presented by alex moor 15 january 2018 · presentation title 15 january 2018 confidentiality level...
TRANSCRIPT
SMIS+
Presented by Alex Moor15 January 2018
Presentation title 15 January 2018 Confidentiality level
Content
• SMIS+ vision
• New data model
• Data migration
• Combined data model and business intelligence
• New system
• Benefits and applications
• Future roadmap
2
Presentation title 15 January 2018 Confidentiality level
GB rail’s health and safety strategy
3
Next generation reporting systems and risk models
Design for health and safety change management
Exploit new technology
Presentation title 15 January 2018 Confidentiality level
What is SMIS
• The Safety Management Intelligence System (SMIS) replaced the Safety Management Information system (also SMIS) on 6 March 2017
What it does:
• Records safety incidents
• Business process workflows
• Tracks investigations and recommendations
• Automated regulatory reporting to the ORR
• Business intelligence
4
SMIS+ vision
5
Presentation title 15 January 2018 Confidentiality level
SMIS+ vision
Reduce safety risk on the GB mainline railway
• Create a platform on which future developments can more easily be developed
• Better monitoring of safety performance and risk
• SMS functionality, for example routing tasks and integrated risk management
6
Presentation title 15 January 2018 Confidentiality level
The next step in safety performance….
Source: Precursor Indicator Model, RSSB
0
5
10
15
20
25
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
FW
I p
er ye
ar
Infrastructure failures SPADs Infrastructure operations
Level crossings Objects on the line Train operations and failures
Risk to public Risk to workforce
New data model
8
Presentation title 15 January 2018 Confidentiality level
What we’re trying to solve
• Categorisation focussed on the worst thing; rather than the whole event
• Don’t capture all relevant information for understanding risk
• Historical variations in how different risk areas are captured
• Better inform decision makers on risk and emerging issues
9
Presentation title 15 January 2018 Confidentiality level
Sub-events
10
Presentation title 15 January 2018 Confidentiality level
Risk based approach
11
Electrocution
(3rd
rail)
Person on
track Person on
track struck
by train
Trespass
Fall at PTI
Fall between
train and
platformPerson on
platform
struck by train
Person struck
by train doors
Person
trapped in
train doors
Trap and drag
Person
between train
and platform
struck by train
Electrocution
(OHLE)
PTI
Presentation title 15 January 2018 Confidentiality level
Risk based approach
12
Presentation title 15 January 2018 Confidentiality level
Risk based approach
13
Data migration
14
Presentation title 15 January 2018 Confidentiality level
Data migration
15
2.2 millionrecords
30-40 organisati
ons
250-300 users
SMIS
75k records per year
433krecords
100 organisati
ons
2900 users
175k records per year C
lose
call
Presentation title 15 January 2018 Confidentiality level
Data migration
16
15
00
fie
lds
4.4 million objects
2.3 million components
76 types of component
13 types of object
Ch
angin
g data m
od
el
Presentation title 15 January 2018 Confidentiality level
Data migration
17
Combined data model and business intelligence
18
Presentation title 15 January 2018 Confidentiality level
Combined data model
19
Injury
Injured person Physical injury
Person
WorkforceNon-workforce
Rail-journey
Organisation
Train fault
Train location
Axle
Axle box
Bogie
Braking system
Buffer
Cab systems
Communication systems
Coupler
Diesel traction equipment
Electric traction equipment
Electrical equipment
External lights
Fire systems
Freight load
Gearbox or transmission
Other train fault
Radio systems
Suspension
Train door fault
Vehicle structure and
body
Warning horn
Wheels
‘Event chain’
Train
Rail vehicle
Yard, depot or siding
Dangerous goods
Other possible cause
Train door
Train fault formGeneral event
details
Sub-contractors
External system reference
Station
Yard, depot, siding
Train faults structure: SMIS+
Fixed asset data
Sub-event detailSub-event
Objects, assets, injuries etc.
‘Event chain’
General details
Train faults structure: SMIS Fixed asset data
Component detail
Component
Objects, assets, injuries etc.
