presentation to the parliamentary portfolio committee on energy sanedi annual report 2012/13 mr km...

57
Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Upload: antony-hunter

Post on 17-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Presentation to the Parliamentary Portfolio Committee on Energy

SANEDI Annual Report 2012/13

MR KM NASSIEPCEO

17 OCTOBER 2013

Page 2: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

CONTENTS

Production / Costs

Reducing the Carbon Footprint

Corporate Information

SANEDI’s Assets – its People

Management of Income , expenditure , transfers , cash and assets

Inputs to different sections of the Financial Statements

Report on Financial Misconduct

Highlights

Achievements as per the APP

Audit and Risk Committee

Audit Findings and Action Plan

 

Page 3: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

PRODUCTION/COSTS

Production • 100 hard copies• 400 copied to USB

Costs of Production• Hard copy – R425.00 each • USB – R95.00 each

 

Page 4: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

REDUCING THE CARBON FOOTPRINT

Environmental responsibility

Collective responsibility

Recycled paper

Benefits of using recycled paper

Other initiatives too to reduce company’s carbon footprint

Actions of today will save the environment tomorrow

Using e- annual reports reduces company overheads – savings could be utilised elsewhere in the organisation

 

Page 5: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

CORPORATE INFO

Vision

To serve as a catalyst for sustainable energy innovation, transformation and technology diffusion in support of South Africa’s sustainable development that benefits our nation.

Mission

Advance innovation of clean energy solutions and rational energy use that effectively supports SA’s national energy objectives and the transition towards a sustainable , low carbon energy future

Values

Innovation, Accountability, Transparency, Integrity, Professionalism, National Interest , Batho Pele

 

Page 6: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

SANEDI’s ASSETS – IT’s PEOPLE

 Category WM IM CM BM WF IF CF BF

Executive Management 0 0 1 0 0 0 0 0

Senior Management 4 1 0 1 0 0 0 1

Acting CFO 0 0 0 0 0 0 1 0

Manager : Corporate Support 0 0 0 0 0 1 0 0

IT Manager 0 1 0 0 0 0 0 0

Accountants 0 0 0 1 0 0 0 1

System Administrator 0 0 0 0 0 0 0 1

Centre Managers 1 0 0 0 2 0 0 0

Project Managers 0 0 0 2 0 0 0 0

Public Awareness Officer 0 0 0 2 0 0 0 2

Project Officers 0 0 0 2 0 0 0 1

Admin Officer 0 0 0 0 0 1 0 0

Research Assistants 0 0 0 0 1 0 0 1

Personal Assistant 0 0 0 0 0 0 1 1

Page 7: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

SANEDI’s ASSETS – IT’s PEOPLE ..cont…

Category WM IM CM BM WF IF CF BF

Receptionist 0 0 0 0 0 0 0 1

Interns 0 0 0 2 0 0 0 0

Consultants 5 0 0 1 0 0 0 0

Refreshment

Officers

0 0 0 0 0 0 0 2

TOTAL 10 1 1 11 4 2 2 11

Page 8: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

SANEDI’s ASSETS – IT’s PEOPLE ....continued

Permanent staff = 8

Contract staff = 14

HDI representation = 75%

Female representation = 53%

Total staff compliment = 42

 

Page 9: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Management of income, expenditure, transfers, cash and assets

Income/Accumulated surplus

Expenditure

DOE Transfer 50,110 33,552

IT Infrastructure 6,000 4,430

EU AIM project (smart grids

71,800 -

SDC  4,258 1,852

SACCCS 22,426 6,282

WFE 34,294 6,477

Green Transport 1,712 2,380

• Application in terms of section 53(3) was made to National Treasury for R16,558 surplus for the year.

• SANEDI is currently busy with implementation of its own ERP system; expected roll-out of the new system is November 2013.

• Processes used during the implementation is based on best practice; including PFMA, Treasury Regulations for Schedule 3A and all GRAP reporting requirements.

Page 10: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Inputs to different sections of financial statements

Commitments:

SANEDI has entered into various contracts with service providers

for the achievement of its key deliverables

Working for Energy programme (R19.6 m)

Centre for Energy Systems Research (R2.2 m)

Hub for Energy Efficiency & Demand Side Management (R4.2 m)

Clean Energy programme (R1.6 m).

Page 11: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Inputs to different sections of financial statements…cont…

Irregular expenditure:

SANEDI incurred R12.6 m irregular expenditure as a result of Procurement processes not being followed which are detailed below:

– R3.3 m – no notification for deviations from procurement process above R1m. The procurement decision enacted while SANEDI was still a Schedule 2 public entity within the CEF Group;

– R0.3 m – three responsive quotes were not obtained in all instances;

– R7.6 m – procurement of goods and services above R30,000.00 from 8 December 2012 were not evaluated as per PPPFA legislation; and

– R1.4 m – no approval of application in terms of Treasury Regulation 16A 6.4 to deviate from the standard procurement process.

