INSPECTION REPORT For the Property at: 120 PARADISE DRIVE FLORENCE, SC 29501 Prepared for: HAPPY HOME BUYER, % THE BEST REALTORS Inspection Date: Monday, February 14, 2011 Prepared by: TOM ROBERTSON EXPERTISE UNLIMITED, INC. 2304 TIMBERLANE DRIVE FLORENCE, SC 29506 843-407-5281 843-669-2940 Fax: 843-229-6400 CELL

Upload: expertise44

Post on 12-Jan-2015

295 views

Category:

Business


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Preview inspectionfull

INSPECTION REPORT

For the Property at:

120 PARADISE DRIVEFLORENCE, SC 29501

Prepared for: HAPPY HOME BUYER, % THE BEST REALTORSInspection Date: Monday, February 14, 2011

Prepared by: TOM ROBERTSON

EXPERTISE UNLIMITED, INC.2304 TIMBERLANE DRIVE

FLORENCE, SC 29506843-407-5281843-669-2940

Fax: 843-229-6400 CELL

Page 2: Preview inspectionfull

February 19, 2011

Dear HAPPY HOME BUYER, % THE BEST REALTORS,

RE: Report No. 2448, v.2120 PARADISE DRIVEFLORENCE, SC29501

At your request a visual inspection of the above referenced property was conducted. This inspection report reflects thevisual conditions of the property at the time of the inspections only. Hidden or concealed defects cannot be included inthis report. No warranty is either expressed or implied. This report is not an insurance policy, nor a warranty service.NOTE: SEE SHORT SLIDE PRESENTATION IN SEPARATE E-MAIL SHOWING SOME ITEMS LISTED IN THERECOMMENDATION SECTION OF THE HOME INSPECTION REPORT.An earnest effort was made on your behalf to discover all visible defects, however, in the event of an oversight, maximumliability must be limited to the fee paid. The following is an opinion report, expressed as a result of the inspection.Please take time to review limitations contained in the inspection agreement. Your inspector is a home inspectiongeneralist and is not acting as a specialist, licensed engineer or expert in any specific trade or craft. The inspection is nottechnically exhaustive and is not a substitute for obtaining specialized evaluation of any particular component, unit, orfeature of the structure, nor is it a home warranty, guarantee, insurance policy, or substitute for a statutory propertydisclosure form. PLEASE REVIEW THE FULL INSPECTION REPORT.REPORT SUMMARY:Overall, the home appears to be constructed in a workmanlike manner, consistent with the local building methods ineffect at the time of construction. However in accordance with prevailing local real estate purchase agreements, theitems listed in the report needing service, repair and/ or further evaluation are recommended to be addressed or furtherevaluated.Some of these items may likely require further evaluation and repair by proper licensed contractor. Other minor itemsare also noted in the following report and should receive attention, but none of them appear to affect the habitability ofthe house. The majority are the result of normal construction process and normal use. Some cosmetic items are notincluded in report or summary.Thank you for selecting EXPERTISE UNLIMITED, INC. to do your HOME inspection. If you have any questionsregarding the inspection report or the home, please feel free to call us.

Sincerely,TOM ROBERTSON

Sincerely,

TOM ROBERTSONon behalf ofEXPERTISE UNLIMITED, INC.

Page 3: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011

EXPERTISE UNLIMITED, INC.2304 TIMBERLANE DRIVE

FLORENCE, SC 29506843-407-5281

843-229-6400 CELLFax: 843-669-2940

Page 4: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INSPECTION AGREEMENT

PARTIES TO THE AGREEMENT

CompanyEXPERTISE UNLIMITED, INC.2304 TIMBERLANE DRIVEFLORENCE, SC 29506

ClientHAPPY HOME BUYER, % THEBEST REALTORS

This is an agreement between HAPPY HOME BUYER, % THE BEST REALTORS and EXPERTISE UNLIMITED, INC..

