presentation s2r and awp2018 - ffg · presentation s2r and awp2018 giorgio travaini, head of...

59
Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

Upload: others

Post on 03-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

Presentation S2R and AWP2018

Giorgio Travaini, Head of Research & Innovation a.i.

2017 December 4th 2017

Page 2: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

A PUBLIC-PRIVATE PARTNERSHIP

R&I PLATFORM FOR RAILWAY

WORKING TOGETHER TO

DRIVE INNOVATION

BY 2024

Page 3: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Page 4: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

the S2R MAAP*

• is a collaborative long-term investment planning document, which now also contains an Executive View (Part A) providing the S2R vision and Capabilities.

• translates strategic R&I priorities for the Railway sector – as per S2R Master Plan - into concrete R&I activities, milestones and deliverables

• contains the description of R&I activities worth an estimated value of about EUR 777 million

• is a living document (ongoing “maintenance” for Part B)

• enables the preparation of result-oriented Annual Work Plans and Calls for Proposals

• grants awarded for the actions(Projects) should aim to implement part(s) of the MAAP

* multi-annual action plan

Page 5: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

MAAP Part A

Page 6: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Page 7: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Innovation Capabilities

Capability 1_Automated train operation

Capability 2_Mobility as a service

Capability 3_Logistics on demand

Capability 4_More value from data

Capability 5_Optimum use of enrgy

Capability 6_Service timed to the second

Capability 7_Low cost railway

Capability 12_Rapid and reliable R&I delivery

Capability 11_Environmental and

social sustainability

Capability 10_Stations and “smart” city mobility

Capability 9_Intelligent trains

Capability 8_Guaranteed asset health and

availability

Page 8: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Automated Train Operation

Trains are able to operate themselves and run closer together

1A_ Automated (passengers and freight) trains run closer together with increased flexibility 1B_ Passenger and freight train preparation processes are automated 1C_ Vehicles split and join on the move. New operational approaches (e.g., virtual coupling, convoying, reduced headway, communication connections between trains/units) are employed 1D_ Self-propelled automated / autonomous single units guide themselves through the system

Page 9: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ATO through… Building Blocks

On-board Train Integrity Cyber security Traffic Management

Passengers and Freight ATO

Page 10: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

MAAP Part B

Page 11: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

S2

R P

RO

GR

AM

ME:

IN

TEG

RA

TED

CO

NS

IS

TEN

T

DELIV

ER

Y O

RIEN

TED

R&I FOR INNOVATION CAPABILITIES

Page 12: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

From TRL0 to TRL6/7

Page 13: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

IP1 (225 Mio EUR)

Page 14: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Example of a Technology Demonstrator

Final Demos of TD 1.2 TCMS :

• Planning (budget estimated at 48,8M€):

14

Specific Specification

Techn. objective Activities Market TRL

Metro 6/7

Regional 6/7

Train Control &

Monit. System Metro 6/7

Regional 5

Metro 6/7

5

6/7 Support the Functional Open Coupl ing

Virtual Placing on the

Market

Technology

defini tion,

protocols and

procedures

Generic 6/7

Standardised s imulation framework in which al l subsystems of the tra in wi l l be

s imulated, a l lowing remote and distributed testing including hardware in-the-

loop through heterogeneous communication networks .

Functional dis tribution

architecture

Speci fication,

architecture

and interface

defini tion

New architectura l concept based on standard framework & appl ication profi les ,

dis tributed computing to al low execution of compl iant functions on end devices

dis tributed a long the vehicle meeting di fferent safety & integri ty requirementsRegional

Research AreaDemonstrator

Wireless TCMS

Radio techn.,

architecture

and protocols

Incorporate wireless technologies to the tra in communication network solutions

(i .e. tra in backbone, cons is t network and tra in to ground communication).

Drive-by-dataArchitecture,

protocols

Provide a tra in-wide communication network for ful l TCMS support including the

replacement of tra in l ines , connecting safety functions up to SIL4 (incl .

s ignal l ing).

