Philippines 2011

Davis Langdon & Seah Philippines Inc.

Construction Cost Handbook

4th Floor, Kings Court 1 Building2129 Pasong Tamo, Makati City 1231, Philippines

Tel: (632) 811 2971 Fax: (632) 811 [email protected]

DLS

PHILIPPIN

ES 2011C

onstruction Cost H

andbook

Page 2: Price Index Phil

33333

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

22222

The following handbook of information relating tothe construction industry has been compiled by:

Davis Langdon & Seah Philippines Inc.Davis Langdon & Seah Philippines Inc.Davis Langdon & Seah Philippines Inc.Davis Langdon & Seah Philippines Inc.Davis Langdon & Seah Philippines Inc.

4th Floor King’s Court I Building2129 Pasong Tamo, Makati CityManila 1231PhilippinesTelephone : 811 2971Fax : 811 2071Email : [email protected] : www.dlsqs.com

©Davis Langdon & Seah Philippines Inc. 2011

All rights reserved. No part of this publication maybe re-produced or copied in any form without priorwritten permission from Davis Langdon & Seah(Philippines).

The information contained herein should beThe information contained herein should beThe information contained herein should beThe information contained herein should beThe information contained herein should beregarded as indicative and for generalregarded as indicative and for generalregarded as indicative and for generalregarded as indicative and for generalregarded as indicative and for generalguidance only. Whilst every effort has beenguidance only. Whilst every effort has beenguidance only. Whilst every effort has beenguidance only. Whilst every effort has beenguidance only. Whilst every effort has beenmade to ensure accuracy, no responsibilitymade to ensure accuracy, no responsibilitymade to ensure accuracy, no responsibilitymade to ensure accuracy, no responsibilitymade to ensure accuracy, no responsibilitycan be accepted for errors and omissions,can be accepted for errors and omissions,can be accepted for errors and omissions,can be accepted for errors and omissions,can be accepted for errors and omissions,however caused.however caused.however caused.however caused.however caused.

If advise concerning individual projects is required,we would be happy to assist.

Unless otherwise stated, costs reflected in thishandbook are anticipated Manila costsanticipated Manila costsanticipated Manila costsanticipated Manila costsanticipated Manila costs in 4th4th4th4th4thQuarter 2010.Quarter 2010.Quarter 2010.Quarter 2010.Quarter 2010.

Davis Langdon & Seah Philippines Inc. would liketo acknowledge the assistance of Jones LangLaSalle Leechiu in providing additional data andinformation for this publication.

Published by Davis Langdon & Seah (Philippines)

Page 3: Price Index Phil

CONSTRUCTION COST DATACONSTRUCTION COST DATACONSTRUCTION COST DATACONSTRUCTION COST DATACONSTRUCTION COST DATAConstruction Costs for Selected Asian CitiesConstruction Costs for Selected Asian CitiesConstruction Costs for Selected Asian CitiesConstruction Costs for Selected Asian CitiesConstruction Costs for Selected Asian Cities

Construction Costs for PhilippinesConstruction Costs for PhilippinesConstruction Costs for PhilippinesConstruction Costs for PhilippinesConstruction Costs for Philippines

M & E Services Costs for PhilippinesM & E Services Costs for PhilippinesM & E Services Costs for PhilippinesM & E Services Costs for PhilippinesM & E Services Costs for Philippines

Construction Cost SpecificationConstruction Cost SpecificationConstruction Cost SpecificationConstruction Cost SpecificationConstruction Cost Specification

Major Rates for Selected Asian CitiesMajor Rates for Selected Asian CitiesMajor Rates for Selected Asian CitiesMajor Rates for Selected Asian CitiesMajor Rates for Selected Asian Cities

Retail Prices of Basic ConstructionRetail Prices of Basic ConstructionRetail Prices of Basic ConstructionRetail Prices of Basic ConstructionRetail Prices of Basic Construction

Materials for PhilippinesMaterials for PhilippinesMaterials for PhilippinesMaterials for PhilippinesMaterials for Philippines

Unit Cost for Ancillary FacilitiesUnit Cost for Ancillary FacilitiesUnit Cost for Ancillary FacilitiesUnit Cost for Ancillary FacilitiesUnit Cost for Ancillary Facilities

for Philippinesfor Philippinesfor Philippinesfor Philippinesfor Philippines

M & E Major Plant Costs for the PhilippinesM & E Major Plant Costs for the PhilippinesM & E Major Plant Costs for the PhilippinesM & E Major Plant Costs for the PhilippinesM & E Major Plant Costs for the Philippines

Fit-out Costs for PhilippinesFit-out Costs for PhilippinesFit-out Costs for PhilippinesFit-out Costs for PhilippinesFit-out Costs for Philippines

Kitchen Equipment Costs for PhilippinesKitchen Equipment Costs for PhilippinesKitchen Equipment Costs for PhilippinesKitchen Equipment Costs for PhilippinesKitchen Equipment Costs for Philippines

Page 4: Price Index Phil

1919191919

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

1818181818

Co

sts

are

at

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

le

vels

. M

an

ila

bu

ild

ing

co

sts

are

exp

ect

ed

to

in

cre

ase

by

app

roxi

mat

ely

0.5

% p

er

mo

nth

(co

mp

ou

nd

ed

)d

uri

ng

20

11

.

