Presentation S2R and AWP2018
Giorgio Travaini, Head of Research & Innovation a.i.
2017 December 4th 2017
#Shift2Rail
A PUBLIC-PRIVATE PARTNERSHIP
R&I PLATFORM FOR RAILWAY
WORKING TOGETHER TO
DRIVE INNOVATION
BY 2024
#Shift2Rail
#Shift2Rail
the S2R MAAP*
• is a collaborative long-term investment planning document, which now also contains an Executive View (Part A) providing the S2R vision and Capabilities.
• translates strategic R&I priorities for the Railway sector – as per S2R Master Plan - into concrete R&I activities, milestones and deliverables
• contains the description of R&I activities worth an estimated value of about EUR 777 million
• is a living document (ongoing “maintenance” for Part B)
• enables the preparation of result-oriented Annual Work Plans and Calls for Proposals
• grants awarded for the actions(Projects) should aim to implement part(s) of the MAAP
* multi-annual action plan
#Shift2Rail
MAAP Part A
#Shift2Rail
#Shift2Rail
Innovation Capabilities
Capability 1_Automated train operation
Capability 2_Mobility as a service
Capability 3_Logistics on demand
Capability 4_More value from data
Capability 5_Optimum use of enrgy
Capability 6_Service timed to the second
Capability 7_Low cost railway
Capability 12_Rapid and reliable R&I delivery
Capability 11_Environmental and
social sustainability
Capability 10_Stations and “smart” city mobility
Capability 9_Intelligent trains
Capability 8_Guaranteed asset health and
availability
#Shift2Rail
Automated Train Operation
Trains are able to operate themselves and run closer together
1A_ Automated (passengers and freight) trains run closer together with increased flexibility 1B_ Passenger and freight train preparation processes are automated 1C_ Vehicles split and join on the move. New operational approaches (e.g., virtual coupling, convoying, reduced headway, communication connections between trains/units) are employed 1D_ Self-propelled automated / autonomous single units guide themselves through the system
#Shift2Rail
ATO through… Building Blocks
On-board Train Integrity Cyber security Traffic Management
Passengers and Freight ATO
#Shift2Rail
MAAP Part B
#Shift2Rail
S2
R P
RO
GR
AM
ME:
IN
TEG
RA
TED
CO
NS
IS
TEN
T
DELIV
ER
Y O
RIEN
TED
R&I FOR INNOVATION CAPABILITIES
#Shift2Rail
From TRL0 to TRL6/7
#Shift2Rail
IP1 (225 Mio EUR)
#Shift2Rail
Example of a Technology Demonstrator
Final Demos of TD 1.2 TCMS :
• Planning (budget estimated at 48,8M€):
14
Specific Specification
Techn. objective Activities Market TRL
Metro 6/7
Regional 6/7
Train Control &
Monit. System Metro 6/7
Regional 5
Metro 6/7
5
6/7 Support the Functional Open Coupl ing
Virtual Placing on the
Market
Technology
defini tion,
protocols and
procedures
Generic 6/7
Standardised s imulation framework in which al l subsystems of the tra in wi l l be
s imulated, a l lowing remote and distributed testing including hardware in-the-
loop through heterogeneous communication networks .
Functional dis tribution
architecture
Speci fication,
architecture
and interface
defini tion
New architectura l concept based on standard framework & appl ication profi les ,
dis tributed computing to al low execution of compl iant functions on end devices
dis tributed a long the vehicle meeting di fferent safety & integri ty requirementsRegional
Research AreaDemonstrator
Wireless TCMS
Radio techn.,
architecture
and protocols
Incorporate wireless technologies to the tra in communication network solutions
(i .e. tra in backbone, cons is t network and tra in to ground communication).
Drive-by-dataArchitecture,
protocols
Provide a tra in-wide communication network for ful l TCMS support including the
replacement of tra in l ines , connecting safety functions up to SIL4 (incl .
s ignal l ing).