Focus of activity

Interaction with other TDs and IPs:

Page 15: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

IP2 (195 Mio EUR)

Page 16: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

IP3 (153 Mio EUR)

Page 17: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

IP4 (86 Mio EUR)

Page 18: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

18

Maximizing service quality, productivity, resource utilization and network capacity

Pan-European rail freight as key enabler for automated driving systems

Boosting productivity/ punctuality

Competitive cost structures

Stimulating

sustainable rail freight growth in Europe

LCC cost and customers benefit

Cost-efficiency in maintenance and operations

Based on smart freight assets

Maximizing reliability

Driver assistance, hybridization and advanced propulsion technologies

Significantly reducing energy consumption and emissions

Automated train composition and

operation

Smart eco-efficient propulsion technologies

• High load efficiency • Low energy

consumption • Low noise emissions • Fully integrated

logistical chain • Increased intermodal

competitiveness • New services for new

markets

• Increased flexibility through train coupling/ sharing

• Increased train length for growth on European corridors

• Competitive strength

Longer coupled trains with distributed power

Condition monitoring for predictive maintenance

Asset Control tower & customer

communication

Logistics capable Future wagon

IP5 (83 Mio EUR)

Page 19: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

CCA (35 Mio EUR)

Page 20: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Around 50 PROJECTS ONGOING

R&I 2018 AND

BEYOND

MAAP STRATEGIC

REVIEW

S2R MID TERM

EVALUATION

DEMOS PLANS

STANDARDS’ ROADMAP

R&I BEYOND

2020

WHAT’S GOING ON

Page 21: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Page 22: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Page 23: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018: CFM, OC

planned activities

AWP2018: CFM, OC

planned activities

Ongoing act: X2RAIL-2; ASTRail

AWP2018: OCplanned activities

TD2.1: Adaptable communications for all railways (quality of

service, interfaces

TD2.2: Railway network capacity increase (ATO up to GoA4 – UTO)2015 2016 2017 2018 2019 2020 2021 …

2020 2021 …2015 2016 2017 2018 2019

TD2.3 Moving Block

TD2.4: Fail-Safe Train Positioning (including satellite technology)2015 2016 2017 2018 2019 2020 2021 …

Ongoing act.: X2Rail1, Mistral

planned activities

Ongoing act.: X2Rail1, ASTRail

2015 2016 2017 2018 2019 2020 2021Ongoing act.: X2Rail1, ASTRail

Page 24: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

2020 2021 …

AWP 2018: CFM, OC

planned activities

TD2.5: On-board Train Integrity 2015 2016 2017 2018 2019 2020 2021 …

Ongoing act.: X2Rail1, Vite

TD2.7: Formal methods and standardisation for smart signalling 2015 2016 2017 2018 2019 2020 2021 …

TD2.8: Virtually – Coupled Train Sets (VCTS)2015 2016 2017 2018 2019 2020 2021 …

AWP2018: CFM, OC

Ongoing act.: X2RAIL-2; ETALON

Ongoing act.: X2RAIL-2; ASTRail

TD2.6: Zero on-site testing (control command in lab demonstrators)

2015 2016 2017

planned activities

2018 2019

planned activities

Page 25: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Ongoing act.: X2Rail1, Cyrail

planned activities

planned activities

Ongoing act.: X2RAIL-2

TD2.11: Cyber Security2015 2016 2017 2018 2019 2020 2021 …

TD2.10: Smart radio-connected all-in-all wayside objects2015 2016 2017 2018 2019 2020 2021 …

Ongoing act.: X2Rail1, ETALON

TD2.9: Traffic management evolution2015 2016 2017 2018 2019 2020 2021

AWP2018: CFM, OCplanned activities

Page 26: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing activities: In2Rail, In2Track

planned activities

ongoing activities: In2Rail, S-CODE

ongoing activities: In2Rail, In2Track

ongoing activities: In2Rail

AWP 2018: CFM

planned activities

planned activities

planned activities

AWP 2018: CFM

AWP 2018: CFM

AWP 2018: CFM

TD3.4 Next Generation Track System2015 2016 2017 2018 2019 2020 2021 …

TD3.3 Optimised Track System2015 2016 2017 2018 2019 2020 2021 …

TD3.2 Next Generation Switch & Crossing System2015 2016 2017 2018 2019 2020 2021 …

