presented by: ken imler sr. vice president raqa arrow international working with suppliers: forming...

29
Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve Supplier Performance

Upload: estella-harrison

Post on 02-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

Presented by:Ken Imler

Sr. Vice President RAQAArrow International

Working with Suppliers:Forming Strategic Alliances to

Accelerate Compliance & Improve Supplier Performance

Page 2: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

2

Page 3: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

3

An Integrated Approach of

Risk Management

Project Management

Page 4: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

4

Suppliers are strategic partners in your ultimate success (or failure).

Page 5: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

5

• Suppliers must understand and meet not just your product or service requirements.– Products and processes – How their parts of services impact these

• They must understand and meet your business requirements.– How they add value– How they impact you ability to do business

Page 6: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

6

• In an FDA, ISO,CMDRAS, PAL, etc. regulated environment, you are responsible for establishing, monitoring and maintaining an adequate level of control over all suppliers and the materials and services they supply.

Page 7: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

7

QUALIFYSUPPLIERS

FEEDBACKTO SUPPLIERS

MONITORSUPPLIERS

SELECTSUPPLIERS

Supplier

Effectiv

e

SupplierIneffective

Most organizations look at Supply Chain Management in this manner.

Page 8: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

8

SELECT & QUALIFY SUPPLIERS

FEEDBACKTO SUPPLIERS MANAGE RISK

& SUPPLIERS

IDENTIFYPOTENTIAL

RISKS

Risk

acceptable

RiskUnacceptable

World-class organizations modify the process

Design Control& Specifications

ProductPerformance& Complaints

QFD & Involvement

Lean -Six SigmaRisk Management

Page 9: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

9

• You must understand and manage the risks involved and demonstrate the appropriate level of controls necessary to assure, to a high degree of confidence that the products, devices and services provided meet their predetermined specifications and requirements.

Page 10: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

10

• You must also understand and manage the process and business risks associated with the Supply Chain; to make the process effective, efficient and value added.

Page 11: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

11

• Risk Based Supply Chain Management– Starts with a cross functional team– Starts in the design and development process– Use a basic FMEA-type approach - Define:

• Process steps• Potential failure modes• Potential effects• Potential causes• Detection/Modes of control• Total Risk

Page 12: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

12

Get the potential suppliers involved in the process, up front.

Page 13: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

13

Occurrence

Sev

erit

ySafety

Qu

alit

y

Regulatory

Bu

siness

Page 14: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

14

Process Step Potential

Failure

S Potential Effect

Potential Cause

P Detection/Mode of Control

RPN

Selection

Qualification

Monitoring

Feedback

FMEA Table

Page 15: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

15

Process Step Potential

Failure

S

1-5Potential

EffectPotential

CauseP

1-5Detection/Mode of Control

RPN

Selection Select ineffective supplier

4-5 Bad components

Ineffective supplier

2 Supplier Audit

First Article Inspection

8-10

Qualification Underestimate capabilities

3-4 Inadequate quantities

Supplier capability underestimated

2-3 Supplier Audit

On site engineer

6-12

Monitoring Poor performance

3 Continued receipt of wrong/bad components

Inadequate purchasing data

2-3 Establish correct data/metrics

6-9

Feedback No link to CAPA 3 No improvement

No communication with supplier

3 Monthly feedback reports and communication

9

FMEA Table

Page 16: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

16

Occurrence

Sev

erit

ySafety

Bu

siness

Highest levelof Management

& Control

Lowest levelof Management

& Control

Safety

Qu

alit

y

Regulatory

Bu

siness

Page 17: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

17

Risk Category Potential

Failure

S Potential Effect

Potential Cause

P Detection/Mode of Control

RPN

Safety Performance or functional failure

5 Harm to patient

User or mfg personnel

Faulty design

Mfg errors

1-2 Inspection and/or testing

5-10

Quality

Reliability

Out of box failure

Rework or scrap

3-4 Unable to use

Back orders

Low yields

Faulty design

Mfg errors

3 Design validations

Inspection and testing

9-12

Regulatory Lack of proper 510 k, PMA, CE certificate or PAL

2-3 Need new submission

Lack of Understanding of regulations

3 Submission Review

Supplier Audit

6-9

Business Lack of detail in contract/agreement

3 Increased cost, schedule and/or resources

Inefficient mfg, standards or documentation

4 Supplier Audit

Supplier monitoring

12

FMEA Table

Page 18: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

18

• It is about strategic Management of the Supplier and the entire Supply Chain integrated with management of strategic suppliers

• It is not just monitoring the deliveries, AQLs and PPVs.

• Link strategic suppliers into your quality system

Page 19: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

19

• More traditional Risk Based methods to manage to and control the supply chain include:– Audits– Certificates of Analysis– Inspection and Testing at the supplier– Inspection and testing in-house

• First Article Inspections• Increased sampling

– Inspection and testing by a third party– Technical presence on site at the supplier

Page 20: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

20

• Think more holistically …

• Supply Chain Management starts in development and extends through the product life cycle.

Page 21: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

21

• Project Management is the other activity vital to the success of Supply Chain Management.

Page 22: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

22

• Project Management establishes a strategic plan that specifically identifies:– Activities– Deliverables– Roles and Responsibilities– Schedules and Milestones

• Remember to get the suppliers involved in the beginning.

Page 23: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

23

• Supply Chain Projects must:– Be prioritized by management– Have adequate resources allocated and

assigned to the project– Have a real project manager– Have a budget– Have goals and metrics– Have management oversight

Page 24: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

24

• Supply Chain Management as a strategic Project is most effectively managed by PURCHASING.

• Team members include:– The Supplier(s)– Quality Assurance– Product Development– Sustaining/Manufacturing Engineering– IT– Others as deemed necessary by the team

Page 25: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

25

Summary

• Integrate risk and project management.

• Together they create synergies that can be extremely effective and efficient.

Page 26: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

26

Summary• Use risk management to understand and

manage the Supply Chain.• Use project management to strategically apply

the appropriate level of control in supplier– Selection,– Qualification,– Monitoring and control.

• Provide objective evidence.

Page 27: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

27

Summary• Get the suppliers involved and engaged,• Keep the suppliers involved and engaged.• Apply state of the art quality, purchasing and

business tools to the process.

Page 28: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

28

In Conclusion

EARLY ENOUGH and GOOD ENOUGH

… NEVER ARE

Page 29: Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve

ASQ Biomedical ConferenceManufacturing Compliance

For Medical Devices

29

Questions