CONSTRUCTION COSTS FOR PHILIPPINESCONSTRUCTION COSTS FOR PHILIPPINESCONSTRUCTION COSTS FOR PHILIPPINESCONSTRUCTION COSTS FOR PHILIPPINESCONSTRUCTION COSTS FOR PHILIPPINES

PE

SO

/m2

PE

SO

/m2

PE

SO

/m2

PE

SO

/m2

PE

SO

/m2

DE

SC

RIP

TIO

ND

ES

CR

IPT

ION

DE

SC

RIP

TIO

ND

ES

CR

IPT

ION

DE

SC

RIP

TIO

N

DO

ME

ST

ICD

OM

ES

TIC

DO

ME

ST

ICD

OM

ES

TIC

DO

ME

ST

ICA

vera

ge

stan

dar

d a

par

tmen

ts, h

igh

ris

eL

uxu

ry a

par

tmen

ts, h

igh

ris

eT

own

hou

ses

Ind

ivid

ual

pre

stig

e h

ouse

s

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

Ave

rag

e st

and

ard

off

ices

, hig

h r

ise

Pre

stig

e of

fice

s, h

igh

ris

eS

hop

pin

g C

ente

rs

CO

NS

TR

UC

TIO

N

CO

ST

S

FO

R

PH

ILIP

PIN

ES

CO

NS

TR

UC

TIO

N

CO

ST

S

FO

R

PH

ILIP

PIN

ES

CO

NS

TR

UC

TIO

N

CO

ST

S

FO

R

PH

ILIP

PIN

ES

CO

NS

TR

UC

TIO

N

CO

ST

S

FO

R

PH

ILIP

PIN

ES

CO

NS

TR

UC

TIO

N

CO

ST

S

FO

R

PH

ILIP

PIN

ES

BU

ILD

ING

BU

ILD

ING

BU

ILD

ING

BU

ILD

ING

BU

ILD

ING

IND

US

TR

IAL

IND

US

TR

IAL

IND

US

TR

IAL

IND

US

TR

IAL

IND

US

TR

IAL

Ow

ner

op

erat

ed fa

ctor

ies,

low

ris

e

HO

TE

LS

HO

TE

LS

HO

TE

LS

HO

TE

LS

HO

TE

LS

Re

sort

hot

els

, in

clu

sive

of F

.F.&

E3-

star

bu

dg

et h

otle

s in

clu

sive

of F

.F.&

E5-

star

luxu

ry h

otel

s in

clu

sive

of F

.F.&

E

OT

HE

RS

OT

HE

RS

OT

HE

RS

OT

HE

RS

OT

HE

RS

Car

par

ks,

ab

ove

gro

un

dG

ener

al h

osp

ital

s

TO

TA

L

SE

RV

ICE

ST

OT

AL

S

ER

VIC

ES

TO

TA

L

SE

RV

ICE

ST

OT

AL

S

ER

VIC

ES

TO

TA

L

SE

RV

ICE

ST

OT

AL

TO

TA

LT

OT

AL

TO

TA

LT

OT

AL

27,1

00-

29,2

006,

800

-9,

300

33,9

00-

38,5

0033

,100

-34

,900

8,90

0-

13,0

042

,000

-48

,800

20,3

00-

23,7

002,

700

-4,

600

23,0

00-

28,5

0039

,700

-40

,350

7,90

0-

12,1

5047

,600

-52

,500

24,0

50-

25,8

009,

450

- 1

3,20

033

,500

-39

,000

30,7

50-

32,6

0013

,150

-16

,400

43,9

00-

49,0

0030

,000

-31

,800

8,10

0-

12,7

0038

,100

-44

,500

12,3

00-

13,8

503,

900

-6,

650

16,2

00-

20,5

00

36,7

50-

49,0

5011

,350

-13

,950

48,1

00-

63,0

0035

,450

-42

,400

12,4

50-

16,6

0047

,900

-59

,000

49,7

50-

51,7

0014

,250

-22

,300

64,0

00-

74,0

00

13,7

50-

17,7

003,

250

- 5

,000

17,0

00-

22,7

0036

,400

-39

,600

12,6

00-

21,4

0049

,000

-61

,000

Page 5: Price Index Phil

2121212121

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

2020202020

Co

sts

are

at

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

4th

Qu

art

er

20

10

le

vels

.

M & E SERVICES COSTS FOR PHILIPPINESM & E SERVICES COSTS FOR PHILIPPINESM & E SERVICES COSTS FOR PHILIPPINESM & E SERVICES COSTS FOR PHILIPPINESM & E SERVICES COSTS FOR PHILIPPINES