TD3.1 Enhanced Switch & Crossing System2015 2016 2017 2018 2019 2020 2021 …

Page 27: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing activities: In2Rail, In2Track

ongoing activities: In2Smart, IN2DREAMS

planned activities

planned activities

ongoing activities: In2Rail, In2Smartplanned activities

AWP 2018: OC

planned activities

ongoing activities: In2Rail, In2Smart, MOMIT

AWP 2018: OC & CFM

TD3.7 Railway Integrated Measuring and Monitoring System 2015 2016 2017 2018 2019 2020 2021 …

TD3.6 Dynamic Railway Information Management System (DRIMS)2015

TD3.8 Intelligent Asset Management Strategies (IAMS)2015 2016 2017 2018 2019 2020 2021 …

2016 2017 2018 2019 2020 2021 …

TD3.5 Proactive Bridge and Tunnel Assessment, Repair and Upgrade2015 2016 2017 2018 2019 2020 2021 …

Page 28: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing activities: In2Rail, In2Stempoplanned activities

ongoing activities: In2Rail, In2Stempo, In2Dreams

TD3.9 Smart Power Supply2015 2016 2017 2018 2019 2020 2021 …

TD3.10 Smart Metering for Railway Distributed Energy Resource

Management System 2015 2016 2017 2018 2019 2020 2021 …

AWP 2017: IN2STEMPO, FAIR STATIONS

TD3.11 Future Stations2015 2016 2017 2018 2019 2020 2021 …

Page 29: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

2015 2016

Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE

AWP 2018 Open Call 1

Planned activities

2015 2016

Ongoing act. IT2RAIL, Co-Active, COHESIVE

AWP 2018 Call For Members

Planned activities

2015 2016

Ongoing act. IT2RAIL, Co-Active, COHESIVE

AWP 2018 Call For Members

Planned activities

2015 2016

Ongoing act. IT2RAIL, Attracktive, My-TRAC

AWP 2018 Call For Members

Planned activities

TD 4.1 Interoperability Framework

TD4.2 Travel Shopping

TD4.3 Booking and Ticketing

TD4.4 Trip Tracker

2019

2020

2020

2020

2020

2021

2021

2021

2017 20192018 2022

2022

2022

2022

2021

2017

2018

2019

20192017

2018

2017 2018

Page 30: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

2015 2016

Ongoing act. IT2RAIL, Attracktive, My-TRAC

AWP 2018 Call For Members

Planned activities

2015 2016

Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE

Planned activities

2015 2016

Ongoing act. IT2RAIL, COHESIVE

AWP 2018 Open Call 2

2017

2017

2020

2020

2018

2018

2022

2020

TD4.6 Business Analytics

ITD4.7 Integrated Technical Demonstrator

2019

2019

2019 2021

2022

2022

2021

2021

2017 2018

TD4.5 Travel Companion

Page 31: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing projects: FR8RAIL, INNOWAG

ongoing projects: ARCC, SMART, OPTIYARD

ongoing projects: FR8RAIL, INNOWAG, FR8HUB

planned activities

planned activities

planned activities

TD5.3 Wagon design2015 2016 2017 2018 2019 2020 2021 …

TD5.1 Freight electrification, brakes and telematics2015 2016 2017 2018 2019 2020 2021 …

TD 5.0 – Business analytics and implementation strategies2020 2021 …2015 2016 2017 2018 2019

ongoing projects: SMART-RAIL, FR8RAIL, INNOWAG, FR8HUB

AWP2018: CFM

AWP2018: CFM

AWP2018: CFM

TD5.2 Access and Operation2015 2016 2017 2018 2019 2020 2021 …

Page 32: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing projects: FR8HUB

ongoing projects: FFL4E, DYNAFREIGHT, FR8HUB

ongoing projects: ARCC, SMART

AWP2018: CFM & OC

2016 2017

AWP2018: CFM

TD 5.4 Novel Terminal, Hubs, Marshalling Yards, Sidings2015 2016 2017 2018 2019 2020 2021 …