EXPERTISE UNLIMITED, INC., 2304 TIMBERLANE DRIVE, FLORENCE. S.C. 29506

Home Inspection Agreement INSPECTION COST $. Between Tom M. Robertson, Expertise Unlimited, Inc (Hereinafter "INSPECTOR") and the undersigned (hereinafter"CLIENT"), collectively referred to herein as "the parties." The Parties Understand and Voluntarily Agree as follows:I. INSPECTOR agrees to perform a visual inspection of the home/building and to provide CLIENT with a writteninspection report identifying the defects that INSPECTOR both observed and deemed material. INSPECTOR may offercomments as a courtesy, but these comments will not comprise the bargained-for report. The report is onlysupplementary to the seller's disclosure.2. Unless otherwise inconsistent with this Agreement or not possible, INSPECTOR agrees to perform the inspection inaccordance to the currentStandards of Practice of the National Association of Certified Home Inspectors posted at click here and/or the Standardsof Practice of The American Society of Home Inspectors click here CLIENT understands that these standards containcertain limitations, exceptions, and exclusions.3. The inspection and report are performed and prepared for the use of CLIENT, who MAY GIVE INSPECTORpermission to discuss observations with real estate agents, owners, repair persons, and other interested parties.INSPECTOR accepts no responsibility for use or misinterpretation by third parties.INSPECTOR'S inspection of the property and the accompanying report are in no way intended to be a guarantee orwarranty, express or implied, regarding the future use, operability, habitability or suitability of the home/building or itscomponents. Any and all warranties express or implied, including warranties of merchantability and fitness for a particularpurpose, are expressly excluded by this Agreement.4. INSPECTOR assumes no liability for the cost of repair or replacement of unreported defects or deficiencies eithercurrent or arising in the future if it is determined the items were not accessible for inspection.CLIENT waives any claim for consequential, exemplary, special or incidental damages or for the loss of the use of thehome/buildingif the CLIENT has been advised of the possibility of such damages. The parties acknowledge that the liquidateddamages are not intended as a penalty but are intended (I) to reflect the fact that actual damages may be difficult andimpractical to ascertain; (II) to allocate risk among the INSPECTOR and CLIENT; and (III) to enable the INSPECTOR toperform the inspection at the stated fee.5. INSPECTOR does not perform engineering, architectural, or any other job function requiring an occupational license inthe jurisdiction where the inspection is taking place, unless the inspector holds a valid occupational license, in which casehe/she may inform the CLIENT that he is so licensed, and is therefore qualified to go beyond this basic home inspection,and for additional fee, perform additional inspections beyond those within the scope of the basic home inspection. Anyagreement for such additional inspections shall be in a separate writing or noted here:6. In the event of a claim against INSPECTOR, CLIENT agrees to supply INSPECTOR with the following: (I) Writtennotification of adverse conditions within 14 days of discovery, and (2) Access to the premises. Failure to comply with the

Report No. 2448, v.2

Page 5: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INSPECTION AGREEMENT

above conditions will release INSPECTOR and its agents from any and all obligations or liability of any kind.7. The parties agree that any litigation arising out of this Agreement shall be filed only in the Court having jurisdiction inthe County in which the INSPECTOR has its principal place of business. In the event that CLIENT fails to prove anyadverse claims against INSPECTOR in a court of law, CLIENT agrees to pay all legal costs, expenses and fees ofINSPECTOR in defending said claims.8. If any court declares any provision of this Agreement invalid or unenforceable, the remaining provisions will remain ineffect. This Agreement represents the entire agreement between the parties. All prior communications are merged intothis Agreement, and there are no terms or conditions other than those set forth herein. No statement or promise ofINSPECTOR or its agents shall be binding unless reduced to writing and signed by INSPECTOR. No change ormodification shall be enforceable against any party unless such change or modification is in writing and signed by theparties. This Agreement shall be binding upon and enforceable by the parties and their heirs, executors, administrators,successors and assignees. CLIENT shall have no cause of action against INSPECTOR after one year from the date ofthe inspection.9. The maximum liability the inspector has to the Client is the cost of the inspection.10. Payment of the fee to INSPECTOR (less any deposit noted above) is due at or before the time of closing. If the homeis not closed within 45 days from the inspection date the full fee is due on the 45th day. Credit card payment is acceptedby Expertise Unlimited, Inc. for an additional fee of $15.00 .The CLIENT agrees to pay all legal and time expenses incurred in collecting due payments, including attorney's fees, ifany. If CLIENT is a corporation, LLC, or similar entity, the person signing this Agreement on behalf of such entity doespersonally guaranty payment of the fee by the entity.CLIENT HAS CAREFULLY READ THE FOREGOING, AGREES TO IT, AND ACKNOWLEDGES RECEIPT OF A COPYOF THIS AGREEMENT