Page 12: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Report on financial misconduct

There was no financial misconduct

Page 13: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Highlights : SACCCS

Core Parties – SANEDI – SASOL– Norwegian Embassy– Eskom – DoE

Participants – Anglo American – Xstrata Coal – Total Coal – PetroSA– Exarro – Alstom

Page 14: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Highlights : Carbon capture and storage globally and in South Africa

Large-scale carbon capture and storage (CCS) plants have been operating globally since 1996

South African has been looking at CCS since 2002

CCS may enable South Africa to continue utilising local, abundant coal reserves while reducing CO2 emissions

In 2009, the South African Centre for CCS was established

In 2010, the Atlas on Geological Storage of CO2 in South Africa was released

The next step in the South African CCS Roadmap (endorsed by cabinet in 2013) is the Pilot CO2 Storage Project

Page 15: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Highlights : The Pilot CO2 Storage Project

The Pilot CO2 Storage Project (PCSP) aims to store 10 – 50,000tCO2 in South Africa

Work is underway by SACCCS to identify a site for the PCSP with KZN and EC showing potential

SACCCS is currently analysing existing geological data while planning further data acquisition

The Department of Energy has committed R197 million to the PCSP with the World Bank allocating another USD25 million

Legal and regulatory clarity as well as positive public engagement are crucial for the success of the PCSP

Page 16: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Highlights : French-funded Technical Advisory Facility, (TAF)

16

A soft-credit facility to finance sustainable energy initiatives in South Africa, with the purpose of alleviating the current energy situation and addressing future supply concerns. The AFD credit line will finance small and medium-sized investments in the field of energy efficiency and renewable energy made by private South African companies in the industrial and commercial sectors, through 3 participating banks, (namely ABSA Bank Ltd, IDC Ltd and Nedbank Ltd).

Projects qualify for Energy Efficiency funding to retrofit existing installations, including on-site cogeneration, rehabilitation of boilers, regenerative burners, commercial energy efficient building construction and design, such as energy efficient heating and ventilation systems, construction materials, as well as combined heat and power generation. 

Renewable Energy investments, including power generation for own consumption or for sale to the national grid, also qualify. 

Page 17: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Highlights : Technical Advisory Facility, (TAF) ..cont….

17

The implementation of this form of financing requires a Technical Assistance Facility (TAF), to support the emergence of targeted investments and the evaluation of their technical eligibility for the credit line.

SANEDISANEDI will provide the required technical assistance in support of the sustainable energy credit line in South Africa and together with a consortium of local and international expertise, we will offer the service to the broader public, including educational, technical and communications support to the South African public.

AFD (Agence Française de Developement), is a French public bi-lateral development finance institution, acting on behalf of the French government in various countries throughout the world. Key strategic objectives of the AFD include poverty reduction, economic growth and combating climate change.

Page 18: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Residential Sector - ‘Limited Offer’ Tax Incentives

18

SANEDISANEDI  believes that in-line with international trends, ‘limited offer/ duration’ tax incentives should be offered on specified energy efficient energy efficient household appliances, including SWH’s.

This can be aligned to the imminent compulsory implementation of the Energy Efficient Appliance Labelling Programme by the DoE and dti, in South Africa.

SANEDISANEDI will submit a proposal to NationalTreasury, via the DoE, in the 1st quarter of the2014/15 business cycle, to consider such anoption, ie. to first assess the implementation of the 12-L TaxRebate system, as well as progress with the finalisation of theNational Appliance Labelling roll-out.

Page 19: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Highlights : Corporate Social Responsibility

Children of Fire

Under privileged children who have been burnt

Staff contributed

Company contributed

Page 20: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP

Objectives Indicator Target Performance

Result Reason for non –

achievement of targets

Administration and Corporate Governance

Executive support Responses and presentations to DoE and the Minister of Energy as and when required

Achieved

EXCO minutes completed and distributed on a monthly basis

Achieved

Support Services (services dependent on CEF)

Quarterly evaluation of services as documented in the SLA

Achieved

Corporate Governance Compliance to relevant legislation Achieved

Effective and efficient operations /administration

Achieved

Corporate and Programme Marketing and communication services

Corporate Not Achieved The corporate communication plan is complete but has not been approved and implemented. The plan will be approved in the first quarter in 2014.