TD 5.5 New Freight Propulsion Concepts2015

planned activities

planned activities

TD 5.6 Autonomous train operation2015 2016 2017 2018 2019 2020 2021 …

2018 2019 2020 2021 …

planned activities

Page 33: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing act.: ROLL2RAIL, IMPACT1, NEAR2050, IMPACT2

planned activities

ongoing act.: ROLL2RAIL, IMPACT1, tender KPIs, IMPACT2

ongoing act.: PLASA, GoSAFE RAIL, IMPACT2, SMaRTE

AWP 2018: CFM

planned activities

2022

2022

2022WA3 Safety, Standardisation, Maintanance, Materials, Virtual Certification

2015 2016 2017 2018 2019 2020 2021 …

WA2 KPI method and integrated assessment2015 2016 2017 2018 2019 2020 2021 …

WA1 Long-term needs and socio-economic research & SPD's2015 2016 2017 2018 2019 2020 2021 …

Page 34: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

ongoing act.: IN2RAIL, PLASA, GoSAFE RAIL, IMPACT2

AWP 2018: CFM

planned activities

ongoing act.: FINE1, OPEUS, DESTINATE

planned activities

ongoing act.: IMPACT2, SMaRTE, tender HC

WA4 Smart Planning, I2M2015 2016 2017 2018 2019 2020 2021 …

WA5 Energy and sustainability2015 2016 2017 2018 2019 2020 2021 …2022

WA6 Human Capital2015 2016 2017 2018 2019 2020 2021 …2022

2022

Page 35: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018

Page 36: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018

Million of EUR Total Members

only

Open to non-

Members

Value of the Call for Proposals R&I 155.2 134.1 21.1

S2R Maximum Co-funding 78.7 59.6 19.1

In-Kind Contribution 76.5 74.5 2

No of topics 18 7 11

Value of Call for tender R&I 2.3 0 2.3

No of topics 4 0 4

Page 37: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 S2R Programme specificities

Topic

number – IP

Topic name (*) indicative figures in EUR

Action Type and

expected Technical

Readiness Level

(TRL)

Maximum S2R co-

funding (*) Complementarity

S2R-OC-IPX-

01-2018

Paradigm shifts

for railway RIA, up to TRL 2 2,200,000

- S2R-CFM-IP1-02-2018 - S2R-CFM-IP2-01-2018 - S2R-CFM-IP3-01-2018

How to read the topics acronyms

Number IP1 IP2 IP3 IP4 IP5 CCA IPX

CFM topic 2 1 1 1 1 1 0

OC topic 1 3 1 2 1 0 3

Linked tender topic

2 1 1

Scope: […] the proposed research should address all the following work-streams described below […]

Page 38: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Technology Readiness Levels definition

Page 39: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 – CFM

Topic

number -

IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-CFM-

IP1-01-

2018

Development of technology

demonstrators for the next

generation of traction systems

and adhesion management

systems

RIA , TRL 5

to 6 28,534,203 12,680,600 15,853,603

S2R-CFM-

IP1-02-

2018

Implementing new

technologies for the TCMS RIA, TRL 5 10,576,058 4,700,000 5,876,058

S2R-CFM-

IP2-01-

2018

Advanced Signalling,

Automation and

Communication System (IP2

and IP5)

IA, TRL6 38,900,540 17,287,400 21,613,140

Page 40: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Topic

number -

IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-CFM-

IP3-01-

2018

Research into optimized and

future railway infrastructure IA, TRL 6 30,153,015 13,400,000 16,753,015

S2R-CFM-

IP4-01-

2018

Passenger service platform

specifications for an enhanced

multi-modal transport eco-

system including Mobility as a

Service (MaaS)

