Facility Integrity National Programme

Findings from Reported Incidents and Planned Inspections

February 2008

Page 2: Presentation - National Programmes Feb 2008 - Simon Schubach

2

Purpose

• Thank you for joining with us to share key lessons learned from NOPSA’s Facility Integrity National Programme and industry’s facility integrity management

Page 3: Presentation - National Programmes Feb 2008 - Simon Schubach

3

What have we been doing?

Data obtained from:– NOPSA’s Planned Inspections using

prompt sheets that reflect NOPSA’s elements of Facility Integrity

– Accidents and dangerous occurrences reporting under the OHS legislation

Page 4: Presentation - National Programmes Feb 2008 - Simon Schubach

4

How do we share results?

• Presentations that provide detailed information on both sets of findings are available on the NOPSA website at:

http://www.nopsa.gov.au/programmes/

Page 5: Presentation - National Programmes Feb 2008 - Simon Schubach

5

Inspection: what we found

• Safety management system areas of improvement:

– Management of change and deferrals– Backlog, maintenance and testing of safety

critical elements– Performance standards for SCEs – Monitoring, independent auditing and review

Page 6: Presentation - National Programmes Feb 2008 - Simon Schubach

6

Good practices from FI inspection

- Overall maintenance/integrity management systems

- Management reporting of performance indicators

- Company staff competency- Onshore/offshore communications- Supervision

Page 7: Presentation - National Programmes Feb 2008 - Simon Schubach

7

Planned Inspections Prompt sheet & Traffic Light Scoring System

FACILITY INTEGRITYFACILITY INTEGRITY MANAGEMENT SYSTEM

ONSHORE INTERVIEWS

OPERATOR: …………………………………… INSPECTION DATE(S): …………………………………… FACILITY(S): …………………………………… No Prompt Guide Notes Comments /Status

1 Policy and strategic objectives for Facility integrity Tick one (√)

2 Planning, Responsibility and Authority Tick one (√)

3 Training and Competency Tick one (√)

4 Deviation/deferrals, monitoring and records Tick one (√)

5 Audit and review Tick one (√)

Legend: - complies - partially complies (incomplete system) - non compliance (major failing or - Not Tested /

Key elements missing) No Evidence INSPECTION CARRIED OUT BY (Please send the completed prompt sheets to T3 EA) Name: Signature:...................................................................

Page 8: Presentation - National Programmes Feb 2008 - Simon Schubach

8

Planned Inspections Progress

• 12 production operators • 8 topic areas:

e.g. maintenance system, corrosion, pressure integrity

• 56 sheets completed• 40% complete

Page 9: Presentation - National Programmes Feb 2008 - Simon Schubach

9

Planned Inspections Expectation Levels - Proportion facilities at each level

Partially meets 45%

Meets 42%

Does not meet 13%

Page 10: Presentation - National Programmes Feb 2008 - Simon Schubach

10

Specific example of integrity management

FI Management ONSHORE % Scores - All Facilities

0

20

40

60

80

100Policy & Strategic Objectives

Planning Responsibility &Authority

Training & CompetencyDeviation/DeferralsMonitoring & Records

Audit & Review

Page 11: Presentation - National Programmes Feb 2008 - Simon Schubach

11

HC Releases – Overall TrendAnnual Total HCT Releases and Rolling Trend

Q1Q1

Q2

Q2

Q2

Q3

Q3Q4

Q4Q3

Q436

26

19

0

5

10

15

20

25

30

35

40

2005 2006 2007

Q105 Q205 Q305 Q405 Q106 Q206 Q306 Q406 Q107 Q207 Q307 Q407

Page 12: Presentation - National Programmes Feb 2008 - Simon Schubach

12

HC Releases by Material Type

Petroleum Liquid17%

HC Gas 73%

Production Water10%

Page 13: Presentation - National Programmes Feb 2008 - Simon Schubach

13

HC Releases by Production Operators - Incidents per Facility

Actual (HCT) and Potential (PHCT) Releases for each Operator per Facility Jan 2005 - Dec 2007 : Operators - Anonymously Coded

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

B L K E C H J G F A D I

Num

ber o

f Rel

ease

s pe

r Fac

ility

PHCT Releases per FacilityHCT Releases per Facility

Page 14: Presentation - National Programmes Feb 2008 - Simon Schubach

14

HC Releases Causes (Tap Root®)

Training6%

Natural Phenomenon

1%Repeat Failures

6%

Tolerable Failure

3% Maintenance15% Equipment /

Parts Defects18%

Design12%

Work Direction 3%

Human Engineering

3%Management

Systems9%

Communications3%Quality

Control7%

Procedures14%

Page 15: Presentation - National Programmes Feb 2008 - Simon Schubach

15

Areas of concern Hydrocarbon releases

• Equipment/parts defects

• Non-adherence to procedures

• Inadequate maintenance and testing of safety critical elements (SCEs)

• Unclear performance standards for SCEs

Page 16: Presentation - National Programmes Feb 2008 - Simon Schubach

16

HCT Releases Parts/Equipment Involved

0.0

5.0

10.0

15.0

20.0

25.0

Pipe

s

Valv

es

Pum

ps

Join

ts

Gas

kets

Engi

nes

Inst

rum

ents

Hyd

raul

ics

Uns

peci

fied

Mis

c.

% of Incidents

Page 17: Presentation - National Programmes Feb 2008 - Simon Schubach

17

International Regulators Forum Asset Integrity Conference 2007

• Leadership commitments to safe and reliable operations

• Monitor and respond to leading indicators to meet defined performance standards

Page 18: Presentation - National Programmes Feb 2008 - Simon Schubach

18

International Regulators Forum Asset Integrity Conference 2007

• Maintaining multiple independent prevention and mitigation barriers

• Self audits not adequate, need independent audits and corrective actions

Page 19: Presentation - National Programmes Feb 2008 - Simon Schubach

19

International Regulators Forum

• Management and control of deferrals and modifications

• Regular review of near misses

• Workforce participation provides insight into process vulnerabilities.

Page 20: Presentation - National Programmes Feb 2008 - Simon Schubach

20

What’s next?

• FI programme through to mid 2009

• Post inspection and Accident & Dangerous Occurrence analysis on the website

• Encourage industry to share good FI practices for continuous improvement

Page 21: Presentation - National Programmes Feb 2008 - Simon Schubach

21

What else could be done?

• Industry website to share good practices

• Common leading indicators in process safety and facility integrity

• Training for Senior Leadership on integrity and major accident events

Page 22: Presentation - National Programmes Feb 2008 - Simon Schubach

22

We are not alone

“But the most important lesson from Norway’s 40 years of petroleum operations is that structures and equipment do not always last as long as expected – even with detailed and systematic inspection and maintenance.”

Page 23: Presentation - National Programmes Feb 2008 - Simon Schubach

23

BP Texas City – US CSB CEO

“All industrial managers need to treat safety and major accident prevention with the same degree of seriousness and rigor that is brought to financial transactions.”