PE

SO

/m2

PE

SO

/m2

PE

SO

/m2

PE

SO

/m2

PE

SO

/m2

DE

SC

RIP

TIO

ND

ES

CR

IPT

ION

DE

SC

RIP

TIO

ND

ES

CR

IPT

ION

DE

SC

RIP

TIO

N

DO

ME

ST

ICD

OM

ES

TIC

DO

ME

ST

ICD

OM

ES

TIC

DO

ME

ST

ICA

vera

ge s

tan

dard

apa

rtm

ents

, hig

h r

ise

Lu

xury

apa

rtm

ents

, hig

h r

ise

Tow

n h

ouse

sIn

divi

dual

pre

stig

e h

ouse

s

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

OF

FIC

E/C

OM

ME

RC

IAL

Ave

rage

sta

nda

rd o

ffic

es, h

igh

ris

eP

rest

ige

offi

ces,

hig

h r

ise

Sh

oppi

ng

Cen

ters

M&

E

SE

RV

ICE

S

CO

ST

S

FO

R

PH

ILIP

PIN

ES

M&

E

SE

RV

ICE

S

CO

ST

S

FO

R

PH

ILIP

PIN

ES

M&

E

SE

RV

ICE

S

CO

ST

S

FO

R

PH

ILIP

PIN

ES

M&

E

SE

RV

ICE

S

CO

ST

S

FO

R

PH

ILIP

PIN

ES

M&

E

SE

RV

ICE

S

CO

ST

S

FO

R

PH

ILIP

PIN

ES

TO

TA

LT

OT

AL

TO

TA

LT

OT

AL

TO

TA

LS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

EL

EC

TR

ICA

LE

LE

CT

RIC

AL

EL

EC

TR

ICA

LE

LE

CT

RIC

AL

EL

EC

TR

ICA

LS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

IND

US

TR

IAL

IND

US

TR

IAL

IND

US

TR

IAL

IND

US

TR

IAL

IND

US

TR

IAL

Ow

ner

op

erat

ed fa

ctor

ies,

low

ris

e

HO

TE

LS

HO

TE

LS

HO

TE

LS

HO

TE

LS

HO

TE

LS

Res

ort h

otel

s, in

clu

sive

of F

.F.&

E3-

star

bu

dge

t hot

les

incl

usi

ve o

f F.F

.&E

5-st

ar lu

xury

hot

els

incl

usi

ve o

f F.F

.&E

OT

HE

RS

OT

HE

RS

OT

HE

RS

OT

HE

RS

OT

HE

RS

Car

par

ks, a

bov

e gr

oun

dG

ener

al h

osp

ital

s

ME

CH

AN

ICA

LM

EC

HA

NIC

AL

ME

CH

AN

ICA

LM

EC

HA

NIC

AL

ME

CH

AN

ICA

LS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

FIR

EF

IRE

FIR

EF

IRE

FIR

ES

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

LIF

TS

/L

IFT

S /

LIF

TS

/L

IFT

S /

LIF

TS

/E

SC

AL

AT

OR

ES

CA

LA

TO

RE

SC

AL

AT

OR

ES

CA

LA

TO

RE

SC

AL

AT

OR

PL

UM

BIN

GP

LU

MB

ING

PL

UM

BIN

GP

LU

MB

ING

PL

UM

BIN

GS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

SE

RV

ICE

SS

ER

VIC

ES

6,80

0-

8,90

03,

600

-4,

200

400

-90

060

0-

900

800

-1,

500

1,40

0-

1,80

08,

900

-12,

700

3,90

0-

4,80

02,

100

-3,

700

700

-1,3

0080

0-

1,50

01,

400

-2,

600

2,70

0-

4,60

01,

400

-1,

800

600

-1,

500

--

700

-1,

500

7,90

0-1

2,15

03,

000

-5,

500

2,50

0-

2,95

0-

-2,

400

-3,

700

9,45

0-1

2,90

03,

300

- 4,

400

3,00

0-

4,00

065

0-1

,100

1,60

0-

2,20

090

0-

1,50

013

,150

-15,

950

4,80

0-

6,00

04,

000

-4,

300

650

-1,2

002,

200

-2,

900

1,50

0-

2,00

07,

900

-11,

300

3,60

0-

5,40

02,

500

-3,

700

650

-80

070

0-

1,70

065

0-

1,10

0

3,90

0-

6,65

02,

000

-3,

500

650

-1,

050

550

-90

0-

700

-1,

200

11,3

00-1

3,95

04,

400

-5,

200

3,00

0-

3,30

065

0-

950

1,50

0-

2,00

01,

800

-2,

500

12,4

00-1

5,35

04,

700

-5,

500

3,30

0-

5,00

065

0-1

,100

1,80

0-

2,30

02,

000

-2,

700

14,2

50-2

0,95

05,

400

-8,

400

4,00

0-

6,00

065

0-1

,100

1,80

0-

3,00

02,

400

-3,

800

3,25

0-

5,00

01,

100

-1,

650

-55

0-

750

1,10

0-

1,70

050

0-

900

12,6

00-2

0,15

05,

000

-7,

700

4,20

0-

6,50

075

0-1

,500

900

-1,

800

1,75

0-

3,90

0

Page 6: Price Index Phil

2323232323

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

2222222222

CONSTRUCTION COST SPECIFICATIONCONSTRUCTION COST SPECIFICATIONCONSTRUCTION COST SPECIFICATIONCONSTRUCTION COST SPECIFICATIONCONSTRUCTION COST SPECIFICATIONThe costs for the respective categories given on theprevious pages are averages based on fixed pricecompetitive tenders. It must be understood that theactual cost of a building will depend upon the design,procurement methods and many other factors and mayvary from the figures shown.

The costs per square metre are based on constructionfloor areas measured to the outside face of the externalwalls/external perimeter including lift shafts, stairwells,plant rooms, water tanks and the like.

All buildings are assumed to have no basements (exceptotherwise stated) and are built on flat ground, withnormal soil conditions and minimal external works. Thecosts exclude land cost, professional fees, finance andlegal expenses.

The standards for each category of building vary fromcountry to country and do not necessarily follow those ofManila.

FF&E refers to loose furnitures, fixtures and equipment.FF&E is excluded from office, residential and retailproject costs, but are included in hotels and country clubproject costs.

D O M E S T I CD O M E S T I CD O M E S T I CD O M E S T I CD O M E S T I C

Average standard apartments of 6-8 flats per floor, 50m2 - 150 m2 per flat, facade comprising textured paintand punch window, internal finishes comprising woodparquet, plaster and paint and painted rubbed concreteto residential units and local ceramic tiles to toilets.

Luxury residential facade comprised of window wall,textured paint with stone accents, finished withhomogenous tiles, wood cladding and coved timber ceilingto lobby, combination of wood planks, plaster and paintand gypsum board to residential units and homogenoustiles to toilets.

Air conditioning, gensets, automatic sprinkler system,complete plumbing and disposal system, complete firealarm and detection system, CATV system are allowedfor luxury apartments and prestige houses.

Services to standard apartment also include forpaging system and Davit type gondola.Services to luxury residential also include CCTVcameras on lobby, track mounted type gondola andhelipad provision.

O F F I C E / C O M M E R C I A LO F F I C E / C O M M E R C I A LO F F I C E / C O M M E R C I A LO F F I C E / C O M M E R C I A LO F F I C E / C O M M E R C I A LBased on buildings 30-40 storeys high with floor plansminimum 1,000 m2 per level.Average standard offices and shopping centres havebare finish and exclude A/C ducting and light fittingsto tenants areas.Prestige offices have curtain wall elevations, stonefinished lobbies.