Monitoring and evaluation of corporate and programme marketing and communication plan

Not Achieved As above

Financial Management and management accounting

SANEDI budget coordinated and aligned to strategic plan and annual performance plan by 30 November 2012

Achieved

Page 21: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target

Performance Result Reason for non – achievement of

targets Spending monitored and financial performance reported on the monthly basis at the Budget Sub Committee

Achieved

Debt and revenue due to SANEDI managed and accurately and timeously recorded and the cash book managed on a monthly basis

Achieved

SANEDI assets managed on a monthly basis

Achieved

SANEDI expenditure and creditors managed on a monthly basis

Achieved

Programme Management Accounting reported monthly

Achieved

IT infrastructure and systems ICT strategic plan developed, approved and implemented

Achieved

Mechanisms to enhance energy data collection and storage provided

Achieved

Project Management system implemented SLA with CEF for ICT services approved

Achieved

Page 22: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance

Result Reason for non – achievement of

targets IT Disaster Recovery plan developed, approved and implemented

Not achieved The SANEDI IT Disaster Recovery Plan has not been developed due to the delay of the Enterprises Resources Management system. SANEDI has adopted the CEF ICT Disaster Recovery Plan until the SANEDI ICT plan is developed

Enterprises resources management system implemented

Not Achieved The Enterprises Resources management system has not been implemented due to delays in the procurement process and funding received

Applied Research : Advanced Fossil Fuels

Clean Coal technologies (CCT) to facilitate the optimisation and efficient use of coal and decrease greenhouse gas emissions

Complete 4 existing CCT projects by 31 March 2013

Achieved

Page 23: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance

Result Reason for non – achievement

of targets

Technical support to the Coal Road Map

Achieved

Financial Management of the South African Coal Road Map (SACRM)

Achieved

Oil and Gas R&D Frameworks – to facilitate the optimisation and efficient use of oil and gas and decrease greenhouse gas emissions

Framework for oil and gas R&D frameworks and submission to DoE by 31 March 2013

Partially Achieved The frameworks was completed by 31 March 2013 but the reports to the DoE were only submitted in the first quarter of 2013/14 financial year

Carbon capture and storage (CCS) to determine the potential and appropriateness of technologies for the geological storage and carbon dioxide in SA

Sourcing of funding Achieved

Completion of current projects

Not Achieved The draft final report was received but was returned to the consultant to revise after review by Technical Committee

Page 24: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target

Performance Result Reason for non –

achievement of targets

Preparation of further exploration of the Zululand Basin

Achieved

International cooperation Achieved

Applied Research : Smart grids

SA smart grid vision which will set the direction to enhance supply reliability and the effective operations of the electricity distribution industry (EDI)

Minutes of stakeholder workshops

Achieved

Report and presentation to SANEDI Board of Directors

Achieved

Submit a briefing document to the DoE by 31 March 2013

Achieved

Current state assessment to amongst others define the EDI constraints from a holistic system reliability and real time data availability perspective

Terms of reference document s

Achieved

Page 25: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont….

Objective Indicator Target

Performance Result

Reason for non – achievement

of targets

Resource requirement identified Achieved

Smart grid scoping document Achieved

Technology, governance and service gap analysis and defined solutions /actions to realise the smart grid vision

Minutes of work group Achieved

Technology, regulatory , institutional policy , skills , ICT gaps and propose solutions identified

Achieved

Smart grid business case Motivation for smart grid with clearly defined project proposals including a funding plan

Achieved

Smart grid Implementation plan

Pilot project running , applied research and results as defined in respect of the pilot project demonstrated

Achieved

Optimised solution portfolio to underpin the business case

Documented results and defined smart grid benefits

Achieved

Page 26: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance

Result Reason for non – achievement of

targets Data enhancement , energy management improvement, reliability improvement and contribution to effective energy planning documented

Achieved

Consolidated smart grid industry guideline

Business case and guidelines and National strategy for smart grids developed by 31 March 2013

Achieved

Applied Research : Renewable Technologies /Clean Energy Solutions

Co ordinate RE (renewable energy)research in South Africa , facilitate RE research ,collaboration, participation, standards development and technology evaluation, contribute to RE skills development , support RE business development and RE awareness creation to stakeholders and students

RECORD RE research co ordination mandate is confirmed, a co ordinated renewable energy research effort in SA with stakeholder buy in and support , a number of research projects are funded by RECORD, value offering to serve RE research paying clients , a platform for international inter-institutional research is expanded and RECORD participates effectively in standard development and technology evaluation

Achieved

Projects, pilots and demonstrations – Wind Atlas South Africa (WASA) , Waste to Energy plant, Algal biofuels and solar road map

Continue as per work plan and seek funding extension from RDE for WASA

Achieved

Pre- feasibility investigations Achieved

Page 27: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont….

Objective Indicator Target Performance

Result Reason for non –

achievement of targets

Set – ups Achieved

Support to Solar park Meteorological (MET) station

Set up solar measuring station

Not Achieved Project delayed due to land matters that need to be addressed at the solar park.

