Tony Randle – Wellington Commuter• Contract Business Analyst• Lived in Johnsonville for 19 years• Married with 3 children•
President & Transport Spokesman forJohnsonville Progressive Association• Public Transport Advocate
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 2/32
Click to edit Master subtitle style
22
• Wellington Public Transport (PT)• Wellington PT Cost & Revenue Structure• Local Subsidy through the Transport Rate• Future Investment in Wellington PT• Greater Wellington Regional Council• Conclusion
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 3/32
Click to edit Master subtitle style
33
Travel across the region All Modes (2006 Census)
Total Trips to GWWorkplaces
(excluding outsidethe Wellingtonregion) A r e a
T o t a l W a i i r a r a p a
T L A T o t a l H u t t
T L A T o t a l K a p i t i
T L A T o t a l P o r i r u a
T L A T o t a l U p p e r H u t t
T L A T o t a l W e l l i n g t o n
T o t a l T r i p s b y G W
R e s i d e n t s ( e x c o u t s i d e
r e g i o n )
Total Wairarapa
14,136 330 12 30 183 864 15,555 TLA Total Hutt 168 24,597 111 687 1,485 13,524 40,572 TLA Total Kapiti 48 756 10,488 879 171 3,768 16,110 TLA Total Porirua 45 1,449 255 7,779 303 8,193 18,024 TLA Total Upper Hutt 69 4,050 45 399 7,320 3,990 15,873 TLA Total Wellington 354 5,256 279 2,619 633 79,149 88,290 Total Trips to GW Workpla 14,820 36,438 11,190 12,393 10,095 109,488 194,424
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 4/32
Click to edit Master subtitle style
44
Census ALL Trips across the Region
All Trips Origin Inter-District Intra-DistrictWellington City 9,141 79,149 Lower Hutt City 15,975 24,597 Upper Hutt City 8,553 7,320 Porirua City 10,245 7,779 Kapiti Coast District 5,622 10,488 Wairarapa 1,419 14,136
Total 50,955 143,469
All Trips Origin % Inter-District % Intra-DistrictWellington City 18%
55%Lower Hutt City 31% 17%Upper Hutt City 17% 5%Porirua City 20% 5%Kapiti Coast District 11% 7%Wairarapa 3% 10%
Total 100% 100%
All Trips Destination Inter-District Intra-DistrictWellington City 30,339 79,149 Lower Hutt City 11,841 24,597 Upper Hutt City 2,775 7,320 Porirua City 4,614 7,779 Kapiti Coast District 702 10,488 Wairarapa 684 14,136
Total 50,955 143,469
All Trips Destination % Inter-District % Intra-DistrictWellington City 60%
55%Lower Hutt City 23% 17%Upper Hutt City 5% 5%Porirua City 9% 5%Kapiti Coast District 1% 7%Wairarapa 1% 10%
Total 100% 100%
All Inter-District % Origin % DestinationWellington City 18%
60%Lower Hutt City 31% 23%Upper Hutt City 17% 5%Porirua City 20% 9%Kapiti Coast District 11% 1%Wairarapa 3% 1%
Total 100% 100%
OriginDestinationOrigin/Destination
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 5/32
Click to edit Master subtitle style
55
Census Bus Trips across the Region OriginDestinationOrigin/Destination
Bus Trips Origin Inter-District Intra-DistrictWellington City 339 12,075 Lower Hutt City 717 1,023 Upper Hutt City 204 117 Porirua City 69 228 Kapiti Coast District 75 117
Wairarapa 15 66 Total 1,419 13,626
Bus Trips Origin % Inter-District % Intra-Di
strictWellington City 24% 89%Lower Hutt City 51% 8%Upper Hutt City 14% 1%Porirua City 5% 2%Kapiti Coast District 5% 1%
Wairarapa 1% 0% Total 100% 100%
Bus Trips Destination Inter-District Intra-DistrictWellington City 900 12,075 Lower Hutt City 366 1,023 Upper Hutt City 42 117 Porirua City 54 228 Kapiti Coast District 27 117
Wairarapa 30 66 Total 1,419 13,626
Bus Trips Destination % Inter-District % Intra-DistrictWellington City 63% 89%Lower Hutt City 26% 8%Upper Hutt City 3% 1%Porirua City 4% 2%Kapiti Coast District 2% 1%
Wairarapa 2% 0% Total 100% 100%
Bus Inter-District % Origin % DestinationWellington City 24%
63%Lower Hutt City 51% 26%Upper Hutt City 14% 3%Porirua City 5% 4%Kapiti Coast District 5% 2%
Wairarapa 1% 2% Total 100% 100%
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 6/32
Click to edit Master subtitle style
66
Census Rail Trips across the Region OriginDestinationOrigin/Destination
Rail Trips Origin Inter-District Intra-DistrictWellington City 282 2,541 Lower Hutt City 3,609 255 Upper Hutt City 1,335 78 Porirua City 1,779 87 Kapiti Coast District 1,302 69