INDUSTRIALINDUSTRIALINDUSTRIALINDUSTRIALINDUSTRIALOwner operated factories exclude manufacturingequipment, air-conditioning and special servicesprovisions.

H O T E L SH O T E L SH O T E L SH O T E L SH O T E L SF.F. &E. includes interior decoration and loosefurniture,etc. but excludes hotel operator's items (e.g. cutlery,crockery, linen etc.).Includes 1 level of basement.

O T H E R SO T H E R SO T H E R SO T H E R SO T H E R SCarparks to be multi-storey, above ground.Schools with standard government provisions.Student hostels to university standard.Hospitals include fit-out to nursing rooms, hospitalfacilities; services i.e., oxygen piping, A/C, genset,ultrapure water sytem, fire suppression system andspecial type plumbing fixtures; fit-out to doctors'offices is excluded.

Page 7: Price Index Phil

2929292929

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

2828282828

Ordinary Concrete Hollow BlocksOrdinary Concrete Hollow BlocksOrdinary Concrete Hollow BlocksOrdinary Concrete Hollow BlocksOrdinary Concrete Hollow Blocks

140

120

100

80

60

40

20

0

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

15

14

13

12

11

10

9

8

7

6

5

TimberTimberTimberTimberTimber

FOR PHILIPPINESFOR PHILIPPINESFOR PHILIPPINESFOR PHILIPPINESFOR PHILIPPINESRETAIL PRICES OF BASICRETAIL PRICES OF BASICRETAIL PRICES OF BASICRETAIL PRICES OF BASICRETAIL PRICES OF BASICCONSTRUCTION MATERIALSCONSTRUCTION MATERIALSCONSTRUCTION MATERIALSCONSTRUCTION MATERIALSCONSTRUCTION MATERIALS

CementCementCementCementCement

AggregatesAggregatesAggregatesAggregatesAggregates

230

210

190

170

150

130

110

90

70

50

Php / bag (40kg)Php / bag (40kg)Php / bag (40kg)Php / bag (40kg)Php / bag (40kg)

1,100

1,000

900

800

700

600

500

400

300

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

Php / bdftPhp / bdftPhp / bdftPhp / bdftPhp / bdft

Php / piece

Php / m3Php / m3Php / m3Php / m3Php / m3

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

Sand Gravel

4" thk 6" thk

Softwood

Hardwood

Page 8: Price Index Phil

3131313131

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

3030303030

60

55

50

45

40

35

30

25

Structural Steel (Wide Flange)Structural Steel (Wide Flange)Structural Steel (Wide Flange)Structural Steel (Wide Flange)Structural Steel (Wide Flange)Php / kgPhp / kgPhp / kgPhp / kgPhp / kg

FOR PHILIPPINESFOR PHILIPPINESFOR PHILIPPINESFOR PHILIPPINESFOR PHILIPPINES

Structural Steel (Angle Bar; A36)Structural Steel (Angle Bar; A36)Structural Steel (Angle Bar; A36)Structural Steel (Angle Bar; A36)Structural Steel (Angle Bar; A36)Php / kgPhp / kgPhp / kgPhp / kgPhp / kg

65

60

55

50

45

40

35

30

25

20

Reinforcing Bar (IntermediateReinforcing Bar (IntermediateReinforcing Bar (IntermediateReinforcing Bar (IntermediateReinforcing Bar (IntermediateGrade - Grade 40; 275 MPa)Grade - Grade 40; 275 MPa)Grade - Grade 40; 275 MPa)Grade - Grade 40; 275 MPa)Grade - Grade 40; 275 MPa)

Php / kgPhp / kgPhp / kgPhp / kgPhp / kg

65

60

55

50

45

40

35

30

25

20

Reinforcing Bar (High Yield Grade -Reinforcing Bar (High Yield Grade -Reinforcing Bar (High Yield Grade -Reinforcing Bar (High Yield Grade -Reinforcing Bar (High Yield Grade -Grade 60; 10 MPa)Grade 60; 10 MPa)Grade 60; 10 MPa)Grade 60; 10 MPa)Grade 60; 10 MPa)

Php / kgPhp / kgPhp / kgPhp / kgPhp / kg

RETAIL PRICES OF BASICRETAIL PRICES OF BASICRETAIL PRICES OF BASICRETAIL PRICES OF BASICRETAIL PRICES OF BASIC CONSTRUCTION MATERIALS CONSTRUCTION MATERIALS CONSTRUCTION MATERIALS CONSTRUCTION MATERIALS CONSTRUCTION MATERIALS

75

70

65

60

55

50

45

40

35

30

25

2006 2007 2008 2009 20010

Y e a rY e a rY e a rY e a rY e a r

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

2006 2007 2008 2009 2010

Y e a rY e a rY e a rY e a rY e a r

16mm 32mm

1/4" x 2" x 20'

3/8" x 3" x 20'

16mm 32mm

14 x 30 lbs

Page 9: Price Index Phil

3333333333

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

3232323232

* includes provision for forward/rear fold ceiling mounted basketball goal.

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION

PLAYGROUND EQUIPMENTPLAYGROUND EQUIPMENTPLAYGROUND EQUIPMENTPLAYGROUND EQUIPMENTPLAYGROUND EQUIPMENT

Outdoor playground equipmentcomprising various activities andsafety mat

S A U N A SS A U N A SS A U N A SS A U N A SS A U N A S

Sauna room for 4-6 peoplecomplete with all accessories(enclosing structure not included)

STEAM BATHSSTEAM BATHSSTEAM BATHSSTEAM BATHSSTEAM BATHS

Steam bath for 4-6 peoplecomplete with all accessories(enclosing structure not included)

GOLF COURSESGOLF COURSESGOLF COURSESGOLF COURSESGOLF COURSES

(Based on ‘Average Cost Model’ ofan 18 hole golf course in Asia)