Focus of activity
Interaction with other TDs and IPs:
#Shift2Rail
IP2 (195 Mio EUR)
#Shift2Rail
IP3 (153 Mio EUR)
#Shift2Rail
IP4 (86 Mio EUR)
#Shift2Rail
18
Maximizing service quality, productivity, resource utilization and network capacity
Pan-European rail freight as key enabler for automated driving systems
Boosting productivity/ punctuality
Competitive cost structures
Stimulating
sustainable rail freight growth in Europe
LCC cost and customers benefit
Cost-efficiency in maintenance and operations
Based on smart freight assets
Maximizing reliability
Driver assistance, hybridization and advanced propulsion technologies
Significantly reducing energy consumption and emissions
Automated train composition and
operation
Smart eco-efficient propulsion technologies
• High load efficiency • Low energy
consumption • Low noise emissions • Fully integrated
logistical chain • Increased intermodal
competitiveness • New services for new
markets
• Increased flexibility through train coupling/ sharing
• Increased train length for growth on European corridors
• Competitive strength
Longer coupled trains with distributed power
Condition monitoring for predictive maintenance
Asset Control tower & customer
communication
Logistics capable Future wagon
IP5 (83 Mio EUR)
#Shift2Rail
CCA (35 Mio EUR)
#Shift2Rail
Around 50 PROJECTS ONGOING
R&I 2018 AND
BEYOND
MAAP STRATEGIC
REVIEW
S2R MID TERM
EVALUATION
DEMOS PLANS
STANDARDS’ ROADMAP
R&I BEYOND
2020
WHAT’S GOING ON
#Shift2Rail
#Shift2Rail
#Shift2Rail
AWP 2018: CFM, OC
planned activities
AWP2018: CFM, OC
planned activities
Ongoing act: X2RAIL-2; ASTRail
AWP2018: OCplanned activities
TD2.1: Adaptable communications for all railways (quality of
service, interfaces
TD2.2: Railway network capacity increase (ATO up to GoA4 – UTO)2015 2016 2017 2018 2019 2020 2021 …
2020 2021 …2015 2016 2017 2018 2019
TD2.3 Moving Block
TD2.4: Fail-Safe Train Positioning (including satellite technology)2015 2016 2017 2018 2019 2020 2021 …
Ongoing act.: X2Rail1, Mistral
planned activities
…
Ongoing act.: X2Rail1, ASTRail
2015 2016 2017 2018 2019 2020 2021Ongoing act.: X2Rail1, ASTRail
#Shift2Rail
2020 2021 …
AWP 2018: CFM, OC
planned activities
TD2.5: On-board Train Integrity 2015 2016 2017 2018 2019 2020 2021 …
Ongoing act.: X2Rail1, Vite
TD2.7: Formal methods and standardisation for smart signalling 2015 2016 2017 2018 2019 2020 2021 …
TD2.8: Virtually – Coupled Train Sets (VCTS)2015 2016 2017 2018 2019 2020 2021 …
AWP2018: CFM, OC
Ongoing act.: X2RAIL-2; ETALON
Ongoing act.: X2RAIL-2; ASTRail
TD2.6: Zero on-site testing (control command in lab demonstrators)
2015 2016 2017
planned activities
2018 2019
planned activities
#Shift2Rail
Ongoing act.: X2Rail1, Cyrail
planned activities
planned activities
Ongoing act.: X2RAIL-2
TD2.11: Cyber Security2015 2016 2017 2018 2019 2020 2021 …
TD2.10: Smart radio-connected all-in-all wayside objects2015 2016 2017 2018 2019 2020 2021 …
Ongoing act.: X2Rail1, ETALON
…
TD2.9: Traffic management evolution2015 2016 2017 2018 2019 2020 2021
AWP2018: CFM, OCplanned activities
#Shift2Rail
ongoing activities: In2Rail, In2Track
planned activities
ongoing activities: In2Rail, S-CODE
ongoing activities: In2Rail, In2Track
ongoing activities: In2Rail
AWP 2018: CFM
planned activities
planned activities
planned activities
AWP 2018: CFM
AWP 2018: CFM
AWP 2018: CFM
TD3.4 Next Generation Track System2015 2016 2017 2018 2019 2020 2021 …