Representation of South Africa in an international forum whereby technical knowledge is gained and skills are transferred . Globalisation of expertise and leveraging of research funding

Maintain IEA and EU FP7 agreements, build up more collaborations and attempt to increase funding

Achieved

Applied Research: Green Transport Programme

A national Green Transport strategic vision and technology development plan including a status quo and gap analysis for the alternate fuels and propulsion systems in RSA developed

Develop a national Green Transport strategic vision and technology development plan including a status quo and gap analysis for alternate fuels and propulsion systems in SA by 31 March 2013

Not Achieved Delays in funding and scope definition with the Department of Transport . Until funding is secured the sustainability of the project is not guaranteed and it can result in wasteful expenditure to commence the programme until a funding stream has been secured

Page 28: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont… Objective Indicator Target

Performance Result

Reason for non – achievement of targets

Develop a technology development incubation centre to offer “Soft Start” facilities to companies and technology partners who are entering the Green Transport sector

Develop the institutional framework and participation Charter for the incubation centre by 31 March 2013

Not Achieved The terms of reference and request for proposals are being prepared

Initiate the call for proposals and expression of interests for prospective partner organisations n or benefactors

Not Achieved As above

Operate the Centre Not Achieved Delays in funding and scope definition with the Department of Transport. Until funding is secured the sustainability of the project is not guaranteed and it can be wasteful expenditure to commence the programme until a funding stream has been secured

Page 29: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance Result Reason for non

– achievement of targets

Develop various demonstration projects in the various alternate fuels and propulsion systems to showcase these technologies and create an enabling environment to bring these alternatives to the market

Develop various demonstration projects in the various alternate fuels and propulsion systems to showcase these technologies . Standards and best practices developed

Not Achieved Funding constraints

Modelling and regulation frameworks developed

Not Achieved Funding constraints

Situational Analysis completed

Not Achieved Funding constraints

Demonstration projects commissioned

Not Achieved Funding constraints

Lessons learnt and best practices communicated through Public Advocacy Programme

Not Achieved Funding constraints

Participate in international knowledge sharing for a to bring best of breed to full commercialisation

Participate in international collaboration partnerships

Achieved

Page 30: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance Result Reason for non

– achievement of targets

Establish knowledge sharing clusters

Achieved

Participated in both local and international events and activities

Achieved

Promote technology and knowledge sharing through the SANEDI website and communicated through the Public Advocacy Programme

Achieved

Develop a substantive public advocacy programme to create market acceptability for alternate fuels and propulsion systems to allow successful market penetration and sustainability

Viral portal platforms developed

Achieved

Print media platforms developed

Achieved

Page 31: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont… Objective Indicator Target

Performance Result

Reason for non – achievement of targets

Events and exhibitions staged

Achieved

Feedback loops created Achieved

Applied Research : Data Knowledge management

Development of the integrated data repository – functional , accurate , integrated and user- friendly database

Coordinate and facilitate development of database by 31 March 2013 and oversee project

Achieved

Review and develop a strategic plan and develop a funding plan by 31 March 2013

Review strategic direction , develop a strategic plan and develop a funding plan by 31 March 2013

Not Achieved A proposal has been sent to the DST and DEA for funding. Discussions being held

Applied Research : Working for Energy

Renewable Energy : Invite tenders, process, assess and approve project proposals

Approve project proposals to develop 5 megawatt (MW) by 31 March 2013

Achieved

Renewable Energy : Kwa- Mashu Biomass to Energy project

Negotiated Management and operational agreement for the Kwa- Mashu biomass to energy plant

Not Achieved The governance process of the project (PPP) is currently in the hands of Ethekwini Metro . Once this process is complete , SANEDI will contribute towards the project

Page 32: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance

Result Reason for non –

achievement of targets

Bela Bela Biogas (Phase 2)

Procurement and implementation

Not Achieved Project is delayed due to non – responsiveness of the service provider

Reticulation of the biogas to the neighbouring community

Not Achieved Project is delayed due to non – responsiveness of the service provider

Phillipi Biogas Project Implementation of the revised interventions

Not Achieved Delayed due to the prioritisation to streamline to streamline learning from the Bio energy cluster project

University of Fort Hare – Renewable Energy Research Facility

Implementation of revised interventions

Achieved

Rehabilitation of the bio- digester for research and development under faculty of science

Achieved

Page 33: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont….

Objective Indicator Target Performance Result Reason for non –

achievement of targets

Melani Village Biogas Project

Implementation of the revised interventions

Not Achieved The contract has been concluded between SANEDI and Fort Cox College. The College is finalising BEE accreditation

Fort Cox Bio energy Project Phase 2

Implementation of the revised interventions , addition of 1 digester , connection of the gas to the kitchen and other facilities for utilisation

Not Achieved The contract has been concluded between SANEDI and Fort Cox College. The College is finalising the BEE accreditation

Mpfuneko Biomass Project Implementation and roll out of community bio- digesters

Not Achieved A contract has been concluded between SANEDI and the service provider – implementation will commence in 2014

Page 34: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance

Result Reason for non – achievement of

targets

Lucingweni Biomass Project

Implementation and rehabilitation of control battery room to become a community early childhood centre retrofitted with energy efficiency and renewable energy technologies

Not Achieved Stakeholder consultation completed and the agreement reached for the establishment of the ECD centre. Community negotiations are on –going with the Nyandeni District Municipality for the joint implementation of the Green ECD Centre

Walter Sisulu University RECORD Establishment

Implementation and re- establishment of the renewable energy facility for rural energy research under the facility of science

Not Achieved Delayed due to the slow response form the University contact persons . A decision has been taken to establish a parallel facility at the Nelson Mandela University

Coal Fuel Tablet (CFT) Implementation and feasibility study using coal dust to produce alternative energy

Not Achieved Project delayed due to non – responsiveness of the service providers .