Excluding fairway construction andrough hydroseeding

Including fairway construction andrough hydroseeding

GOLF SIMULATORGOLF SIMULATORGOLF SIMULATORGOLF SIMULATORGOLF SIMULATOR

Complete golf simulation systemcomplete with projector, high impactprojection screen, artificial grassputting turf, putting green cup andcontrol computer with softwareoverall size 4m x 7m x 3m high(enclosing structure not included)

UNITUNITUNITUNITUNIT PESOPESOPESOPESOPESO

500,000to

1,500,000

500,000

500,000

20,000,000

25,000,000

3,000,000to

4,500,000

per set

perroom

perroom

per hole

per hole

per set

UNIT COSTS FOR ANCILLARYUNIT COSTS FOR ANCILLARYUNIT COSTS FOR ANCILLARYUNIT COSTS FOR ANCILLARYUNIT COSTS FOR ANCILLARYFACILITIES FOR PHILIPPINESFACILITIES FOR PHILIPPINESFACILITIES FOR PHILIPPINESFACILITIES FOR PHILIPPINESFACILITIES FOR PHILIPPINES

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION

SQUASH COURTSSQUASH COURTSSQUASH COURTSSQUASH COURTSSQUASH COURTS

Single court with glass backwall includingassociated mechanical and electrical servicesbut including any public facilities (enclosingstructure not included)

TENNIS COURTSTENNIS COURTSTENNIS COURTSTENNIS COURTSTENNIS COURTS

Single court on grade with acrylic surfacingcompleted with chain link fence

Single court on grade with artificial turfsurfacing including chain link fence

Extra for lighting

SWIMMING POOLSSWIMMING POOLSSWIMMING POOLSSWIMMING POOLSSWIMMING POOLS

Half Olympic (25m x 16m) 6-lanes outdoorswimming pool built in ground, fully tiled,complete with 5m wide deck andassociated equipment

Half Olympic (25m x 16m) 6-lanes indoorswimming pool with suspended structure(enclosing structure not included) fully tiledand completed with 5m wide deck, includingmechanical ventilation and associatedequipment.

Extra for heating equipment

Extra for salt chlorine generator

BASKETBALL COURTSBASKETBALL COURTSBASKETBALL COURTSBASKETBALL COURTSBASKETBALL COURTS

Exposed court, approximately 975m2,including player benches and excludingequipment

Covered court approximately 975m2,including metal viewing seats, built-infurnitures, provision for T&B, etc.*

UNITUNITUNITUNITUNIT PESO PESO PESO PESO PESO

per court 1,300,000

per court 1,960,000

per court 2,400,000

per court 500,000

per pool 7,200,000

per pool 11,200,000

per pool 1,500,000

per pool 500,000

per court 3,400,000

per court 17,550,000

Page 10: Price Index Phil

3535353535

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

3434343434

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION

9. Power transformers, withbuilt-in primary protections;padmount

10. Power transformers, withprimary protection; silicon oilfilled

11. Power transformers, withprimary protection cast resin

12. Sewage Treatment Plant;Sequencing Batch Reactor(SBR); including civil works

COSTCOSTCOSTCOSTCOST(Php)(Php)(Php)(Php)(Php)

1,600 – 6,000

1,300 – 4,400

2,000 – 5,000

20,000 – 30,000

UNITUNITUNITUNITUNIT

perKVA

perKVA

perKVA

perm³/day

FOR THE PHILIPPINESFOR THE PHILIPPINESFOR THE PHILIPPINESFOR THE PHILIPPINESFOR THE PHILIPPINES M & E MAJOR PLANT COSTSM & E MAJOR PLANT COSTSM & E MAJOR PLANT COSTSM & E MAJOR PLANT COSTSM & E MAJOR PLANT COSTS

N O T E :N O T E :N O T E :N O T E :N O T E :

1. Rates are based on direct supply of imported quipment

and materials by the developer.

2. Rates include all government imposed taxes, import duties

brokerage fees and allowances for local materials and

installation cost.

3. Rates exclude preliminaries and contingencies.

4. Rates are based on fixed price tenders received in

4th Quarter 2010.

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION

1. Water cooled electricchiller

2. Air-cooled electric chillers

3. Cooling Towers; induceddraft

4. Air Handling Units (AHU)

5. Packaged water-cooledunits (PWCU)

6. Fire Pumps; electric motordriven

7. Fire Pumps; diesel enginedriven

8. Standby generator sets

COSTCOSTCOSTCOSTCOST(Php)(Php)(Php)(Php)(Php)

16,000 – 25,000

25,000 – 35,000

1,500 – 2,000

11,000 – 18,000

16,000 – 21,000

17,000 – 21,000

22,000 – 25,000

5,500 – 9,000

UNITUNITUNITUNITUNIT

per TR

per TR

perGPM

perTR

per TR

per HP

per HP

perKW

Page 11: Price Index Phil

3737373737

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

3636363636

DESCRIPTION PESO/m DESCRIPTION PESO/m DESCRIPTION PESO/m DESCRIPTION PESO/m DESCRIPTION PESO/m22222

OFFICESOFFICESOFFICESOFFICESOFFICES

Standard offices * 18,000 - 26,000Executive offices ** 35,000 - 50,000Banking lobby *** 55,000 - 65,000

* Medium quality systems furniture** High quality furnitures and finishes*** Imported stone finishes; double

volume spaces

Note :Note :Note :Note :Note :See notes 1, 2 & 3 below

RESTAURANTSRESTAURANTSRESTAURANTSRESTAURANTSRESTAURANTS

General dining restaurant 15,000 - 30,000Fine dining restaurant 30,000 up

Note :Note :Note :Note :Note :

Includes furniture, floor, wall and ceilingfinishes, minor alteration to air-conditioningand fire services installation to suit layout,exhaust for kitchen but excludes exhaustflue, operational items (e.g. cutlery,crockery, linen, utensils, etc.).