TD3.3 Optimised Track System2015 2016 2017 2018 2019 2020 2021 …
TD3.2 Next Generation Switch & Crossing System2015 2016 2017 2018 2019 2020 2021 …
TD3.1 Enhanced Switch & Crossing System2015 2016 2017 2018 2019 2020 2021 …
#Shift2Rail
ongoing activities: In2Rail, In2Track
ongoing activities: In2Smart, IN2DREAMS
planned activities
planned activities
ongoing activities: In2Rail, In2Smartplanned activities
AWP 2018: OC
planned activities
ongoing activities: In2Rail, In2Smart, MOMIT
AWP 2018: OC & CFM
TD3.7 Railway Integrated Measuring and Monitoring System 2015 2016 2017 2018 2019 2020 2021 …
TD3.6 Dynamic Railway Information Management System (DRIMS)2015
TD3.8 Intelligent Asset Management Strategies (IAMS)2015 2016 2017 2018 2019 2020 2021 …
2016 2017 2018 2019 2020 2021 …
TD3.5 Proactive Bridge and Tunnel Assessment, Repair and Upgrade2015 2016 2017 2018 2019 2020 2021 …
#Shift2Rail
ongoing activities: In2Rail, In2Stempoplanned activities
ongoing activities: In2Rail, In2Stempo, In2Dreams
TD3.9 Smart Power Supply2015 2016 2017 2018 2019 2020 2021 …
TD3.10 Smart Metering for Railway Distributed Energy Resource
Management System 2015 2016 2017 2018 2019 2020 2021 …
AWP 2017: IN2STEMPO, FAIR STATIONS
TD3.11 Future Stations2015 2016 2017 2018 2019 2020 2021 …
#Shift2Rail
2015 2016
Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE
AWP 2018 Open Call 1
Planned activities
2015 2016
Ongoing act. IT2RAIL, Co-Active, COHESIVE
AWP 2018 Call For Members
Planned activities
2015 2016
Ongoing act. IT2RAIL, Co-Active, COHESIVE
AWP 2018 Call For Members
Planned activities
2015 2016
Ongoing act. IT2RAIL, Attracktive, My-TRAC
AWP 2018 Call For Members
Planned activities
TD 4.1 Interoperability Framework
TD4.2 Travel Shopping
TD4.3 Booking and Ticketing
TD4.4 Trip Tracker
2019
2020
2020
2020
2020
2021
2021
2021
2017 20192018 2022
2022
2022
2022
2021
2017
2018
2019
20192017
2018
2017 2018
#Shift2Rail
2015 2016
Ongoing act. IT2RAIL, Attracktive, My-TRAC
AWP 2018 Call For Members
Planned activities
2015 2016
Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE
Planned activities
2015 2016
Ongoing act. IT2RAIL, COHESIVE
AWP 2018 Open Call 2
2017
2017
2020
2020
2018
2018
2022
2020
TD4.6 Business Analytics
ITD4.7 Integrated Technical Demonstrator
2019
2019
2019 2021
2022
2022
2021
2021
2017 2018
TD4.5 Travel Companion
#Shift2Rail
ongoing projects: FR8RAIL, INNOWAG
ongoing projects: ARCC, SMART, OPTIYARD
ongoing projects: FR8RAIL, INNOWAG, FR8HUB
planned activities
planned activities
planned activities
TD5.3 Wagon design2015 2016 2017 2018 2019 2020 2021 …
TD5.1 Freight electrification, brakes and telematics2015 2016 2017 2018 2019 2020 2021 …
TD 5.0 – Business analytics and implementation strategies2020 2021 …2015 2016 2017 2018 2019
ongoing projects: SMART-RAIL, FR8RAIL, INNOWAG, FR8HUB
AWP2018: CFM
AWP2018: CFM
AWP2018: CFM
TD5.2 Access and Operation2015 2016 2017 2018 2019 2020 2021 …
#Shift2Rail
ongoing projects: FR8HUB
ongoing projects: FFL4E, DYNAFREIGHT, FR8HUB
ongoing projects: ARCC, SMART
AWP2018: CFM & OC
2016 2017
AWP2018: CFM
TD 5.4 Novel Terminal, Hubs, Marshalling Yards, Sidings2015 2016 2017 2018 2019 2020 2021 …
TD 5.5 New Freight Propulsion Concepts2015
planned activities
planned activities
TD 5.6 Autonomous train operation2015 2016 2017 2018 2019 2020 2021 …
2018 2019 2020 2021 …
planned activities
#Shift2Rail
