12
Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala 1 Tripura State Electricity Corporation Limited (A Government of Tripura Enterprise) Office of the Deputy General Manager Central Civil Division 79-Tilla, Agartala. PRICE BID Name of work: - Construction of RCC framed boundary wall with pile foundation at Banamalipur Power House Complex, Agartala. D.N.I.T. No.: - DNIT / DGM / CCD / 2015-2016 / 09 Date: - 05-11-2015. Estimated cost: - Rs.54,19,750.00 (Rupees Fifty Four Lakh Nineteen Thousand Seven Hundred and Fifty) only. Earnest money: - Rs.1,08,395.00 (Rupees One Lakh Eight Thousand Three Hundred and ninety Five) only. Completion Period: - 180 (One hundred & eighty) days. [This D.N.I.T. (Price Bid) contain 12 (Twelve) pages including cover pages].

Upload: vuongnguyet

Post on 30-Jul-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

1

Tripura State Electricity Corporation Limited(A Government of Tripura Enterprise)

Office of the Deputy General ManagerCentral Civil Division

79-Tilla, Agartala.

PRICE BID

Name of work: - Construction of RCC framed boundary wall with pile foundation at

Banamalipur Power House Complex, Agartala.

D.N.I.T. No.: - DNIT / DGM / CCD / 2015-2016 / 09 Date: - 05-11-2015.

Estimated cost: - Rs.54,19,750.00 (Rupees Fifty Four Lakh Nineteen Thousand Seven Hundred and Fifty) only.

Earnest money: - Rs.1,08,395.00 (Rupees One Lakh Eight Thousand Three Hundred and ninety Five) only.

Completion Period: - 180 (One hundred & eighty) days.

[This D.N.I.T. (Price Bid) contain 12 (Twelve) pages including cover pages].

Page 2: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

2

- B L A N K -

Page 3: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

3

SECTION - VIII

“A”BILL OF QUANTITIES

ANDPRICE BID

Page 4: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

4

- B L A N K -

Page 5: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

5

Name of work: - Construction of RCC framed boundary wall with pile foundation at Banamalipur Power House Complex, Agartala.

ItemNo

Description of items QuantityRate

(in Rs.)Unit

Amount(in Rs.)

1 Demolishing brick work including stacking ofserviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50 m. etc. complete as per direction of the Engineer-in-charge:-

65.42 Cum. 335.60Per

Cum. 21955.00i) In cement mortar.

2 Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer-in-charge. 1.38 Cum. 583.20

Per Cum. 805.00

3 Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

161.57Cum. 113.40

Per Cum. 18322.00- All kinds of soil

4 Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m.

300.04 Cum. 114.70

Per Cum. 34415.00

5 Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. 17.49 Cum. 424.40

Per Cum. 7423.00

6 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level:

18.58 Cum. 5815.10Per

Cum. 108045.00

i) 1:3:6 (1 Cement: 3 fine sand : 6 graded stone aggregate40 mm nominal size).

190965.00

Page 6: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

6

Item No

Description of items QuantityRate

(in Rs.)Unit

Amount(in Rs.)

B.F. 190965.00

7 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement -

47.29 Cum. 6908.20Per

Cum. 326689.00

A. All work upto plinth level:

i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)

8 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-

37.30 Cum. 7181.40Per

Cum. 267866.00

A. RCC work in beams, lintels, bands, plain window sills, staircases and spiral staircases excluding precast spiral staircase.

i) 1:1½:3 (1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm. nominal size).

9 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-

39.72 Cum. 7296.40Per

Cum. 289813.00

A. In plinth and skirting courses, fillets, columns, pillars, posts and struts.

i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm. nominal size).

10 Centering shuttering including struttings, propping etc. and removal of form work for:

25.83 Sqm. 135.90Per

Sqm. 3510.00

i) Foundations, footings, bases for columns etc. for mass concrete with timber plank.

ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply

550.85 Sqm. 205.60

Per Sqm. 113255.00

iii) Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply

586.08 Sqm. 275.80

Per Sqm. 161641.00

11 Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified diameter and length below the pile cap, to carry

1353739.00

Page 7: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

7

Item No

Description of items QuantityRate

(in Rs.)Unit

Amount(in Rs.)

B.F. 1353739.00

a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads as per specification & the direction of Engineer-in-charge Length of pile for payment shall be measured upto bottom of pile cap) :-

645.45 Mtr. 1315.00

Per Mtr. 848767.00

a) In M20 reinforced cement concrete:-

i) 400 mm dia piles.

12 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.

26391.51 Kg. 63.30

Per Kg. 1670583.00

i) Thermo-Mechanically Treated bars / Cold twisted deformed steel bars.

13 Steel work welded in built up section / framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:-

5875.62 Kg. 76.10

Per Kg. 447135.00

i) In grating, frames, guard bar, railing, brackets, gates and similar works, all complete.

14 Providing structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required. 270.48 Kg. 60.80

Per Kg. 16445.00

15 Providing and fixing 1mm thick M.S. sheet door with frame of 40 x 40 x 6 mm. angle iron and 3mm M.S. gusset plates at the junctions and corners, & with cleats with bolts & nuts, rivets, locking arrangement, handles, hooks & eyes, pinlets including embedding in cement concrete of required grade for fixing in position, all necessary fittings, including applying a priming coat of approved steel primer etc. complete as required:-

21.60 Sqm. 2388.00Per

Sqm. 51581.00

i) Using M.S. angels 40 x 40 x 6 mm. for diagonal braces.