3. Costs exclude operational equipment and supplies, structure, external enclosure, major M&E plant, financing and developers costs, professional and marketing fees.

(Cont'd)

FIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINES

HOTELSHOTELSHOTELSHOTELSHOTELS

Public Areas (Front of House) :Public Areas (Front of House) :Public Areas (Front of House) :Public Areas (Front of House) :Public Areas (Front of House) :

3-star Hotel 18,000-22,0004-star Hotel 24,000-28,0005-star Hotel 30,000 up

Guest rooms :Guest rooms :Guest rooms :Guest rooms :Guest rooms :3-star Hotel 16,000-18,0004-star Hotel 20,000-25,0005-star Hotel 25,000-35,000

Notes : Notes : Notes : Notes : Notes :

1. Includes furniture, floor, wall andceiling finishes, drapery, sanitaryfittings and light fittings.

2. Excludes partitioning, M & E works,building shell, chandelier, operationalitems and equipment (e.g. bed, cutlery,crockery, linen, television, refrigera-tor, etc.), opening expenses, stageequipment and computer systems.

COMMERCIALCOMMERCIALCOMMERCIALCOMMERCIALCOMMERCIAL

Shopping centers 18,000-22,000

Notes :Notes :Notes :Notes :Notes :

1. Mall/Public areas only; tenant area

to be bare finish

2. See notes 1,2 & 3 below

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION PESO/m PESO/m PESO/m PESO/m PESO/m22222

N O T E :N O T E :N O T E :N O T E :N O T E :1. Costs are at December 2010 Levels.2. Costs include wall, floor, ceiling finishes, doors, FF&E, M&E Works service reticulation, preliminaries

Forex US$1 : 44

Page 12: Price Index Phil

3939393939

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA1. CONSTRUCTION COST DATA

3838383838

KITCHEN EQUIPMENT COSTSKITCHEN EQUIPMENT COSTSKITCHEN EQUIPMENT COSTSKITCHEN EQUIPMENT COSTSKITCHEN EQUIPMENT COSTS FOR PHILIPPINES FOR PHILIPPINES FOR PHILIPPINES FOR PHILIPPINES FOR PHILIPPINES

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION COST (Php) COST (Php) COST (Php) COST (Php) COST (Php)

BUSINESS CLUBBUSINESS CLUBBUSINESS CLUBBUSINESS CLUBBUSINESS CLUB 15M - 20M

500 - 900 m2 floor area

EXECUTIVE DININGEXECUTIVE DININGEXECUTIVE DININGEXECUTIVE DININGEXECUTIVE DINING 15M - 25M

200 - 400 m2 floor area

4 STAR HOTEL4 STAR HOTEL4 STAR HOTEL4 STAR HOTEL4 STAR HOTEL 20M - 30M

50 - 150 rooms

5 STAR HOTEL5 STAR HOTEL5 STAR HOTEL5 STAR HOTEL5 STAR HOTEL

200 - 500 rooms 30M - 40M

OFFICE CANTEENOFFICE CANTEENOFFICE CANTEENOFFICE CANTEENOFFICE CANTEEN 10M - 20M

200 - 300 m2 floor area

(Cont'd)

55,000 - 70,00030,000- 45,000

50,000- 65,000

45,000 - 70,000

40,000 - 45,000

THEATRES / CINEMASTHEATRES / CINEMASTHEATRES / CINEMASTHEATRES / CINEMASTHEATRES / CINEMAS

Theatres *Cinemas **

* Includes stage rigging and equipment,draperies, AV equipment projectors,screens, acoustics and seatings

** Includes screens, projectionequipment, seats, finishes, ticketingbooth

AUDITORIUMSAUDITORIUMSAUDITORIUMSAUDITORIUMSAUDITORIUMS

BUSINESS CLUBSBUSINESS CLUBSBUSINESS CLUBSBUSINESS CLUBSBUSINESS CLUBS

BAR / BILLIARDS *BAR / BILLIARDS *BAR / BILLIARDS *BAR / BILLIARDS *BAR / BILLIARDS *

* Excluding kitchen equipment

NOTE: NOTE: NOTE: NOTE: NOTE:1. Costs are at December 2010 Levels.2. Costs include wall, floor, ceiling finishes, doors, FF&E,

M&E Works service reticulation, preliminariesForex US$1 : 44

3. Costs exclude operational equipment and supplies,structure, external enclosure, major M&E plant,financing and developers costs, professional andmarketing fees.

FIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINESFIT-OUT COSTS FOR PHILIPPINES

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION PESO/mPESO/mPESO/mPESO/mPESO/m22222

Page 13: Price Index Phil

Trends in Construction Cost for PhilippinesTrends in Construction Cost for PhilippinesTrends in Construction Cost for PhilippinesTrends in Construction Cost for PhilippinesTrends in Construction Cost for Philippines

Construction ValueConstruction ValueConstruction ValueConstruction ValueConstruction Value

Construction ActivityConstruction ActivityConstruction ActivityConstruction ActivityConstruction Activity

Lead Time of Different PackagesLead Time of Different PackagesLead Time of Different PackagesLead Time of Different PackagesLead Time of Different Packages

Utility Costs for Selected Asian CitiesUtility Costs for Selected Asian CitiesUtility Costs for Selected Asian CitiesUtility Costs for Selected Asian CitiesUtility Costs for Selected Asian Cities

Estimating Rules of ThumbEstimating Rules of ThumbEstimating Rules of ThumbEstimating Rules of ThumbEstimating Rules of Thumb

Progress PaymentsProgress PaymentsProgress PaymentsProgress PaymentsProgress Payments

Construction Materials Wholesale Price IndexConstruction Materials Wholesale Price IndexConstruction Materials Wholesale Price IndexConstruction Materials Wholesale Price IndexConstruction Materials Wholesale Price Index