ongoing act.: ROLL2RAIL, IMPACT1, NEAR2050, IMPACT2
planned activities
ongoing act.: ROLL2RAIL, IMPACT1, tender KPIs, IMPACT2
ongoing act.: PLASA, GoSAFE RAIL, IMPACT2, SMaRTE
AWP 2018: CFM
planned activities
2022
2022
2022WA3 Safety, Standardisation, Maintanance, Materials, Virtual Certification
2015 2016 2017 2018 2019 2020 2021 …
WA2 KPI method and integrated assessment2015 2016 2017 2018 2019 2020 2021 …
WA1 Long-term needs and socio-economic research & SPD's2015 2016 2017 2018 2019 2020 2021 …
#Shift2Rail
ongoing act.: IN2RAIL, PLASA, GoSAFE RAIL, IMPACT2
AWP 2018: CFM
planned activities
ongoing act.: FINE1, OPEUS, DESTINATE
planned activities
ongoing act.: IMPACT2, SMaRTE, tender HC
WA4 Smart Planning, I2M2015 2016 2017 2018 2019 2020 2021 …
WA5 Energy and sustainability2015 2016 2017 2018 2019 2020 2021 …2022
WA6 Human Capital2015 2016 2017 2018 2019 2020 2021 …2022
2022
#Shift2Rail
AWP 2018
#Shift2Rail
AWP 2018
Million of EUR Total Members
only
Open to non-
Members
Value of the Call for Proposals R&I 155.2 134.1 21.1
S2R Maximum Co-funding 78.7 59.6 19.1
In-Kind Contribution 76.5 74.5 2
No of topics 18 7 11
Value of Call for tender R&I 2.3 0 2.3
No of topics 4 0 4
#Shift2Rail
AWP 2018 S2R Programme specificities
Topic
number – IP
Topic name (*) indicative figures in EUR
Action Type and
expected Technical
Readiness Level
(TRL)
Maximum S2R co-
funding (*) Complementarity
S2R-OC-IPX-
01-2018
Paradigm shifts
for railway RIA, up to TRL 2 2,200,000
- S2R-CFM-IP1-02-2018 - S2R-CFM-IP2-01-2018 - S2R-CFM-IP3-01-2018
How to read the topics acronyms
Number IP1 IP2 IP3 IP4 IP5 CCA IPX
CFM topic 2 1 1 1 1 1 0
OC topic 1 3 1 2 1 0 3
Linked tender topic
2 1 1
Scope: […] the proposed research should address all the following work-streams described below […]
#Shift2Rail
Technology Readiness Levels definition
#Shift2Rail
AWP 2018 – CFM
Topic
number -
IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-CFM-
IP1-01-
2018
Development of technology
demonstrators for the next
generation of traction systems
and adhesion management
systems
RIA , TRL 5
to 6 28,534,203 12,680,600 15,853,603
S2R-CFM-
IP1-02-
2018
Implementing new
technologies for the TCMS RIA, TRL 5 10,576,058 4,700,000 5,876,058
S2R-CFM-
IP2-01-
2018
Advanced Signalling,
Automation and
Communication System (IP2
and IP5)
IA, TRL6 38,900,540 17,287,400 21,613,140
#Shift2Rail
Topic
number -
IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-CFM-
IP3-01-
2018
Research into optimized and
future railway infrastructure IA, TRL 6 30,153,015 13,400,000 16,753,015
S2R-CFM-
IP4-01-
2018
Passenger service platform
specifications for an enhanced
multi-modal transport eco-
system including Mobility as a
Service (MaaS)
IA, TRL 6 11,701,170 5,200,000 6,501,170
AWP 2018 – CFM
#Shift2Rail
Topic
number -
IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-CFM-
IP5-01-
2018
Technology demonstrators for
competitive, intelligent rail
freight operation
IA, TRL 6 12,376,238 5,500,000 6,876,238
S2R-CFM-
CCA-01-
2018
Virtual certification & smart
planning RIA TRL 3 1,894,689 842,000 1,052,689
TOTAL 134,135,914 59,610,000 74,525,914
AWP 2018 – CFM
#Shift2Rail
AWP 2018 - OC
Topic
number
– IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-OC-
IPX-01-
2018
Paradigm shifts for railway RIA, up to
TRL 2 2,200,000 2,200,000 n.a
S2R-OC-
IPX-02-
2018
Transversal exploratory
research activities and
knowledge transfer