General details
Safety related defect (train/rail vehicle/
plant machinery etc)
Train - axle failure
rain - buffer locking
Train - door failure/open/on
catch
Train - hot axle box/wheel impact load detections
Train - other safety related
failure
Train - wheel failure
Train - tail lamp unlit/missing
SAFETY_EVENT
COMP_OBJ_LINK
COMPONENT_INVOLVED
OBJECT_INVOLVED
COMPONENT_DVS
PERSONAL_ACCIDENT
SAFETY_RELATED_DEFECT
PERSON_INVOLVED
PERS_INJURY
ORG_EVENT_DATA
NARRATIVE
TRAIN_INVOLVED
WORKFORCE_INVOLVED
RAIL_VEHICLE_INVOLVED
NEW_LOCATION
DANGEROUS_GOODS
CAUSE_INVOLVED
Injury
Injured person Physical injury
Person
WorkforceNon-workforce
Rail-journey
Organisation
Train fault
Train location
Axle
Axle box
Bogie
Braking system
Buffer
Cab systems
Communication systems
Coupler
Diesel traction equipment
Electric traction equipment
Electrical equipment
External lights
Fire systems
Freight load
Gearbox or transmission
Other train fault
Radio systems
Suspension
Train door fault
Vehicle structure and
body
Warning horn
Wheels
‘Event chain’
Train
Rail vehicle
Yard, depot or siding
Dangerous goods
Other possible cause
Train door
Train fault formGeneral event
details
Sub-contractors
External system reference
Station
Yard, depot, siding
Train faults structure: SMIS+
Fixed asset data
Sub-event detailSub-event
Objects, assets, injuries etc.
‘Event chain’
General details
Train faults structure: SMIS Fixed asset data
Component detail
Component
Objects, assets, injuries etc.
General details
Safety related defect (train/rail vehicle/
plant machinery etc)
Train - axle failure
rain - buffer locking
Train - door failure/open/on
catch
Train - hot axle box/wheel impact load detections
Train - other safety related
failure
Train - wheel failure
Train - tail lamp unlit/missing
SAFETY_EVENT
COMP_OBJ_LINK
COMPONENT_INVOLVED
OBJECT_INVOLVED
COMPONENT_DVS
PERSONAL_ACCIDENT
SAFETY_RELATED_DEFECT
PERSON_INVOLVED
PERS_INJURY
ORG_EVENT_DATA
NARRATIVE
TRAIN_INVOLVED
WORKFORCE_INVOLVED
RAIL_VEHICLE_INVOLVED
NEW_LOCATION
DANGEROUS_GOODS
CAUSE_INVOLVED
Presentation title 15 January 2018 Confidentiality level
Architecture
20
External dataDML
Initialmigration
SMISOracle
SIDBOracle
ETLLegacy SMIS model
SMIS
Initial migration
New input modelSMIS
Self-service
RSSB Data WarehousePostgres
Legacy DM
SMIS+ DM
ETL
ETL
Views
Reports
Snapshots
Self-service
New system
21
Presentation title 15 January 2018 Confidentiality level
New interface
22
Presentation title 15 January 2018 Confidentiality level
New workflow
23
Benefits and applications
24
Presentation title 15 January 2018 Confidentiality level
Taking safe decisions
25
Presentation title 15 January 2018 Confidentiality level
Self service reporting
26
Presentation title 15 January 2018 Confidentiality level
Automated monitoring and alerting
27
Presentation title 15 January 2018 Confidentiality level
Filtering automated monitoring
28
measure stat_test
Monthly assault and abuse incidents Warrants investigation
Monthly awkward body movement incidents
Warrants investigation
Monthly congestion or crowding incidents
Warrants investigation
Monthly electric shock incidents Expected observation
Monthly environmental contamination incidents
Warrants investigation
Monthly fire or explosion incidents Warrants investigation
Monthly incorrect usage of level crossing incidents
Expected observation
Monthly intervening in a suicide or self harm event incidents
Warrants investigation
Monthly irregular signal aspect sequence incidents
Expected observation
Future roadmap
29
Presentation title 15 January 2018 Confidentiality level
Linking to existing systems and datasets
30
Operational data(eg train miles)
Asset information(eg maintenance)
Single version of the truth
Cost savings (single input)
Greater understanding of risk
Existing safety Event systems
SMIS
Presentation title 15 January 2018 Confidentiality level
Integrated bow-ties and risk management
31
Control A1Threat A Event A Barrier AConsequence
A
Control BThreat B Event B Barrier BConsequence
B
Standard
200 10 3 1
Standard
AuditAudit
2 / 17 / 3170 / 30
Control A2
20 / 10
X% fail rate Emerging risk
Presentation title 15 January 2018 Confidentiality level
Integrated bow-ties and risk management
32
System alerts level crossing manager
Audit
Maintenance cycle at this level crossing over one year prior
Unusually high number of near miss events at level crossings with last maintenance over one year prior
Presentation title 15 January 2018 Confidentiality level
Additional benefits
33
• Enables future development to incorporate more strategic elements of risk management, including:
• Training and competence
• Audit and Inspections
• Improvement planning
• Compliance to Group Standards
• Document Management
Presentation title 15 January 2018 Confidentiality level
More information…
You can also talk to us, or drop us a line at [email protected]
Thank you