ASCO POMPE GROUP
![Page 3: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/3.jpg)
who we areYear of establishment: 1954 Employees: 52 (end 2014)
Manufacturing plant: 4,000 m2
ASCO POMPE ENGINEERED SYSTEMSIs a Division of ASCO POMPE srl that provides:Engineering, Procurement and Construction of technical solutions to any dosing or fluid handlings need
![Page 4: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/4.jpg)
What we do
We create tailor made packages and skids,
engineered to customer specifications and
compliant with any international standards
![Page 5: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/5.jpg)
Why choose us
Pump
SKID
• Can choose from any pump vendors (no restriction!)
• Pump portion is only 10 to 15% of skids and packages.
• Remaining 85 to 90% is where we have know-how.
• In-house design of baseplates, tanks, and piping.
• Internal welders and piping fabrication
![Page 6: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/6.jpg)
Range of Production• Chemical Injection Packages
• Sampling Systems
• Methanol Injection Packages
• Odorization Packages
• Solar Power Skids
• Well Head Control Panels & HPU
![Page 7: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/7.jpg)
Markets Followed
• Oil & Gas, offshore & onshore• Petrochemical• Power plant• FPSO• Water Treatment
![Page 8: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/8.jpg)
Asco Worldwide
Sales RepresentativeAuthorized•Spain•Portugal•Egypt•UAE•Kuwait•Oman•Malaysia•Brunei•Vietnam•Japan•Saudi Arabia•South Korea
Coming Soon•USA•Canada•Brazil•Iran
![Page 9: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/9.jpg)
applications
• Injection of additives into pipelines
• Boiler feed water
• MEG injection into well heads
• Water reinjection
• Glycol Injection
![Page 10: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/10.jpg)
Mechanical design
• ASME VIII div.1, ASME IX , R&Y
• API, EN 15614-1
• FEM (Solidworks)
• Dynamic & Static Calculation
• Vibration and Noise Analysis
![Page 11: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/11.jpg)
REFERENCES
![Page 12: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/12.jpg)
CUSTOMER:SMS IMMSE
END USER: SEVERAL
SERVICE: Still mill nozzle
feeding
LOCATION: ITALY
YEAR: 2009
![Page 13: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/13.jpg)
CUSTOMER:Technip
PROJECT:Refinery
SERVICE: additive
injection
LOCATION: Sweden
YEAR: 2010
![Page 14: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/14.jpg)
CUSTOMER:Linde AG
PROJECT: Milazzo Refinery
END USER:ERG
SERVICE: additive
injection
LOCATION: Italy
YEAR: 2010
![Page 15: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/15.jpg)
CUSTOMER:PETROCONST
PROJECT: REFINERY
END USER: OMV PETROM
SERVICE: Methanol Injection
LOCATION: ROMANIA
YEAR: 2010
![Page 16: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/16.jpg)
CUSTOMER: BONATTI
PROJECT:New Utility Water System
END USER: AKAKUS OIL
SERVICE:water relaunching
LOCATION: LYBIA
YEAR: 2010
![Page 17: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/17.jpg)
CUSTOMER:STP
PROJECT:Oil regenaration
END USER: VEOLIA
SERVICE: Oil rerecovery
LOCATION:CANADA
YEAR: 2010
![Page 18: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/18.jpg)
CUSTOMER:REGGIANE Italy
END USER: Daewoo
SERVICE: Water desalination
LOCATION: Lybia
YEAR: 2011
![Page 19: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/19.jpg)
CUSTOMER:SAIPEM
PROJECT:Fertilizer plant
END USER: QAFCO
SERVICE: Fertilizer
LOCATION: QATAR
YEAR: 2011
![Page 20: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/20.jpg)
CUSTOMER:TECNIMONT
PROJECT: JSC Sibur PDH
Tobolsk Polimer Project
END USER: LUKOIL
SERVICE: Chemical Injection
LOCATION: Russia
YEAR: 2011
Design Temperature:-46C
![Page 21: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/21.jpg)
CUSTOMER:BONATTI Italy
END USER: SONATRACH
SERVICE: Water reinjection
LOCATION: ALGERIA
YEAR: 2012
![Page 22: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/22.jpg)
CUSTOMER:OMV
PROJECT:MEHRAB
END USER: OMV PAKISTAN
SERVICE: Corrosion Inhibitor
LOCATION: PAKISTAN
YEAR: 2012Air driven pumps
Tank 18 m3
![Page 23: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/23.jpg)
Chemical injection units FAST TRACK PROJECTDelivery time 3 monthsApplication: Additives injection
Final destination: CongoDim. each: 7000x2500x3500H
Weight each: 4000 KgsMatl’s:AISI 316LAP job ref. VO11-4246
![Page 24: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/24.jpg)
CUSTOMER:TECHNIP
PROJECT:Bourgas Refinery
END USER: LUKOIL NEFTOKIM
SERVICE: Chemical injection
LOCATION: BULGARIA
YEAR: 2013
N.24 skids
![Page 25: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/25.jpg)
CUSTOMER: ILK TURKEY
PROJECT:WEST DIYARBEKIR
END USER: PETRONAS CARIGALI
SERVICE: MEG injection package
LOCATION: TURKMENISTAN
YEAR: 2013
Weight 76 t, lenght 12 m
![Page 26: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/26.jpg)
CUSTOMER: KT
PROJECT:PERM REFINERY
END USER: LUKOIL
SERVICE: MEG injection package
LOCATION: RUSSIA-SIBERIA
YEAR: 2013
![Page 27: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/27.jpg)
CUSTOMER: ILK
PROJECT:GARAGOL
END USER: PETRONAS
SERVICE: WHCP
LOCATION:
TURKMENISTAN
YEAR: 2015
![Page 28: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/28.jpg)
CUSTOMER: KNM
PROCESS & SYSTEMS
PROJECT:GISSAR
END USER: LUKOIL UZB
SERVICE: Chemical Injection
LOCATION: UZBEKISTAN
YEAR: 2014
![Page 29: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/29.jpg)
CUSTOMER: ENPPI
PROJECT:WDDM Phase IX A
END USER: BURULLUS
SERVICE: Chemical Injection pck
LOCATION: EGYPT
YEAR: 2015
![Page 30: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/30.jpg)
CUSTOMER: ABB
END USER: PDO OMAN
SERVICE: SAMPLING SYSTEM
LOCATION: OMAN
YEAR: 2015
![Page 31: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/31.jpg)
Recent updates
TAKREER Approval
![Page 32: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/32.jpg)
Company Name: ASCO POMPE SRLCompany ID: 155506Subscription to SHELL SUPPLIER QUALIFICATION SYSTEM,
SHELL Approval
![Page 33: Presentazione engineered systems 2015 lkd](https://reader035.vdocuments.net/reader035/viewer/2022062711/55c49336bb61ebe70c8b46ab/html5/thumbnails/33.jpg)
Recent updates
PETRONAS licensed