CSA 500,000 500,000 n.a
S2R-OC-
IPX-03-
2018
Innovative/breakthrough
mobility concepts (with rail
as backbone)
CSA 500,000 500,000 n.a
#Shift2Rail
AWP 2018 - OC
Topic
number
– IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-OC-
IP1-01-
2018
Technical solutions for the
next generation of TCMS
RIA, up to
TRL 4/5 4,000,000 4,000,000 n.a
S2R-OC-
IP2-01-
2018
Analysis for Moving Block
and implementation of
Virtual Coupling concept
RIA, up to
TRL 3 1,300,000 1,300,000 n.a
S2R-OC-
IP2-02-
2018
Modern methodologies and
verifications for GNSS in
Railways and virtual test
environment.
RIA, up to
TRL 3 1,020,000 1,020,000 n.a
#Shift2Rail
AWP 2018 - OC
Topic
number
– IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-OC-
IP2-03-
2018
Communication environment
assessment and validation
RIA, up to
TRL 5/6 750,000 750,000 n.a
S2R-OC-
IP3-01-
2018
Measuring and monitoring
devices for railway assets
IA up to TRL
6 6,785,714 4,750,000 2,035,714
S2R-OC-
IP4-01-
2018
Semantic framework for
multimodal transport
services
RIA up to
TRL4 2,000,000 2,000,000 n.a
#Shift2Rail
AWP 2018 - OC
Topic
number
– IP
Topic name
(*) indicative figures in EUR
Type of
action and
expected
Technical
Readiness
Level (TRL)
Value of the
actions (*)
Maximum
S2R co-
funding (*)
In-kind
contribution
(*)
S2R-OC-
IP4-02-
2018
Supporting the
implementation of the IP4
multi-modal transport
ecosystem
RIA up to
TRL4 1,500,000 1,500,000 n.a
S2R-OC-
IP5-01-
2018
Radio communication and
simulation of train dynamics
for Distributed Power within
long trains
RIA up to
TRL5 600,000 600,000 n.a
TOTAL 21,155,714 19,120,000 2,035,714
#Shift2Rail
AWP 2018 - Tenders
Number Subject of
tender Indicative scope
Maximu
m
budget
1 -
contract
Study on
alternativ
e
communic
ation
bearers in
the
railway
environm
ent
The activity shall assess the railway environment and identify new
alternative bearer beyond established cellular technologies
(UMTS/HSPA, LTE, LTE-A, etc.) or other access technologies
(WiFi/802.11, SatCom, etc.), which are or expected to become
available for on-board to trackside communication needs. The
availability of the alternative bearers might be restricted to certain
areas (for example train stations, shunting yards, high-speed lines,
different terrains, etc.). The alternative bearers could rely on or
leverage already available infrastructure or equipment alongside the
railway tracks. Some potential candidates include but are not limited
to data over power lines, free space optical communications, etc.
The results of the study are expected to enrich the set of access
network options for infrastructure managers, when they deploy their
new adaptable communication system and leverage the benefits of
alternative bearers to address specific needs of their planned rollout
of advanced services and applications.
€
150,000
#Shift2Rail
AWP 2018 - Tenders
Number Subject of tender Indicative scope
Maximu
m
budget
2 -
contract
Study on railway
bridge dynamics
and the interface
with rolling stock
Under supervision of the JU, in collaboration with the ERA,
the study should collect bridge and train data, as well as
calculation and validation methods, including:
calculation methods to describe the dynamic interface
vehicle – bridge;
vehicle design assessment method;
validation of calculation methods;
load models and vehicle design limits;
proposal and suggestions for standardisation and
regulation.