_________________________ _______________________________________________Tom M. Robertson, Inspector CLIENT OR REPRESENTATIVEExpertise Unlimited, Inc. Printed Name, and address:_____________________________________________________________

_______________________________

E-mail address: _____________________________________

I, HAPPY HOME BUYER, % THE BEST REALTORS (Signature)___________________________,(Date)_______________, have read, understood and accepted the terms of this agreement.

Report No. 2448, v.2

Page 6: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011REPORT SUMMARY- ITEMS OF MOST CONCERN

Thank you for the privilege of helping you with your home purchase.Potentially significant items, or immediate safety issues over the short term are identified in the summary section. Thissummary must not be considered as the complete report. The full report may include items the buyer may request to beaddressed, other text and reference material and other items that the buyer should be aware of are included in the fullreport.

Structure

FOUNDATIONS \ FoundationCondition: Newer type sealed or encapsulated crawlspace system observed.Location: Crawl SpaceTask: Request disclosure from the seller as to operation and maintenance of the system. Confirm that the Termitecontrol company holding the bond is satisfied with the system.

Insulation and Ventilation

FLOORS \ Floors over unheated areasCondition: No floor insulation observed.Only floor system insulation observed is at the perimeter of the crawlspace.Location: Crawl SpaceTask: Request disclosure- confirm that this is as recommended for the sealed or encapsulated crawlspace system used.

Plumbing

FIXTURES AND FAUCETS \ ToiletCondition: Toilets not sealed at floor connections. This is NOW recommended to improve ease of cleaning and othersanitary reasons.NOTE: Not enforced in this area by local authority having jurisdiction.Location: Various BathroomTask: Improve

Report No. 2448, v.2

Page 1 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 7: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011REPORT SUMMARY- ITEMS OF MOST CONCERN

1. 

Interior

DOORS \ HardwareCondition: Garage man door into home and rear screen door need minor adjustment at hardware side entrance doesnot have a door stop.Location: VariousTask: Improve

2.  3. 

Report No. 2448, v.2

Page 2 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 8: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011REPORT SUMMARY- ITEMS OF MOST CONCERN

4. 

GARAGE \ Vehicle door operatorsCondition: Adjustment needed to open or close limitsThe pressure return activation load appears to exceed the recommend 60 lbs. at garage doors. Warning label for garagedoor operators observed near wall controls but not on garage doors.Implication(s): Equipment not operating properlyLocation: GarageTask: Improve- adjustments recommended.- maintenance type item. Safety concern. Proper warning labelsrecommended.

5. 

The following rating reflects both the original quality of construction and the current condition of the home, based on acomparison to similar homes:VERY GOOD BASE ON ITEMS THAT ARE ACCESSIBLE FOR OBSERVATION. THE HOME APPEARS TO BESTABLE AND FUNCTIONAL. THE HOME APPEARS TO HAVE BEEN CONSTRUCTED USING MEANS AND

Report No. 2448, v.2

Page 3 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 9: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011REPORT SUMMARY- ITEMS OF MOST CONCERN

METHODS IN COMMON USE IN THIS AREA AT THIS TIME WITH SOME FEATURES WELL ABOVE THE NORMAL.SEVERAL ITEMS APPEARS TO NEED SOME VERY MINOR REPAIRS, AND/ OR POSSIBLE FURTHEREVALUATION. Review the full inspection report for other items that may be of concern to the buyer. SOME ITEMSNOTED IN THE REPORT MAY NOT BE ENFORCED IN THIS AREA AT THIS TIME BUT ARE INCLUDED FORCONSIDERATION BY THE BUYER FOR SAFETY AND FUNCTIONAL IMPROVEMENTS.