IA, TRL 6 11,701,170 5,200,000 6,501,170

AWP 2018 – CFM

Page 41: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Topic

number -

IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-CFM-

IP5-01-

2018

Technology demonstrators for

competitive, intelligent rail

freight operation

IA, TRL 6 12,376,238 5,500,000 6,876,238

S2R-CFM-

CCA-01-

2018

Virtual certification & smart

planning RIA TRL 3 1,894,689 842,000 1,052,689

TOTAL 134,135,914 59,610,000 74,525,914

AWP 2018 – CFM

Page 42: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - OC

Topic

number

– IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-OC-

IPX-01-

2018

Paradigm shifts for railway RIA, up to

TRL 2 2,200,000 2,200,000 n.a

S2R-OC-

IPX-02-

2018

Transversal exploratory

research activities and

knowledge transfer

CSA 500,000 500,000 n.a

S2R-OC-

IPX-03-

2018

Innovative/breakthrough

mobility concepts (with rail

as backbone)

CSA 500,000 500,000 n.a

Page 43: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - OC

Topic

number

– IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-OC-

IP1-01-

2018

Technical solutions for the

next generation of TCMS

RIA, up to

TRL 4/5 4,000,000 4,000,000 n.a

S2R-OC-

IP2-01-

2018

Analysis for Moving Block

and implementation of

Virtual Coupling concept

RIA, up to

TRL 3 1,300,000 1,300,000 n.a

S2R-OC-

IP2-02-

2018

Modern methodologies and

verifications for GNSS in

Railways and virtual test

environment.

RIA, up to

TRL 3 1,020,000 1,020,000 n.a

Page 44: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - OC

Topic

number

– IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-OC-

IP2-03-

2018

Communication environment

assessment and validation

RIA, up to

TRL 5/6 750,000 750,000 n.a

S2R-OC-

IP3-01-

2018

Measuring and monitoring

devices for railway assets

IA up to TRL

6 6,785,714 4,750,000 2,035,714

S2R-OC-

IP4-01-

2018

Semantic framework for

multimodal transport

services

RIA up to

TRL4 2,000,000 2,000,000 n.a

Page 45: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - OC

Topic

number

– IP

Topic name

(*) indicative figures in EUR

Type of

action and

expected

Technical

Readiness

Level (TRL)

Value of the

actions (*)

Maximum

S2R co-

funding (*)

In-kind

contribution

(*)

S2R-OC-

IP4-02-

2018

Supporting the

implementation of the IP4

multi-modal transport

ecosystem

RIA up to

TRL4 1,500,000 1,500,000 n.a

S2R-OC-

IP5-01-

2018

Radio communication and

simulation of train dynamics

for Distributed Power within

long trains

RIA up to

TRL5 600,000 600,000 n.a

TOTAL 21,155,714 19,120,000 2,035,714

Page 46: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - Tenders

Number Subject of

tender Indicative scope

Maximu

m

budget

1 -

contract

Study on

alternativ

e

communic

ation

bearers in

the

railway

environm

ent

The activity shall assess the railway environment and identify new

alternative bearer beyond established cellular technologies

(UMTS/HSPA, LTE, LTE-A, etc.) or other access technologies

(WiFi/802.11, SatCom, etc.), which are or expected to become

available for on-board to trackside communication needs. The

availability of the alternative bearers might be restricted to certain

areas (for example train stations, shunting yards, high-speed lines,

different terrains, etc.). The alternative bearers could rely on or

leverage already available infrastructure or equipment alongside the

railway tracks. Some potential candidates include but are not limited

to data over power lines, free space optical communications, etc.

The results of the study are expected to enrich the set of access

network options for infrastructure managers, when they deploy their

new adaptable communication system and leverage the benefits of

alternative bearers to address specific needs of their planned rollout

of advanced services and applications.

150,000

Page 47: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - Tenders

Number Subject of tender Indicative scope

Maximu

m

budget

2 -

contract

Study on railway

bridge dynamics

and the interface

with rolling stock

Under supervision of the JU, in collaboration with the ERA,

the study should collect bridge and train data, as well as

calculation and validation methods, including:

calculation methods to describe the dynamic interface

vehicle – bridge;

vehicle design assessment method;

validation of calculation methods;

load models and vehicle design limits;

proposal and suggestions for standardisation and

regulation.