€
250,000
#Shift2Rail
AWP 2018 - Tenders
Number Subject of
tender Indicative scope
Maximum
budget
3 -
contract
Support to
ERTMS
European Action
Plan to pave the
way for the
deployment of
the future S2R
Innovative
Solutions
This activity aims at supporting the implementation of the
ERTMS European Action Plan, published by the European
Commission in June 2017.
Under the supervision of the JU and together with Commission
Services (DG Move), inter alia, the contractor will perform tasks
such as support the ERA Change Control Management process’
and related update of specification documentation (including
test specifications); Identification of the existing sets of
engineering rules regarding transitions between systems;
Contribution to the technical review of trackside deployment of
ERTMS in cross-border sections; Contribution to the
drafting/updating of technical specifications for upcoming
ERTMS communication system set to replace GSM-R and to the
appraisal of the impact on interoperability of its roll-out.
€ 1,600,000
#Shift2Rail
AWP 2018 - Tenders
Number Subject of tender Indicative scope Maximum
budget
4 -
contract
Study on use of
fuel cell hydrogen
in railway
environment
This activity aims at analysing the business case of
hydrogen and fuel cell usage in the rail environment,
both in passenger train and freight.
The investigation could for example include analyses
on the CO2 performance (through Life Cycle Analysis
techniques) of current rail powertrain solutions and
demonstrate the specific emissions saving that can be
achieved by replacing conventional technologies.
€ 270,000
TOTAL € 2,270,000
#Shift2Rail
Programme approach and future/current projects
50
#Shift2Rail
YOUR PROJECT and the overall S2R programme
• EACH PROJECT contributes to the achievement of the Master Plan and the MAAP objectives
• EACH PROJECT is part of a programme and cooperation with other projects must be ensured
Through the collaboration and input to the JU Members, EACH PROJECT will support the realization of long-term S2R technological demonstrations or innovative break-through
• Particular attention is given to ensure that there is no duplication of work between EACH PROJECT and current/future R&I activities
• EACH PROJECT results are taken into consideration for the next annual work plans to ensure sufficient complementarity and coherence.
#Shift2Rail
Complementarity & Collaboration Agreement
1. Complementary is defined at topic level
2. Complementarity between topics is compulsory established in the Grant Agreement (need for a Collaboration Agreement)
3. IP/CCA SteCos, high level synchronization points: Project Coordinators may attend the SteeCo meetings as observer and IP Coordinators cooperate with project coordinator to foster/promote synergies
4. S2R Programme Managers: Central Contact Point for both projects
#Shift2Rail
Complementarity & Collaboration Agreement
Issues to be tackled in the Collaboration Agreement (COLA) (examples/non-exhaustive list)
• Rules for collaboration, “who does what?”; Point of Contacts etc.
• Handling review of documents
• Agreement on action to be performed by both sides + linked timing (e.g. project A provides “user requirements” by M6 to project B; project B provides input by M18 to project A project A uses input for deliver their deliverable 2.3).
• Participation to restricted meetings (for specific purpose) or to public meetings (including Advisory Groups, etc…).
#Shift2Rail
Overview of the standard call process
5 months max. 3 months max.
Invitation to grant preparation
Grant signature Call deadline
Proposal Evaluation Grant Agreement Preparation Prefinancing submission
Accession GA
H2020 max. duration to Grant signature:
Maximum five months from call closure date to end of evaluation - until the date of informing applicants
Maximum three months to prepare grant agreement from the date of inviting (informing) applicants until the signature of the grant agreement
Maximum eight months from call closure - until the signature of the grant agreement
8 months maximum
#Shift2Rail
• Standard H2020 eligibility conditions:
• 'Research and Innovation Actions' (RIA) and 'Innovation Actions' (IA): Minimum three legal entities established in minimum three different Member States or an Associated Countries
• 'Coordination and Support Actions' (CSA): one or more legal entity(ies) established in a Member State or in an Associated Country
Other entities from countries outside a Member State or Associated Country may participate to the open calls, but are, in principle, not eligible for funding unless there is a reciprocal agreement in place with that country or the applicant can demonstrate that the entity has unique resources that render its participation essential for the project to go ahead successfully
• Additional conditions of S2R (Art 9(5) of H2020 RfP & Art. 17 S2R Regulation):
• Calls for members: Open only to members of the S2R JU and their affiliated entities
• Open calls: Open only to entities that are not members or affiliated entities of members of the S2R JU
who can participate?