Minimum WageMinimum WageMinimum WageMinimum WageMinimum Wage

Average Earnings Index for ConstructionAverage Earnings Index for ConstructionAverage Earnings Index for ConstructionAverage Earnings Index for ConstructionAverage Earnings Index for Construction

GENERAL CONSTRUCTION DATAGENERAL CONSTRUCTION DATAGENERAL CONSTRUCTION DATAGENERAL CONSTRUCTION DATAGENERAL CONSTRUCTION DATA

Page 14: Price Index Phil

4343434343

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

4242424242

2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA

Y e a rY e a rY e a rY e a rY e a r H o t e l sH o t e l sH o t e l sH o t e l sH o t e l s O f f i c eO f f i c eO f f i c eO f f i c eO f f i c e R e s i d e n t i a lR e s i d e n t i a lR e s i d e n t i a lR e s i d e n t i a lR e s i d e n t i a l R e t a i lR e t a i lR e t a i lR e t a i lR e t a i l U S $U S $U S $U S $U S $to Phpto Phpto Phpto Phpto Php

2000 55,200 30,240 36,000 21,000 48.00

2001 56,160 30,680 36,140 20,800 52.00

2002 57,240 31,270 36,835 21,200 53.00

2003 57,750 31,625 37,125 20,625 55.00

2004 58,800 32,200 36,680 18,840 56.00

2005 58,850 32,175 36,850 19,800 55.00

2006 60,000 34,000 37,000 21,750 50.00

2007 60,200 36,980 37,410 26,500 43.00

2008 66,960 45,120 44,160 29,500 48.00

2009 67,000 45,120 44,180 29,800 47.00

2010 69,080 46,860 45,760 32,340 44.00

TRENDS IN CONSTRUCTION COSTSTRENDS IN CONSTRUCTION COSTSTRENDS IN CONSTRUCTION COSTSTRENDS IN CONSTRUCTION COSTSTRENDS IN CONSTRUCTION COSTS FOR PHILIPPINES FOR PHILIPPINES FOR PHILIPPINES FOR PHILIPPINES FOR PHILIPPINES

Building Construction Cost (Php/mBuilding Construction Cost (Php/mBuilding Construction Cost (Php/mBuilding Construction Cost (Php/mBuilding Construction Cost (Php/m22222)))))

Php / m2 (Thousands)Php / m2 (Thousands)Php / m2 (Thousands)Php / m2 (Thousands)Php / m2 (Thousands)

0

10

20

30

40

50

60

70

80

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Year

Office Bldgs. - Grade A

Residential - Luxury Apts.

Retail StoresHotels - 5-star

Page 15: Price Index Phil

4545454545

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

4444444444

2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA

Residential

Non-Residential

Residential

Non-Residential

CONSTRUCTION ACTIVITYCONSTRUCTION ACTIVITYCONSTRUCTION ACTIVITYCONSTRUCTION ACTIVITYCONSTRUCTION ACTIVITY

Usable Floor Area (Millions m²) Usable Floor Area (Millions m²) Usable Floor Area (Millions m²) Usable Floor Area (Millions m²) Usable Floor Area (Millions m²)

Usable Floor Area (m²)Usable Floor Area (m²)Usable Floor Area (m²)Usable Floor Area (m²)Usable Floor Area (m²)YearYearYearYearYear

Residential Non-Residential Residential Non-Residential Residential Non-Residential Residential Non-Residential Residential Non-Residential

2004 8,511,351 5,746,8192005 8,460,337 5,234,0442006 7,808,050 6,024,8892007 7,740,142 7,028,6432008 9,305,281 6,310,0712009 9,848,587 5,355,5682010* 11,224,213 8,924,500

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010*

Y e a rY e a rY e a rY e a rY e a r

12

10

8

6

4

2

0

CONSTRUCTION VALUECONSTRUCTION VALUECONSTRUCTION VALUECONSTRUCTION VALUECONSTRUCTION VALUE

Construction Value (Php Billions) Construction Value (Php Billions) Construction Value (Php Billions) Construction Value (Php Billions) Construction Value (Php Billions)

105

90

75

60

45

30

15

0

Construction Value Php (1,000)Construction Value Php (1,000)Construction Value Php (1,000)Construction Value Php (1,000)Construction Value Php (1,000) Year Year Year Year Year

ResidentialResidentialResidentialResidentialResidential Non-ResidentialNon-ResidentialNon-ResidentialNon-ResidentialNon-Residential

2004 49,948,139 40,032,0782005 51,454,973 33,560,5522006 51,179,051 50,772,2172007 53,596,319 53,240,552

2008 69,043,520 50,718,1722009 77,953,836 48,895,2482010* 94,791,872 81,079,077

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010*

Y e a rY e a rY e a rY e a rY e a r

***** Forecast Source : www.census.gov.ph/data/sector data

***** Forecast Source : www.census.gov.ph/data/sector data

Page 16: Price Index Phil

4747474747

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

4646464646

2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA

The lead time provided shall serve only as guide for use inprojects, this is due mainly to the variability of factors likelocal customs processing/clearing, material availability,among others.

Lead times do not refer to any particular building/project typeand are based on average times. For example; Air-condi-tioning plant may require between six and twelve weeks de-pending on the plant specified or required. Therefore, anaverage of nine weeks has been used in the table.