Wairarapa 519 33 Total 8,826 3,063
Rail Trips Origin % Inter-District % Intra-DistrictWellington City 3%
83%Lower Hutt City 41% 8%Upper Hutt City 15% 3%Porirua City 20% 3%Kapiti Coast District 15% 2%
Wairarapa 6% 1% Total 100% 100%
Rail Trips Destination Inter-District Intra-DistrictWellington City 8,082 2,541 Lower Hutt City 336 255 Upper Hutt City 114 78 Porirua City 177 87 Kapiti Coast District 57 69
Wairarapa 60 33 Total 8,826 3,063
Rail Trips Destination % Inter-District % Intra-DistrictWellington City 92% 83%Lower Hutt City 4% 8%Upper Hutt City 1% 3%Porirua City 2% 3%Kapiti Coast District 1% 2%
Wairarapa 1% 1% Total 100% 100%
Rail Inter-District % Origin % DestinationWellington City 3%
92%Lower Hutt City 41% 4%Upper Hutt City 15% 1%Porirua City 20% 2%Kapiti Coast District 15% 1%
Wairarapa 6% 1% Total 100% 100%
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 7/32
Click to edit Master subtitle style
77
-
5,000
10,000
15,000
20,00025,000
30,000
35,000
40,000
45,000
WellingtonCity
Lower HuttCity
Upper HuttCity
PoriruaCity
KapitiCoast
District
Wairarapa
All Trips
Bus
Rail
What does the census tell us about PT ?• Most travel is by car• Most short PT trips are by bus•
Most longer trips (between cities) are by rail• Over half of all PT in within Wellington City
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 8/32
Click to edit Master subtitle style
88
The two roles of Public Transport:The appropriate role for public transport is to provide an alternative to private cars,particularly for longer journeys where active modes are less attractive.It also has a vital role in providing for people who do not own a private vehicle, are unable to drive or cannot use active modes to access the goods or services they need.(source: GWRC RLTS)
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 9/32
Click to edit Master subtitle style
99
-
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
Bus Rail Ferry
2005/06
2010/11
Wellington Public Transport AnnualPatronage 2005/06 and 20011/12
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 10/32
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 11/32
Click to edit Master subtitle style
11
Est. Rail Costs split by Line
$-
$10
$20
$30
$40
$50
$60
Jville Line Waikanie Line Hutt Line Wairarapa Line
QWERTYUIOPASDFG
$-
$10
$20
$30
$40
$50
$60
Jville Line Waikanie Line Hutt Line Wairarapa Line
Wairarapa
Kapiti Coast District
Upper Hutt City
Hutt City
Porirua City
Wellington City
by City Patronage
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 12/32
Click to edit Master subtitle style
12
Public Transport Per Trip Cost Ave Bus & JvilleWaikanie Line
$6.94 $6.80
$11.10$9.20
$29.63
$-
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
Hutt City 91-4 Sectns Upper Hutt 91-7 Sectns Wairarapa
$5.70$3.86
$9.10
$6.00
$19.85
$10.80
$-
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
Well 211-4Sectns
Porirua 211-5Sectns
Kapiti 91-9 Sectns
$3.37$5.83
$3.44
$11.59
$-
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
Diesel Trolley 91/211-3 Sectns Jville Line
Hutt & Wairarapa
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 13/32
Click to edit Master subtitle style
13
Summary of Costs by Mode & City• Trolley bus costs significantly more than diesel• Rail costs more than bus on an equivalent tripbasis• The rail trip costs increase with distance• The rail costs vary significantly due todifferences between patronage and vehiclemileage
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 14/32
Click to edit Master subtitle style
14
GWRC Transport Rates 2011/12 ($46.4M)
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
Rail Bus Other
Rates
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
Rail Bus2Rail Deisel Bus Trolley Other
Rates
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
Rail Bus2Rail Deisel Bus Trolley Other
CBD
Business
Residential
CBD Rates
Wellington City Diesel Buses 50%Wellington City Trolley Buses 50%Wellington Rail Costs 42%
Other City Buses 42%
CBD Rates
Wellington City Diesel Buses 4,464,250$Wellington City Trolley Buses 2,241,994$Wellington Rail Costs 9,579,679$
Other City Buses 1,536,081$
In fact the CBD Rail Costs are a bargain !