This is the end of the REPORT SUMMARY section. The remainder of the report deals with individual systems in moredetail. Please read each section carefully as some items the buyer may request be addressed are included in the fullreport..

Report No. 2448, v.2

Page 4 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 10: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011ROOFING

Description

Sloped roofing material: No signs of active leaks observed. Recommend the buyers insurance company certifycoverage of roofing in present condition. Architectural type shingles observed. Flashing areas at roof appear to befunctional. Hip type roof. Gable Roof

Sloped roofing material:Composition shingles

6. 

Limitations

General: Although the shingles appears to be stable and functional, it is noted that underlayment, nailing pattern andlocation can not be determined without intrusive inspection.

Report No. 2448, v.2

Page 5 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 11: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011EXTERIOR

Description

General: Functional 3 car garage observed at left end front of the home.

7. 

General: Concrete slab at left rear yard exposed anchor bolts could be a trip hazard.

8. 

Report No. 2448, v.2

Page 6 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 12: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011EXTERIOR

General: Covered side entrance.

9. 

General: Concrete drive and walks appear to be functional with normal minor weathering and cracks observed.

10. 

General: Some planting and ground cover observed.

Report No. 2448, v.2

Page 7 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 13: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011EXTERIOR

11. 

General: Signs of a yard sprinkler system observed. Function not checked. Recommend the seller be consulted as tooperation, condition, and location it sprinkler system items.

12. 

General: Covered front entrance area observed.

Report No. 2448, v.2

Page 8 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 14: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011EXTERIOR

13. 

General: A functional sprinkler system observed. Controls in garage.Note: Appears to be off for winter weather.

General: Covered rear porch observed.Note: Screen type porch. Appears to be functional.

14. 

Report No. 2448, v.2

Page 9 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 15: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011EXTERIOR

Gutter & downspout material: None observed.

Lot slope: Some storm water may stand at yard areas for a time during and after rain,

Wall surfaces - masonry: Vinyl and metal trim observed.

Wall surfaces - masonry: Brick

Wall surfaces : Cementous siding

Driveway: Concrete No performance issues were noted.

Walkway: Concrete No performance issues were noted.

Exterior steps: Hand rails observed at steps.

Exterior steps: Brick

Report No. 2448, v.2

Page 10 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 16: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011STRUCTURE

Description

Configuration: Crawlspace dry at the time of inspection.

Configuration:Crawl space

Newer type sealed or encapsulated crawlspace observed. Exhaust fan system observed in crawlspace. No source ofmakeup air observed.

15.  16. Slab-on-grade

at garage areas. Garage floor has been sealed.Piers

17. 

Report No. 2448, v.2

Page 11 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 17: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011STRUCTURE

Foundation material: Sealed type crawlspace observed. Crawlspace access by metal panel at left end foundationwall. Crawlspace access by metal panel at right end foundation wall.

Foundation material: Poured concrete Masonry block Brick

Floor construction: Recommend the CL-100 (Termite) report be consulted for additional information aboutcrawlspace conditions and recommendations. Joist and sills.

Floor construction: Subfloor - OSB (Oriented Strand Board)

Exterior wall construction: Wood frame Wood frame, brick veneer

Roof and ceiling framing: Attic bracing observed.

18. 

Roof and ceiling framing: Some floored storage area observed in attic.

19. 

Report No. 2448, v.2

Page 12 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 18: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011STRUCTURE

Roof and ceiling framing: Lower Attic access by wall panels at several areas at second floor.

Roof and ceiling framing: Attic access by door off second floor hall.

Roof and ceiling framing: Attic access by doors and/ or panels off second floor areas.

Roof and ceiling framing: Rafter ties observed.