4388250.00

Page 8: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

8

Item No

Description of items QuantityRate

(in Rs.)Unit

Amount(in Rs.)

B.F. 4388250.00

16 First class brick work in foundation and plinth including cost of all materials as required complete:-

47.27 Cum. 4040.60Per

Cum. 190999.00i) In cement mortar 1:4 (1 cement : 4 fine sand).

17 First class brick work in superstructure above plinth level and upto floor five level including cost of all materials as required complete:-

23.22 Cum. 4355.20Per

Cum. 101128.00i) In cement mortar 1:4 (1 cement : 4 fine sand).

18 Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-

612.76Sqm. 577.80

Per Sqm. 354053.00i) In cement mortar 1:4 (1 cement : 4 fine sand).

19 12 mm. cement plaster in single layer including cost of materials required and finishing even and smooth and curing complete.

1141.70 Sqm. 90.20

Per Sqm. 102981.00i) In cement mortar 1:4 (1 cement : 4 fine sand).

20 15 mm. cement plaster in single layer including cost of materials required and finishing even and smooth and curing complete.

954.99 Sqm. 105.40

Per Sqm. 100656.00i) In cement mortar 1:4 (1 cement : 4 fine sand).

21 Neat cement punning. 432.95 Sqm. 28.70

Per Sqm. 12426.00

22 Applying one coat of cement primer of approved brand and manufacturer on wall surface complete.

1396.98 Sqm. 24.10

Per Sqm. 33667.00

23 Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture on new work (two or more coats applied @ 1.67 kg. / 10 Sqm.) over and including base coat water proofing cement paint applied @ 2.20 Kg. / 10 Sqm. complete.

1678.64 Sqm. 65.20

Per Sqm. 109447.00

24 Finishing with epoxy paint (two or more coats) of approved brand and manufacture at all locations prepared and applied as per manufacturer's specification on new work including appropriate priming coat, preparation of surface etc. complete.

278.71 Sqm. 93.80

Per Sqm. 26143.00

5419750.00

(Rupees Fifty Four Lakh Nineteen Thousand Seven Hundred and Fifty) only.

Page 9: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

9

SCHEDULEPRICE BID

Date…………………..To,The Deputy General ManagerCentral Civil Division79-Tilla, Agartala, West Tripura.

Authorized address for communication: -

Telephone nos.: -

Mobile Nos.: -

Fax no.: -

Email ID: -

Name of Work: - Construction of RCC framed boundary wall with pile foundation at Banamalipur Power House Complex, Agartala.

1. I / WE offer to execute the work(s) described above and remedy any defects therein with conditions of the contract, specifications, drawings, Bill of quantities and Addenda for

a. Item rate Contract (Total Bid Price) Rs………………..............*(NOT APPLICABLE HERE).

b. For percentage Rate Contract,…………………………… (in figures)……………………….

…………… …………………………………………………………………………….. (in words)

Percent below / above / at par with the rates entered in the schedule of rates, as referred to clause 12 of ITB.

1. I / WE undertake to commence the work(s) on receiving the notice to precede with work in accordance with the contract documents.

2. This bid and your written acceptance of it shall constitute a binding contract between us. I understand that you are not bound to accept the lowest or any bid you receive.

I / WE hereby confirm that this bid complies with the Bid validity and earnest money required by the bidding documents and specified in NIT.

Authorized Signature……………………………….

Name and Title of Signatory…………………………

Name of the Bidder……………………………………

Address………………………………………………..

………………………………………………………...

Page 10: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

10

- B L A N K -

Page 11: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

11

BILL OF QUANTITIES

PREAMBLE

1. The Bill of quantity shall be read in conjunction with the instruction to Bidders, conditions of contract, Specifications and drawings.

2.1. For the construction works, the quantities given in the Schedule of quantities are estimated, and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of the work ordered and carried out, as measured and verified by the Manager (Engineer) and valued

a. At the rates and prices tendered in the Schedule of quantities in the case of item rate tenders; and

b. At percentage rate above or below or at par of the schedule of rates as tendered by the contractor.

2.2 The rates and prices tendered in the priced bill of quantities shall, except in so far as it is otherwise provided under the contract, include all constructional plant, labour, supervision, materials, erection, maintenance, insurance, profit, taxes and duties, together with all general risks, liabilities and obligations, etc. set out in the contract.

3. Discrepancies between rate in figures and words if arises, will govern by the Clause no 14 of NIT & Clause no. 24 of ITB.

4. When percentage rate tenders are invited, the Schedule of quantities will show in the bidding documents the rates used for different items.

Page 12: PRICE BID - Tripura State Electricity Corporation Ltd. CCD... · BILL OF QUANTITIES AND PRICE BID. Deputy General Manager ... bands, plain window sills, staircases and spiral stair

Deputy General Manager Signature of contractor with full name. Central Civil Division 79-Tilla, Agartala

12

BILL OF QUANTITIES FOR PERCENTAGE RATE BIDS

Sl NoDescription

of ItemQuantity Unit

RateAmount

In Figures In words

1.For description of items & schedule of quantities, refer page 5 (five) to page 8 (eight)

of bidding documents.