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 15/32
Click to edit Master subtitle style
15
Greater Wellington uses the following funding allocations in respect of expenditure on public transport services, except for Total Mobility: • • The remainder from a community contribution This is funded as follows: • The maximum
, primarily New Zealand Transport Agency (NZTA), ... (this contribution ranges from 50%-100%, depending on the type of service)
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 16/32
Click to edit Master subtitle style
16
The balance ... is from a Greater Wellington contribution funded
• Inter-district services includes and a portion of the cost of
• 20%-
with the remainder borne equally by ratepayers in the district of origin and the district of destination using census journey to work statistics
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 17/32
Click to edit Master subtitle style
17
• Intra-district services include
to inter-district costs • The rates required for intra-district services are borne by the ratepayers in the district that services operate in • A cost apportionment is made where services travel through more than one district • Within Wellington city 50% of intra-district trips are allocated to the Wellington CBD
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 18/32
Click to edit Master subtitle style
18
Rates for -District Bus and Ferry Services
$-$2,000,000
$4,000,000
$6,000,000
$8,000,000$10,000,000
$12,000,000
$14,000,000
$16,000,000
Other
Trolleys
Diesel Bus
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 19/32
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 20/32
Click to edit Master subtitle style
20
Factors Used to calculate the rates:• Intra-District (Bus & Ferry) =
Contracted Subsidy Cost by CitySplit 50% Original and Destination
•
Inter-District (Rail & Bus to Rail) =2006 Census Trips between citiesSplit 50% Origin and Destinationwith 25% of Origin charged to the CBDBUT NOTETrips are ALL Trips (not just rail trips) ANDThere is no adjustment for distance !
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 21/32
Click to edit Master subtitle style
21
What does this mean ? Using Intra-District (Bus)
$-$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
Bus2Rail
Rail
$1,436,918 $1,446,437
$476,353
-$1,992,626
-$1,298,369
-$2,500,000
-$2,000,000
-$1,500,000
-$1,000,000
-$500,000
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
Well City Hutt City U Hutt Porirua Kapiti Wairarapa
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
Bus2Rail
Rail
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 22/32
Click to edit Master subtitle style
22
Summary of Transport Rates Discussion• Rates to support Bus services are calculated ona totally different basis from Rail Services• There is significant cross-subsidies from
Wellington and Hutt Cities to Kapiti andWairarapa through the rates calculation• The rail rates essentially penalise residents wholive closer to the CBD and favour residents living
far away• The Transport Rates Calculation is a secret …the information here was only obtained with theintervention of the Ombudsman and some $$$s
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 23/32
Click to edit Master subtitle style
23
Objectives for PT Growth in Bus and RailThe overall public transport mode share is the
key indicator for public transport’s efficiency and effectiveness.
