HONDA SIEL CARS INDIA LTD.
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
continued….
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings Result Learning Conclusion References
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley
3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
After GNU, 2nd facility was set up in 2008Spread over 600 acres with investment of 1000cr.Annual capacity- 60000 units Inaugurated in- Sept’2008Press parts & PT parts manufactured Parts supplied to GNU for final assemblyEvery scope of producing Brio in this facility
About HSCI, TKR plant
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart allied with press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Project associated with PLC Dept. of HSCI, TKR plant To ensure ideal & accurate delivery of press parts to GNU To establish checking standards for each transportation trolley
used for 2PY, 2AZ & 2CV Setting check points of the transportation trolleys in 3 stages-
1) Trolleys in dismantled condition
2) Trolleys in assembled condition
3) Trolleys packed with press parts To avoid any damages like scratches, dent, flange bend over the
parts Newly set up plant, preparing OPS with respect to PLC Dept.
Project Premise
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart allied with press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Delivers the right quantity, right quality of material on the line at right time & right place to meet the required production target
Responsible for supplying all the necessary material for production
In PLC team, few private companies are-
Introduction of PLC Dept.
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart allied with press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
PLC Responsibilities
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Press parts Identification
continued….
HONDA CITY (2PY) HONDA JAZZ (2AZ) HONDA BRIO (2CV) 1) HOOD SKIN 1) HOOD SKIN 1) HOOD SKIN 2) TRUNK LID SKIN 2) TAIL GATE SKIN 2) SPOILER 3) FR. DOOR SKIN (R) 3) FR. DOOR SKIN (R) 3) FR. DOOR SKIN (R) 4) FR. DOOR SKIN (L) 4) FR. DOOR SKIN (L) 4) FR. DOOR SKIN (L) 5) RR. DOOR SKIN (R) 5) RR. DOOR SKIN (R) 5) RR. DOOR SKIN (R) 6) RR. DOOR SKIN (L) 6) RR. DOOR SKIN (L) 6) RR. DOOR SKIN (L) 7) FR.FENDER (R) 7) FR.FENDER (R) 7) FR.FENDER (R) 8) FR.FENDER (L) 8) FR.FENDER (L) 8) FR.FENDER (L) 9) ROOF PANEL 9) ROOF PANEL 9) ROOF PANEL 10) SPO (RH) 10) SPO (RH) 10) SPO (RH) 11) SPO (LH) 11) SPO (LH) 11) SPO (LH) 12) FRONT FLOOR 12) FRONT FLOOR 12) FRONT FLOOR 13) REAR FLOOR 13) REAR FLOOR 13) REAR FLOOR 14) TRUNK LID FRAME 14) TAIL GATE FRAME 14) SPOILER FRAME 15) HOOD FRAME 15) HOOD FRAME 15) HOOD FRAME 16) FR. DOOR PANEL(R) 16) FR. DOOR PANEL(R) 16) FR. DOOR
PANEL(R) 17) FR. DOOR PANEL(L) 17) FR. DOOR PANEL(L) 17) FR. DOOR
PANEL(L) 18) RR. DOOR PANEL(R) 18) RR. DOOR PANEL(R) 18) RR. DOOR
PANEL(R) 19) RR. DOOR PANEL(L) 19) RR. DOOR PANEL(L) 19) RR. DOOR
PANEL(L) 20) PANEL RR. INSIDE(RH) 20) PANEL RR.
INSIDE(RH) 20) PANEL RR. INSIDE(RH)
21) PANEL RR. INSIDE(LH) 21) PANEL RR. INSIDE(LH) 21) PANEL RR. INSIDE(LH)
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Process flow chart with allied press parts
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Two or four wheeled carriageUsed to carry goodsUsed to move according to needs In HSCI, TKR plant trolleys are used for dispatching
good to GNU
Trolley Introduction
continued….