250,000

Page 48: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - Tenders

Number Subject of

tender Indicative scope

Maximum

budget

3 -

contract

Support to

ERTMS

European Action

Plan to pave the

way for the

deployment of

the future S2R

Innovative

Solutions

This activity aims at supporting the implementation of the

ERTMS European Action Plan, published by the European

Commission in June 2017.

Under the supervision of the JU and together with Commission

Services (DG Move), inter alia, the contractor will perform tasks

such as support the ERA Change Control Management process’

and related update of specification documentation (including

test specifications); Identification of the existing sets of

engineering rules regarding transitions between systems;

Contribution to the technical review of trackside deployment of

ERTMS in cross-border sections; Contribution to the

drafting/updating of technical specifications for upcoming

ERTMS communication system set to replace GSM-R and to the

appraisal of the impact on interoperability of its roll-out.

€ 1,600,000

Page 49: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

AWP 2018 - Tenders

Number Subject of tender Indicative scope Maximum

budget

4 -

contract

Study on use of

fuel cell hydrogen

in railway

environment

This activity aims at analysing the business case of

hydrogen and fuel cell usage in the rail environment,

both in passenger train and freight.

The investigation could for example include analyses

on the CO2 performance (through Life Cycle Analysis

techniques) of current rail powertrain solutions and

demonstrate the specific emissions saving that can be

achieved by replacing conventional technologies.

€ 270,000

TOTAL € 2,270,000

Page 50: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Programme approach and future/current projects

50

Page 51: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

YOUR PROJECT and the overall S2R programme

• EACH PROJECT contributes to the achievement of the Master Plan and the MAAP objectives

• EACH PROJECT is part of a programme and cooperation with other projects must be ensured

Through the collaboration and input to the JU Members, EACH PROJECT will support the realization of long-term S2R technological demonstrations or innovative break-through

• Particular attention is given to ensure that there is no duplication of work between EACH PROJECT and current/future R&I activities

• EACH PROJECT results are taken into consideration for the next annual work plans to ensure sufficient complementarity and coherence.

Page 52: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Complementarity & Collaboration Agreement

1. Complementary is defined at topic level

2. Complementarity between topics is compulsory established in the Grant Agreement (need for a Collaboration Agreement)

3. IP/CCA SteCos, high level synchronization points: Project Coordinators may attend the SteeCo meetings as observer and IP Coordinators cooperate with project coordinator to foster/promote synergies

4. S2R Programme Managers: Central Contact Point for both projects

Page 53: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Complementarity & Collaboration Agreement

Issues to be tackled in the Collaboration Agreement (COLA) (examples/non-exhaustive list)

• Rules for collaboration, “who does what?”; Point of Contacts etc.

• Handling review of documents

• Agreement on action to be performed by both sides + linked timing (e.g. project A provides “user requirements” by M6 to project B; project B provides input by M18 to project A project A uses input for deliver their deliverable 2.3).

• Participation to restricted meetings (for specific purpose) or to public meetings (including Advisory Groups, etc…).

Page 54: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Overview of the standard call process

5 months max. 3 months max.

Invitation to grant preparation

Grant signature Call deadline

Proposal Evaluation Grant Agreement Preparation Prefinancing submission

Accession GA

H2020 max. duration to Grant signature:

Maximum five months from call closure date to end of evaluation - until the date of informing applicants

Maximum three months to prepare grant agreement from the date of inviting (informing) applicants until the signature of the grant agreement

Maximum eight months from call closure - until the signature of the grant agreement

8 months maximum

Page 55: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

• Standard H2020 eligibility conditions:

• 'Research and Innovation Actions' (RIA) and 'Innovation Actions' (IA): Minimum three legal entities established in minimum three different Member States or an Associated Countries

• 'Coordination and Support Actions' (CSA): one or more legal entity(ies) established in a Member State or in an Associated Country

Other entities from countries outside a Member State or Associated Country may participate to the open calls, but are, in principle, not eligible for funding unless there is a reciprocal agreement in place with that country or the applicant can demonstrate that the entity has unique resources that render its participation essential for the project to go ahead successfully

• Additional conditions of S2R (Art 9(5) of H2020 RfP & Art. 17 S2R Regulation):

• Calls for members: Open only to members of the S2R JU and their affiliated entities

• Open calls: Open only to entities that are not members or affiliated entities of members of the S2R JU

who can participate?