Working for Energy Outreach programme

Implementation of the outreach programme for the WFE programme

Not Achieved Finalisation of the proposed roll out plan with the Department is still work in progress

Page 35: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont…

Objective Indicator Target Performance Result Reason for non –

achievement of targets

Tshireleco School Renewable Energy Demonstration Centre project

Implementation and establishment of a demonstration centre for renewable energy and energy efficiency under the department of science within the school

Not Achieved The MoA between SANEDI and Tshireleco High School has been finalised – implementation will commence in the first quarter of 2014

Energy Management : Invite tenders , process, assess, approve project proposals

Approved project proposals to deliver 500 kilowatt energy management projects

Partially Achieved The MoA negotiations with the Gauteng department of Infrastructure Development (DID) is in the process for the greening of at least 4 schools. Technology supply tenders will be issued between SANEDI and DID

Page 36: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

ACHIEVEMENTS AS PER APP….cont….

Objective Indicator Target Performance Result Reason for non

– achievement of targets

Applied Research : Energy Efficiency

Integrated public advocacy plan, draft consultation paper in place, coordinate and facilitate implementation and overseeing implementation

Integrated plan developed and submitted to DoE

Achieved

Measurement and verification – integrated on line system developed

Integrated on line system fully operational

Achieved

Demand side energy diversification ; Multi Stakeholder Advisory Group

Advisory Group in place and fully functional

Achieved

Ad hoc project development and technical support : Number of projects proposed

2 projects developed and proposed to the DoE

Achieved

International collaboration : Contributions to international collaboration efforts

Membership and participation in CEM-GSEP activities and IEA 4E Implementing Agreement on behalf of DoE

Achieved

Page 37: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee

The Audit and Risk Committee currently consists of two independent non-executive members.

The Chairperson is a CA(SA) and a CIA (Certified ) Internal Auditor) – Mr Viren Magan

Other member is a registered CA(SA) – Ms Mizeria Nyathi

Regarding independence - Members sign declaration of interests. They are also not involved in daily activities of SANEDI nor do they have any business with SANEDI

Page 38: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee ..cont…

The audit committee has noted that the system of internal controls that is in place needs to be reviewed and improved to ensure that it is appropriate in all material respects to:

‑ reduce risks to an acceptable level;

‑ meet the business objectives;

‑ ensure all assets are adequately safeguarded; and ‑ ensure that transactions undertaken are recorded in the accounting records.

Page 39: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee ...cont…

Internal and external audit provides the audit committee with reasonable assurance that the majority of internal controls are appropriate and effective. This is achieved by means of the risk management process, as well as the identification of corrective actions and suggested enhancements to the controls and processes. From the various reports of the internal and external auditors, the Audit Committee noted that matters which indicated any deficiencies in the system of internal control have been brought under management's attention and corrective measures are being implemented.

Page 40: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee …..cont…

The company implemented a risk management strategy which includes the fraud prevention plan. A formal risk assessment was undertaken for the year ended 31 March 2013 with quarterly reviews, updates and reports. Consequently, internal audit used this data to prepare the 3 year rolling strategic plan and the annual operating audit plan. The risk committee monitored the significant risks faced by the company through reviewing risk reporting and participation in the risk assessment workshop. The Committee is satisfied that significant risks were managed to an acceptable level.

Page 41: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee …..cont…

The Committee acknowledge that the company continues to strive towards complying sound principles of corporate governance. As per our discussions with management, management confirms that the content and quality of monthly and quarterly reports prepared and issued by the Chief Executive Officer during the year under review were properly formulated and have complied with the PFMA in this regard.

Page 42: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee ….cont…

The Committee have: • Reviewed and discussed the audited annual financial statements to

be included in the annual report, with the Auditor‑General of South Africa and the Accounting Officer;

• Reviewed the entity's compliance with legal and regulatory provisions;

• Reviewed the Auditor‑General of South Africa's management report and management's responses thereto;

• Reviewed changes in accounting policies and practices; and • Reviewed significant adjustments resulting from the audit.

 

The Committee concurs and accepts the Auditor‑General of South Africa's (AGSA) report on the annual financial statements, and is of the opinion that the audited financial statements be accepted and read together with the report of the AGSA.