Pictorial form
2PY TROLLEY 2AZ TROLLEY 2CV TROLLEY
CONROD TROLLEY CRANKSHFT TROLLEYPRESS TROLLEY
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Classification of Trolley
TROLLEYS
Transportation Trolleys
Trolleys for press parts
Trolleys for PT parts
Press Trolleys
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Specialty of transportation trolley
To absorb shocks during transportation, appropriate absorbers are used in each trolleyTo avoid part damages and scratches, few special materials like style foam, EVA sheet, PU sheet, PVC pipe are usedTo avoid jerks during transportation, shock absorbing wheel are used in the trolley which is known as caster wheel. These wheel are of two type- a) fixed wheel b) movable wheelFor toeing so many trolleys together, toeing bar with toeing hook is used in each of the trolley
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Classification of transportation trolley
Transportation trolleys
Unique/Different trolleys(Trolleys in which press
parts of a single model is packed)
Common trolleys(Trolleys in which press
parts of each of the three models can be packed)
FR. FENDER (R & L)ROOF PANELSPO (R & L)PANEL RR. INSIDE (R & L)FRONT FLOORREAR FLOORTRUNK LID/TAIL GATE SKIN/SPOILERTRUNK LID/TAIL GATE/SPOILER FRAME
HOOD SKINHOOD FRAMEFR. DOOR SKIN (R & L)RR. DOOR SKIN (R & L)FR. DOOR PANEL (R & L)RR. DOOR PANEL (R & L)
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
Identification of common trolley
This location in trolley (blue color) is used for packing 2PY parts
This location is common for 2AZ & 2CV in a single trolley. Yellow color is for 2AZ & Red color is for 2CV parts
FR.DOOR SKIN(R & L) TROLLEY:
About HSCI, TKR plant Project premise Introduction of PLC Dept. in HSCI, TKR plant PLC responsibilities Press parts identification Process flow chart with allied press parts Study on trolleys 1) Trolley introduction 2) Classification of trolley 3) Specialty of transportation trolley 4) Classification of transportation trolley 5) Identification of common trolley 6) Model wise trolley identification
AGENDA
2PY Unique trolleys
2AZ Unique trolleys
2CV Unique trolleys
Common trolleys for 2PY, 2AZ & 2CV
Model wise trolley identification
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings Result Observation Conclusion References
AGENDA
Checking standards in two stages
For 2PY, 2AZ & 2CV Transportation trolleys:
Stage- I: Observing the trolleys in dismantled condition while the parts of the trolley are not attached to it
a) Must not be any welding defects
b) Should not be any bending
c) Must not be any sharp edges or corners in the trolley
d) Presence of PVC pipe, EVA sheet, PU sheet, Absorbers, Style foam, cable tie, superlon tube is must in the trolley
f) Any partition or separating or supporting bracket used in the trolley, must be equally spaced
continued….
Stage- II: Observing the trolleys in assembled condition while the parts of the trolley are attached to it but the press parts are not packed in the trolley
All the welding joints should be checked in assembled condition, that whether joints are welded properly or not.There should not be dust or rust on the part rest area in the trolley.Wheels of the trolley should move at ease, very freely.It must be ensured that Toeing bar & Toeing hook are available in proper way in the trolley.In each of the assembled trolley, none of the accessories should be in broken condition.Trolley, in which wire mesh is used, must be in a uniform manner. It must not be in ragged condition.Locking arrangement available in each trolley must be easily operable.
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings Result Observation Conclusion References
AGENDA
Checking standards at 3rd stage
2CV PANEL RR. INSIDE TROLLEY (L & R)
1
2
34
5
6
1) SIDE LOCKING BAR
2) PART GUIDE ROD
3) DUMMY PART (right)
4) PART RESTING FRAME
5) FLAT SUPPORTING GAUGE
6) DUMMY PART (left)
continued….
Packed RR. Inside Trolley
PART GUIDE ROD MUST BE SUPPORTING THE PART IN PROPER WAY WHILE BEING WELDED
PART MUST BE SUPPORTED TIGHTLY WITH FOAM
LASHING BELT MUST CLAMPED TIGHT TO FIX FOAM WITH THE PART
SIDE LOCKING BAR HINGED TIGHTLY WITH THE LOCK PIN PROVIDED
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings Result Observation Conclusion References
AGENDA
Any deviation found in the trolley, from the above checking standards is not permissible & packing of the parts is not allowed in that trolley
At the time of unloading the trolleys from the trucks, which comes back from GNU, if any deviation from the standard checking items are found in the trolley, it’s considered as NG (not good) trolley
Routine repairing and maintenance activities are followed upon the NG trolleys
Findings
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings Result Observation Conclusion References
AGENDA
Before finalizing the dispatch, if these standards are followed, chances of damages like scratches, dents, flange bend on the parts can be depleted to a significant level
Result
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings ResultObservation Conclusion References
AGENDA
HONDA is the synonym of qualityPraiseworthy management policies towards the
employees which enable them to think, learn, evaluate & analyze problems while working with complete freedom without any domination
Admirable healthy culture is prevalent throughout the organization
Proper consumables are allocated to every HONDA employees to ensure safety while working
Observation
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings ResultObservation Conclusion References
AGENDA
Usage of spring lock system over the side locking bar, must be incorporated in each trolley
Total trolley making cost can be reduced to some extent while depleting the usage of cable tie, wire locking & reinforcement sheet attached to the trolley
Conclusion
Checking points in transportation trolleys in two stages Checking items at 3rd stage before dispatch Findings ResultObservation Conclusion References
AGENDA
http://www.hondacarindia.com/http://docs.google.com/viewer?
a=v&q=cache:b5XZZyFuylYJ:www.autonews.com
http://www.siamindia.com/scripts/market-share.aspx
References
“Only One Life, Why Not Get Thrilled”