Roof and ceiling framing: Rafters/roof joists OSB (Oriented Strand Board) sheathing

Limitations

Inspection limited/prevented by: no access to wall framing systems. Some areas of attic not accessible due totype construction. Furnishings and floor coverings. Below grade areas at foundation.

Inspection limited/prevented by: Storage Insulation

Recommendations

FOUNDATIONS \ Foundation1. Condition: Newer type sealed or encapsulated crawlspace system observed.Location: Crawl SpaceTask: Request disclosure from the seller as to operation and maintenance of the system. Confirm that the Termitecontrol company holding the bond is satisfied with the system.

Report No. 2448, v.2

Page 13 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 19: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011ELECTRICAL

Description

Service entrance cable and location: Underground aluminum

Service size: 400 Amps (240 Volts)

Main disconnect/service box rating:200 Amps

2 disconnect panels observed at the electrical service entrance located at the right end of the home.

20. 

Main disconnect/service box type and location: Breakers -exterior wall

System grounding material and type: metal ground rod

Distribution panel rating: 200 Amps

Distribution panel type and location: Breakers located in laundry room wall.

Report No. 2448, v.2

Page 14 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 20: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011ELECTRICAL

21. 

Distribution wire material and type: Copper - non-metallic sheathed

Type and number of outlets (receptacles): Random outlets checked.

Type and number of outlets (receptacles): Grounded - typical

Circuit interrupters: Ground Fault (GFCI) & Arc Fault (AFCI): GFCI - bathroom GFCI - outside GFCI - panel GFCI - whirlpool GFCI - garage GFCI - kitchen AFCI - panel AFCI - bedroom

Smoke detectors: A functional alarm system observed. Recommend the seller be consulted as to condition andoperation of system.

22. 

Report No. 2448, v.2

Page 15 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 21: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011ELECTRICAL

Smoke detectors: Speaker system with controls observed.

Smoke detectors: Phone and TV outlets observed.

Smoke detectors: Present

Report No. 2448, v.2

Page 16 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 22: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011HEATING

Description

Fuel/energy source:Gas

For fireplace, cook top, and water heater.Electricity

System type: 1 Package and one split heat pump type systems located at right end exterior.Note: Interior air handler for split system for second floor located in upper attic area. Systems appeared to functionproperly in heat mode at the time of inspection.

23.  24. 

25. 

Report No. 2448, v.2

Page 17 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 23: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011HEATING

Approximate capacity: 90M to 100M BTUs each estimated.

Efficiency: Mid-efficiency

Approximate age:1 year

+/- in operation.

Failure probability: Low

Main fuel shut off at:Meter

located at the right side exterior of the home. Secondary cut offs observed at water heater and gas logs.

26. 

Temperature difference: 35°

Fireplace:Gas logs

at rear screen porch fire box. No chimney. Logs functional at the time of inspection.

Report No. 2448, v.2

Page 18 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 24: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011HEATING

27. 

Factory-builtfor family room fireplace. No logs installed at interior fireplace. For vent free gas logs only.

28. 

Report No. 2448, v.2

Page 19 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 25: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011COOLING & HEAT PUMP

Description

General: Duct system located in crawlspace.

29. 

General: Duct system located in attic area. Appeared to be functional at time of inspection.

30. 

Report No. 2448, v.2

Page 20 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 26: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011COOLING & HEAT PUMP

General: Air handler located in attic area. Has catch pan, overflow cut off and condensation drain lines.

Heat pump type: Air source

Manufacturer: Bryant

Cooling capacity: 3 ton +/-.Note: at the split system.

Cooling capacity: 5+/- tons.Note: at the package system

Compressor approximate age:1 year

+/- in service.

Failure probability:Low

Based on operation of the systems in the heat mode only.

Temperature difference: Thermostats appeared to be functional.

Return air filters installed and clean at time of inspection.

31.  32. 

Limitations

Inspection limited/prevented by: Low outdoor temperature

Report No. 2448, v.2

Page 21 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 27: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INSULATION AND VENTILATION

Description

Attic/roof insulation material: Loose blown type.