Page 43: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee…..cont…

The following major findings were discussed at the Audit and Risk Committee meeting held on 30 July 2013:

Irregular expenditure on Procurement; this resulted in disclosure in the annual financial statements of R12.6 million.

Fruitless and wasteful expenditure of R0.02 million. A penalty of 5%, amounting to R2,090.18, was raised for late payment of a previous supplier invoices.

Restating of prior year figures due to error identified.

Page 44: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

Audit and Risk Committee ..cont…

The Audit and Risk Committee concluded the following :

Proper Procurement processes need to be put in place. The procurement policy needs to be aligned to prevent; detect and mitigate any fruitless and wasteful; unauthorised and irregular expenditure. 

The revised procurement policy and procedure should also include all recommendations made by AG.  

All staff to undergo training on Procurement process for Schedule 3A public entity. 

The Board will need to condone the irregular expenditure incurred in 2012/13.

Page 45: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Material adjustments made to the financial statements after submission 

Financials  In its establishing business case, SANEDI proposed that a transitional plan be implemented that would see a gradual shift away from the dependence on CEF (SOC) Ltd. An 18 month period was originally envisaged . 

The SANEDI policies and processes will be drafted to specifically include the appropriate processes  to be followed during the  preparation of annual financial statements. Controls should be put in place to ensure proper financial management and reporting lines to be communicated to all staff

The following policies and /or  procedures have been drafted and will be submitted to  EXCO for approval•Journal  Management •Revenue Management •Asset Management •Petty  Cash •Fruitless and wasteful expenditure 

A copy of all contracts and agreements must be submitted to Finance to ensure that the accounting treatment is in terms of the GRAP statements 

Request copies of all contracts from CEF  Legal All draft contracts will be submitted to the CFO office before sending to the CEO for signature 

Page 46: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Incorrect accounting for the Centre for Carbon Capture and Storage  : the assets , liabilities and income  are to be recognised separately with SANEDI showing liability for any funds invested on behalf of CCS 

Financials  SANEDI established SACCCS  as an instrument to house and administer funds and activities on behalf  of donors  and private sector partners.  At no stage , was the Centre intended to be an autonomous  structure outside of SANEDI.  The SANEDI Board on the strength  of a previous recommendation fro m the AG insisted that the annual workplan  be approved by the SANEDI Board as this is the accounting authority responsible for the  budget since neither SACCCS nor its Board of Governance are a legal entity. 

Awaiting the Governance review for SACCCS. 

All procurement over R1m  is sent to the SANEDI Board for approval. Some of the staff costs are paid directly from the SANEDI base allocation from MTEF. 

All procurement above R1m  must be tabled at the SANEDI Board for approval. National  Treasury and AG should be notified 

Unauthorised accumulation of surpluses 

Financials  The surpluses  as well as the contingent liability will be disclosed in the financial statements  and a request will be done to NT to retain the surpluses 

Commitments which relate to the following financial year must be disclosed as Contingent Liability.Application for  surplus funds or accumulated deficits should be sent to NT by 31 May  (together with unaudited financial statements )

Page 47: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

SANEDI specific policies and procedures 

SANEDI entity  SANEDI currently still has a SLA in place with CEF (SOC) Ltd for support services , therefore  the CEF systems , policies and procedures are still being used

The current SLA with CEF needs to be revised. The following services should be housed within SANEDI – Procurement , Finance , Logistics and Facilities, Secretariat and IT 

SANEDI is currently in the process of implementing its own ERP system and the policies and procedures will be drafted during this process to be in line with  PFMA requirements for Schedule 3A public entity and industry best practice 

The ERP implementation is scheduled for 25 November 2013. As the system is tested, the policies and procedures will be amended. 

Assets not in the Assets Register 

Assets  A  reasonableness calculation was submitted to the Auditors taking the opening balances  and any additions and disposals into account.  The balance  was then compared to information in the asset register. The difference between the reasonableness calculation  and the asset register was not material. 

All assets are to be delivered to Logistics  for receipting and then to Finance to barcode before issuing to user.

Assets not bar coded  Assets  There is a control deficiency  identified by management due to the fact that SANEDI was operating using a decentralised process.  SANEDI has now implemented controls to ensure that one line function is responsible for receiving and bar coding assets

All assets are to be delivered to Logistics  for receipting and then to Finance to barcode before issuing to user.

Page 48: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Depreciation of assets bot done according to policy 

Assets  The tangible asset policy used by SANEDI will be  amended to reflect the correct depreciation rates for all assets. This will be submitted to the Board for approval

SANEDI to relook at the Asset Management  policy and ensure depreciation rates  are amended accordingly.  This will be submitted to Board for approval 

SANEDI is currently busy with the implementation of a new ERP system. Busy with the exercise to determine the correct depreciation period  for all assets  as well as the residual life  for assets. . When the exercise is  completed , all amendments to assets will be revised and correcting entries processed before implementation of the  new system

Differences between the fixed assets register and the financial statements 

Assets  The office equipment costs were incorrectly mapped  to the office furniture., hence the difference.  The computer equipment difference  is merely a rounding difference as caseware rounds off to the nearest rand . The IT infrastructure costs  are  for IT software which were purchased  for the new ERP system. The disclosure in the AFS was corrected .

