT

    IFEMA

      AMOUNT

    7.51 M€.

    (total amount of full works,performerd by JVCA: COBRA,ISOLUX y CRESPO y BLASCO)

      DEADLINE

    2001

      SCOPE OF WORKS

    New pavilions 9 and 10, CongressBuildings, completing in all: Electrical facilities (lighting and power 

    supply) Installation of 5 transformer stations UPS System  Alumbrado exterior 

    External lighting Public address system, internetsystems, etc…

    REFERENCIAS

  • 8/16/2019 Presentation Instalaciones Special MEP Facilities

    80/80

    REFERENCIAS

    Filial Instalaciones

      DESCRIPTION

    King Juan Carlos I Ferial Park,at Madrid

      CLIENTE

    IFEMA

      IMPORTE

    36,03- M€.(total amount of full works,performerd by JVCA: COBRA,ISOLUX y CRESPO y BLASCO)

      DEADLINE

    1991

      ALCANCE

    Office Building and Facilities and Plant Room Building of new

    ferial buildings , including :

    Electrical facilities at pavilions 1 to 8.

    Electrical facilities for lighting and power supply.

    Installation of electrical substation 45 kV yMedium Voltage network15 kV.

    UPS System

    External Lighting

    Public address system, communication systems,etc...