33. 

Attic/roof insulation material: Some areas of batt insulation observed in attic area.

Attic/roof insulation amount/value: Appears to be as now recommended at ceiling areas in attic.

Attic/roof ventilation: Soffit vent Gable vent Ridge vent

Wall insulation material: Exterior wall probed at electrical outlet. Insulation present.

34. 

Report No. 2448, v.2

Page 22 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 28: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INSULATION AND VENTILATION

Wall insulation amount/value: Spot checked only

Floor above crawlspace insulation material:Glass fiber

At perimeter of crawlspace only.

Crawlspace ventilation: Sealed type crawlspace. Recommend the seller be consulted as to type and maintenancerecommended for this type crawlspace.

Air/vapor barrier:Plastic

Appears to be newer type sealed crawlspace.

35. 

Recommendations

FLOORS \ Floors over unheated areas2. Condition: No floor insulation observed.Only floor system insulation observed is at the perimeter of the crawlspace.Location: Crawl SpaceTask: Request disclosure- confirm that this is as recommended for the sealed or encapsulated crawlspace system used.

Report No. 2448, v.2

Page 23 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 29: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011PLUMBING

Description

General: The bath areas appear to be functional. No signs of active leaks observed at time of inspection.

General: A functional whirlpool tub observed.

36.  37. 

General: Bath vent fans functional at time of inspection. Piping to vented areas observed at some bath vent fans.Note: Appear to be piped to vented areas in the soffit.

38. 

Report No. 2448, v.2

Page 24 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 30: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011PLUMBING

Water supply source: Public

Service piping into building: Plastic

Supply piping in building:Plastic

39. 

Main water shut off valve at the: Located at the front lot line area.Note: near center.

Main water shut off valve at the: Meter

Water flow (pressure): Functional

Water heater fuel/energy source: Newer type instant gas water heater located at the right end exterior of the home.Note: Control thermostat for water heater located in hall closet near master bedroom.

40.  41. 

Report No. 2448, v.2

Page 25 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 31: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011PLUMBING

Water heater fuel/energy source: Gas

Water heater type: Tankless/indirect

Tank capacity: adequate for home.

Water heater approximate age:1 year

+/- in service

Water heater failure probability: Low

Waste disposal system: Public

Waste piping in building:Plastic

42. 

Recommendations

FIXTURES AND FAUCETS \ Toilet3. Condition: Toilets not sealed at floor connections. This is NOW recommended to improve ease of cleaning andother sanitary reasons.NOTE: Not enforced in this area by local authority having jurisdiction.Location: Various BathroomTask: Improve

Report No. 2448, v.2

Page 26 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 32: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011PLUMBING

43. 

Report No. 2448, v.2

Page 27 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 33: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

Description

General: Interior finishes appear to be functional with minor finish flaws observed.

Recommend the buyer compile a list of cosmetic items of concern.Note: Some typical items pictured. Item appear to be typical and minor.

44.  45. 

46.  47. 

Report No. 2448, v.2

Page 28 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 34: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

48. 

General: No testing for mold or other toxic items included in this inspection. See information in contract for additionalrecommendations about possible toxic items.

Major floor finishes: Interior doors appear to be functional with minor use and finish flaws observed.

Major floor finishes: Hard Tile

Major floor finishes: Interior stairs and hand rails.

49. 

Report No. 2448, v.2

Page 29 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 35: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

Major floor finishes: Carpet Hardwood

Major wall finishes: drywall type.

Major ceiling finishes: Dry wall type.

Windows: Vinyl windows observed.

Windows: No screens installed.

Windows: Single hung type

Windows: Sky lightsNote: None observed.

Windows: Fixed

Glazing: Vacuum seals appear to be intact at this time.

Glazing: Double

Exterior doors - type/material: Garage from home to garage appears to be proper fire rated type.

50. 

Exterior doors - type/material: Garage door, automatic operator and safety returns functional at time of inspection.