55

Page 56: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

• Who are the affiliated entities of the S2R JU members?

• Any legal entity that is under the direct or indirect control of a member (or, in the case of consortia, a constituent entity of the consortium), or under the same direct or indirect control as the member (or constituent entity of the consortium), or that is directly or indirectly controlling a member (or constituent entity of the consortium)

• The control may take in particular either of the following forms:

• direct or indirect holding of more than 50% of the nominal value of the issued share capital in the legal entity concerned, or of a majority of the voting rights of the shareholders or associates of that entity or

• the direct or indirect holding, in fact or in law, of decision-making powers in the legal entity concerned.

• The following relationships between legal entities do not constitute control relationships:

• the same public investment corporation, institutional investor or venture-capital company has a direct or indirect holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the shareholders or associates;

• the legal entities concerned are owned or supervised by the same public body.

56

who can participate?

Page 57: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

S2R Members

57

European Union

8 Founding Members

Alstom, Ansaldo STS, Bombardier, Construcciones y Auxiliar de Ferrocarriles (CAF), Siemens, Thales and infrastructure managers Trafikverket and Network Rail

12 Associated Members (single legal entities)

Amadeus IT Group, AZD Praha, Deutsche Bahn, DIGINEXT, Faiveley Transport, HaCon Ingenieurgesellschaft, INDRA Sistemas, Kapsch CarrierCom, Knorr-Bremse, MER MEC, SNCF Mobilités, Patentes Talgo

7 Associated Members (consortia)

• AERFITEC (AERNNOVA Aerospace, FIDAMC, Fundacion TECNALIA)

• Competitive Freight Wagon (Contraffic, DLR, Waggonbau Niesky, Centro de Estudios e Investigaciones Técnicas (CEIT), Verband der Bahnindustrie in Deutschland)

• EUropean Rail Operating community (Infraestruturas de Portugal, BLS, CP, Finnish Transport Agency, ÖBB-Infrastruktur, Polskie Koleje Państwowe, PRORAIL ,Schweizerische Bundesbahnen, Slovenske zeleznice, Türkiye Cumhuriyeti Devlet Demiryollari)

• Smart DeMain (Strukton Rail, ACCIONA Infraestructuras, DLR, Fraunhofer, CEMOSA)

• SmartRaCon (DLR, CEIT, Fondation Railenium, Nottingham Scientific Ltd)

• Swi'Tracken (Fondation Railenium, Universidade Do Porto, Universidad Del Pais Vasco, Universidade Do Minho, TATASTEEL, VOSSLOH-COGIFER, Institut für Zukunftsstudien und Technologiebewertung, EGIS RAIL, Groupe EUROTUNNEL, TRONICO ALCEN)

• Virtual Vehicle Austria consortium+ (Kompetenzzentrum, FCP Firtsch, Getzner Werkstoffe, Kirchdorfer Fertigteilholding, Plasser&Theurer, Vvoestalpine Schienen, Voestalpine VAE, Wiener Linien, AVL List, PJM Messtechnik, TATRAVAGONKA, AC2T research, Materials Center Leoben Forschung

Page 58: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

• Applicable funding rates for the open calls:

• Funding rate depending on the type of action:

• Up to 100% of eligible costs for 'Research and Innovation Actions' (RIA) and for 'Coordination and Support Actions' (CSA)

• Up to 70% for 'Innovation Actions' (IA), except non-profit organisations (up to 100%)

• One project = One funding rate for all beneficiaries / activities in the grant*

*However, if non-profit organisations are in an IA together with for-profit organisations, their eligible costs will be reimbursed according to the different reimbursement rates specified above

The reimbursement rates apply to all forms of costs, including indirect costs (overheads): 25% flat rate (calculated on the basis of eligible direct costs, excluding direct sub-contracting costs)

funding rates

58

Page 59: Presentation S2R and AWP2018 - FFG · Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017

#Shift2Rail

Thank you

http://shift2rail.org Twitter@Shift2Rail_JU