Segregation of duties- Accountant should prepare the financial statements , Finance Manager should review and the CFO must perform the final review 

Page 49: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Appropriate procurement processes not followed : City Square  

Procurement  In its establishing business case , SANEDI proposed that a transitional plan be implemented that would see a gradual shift away from dependence on CEF (SOC) Ltd . An 18 month period was  initially envisaged . Seeing that the budget required to ensure independence from CEF was not secured through the MTEF , a more gradual move away from CEF was required . The business case  that refers to the independence from CEF  and the related transitional plan was approved  by National Treasury.

All SANEDI staff are to undergo training on Supply Chain Management. SANEDI to establish relevant committees as recommended in the PPPFA, namely BEC and BSC. Active interactions with the AG and NT regarding specific procurement matters within SANEDI.

Due to the abovementioned , SANEDI had to acquire premises in close proximity to CEF as we shared telephony, network and other support services. An underground cable serves to connect the two buildings in terms of the network and telephony network.  SANEDI is  highly dependent on CEF  for financial management systems and HR systems as well as Legal, Secretariat, and Internal Audit services. 

Page 50: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Incorrect scoring of bids  Procurement  The  SANEDI policy  does indicate a scoring process  and the requirements of the 80/20  principle for bids below R1m  and the 90/10  principle  for bids over R1m

The revised policy aligned to PPPFA  submitted to EXCO and then Board for approval

A scoring criteria  practice  note is also operationalised . As the bid was not based on commercial scoring only, the base score was not material to the outcome

Incorrect thresholds used when evaluating bids 

Procurement In terms of Practice note 8, entities may use lower thresholds than that stipulated in the Treasury Regulations.  SANEDI therefore took a prudent approach and used lower thresholds as SANEDI is still in its infancy stage as a schedule 3A entity. The Procurement policy was approved by the SANEDI Board.

Limit will remain R200 000.00 until the ERP system is fully operational and procurement irregularities identified, mitigated and prevented

Supplier SBD4’s do not contain correct information- bidders do not supply correct bidding documentation 

Procurement  The SBD 4 document  was attached to Bid  documents as the CEF standard document.  When tenderers  were tested for responsiveness this conflict was not raised.  A SANEDI staff  member acted inappropriately by declaring her knowledge of this company. This SANEDI staff member who has knowledge of this company played no part or influence in the award.

Ensure that the SBD  1-9  documents are aligned to the prescripts of National Treasury Regulations . SBD forms are used as per National Treasury’s guidelines

Page 51: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Errors in request for proposal documentation – Software tender

Procurement  The RFP was issued by CEF Procurement office without being submitted to the Procurement Committee for review.  The use of a base document  and a cut and paste probably  led to the errors in the document which was further exacerbated by the lack of proof reading 

All Bid documents to be tabled before the Procurement Committee for vetting prior to release 

Functionality not used to evaluate Microsoft tender 

Procurement  The Bid Evaluation Committee  as chaired by CEF Procurement erred in this regard as functionality  was determined on limited criteria which was not consistent with the RFP.  The remedial steps as reflected hereunder will prevent recurrence.

Complete bid documents to be  tabled at the Procurement Committee before authority to release is granted.. A standing Bid Evaluation Committee is constituted to ensure consistence.  Members appointed July 2013.

Unfair disqualification of bidders 

Procurement  The Bid Evaluation Committee as chaired by CEF Procurement erred in this regard as functionality was determined on limited criteria., which was  not consistent with the RFP.  It is not fair to expect their Procurement Manager to lead the process with due diligence and procedural correctness

Complete bid documents to be tabled at the Procurement Committee. Before authority  to release is granted.  A  standing bid evaluation is constituted to ensure consistence. 

Information Technology Service  Continuity – Management have nit tested the IT disaster recovery plan 

SANEDI entity  Shortcomings of the current Disaster Recovery Plan were identified and are being addressed . The new plan will be tested by the end of Q3

Need to draft a disaster recovery plan  and business continuity for tabling at EXCO once the ERP system is implemented – Dec 2013 or Jan 2014

Page 52: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Procurement Control Deficiencies 

Procurement The CEF Procurement staff should be competent and current on all matters, Treasury Regulations , practice notes and guidelines irrespective of the different classifications of a schedule 2 or 3 public entity and be able to handle the matters pertaining to the procurement requirements for SANEDI in accordance with the SLA.