for journey-to-work trips. The strategic target for public transport trips equates to around 5.6 million additional peak period trips per annum
(a 32% increase in trips from 2009/10). RLTS 2010
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 24/32
Click to edit Master subtitle style
24
-
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
BusRailFerry
Peak Patronage Past and Future4% Growth
Actual RLTS
+3.1M Trips
+2.3M
Trips
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 25/32
Click to edit Master subtitle style
25
GWRC Long Term Plan Transport Projects Project description Total cost Year(s)48 new two-car Matangi trains* $8 million 2012/13
Refurbish Ganz Mavag trains $79 million 2012-17 Rail infrastructure renewal and minor improvements**
$49 million 2012-22
Rail rolling stock heavy maintenance and minor improvements***
$78 million 2012-22
Regional Rail Plan – reliability and frequencyupgrades
$52 million 2015-20
Trolley bus overhead network infrastructurerenewals
$36 million 2012-22
Bus shelters and interchanges $3 million 2012-22 Electronic/integrated ticketing $39 million 2013-16 Install bike racks on buses $1 million 2017/18Customer information systems $2 million 2012-22Total $347 million
Total Transport Projects of $347M• $236M on Rail• $36M on Trolley Buses Maintenance• $39M on Integrated Ticketing (Mainly on Rail)• $4M on Buses ($1M for Bikes on Buses !)
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 26/32
Click to edit Master subtitle style
26
In fact the truth is:• Rail costs are increasing 10% per year• Bus costs are static
The Transport Rate Increasing 5%The costs of providing passenger transport services usually increase each year.The last year has seen an over 5% increase in costs with operators being reimbursed by Council through increased contract payments.
(GWRC Long Term Plan)
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 27/32
Click to edit Master subtitle style
27
ALL fares are increasing
An increase in fare levels is likely to be needed to maintain the required contribution
from passengers ... If the passenger contribution was to drop, the ratepayers and NZTA would have to contribute more. A 3% revenue increase equates to a $0.7m impact
on rates ...In fact, bus users are being made to pay muchmore than 50% of their costs to hide that railusers are paying less than 50% of their costs !
due to rail cost increasesGWRC says bus fares must go up even when they are alreadymore expensive than cars.Meanwhile it funds rail users to get extra discount fares that meanlong distance rail journeys are less than half or even a quarter that
of a car !
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 28/32
Click to edit Master subtitle style
28
The rail costs drive ongoing Transport Rate hikes
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
Trans Rates
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
Rail
Other
Ferry
Trolley Bus
Deisel Bus
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 29/32
Click to edit Master subtitle style
29
GWRC Loves Rail so much• It wants more new Matangis• Ganz-Mavag refurbishment claimed = $80M• The minimum cost is actually = $60M• It states new Matangis will cost $135M• But this is just the trains• It states it needs the additional capacity• But refuses to consider bus alternatives• Want a good price, use the Superbus !
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 30/32
Click to edit Master subtitle style
30
GWRC Loves Rail so much• It subsidises rail more heavily than bus• It rates Wellington City to subsidise others• It increases bus fares to fund rail costs• It provides rail monthly discounts but not bus• It keeps investing only rail not bus• It refuses to subsidise alternative bus services such as the 211, 97 or 91/Flyer
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 31/32
Click to edit Master subtitle style
31
GWRC Loves Rail so muchThey Bought the Company !GWRL: owns rolling stock and stationsis now the 2nd Largest PT Operatorhas no permanent staff, insteadit is operated by GWRC transport officers
who also decide PT funding for the region
recently applied to make GWRL “for profit” The GWRC LTP has $80M for GM Refurbbut GWRL already budgets for Maitangis!
7/31/2019 Presentation to Infrastructure ECCC Committee 120904
http://slidepdf.com/reader/full/presentation-to-infrastructure-eccc-committee-120904 32/32
Click to edit Master subtitle style
The Regional Council’s action do not match it’s plans or strategy:•
The costs of PT services are not known• The rates funding of rail is not understood and kept secret by the regionalcouncil• The PT Strategy cannot succeed without investment in buses as well as rail• How do ratepayers know that it is the Greater Wellington Regional Council thatcontrols Greater Wellington Rail Ltd and not the other way around ?