Facility Integrity National Programme
Findings from Reported Incidents and Planned Inspections
February 2008
2
Purpose
• Thank you for joining with us to share key lessons learned from NOPSA’s Facility Integrity National Programme and industry’s facility integrity management
3
What have we been doing?
Data obtained from:– NOPSA’s Planned Inspections using
prompt sheets that reflect NOPSA’s elements of Facility Integrity
– Accidents and dangerous occurrences reporting under the OHS legislation
4
How do we share results?
• Presentations that provide detailed information on both sets of findings are available on the NOPSA website at:
http://www.nopsa.gov.au/programmes/
5
Inspection: what we found
• Safety management system areas of improvement:
– Management of change and deferrals– Backlog, maintenance and testing of safety
critical elements– Performance standards for SCEs – Monitoring, independent auditing and review
6
Good practices from FI inspection
- Overall maintenance/integrity management systems
- Management reporting of performance indicators
- Company staff competency- Onshore/offshore communications- Supervision
7
Planned Inspections Prompt sheet & Traffic Light Scoring System
FACILITY INTEGRITYFACILITY INTEGRITY MANAGEMENT SYSTEM
ONSHORE INTERVIEWS
OPERATOR: …………………………………… INSPECTION DATE(S): …………………………………… FACILITY(S): …………………………………… No Prompt Guide Notes Comments /Status
1 Policy and strategic objectives for Facility integrity Tick one (√)
2 Planning, Responsibility and Authority Tick one (√)
3 Training and Competency Tick one (√)
4 Deviation/deferrals, monitoring and records Tick one (√)
5 Audit and review Tick one (√)
Legend: - complies - partially complies (incomplete system) - non compliance (major failing or - Not Tested /
Key elements missing) No Evidence INSPECTION CARRIED OUT BY (Please send the completed prompt sheets to T3 EA) Name: Signature:...................................................................
8
Planned Inspections Progress
• 12 production operators • 8 topic areas:
e.g. maintenance system, corrosion, pressure integrity
• 56 sheets completed• 40% complete
9
Planned Inspections Expectation Levels - Proportion facilities at each level
Partially meets 45%
Meets 42%
Does not meet 13%
10
Specific example of integrity management
FI Management ONSHORE % Scores - All Facilities
0
20
40
60
80
100Policy & Strategic Objectives
Planning Responsibility &Authority
Training & CompetencyDeviation/DeferralsMonitoring & Records
Audit & Review
11
HC Releases – Overall TrendAnnual Total HCT Releases and Rolling Trend
Q1Q1
Q2
Q2
Q2
Q3
Q3Q4
Q4Q3
Q436
26
19
0
5
10
15
20
25
30
35
40
2005 2006 2007
Q105 Q205 Q305 Q405 Q106 Q206 Q306 Q406 Q107 Q207 Q307 Q407
12
HC Releases by Material Type
Petroleum Liquid17%
HC Gas 73%
Production Water10%
13
HC Releases by Production Operators - Incidents per Facility
Actual (HCT) and Potential (PHCT) Releases for each Operator per Facility Jan 2005 - Dec 2007 : Operators - Anonymously Coded
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
B L K E C H J G F A D I
Num
ber o
f Rel
ease
s pe
r Fac
ility
PHCT Releases per FacilityHCT Releases per Facility
14
HC Releases Causes (Tap Root®)
Training6%
Natural Phenomenon
1%Repeat Failures
6%
Tolerable Failure
3% Maintenance15% Equipment /
Parts Defects18%
Design12%
Work Direction 3%
Human Engineering
3%Management
Systems9%
Communications3%Quality
Control7%
Procedures14%
15
Areas of concern Hydrocarbon releases
• Equipment/parts defects
• Non-adherence to procedures
• Inadequate maintenance and testing of safety critical elements (SCEs)
• Unclear performance standards for SCEs
16
HCT Releases Parts/Equipment Involved
0.0
5.0
10.0
15.0
20.0
25.0
Pipe
s
Valv
es
Pum
ps
Join
ts
Gas
kets
Engi
nes
Inst
rum
ents
Hyd
raul
ics
Uns
peci
fied
Mis
c.
% of Incidents
17
International Regulators Forum Asset Integrity Conference 2007
• Leadership commitments to safe and reliable operations
• Monitor and respond to leading indicators to meet defined performance standards
18
International Regulators Forum Asset Integrity Conference 2007
• Maintaining multiple independent prevention and mitigation barriers
• Self audits not adequate, need independent audits and corrective actions
19
International Regulators Forum
• Management and control of deferrals and modifications
• Regular review of near misses
• Workforce participation provides insight into process vulnerabilities.
20
What’s next?
• FI programme through to mid 2009
• Post inspection and Accident & Dangerous Occurrence analysis on the website
• Encourage industry to share good FI practices for continuous improvement
21
What else could be done?
• Industry website to share good practices
• Common leading indicators in process safety and facility integrity
• Training for Senior Leadership on integrity and major accident events
22
We are not alone
“But the most important lesson from Norway’s 40 years of petroleum operations is that structures and equipment do not always last as long as expected – even with detailed and systematic inspection and maintenance.”
23
BP Texas City – US CSB CEO
“All industrial managers need to treat safety and major accident prevention with the same degree of seriousness and rigor that is brought to financial transactions.”