CEF no longer involved in SANEDI Procurement. All SANEDI staff to undergo training on Supply Chain Management. SANEDI to establish relevant committees as recommended  in PPPFA, namely the BEC and BSC. Active interactions with the AG and NT regarding specific procurement matters with SANEDI

Bids not evaluated in required time period 

Procurement  Bids will be evaluated within 14 days as per Treasury guidelines 

Bids will be evaluated within 14 days as per Treasury guidelines 

No Bid Adjudication Committee

Procurement  SANEDI is busy building capacity to take over the entire SCM functionality

Operational  1st July 2013 . Enhanced by training sessions and monthly dialogue session.

Delays in awarding of tenders 

Procurement  A Bid Evaluation Committee was constituted although a record of proceedings was not adequate.Procurement process enhancement Development of a template to ensure all relevant information is recorded

BEC appointed 18 July 2013 

Meetings  are now being recorded . Minutes need to be circulated to members and should be signed by the  Chair 

Page 53: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Poor IT controls over tender submission email address 

Procurement The Procurement buying office is outsourced to CEF Procurement under a SLA. It is not fair to expect their Procurement Manager to lead the process with due diligence  and procedural correctness 

As from July 2013 , SANEDI will be responsible for its own buying. A Procurement Officer and a Procurement Manager should be appointed.

Development of a control sheet for all bids to be signed off  by the BSC , ICT, Procurement and the Senior Manager responsible  before tabling at the Procurement Committee and bid documents released 

Only submissions that comply with the required sign offs are considered at the Procom meetings 

Functionality criteria not objective 

Procurement  When purchasing a commercially developed and off the shelf product one needs not specify too deeply for such items. For instance , when wanting to purchase Microsoft office , it would be reasonable to assume that this is the sole developer  and that one would need to specify would be the level of package. 

Complete bid documents to be tabled before the Procurement Committee before authority to release is granted 

Misstatements in the bonus provision 

Provision  Internal Audit checked the calculation  and based  on the outcome adjustments have been processed 

SANEDI Finance to submit bonus  provision calculation to Internal Audit for review before passing entry in financial statements 

Page 54: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Inadequate evidence for performance appraisals 

CEF HR  HR will ensure that senior and line managers are well informed about the performance review policy and their respective monitoring role/responsibility in this regard.  The GM Corporate Services will be the accountable officer in this regard.

All staff to submit quarterly reviews to the Manager : Corporate Services  by 15th of month after expiry of the last quarter.  This will then be submitted to HR. Once SANEDI ha s the ERP system implemented , quarterly reviews will be done electronically and available on the system. 

Provision of receivables understated 

Receivables  The journal for provision  for bad debt for DoE, Alstom and NYSDP was submitted on 3 July 2013 

Debtors outstanding for longer than 60 days are followed up by the Accountant during the year. This should be reported to the FM or the CFO on a quarterly basis.

Interest not levied on long overdue debtors 

Receivables  The nature of  a majority long overdue invoices is in respect of grants, donor funds and  membership fees that SANEDI receives for its operations  and applied research and therefore no interest is charged on this . The debtors management procedure will be updated to include interest  to be charged to other debtors . The nature of the debtors will be specified in the revised SANEDI debtors policy 

The Revenue Management policy drafted will indicate the nature of SANEDI’s debtors  and stipulate the interest clauses for debtors where interest will be applicable 

Page 55: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Creditors reconciliations not done correctly 

Payables  Auditors findings noted . With the implementation of the new ERP system the monthly reconciliations   will be done monthly and not when payments are made only.

The intern and /or creditors clerk will prepare monthly creditor reconciliations and submit to the Accountant for review. Any long outstanding creditors should be followed up by the Accountant.

Accruals are overstated  Payables  Various  Accruals will only be raised for PO’s where the invoice is still outstanding . All other invoices should be raised in AP.

Incorrect accounting for Donor Funding 

Income  The deferred income for SANEDI and Green Transport has been corrected 

All finance staff to attend GRAP training 

No accounting policy for membership fees 

Income  SANEDI will also draft its own Revenue Policy which will include the recognition and measurement criteria for membership fees 

Revenue management policy should address all items of income  for SANEDI 

Page 56: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013

AUDIT FINDINGS AND ACTION PLAN …cont…

AUDIT FINDINGS SUMMARY

COMPONENT MANAGEMENT RESPONSE ACTION PLAN PROPOSED

Interest expense not valid 

Expenses  In terms of the agreements  signed with the third parties it specifically states that any interest accrued on surplus funds must be accounted for in that specified period 

Interest should be accounted for as per the signed agreements 

Expenses not correctly classified 

Expenses  The accounting fees were for an external company to provide assistance  with the SACCCS reporting and were not services provided by CEF in terms of the SLA. The classification between advertising and marketing was corrected 

All items  must be correctly classified. Monthly review by the Accountant of reconciliations will identify  and prevent possible incorrect classification 

Page 57: Presentation to the Parliamentary Portfolio Committee on Energy SANEDI Annual Report 2012/13 MR KM NASSIEP CEO 17 OCTOBER 2013