October 2011Completing a Project –Cradle to Grave
Completing a Project –Cradle to Grave
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding• Construction• Close-out
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding• Construction• Close-out
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding • Construction• Close-out
• Preliminary Engineering Report (PER)Technical presentation (alternatives
analysis)Environmental evaluationFinancial presentationProject management and implementationResource and citizen benefit
Planning
• Alternatives analysisRenewable resource benefitCost effectivenessReliabilityEnvironmental impactOperational ease
Planning
• Planning Grants - Department of Natural Resource Conservation (DNRC)Call DNRC Renewable Resource Grant and
Loan (RRGL) ProgramApply for planning grantHire EngineerPrepare Preliminary Engineering Report
(PER)Submit (PER) for RRGL grantPlanning grant (2011)/RRGL grant (2013)
Planning
• How to hire an engineerDistrict vs. Companyif fees > $20,000, then MCA MCA Title 18.8.Part 2 – Procurement of
ServicesMCA Title 7.1.2121 – Publication and
content of notice
Planning
• How to hire an engineer http://www.map-inc.org/pdf/HowtoHireanEngineer-0207.pdf
Planning
• Engineer’s teamSurveyEnvironmentalDraftingGeotechnicalCulturalGrant writer
• OwnerLegalInsurance
Planning
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding • Construction• Close-out
• Preferred alternative from PER• Design calculations and
documentation• Preliminary drawings and
specifications• Funding/grants in place
Preliminary Design
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding • Construction• Close-out
• Talk to your engineer• Reference environmental evaluation in
PER• Call agencies• Examples:
MPDES (Erosion)Section 404 (USACE)FloodplainNavigable Rivers (DNRC)
Permitting
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction
Documents• Bidding • Construction• Close-out
• Final drawings• Technical specifications• Review package
Engineer’s quality assurance reviewOwnerRegulatory agenciesPermitting agencies
Final Design – Construction Documents
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding • Construction• Close-out
• Front-EndInvitation to bidBid formOwner – contractor agreementGeneral conditionsSpecial provisions Misc. forms
Notice of awardNotice to proceed
Bidding
• State procurement rulesIf bid >$75,000, then MCAMCA title 18.2.Part 3 – Contract
Requirements and RestrictionsMCA Title 7.1.2121 – Publication and
content of notice
Bidding
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding • Construction• Close-out
• Resident Project RepresentativeConstruction diary
• Payment applications• Requests for information• Shop drawings• Close-out
Construction
Overview
• Project Need• Planning• Preliminary Design• Permitting • Final Design/Construction Documents• Bidding • Construction• Close-out