Exterior doors - type/material:HingedFrenchWood

at jamb and trim areas.MetalGarage door - metal

Report No. 2448, v.2

Page 30 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 36: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

Oven type: Conventional Convection

Oven fuel: Electricity

Range fuel: Gas

Appliances: Appliances appeared to be functional at time of inspection.

Appliances: Functional stainless steel sink and hand held spray observed.

Appliances: Functional bar sink area observed.

51. 

Appliances: Ice maker connection observed.

Appliances: Slide in type range.

Appliances: Functional laundry sink observed.

Appliances: Pictures of appliances

Report No. 2448, v.2

Page 31 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 37: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

52.  53. 

Appliances: Cabinets appear to be factory or shop built type.

Appliances: Granite type kitchen counter tops.

Appliances:RefrigeratorRange hood

Up draft venting

54. 

DishwasherWaste disposal

Report No. 2448, v.2

Page 32 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 38: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

Central vacuum

55. 

Laundry facilities: dryer vent.

56. 

Laundry facilities: Sink in laundry area.

Report No. 2448, v.2

Page 33 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 39: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

57. 

Laundry facilities:Hot/cold water supplyVented to outside

58.  59. 120-Volt outlet240-Volt outletWaste standpipe

Report No. 2448, v.2

Page 34 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 40: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

Recommendations

DOORS \ Hardware4. Condition: Garage man door into home and rear screen door need minor adjustment at hardware side entrancedoes not have a door stop.Location: VariousTask: Improve

60.  61. 

62. 

GARAGE \ Vehicle door operators5. Condition: Adjustment needed to open or close limitsThe pressure return activation load appears to exceed the recommend 60 lbs. at garage doors. Warning label for garagedoor operators observed near wall controls but not on garage doors.Implication(s): Equipment not operating properlyLocation: Garage

Report No. 2448, v.2

Page 35 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 41: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011INTERIOR

Task: Improve- adjustments recommended.- maintenance type item. Safety concern. Proper warning labelsrecommended.

63. 

Report No. 2448, v.2

Page 36 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 42: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011SITE INFO

Description

Weather: Sunny Ground was dry

Approximate temperature: 50°

Attendees: Seller Seller left before the inspection was complete.

Access to Home Provided by: Seller’s agent Seller Lockbox

Occupancy: There was no one home during the inspection. The home was furnished during the inspection.

Utilities: All utilities were on during the inspection. The water service is public. The plumbing waste disposal

system is public.

Approximate inspection start and end time: The inspection started at 9:00 a.m. The inspection ended at 11:30

a.m.

Approximate age of home: 1 to 5 years

Approximate size of home: 3500 ft.² to 4000 ft.²

Building type: Detached home

Number of dwelling units: Single-family

Number of stories: Two

Below grade area: Crawlspace

Garage, carport and outbuildings: Attached three-car garage

END OF REPORT

Report No. 2448, v.2

Page 37 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE

Page 43: Preview inspectionfull

120 PARADISE DRIVE, FLORENCE, SC February 14, 2011REFERENCE LIBRARY

The links below connect you to a series of documents that will help you understand your home and how it works. Thebody of the report contains specific information about your home. Many report items have related links that provide youmore information about that particular component or issue.

This Library is a broad reference tool. For example, if you want to know the difference between asphalt shingles andwood shingles, you can look in here. If you have a conventional furnace and are trying to decide whether to upgrade to amid-efficiency or high-efficiency furnace, this information may be helpful. If your home does not have air conditioning, butyou are thinking about adding it, there is helpful information for you in here.

The Library is broken into nine house systems: Roofing, Exterior, Structure, Electrical, Heating, Cooling, Insulation,Plumbing and Interior. Click on any link to read about that system.

1. Roofing and Chimney2. Exterior3. Structure4. Electrical5. Heating6. Cooling7. Insulation8. Plumbing9. Interior

Report No. 2448, v.2

Page 38 of 38

REPORT SUM ROOFING EXTERIOR STRUCTURE ELECTRICAL HEATING COOLING INSULATION PLUMBING INTERIOR

SITE INFO REFERENCE