55
#Shift2Rail
• Who are the affiliated entities of the S2R JU members?
• Any legal entity that is under the direct or indirect control of a member (or, in the case of consortia, a constituent entity of the consortium), or under the same direct or indirect control as the member (or constituent entity of the consortium), or that is directly or indirectly controlling a member (or constituent entity of the consortium)
• The control may take in particular either of the following forms:
• direct or indirect holding of more than 50% of the nominal value of the issued share capital in the legal entity concerned, or of a majority of the voting rights of the shareholders or associates of that entity or
• the direct or indirect holding, in fact or in law, of decision-making powers in the legal entity concerned.
• The following relationships between legal entities do not constitute control relationships:
• the same public investment corporation, institutional investor or venture-capital company has a direct or indirect holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the shareholders or associates;
• the legal entities concerned are owned or supervised by the same public body.
56
who can participate?
#Shift2Rail
S2R Members
57
European Union
8 Founding Members
Alstom, Ansaldo STS, Bombardier, Construcciones y Auxiliar de Ferrocarriles (CAF), Siemens, Thales and infrastructure managers Trafikverket and Network Rail
12 Associated Members (single legal entities)
Amadeus IT Group, AZD Praha, Deutsche Bahn, DIGINEXT, Faiveley Transport, HaCon Ingenieurgesellschaft, INDRA Sistemas, Kapsch CarrierCom, Knorr-Bremse, MER MEC, SNCF Mobilités, Patentes Talgo
7 Associated Members (consortia)
• AERFITEC (AERNNOVA Aerospace, FIDAMC, Fundacion TECNALIA)
• Competitive Freight Wagon (Contraffic, DLR, Waggonbau Niesky, Centro de Estudios e Investigaciones Técnicas (CEIT), Verband der Bahnindustrie in Deutschland)
• EUropean Rail Operating community (Infraestruturas de Portugal, BLS, CP, Finnish Transport Agency, ÖBB-Infrastruktur, Polskie Koleje Państwowe, PRORAIL ,Schweizerische Bundesbahnen, Slovenske zeleznice, Türkiye Cumhuriyeti Devlet Demiryollari)
• Smart DeMain (Strukton Rail, ACCIONA Infraestructuras, DLR, Fraunhofer, CEMOSA)
• SmartRaCon (DLR, CEIT, Fondation Railenium, Nottingham Scientific Ltd)
• Swi'Tracken (Fondation Railenium, Universidade Do Porto, Universidad Del Pais Vasco, Universidade Do Minho, TATASTEEL, VOSSLOH-COGIFER, Institut für Zukunftsstudien und Technologiebewertung, EGIS RAIL, Groupe EUROTUNNEL, TRONICO ALCEN)
• Virtual Vehicle Austria consortium+ (Kompetenzzentrum, FCP Firtsch, Getzner Werkstoffe, Kirchdorfer Fertigteilholding, Plasser&Theurer, Vvoestalpine Schienen, Voestalpine VAE, Wiener Linien, AVL List, PJM Messtechnik, TATRAVAGONKA, AC2T research, Materials Center Leoben Forschung
#Shift2Rail
• Applicable funding rates for the open calls:
• Funding rate depending on the type of action:
• Up to 100% of eligible costs for 'Research and Innovation Actions' (RIA) and for 'Coordination and Support Actions' (CSA)
• Up to 70% for 'Innovation Actions' (IA), except non-profit organisations (up to 100%)
• One project = One funding rate for all beneficiaries / activities in the grant*
*However, if non-profit organisations are in an IA together with for-profit organisations, their eligible costs will be reimbursed according to the different reimbursement rates specified above
The reimbursement rates apply to all forms of costs, including indirect costs (overheads): 25% flat rate (calculated on the basis of eligible direct costs, excluding direct sub-contracting costs)
funding rates
58