Process Code* (in weeks)Process Code* (in weeks)Process Code* (in weeks)Process Code* (in weeks)Process Code* (in weeks)

Packages Packages Packages Packages Packages A BA BA BA BA B CCCCC D D D D D

Passenger lifts 8 3 - 27(non-standard)

Escalators 4 2 - 18

Mechanical 4 2 1 1pipework

Ductwork 4 2 4 3

Sprinklers 6 2 4 3

Air-conditioning 2 2 3 6plant

Variable air- 1 1 3 6volume unit

Electrical package 6 3 - -

Switchgear 2 2 - 10

Generators 4 2 - 13(600 kW)

Light fittings 1 1 6 -

Security systems 3 3 4 -

Controls 4 3 3 -

Furniture 2 2 4 8

Data and voice

* Process Code Legend:

A - Working DrawingB - Approve working drawingC - Procurement of materialsD - Manufacture

LEAD TIME OF DIFFERENTLEAD TIME OF DIFFERENTLEAD TIME OF DIFFERENTLEAD TIME OF DIFFERENTLEAD TIME OF DIFFERENT PACKAGES PACKAGES PACKAGES PACKAGES PACKAGES

Process Code* (in weeks)Process Code* (in weeks)Process Code* (in weeks)Process Code* (in weeks)Process Code* (in weeks)

P a c k a g e sP a c k a g e sP a c k a g e sP a c k a g e sP a c k a g e s A A A A A B B B B B C C C C C D D D D D

Insitu Concrete 1 1 2 -Works

Structural steel 4 2 - 5

frames

Cladding- 10 2 - 14curtain walling

Brickwork 1 1 2 -

Roof finishes- 3 1 4 4profiled metal

Windows 2 1 3 6

Drylining, 1 1 1 -

plaster and screeds

Demountable 2 1 2 3partitions

General joinery 2 2 3 5

Raised floors 2 2 - -

Suspended ceilings 2 2 3 3

Decorations - - 2 -(wall coverings)

Stone wall and 3 2 4 5floor finishes

Page 17: Price Index Phil

5555555555

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

5454545454

2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA

Source: www.census.gov.ph/data/sectordata

2 0 1 02 0 1 02 0 1 02 0 1 02 0 1 0

A p rA p rA p rA p rA p r MayMayMayMayMay J u nJ u nJ u nJ u nJ u n J u lJ u lJ u lJ u lJ u l A u gA u gA u gA u gA u g SepSepSepSepSep O c tO c tO c tO c tO c t N o vN o vN o vN o vN o v

470.7 477.3 478.8470.7 477.3 478.8470.7 477.3 478.8470.7 477.3 478.8470.7 477.3 478.8 479.7 479.7 479.7 479.7 479.7 483.7 483.7 483.7 483.7 483.7 482.1 482.1 482.1 482.1 482.1 482.1 482.1 482.1 482.1 482.1 459.7 459.7 459.7 459.7 459.7

691.7 705.6 705.9 706.2 708.1 707.9 707.8 707.8

341.4 348.6 358.4 361.9 359.4 353.0 351.7 346.6

454.1 468.0 472.5 472.5 483.5 486.0 486.0 486.0

258.2 261.7 261.7 262.5 263.9 263.9 267.9 267.9

477.2 481.6 481.7 481.7 485.4 485.8 488.0 488.0

560.8 558.2 542.9 538.7 548.3 533.3 542.9 517.4

632.8 632.8 632.8 632.8 632.8 632.8 632.8 680.2

280.2 282.8 282.8 285.0 292.2 292.2 292.2 292.2

387.7 393.2 393.6 394.2 394.2 394.2 394.2 394.2

425.8 431.5 431.9 431.9 430.6 430.6 430.4 430.4

472.5 482.3 482.3 482.3 482.3 482.3 482.3 482.3

383.4 383.7 383.7 384.0 387.2 387.2 387.2 387.2

228.9 229.7 229.7 230.0 230.0 230.0 230.0 230.0

255.4 257.9 258.3 258.7 259.1 258.4 257.8 259.7

824.8 832.6 834.0 835.4 839.7 831.3 829.5 829.5

447.5 450.9 450.9 452.7 454.6 451.9 451.9 451.9

285.6 289.9 291.7 293.6 294.0 294.0 294.0 294.0

366.4 366.4 366.4 366.4 368.6 368.6 368.6 368.6

492.2 492.2 492.3 492.3 492.5 492.5 492.5 492.5

371.3 374.3 375.4 377.3 377.0 377.0 377.0 377.0

254.0 254.0 254.0 256.2 257.6 261.7 266.0 266.0

172.2 172.2 172.2 172.2 172.2 172.2 172.2 172.2

355.2 355.2 355.2 355.2 355.2 355.2 355.2 355.2

393.8 399.5 400.8 402.3 402.3 402.3 402.3 402.3

343.1 343.1 343.1 341.1 343.1 343.1 343.1 343.1

Construction Materials Wholesale Price IndexConstruction Materials Wholesale Price IndexConstruction Materials Wholesale Price IndexConstruction Materials Wholesale Price IndexConstruction Materials Wholesale Price Index Base Year ( 1985 = 100 ) Base Year ( 1985 = 100 ) Base Year ( 1985 = 100 ) Base Year ( 1985 = 100 ) Base Year ( 1985 = 100 )

in the National Capital Region (NCR)in the National Capital Region (NCR)in the National Capital Region (NCR)in the National Capital Region (NCR)in the National Capital Region (NCR)

2 0 1 02 0 1 02 0 1 02 0 1 02 0 1 02 0 0 92 0 0 92 0 0 92 0 0 92 0 0 9

DecDecDecDecDec Ave Ave Ave Ave Ave Jan Jan Jan Jan Jan Feb Feb Feb Feb Feb M a rM a rM a rM a rM a r

ALL ITEMS 460.0ALL ITEMS 460.0ALL ITEMS 460.0ALL ITEMS 460.0ALL ITEMS 460.0 460.5 462.1 460.4 461.1460.5 462.1 460.4 461.1460.5 462.1 460.4 461.1460.5 462.1 460.4 461.1460.5 462.1 460.4 461.1

A. Sand, stone and gravel 679.2 680.7 691.7 691.7 691.7

B. Cement 340.8 338.4 344.2 340.5 340.3

C. Lumber 451.4 450.8 449.0 448.6 448.6

D. Plywood 253.8 256.3 253.8 255.1 257.0

E. Wood Products 490.8 497.7 552.5 540.5 555.5

F. Fuels and lubricants 535.4 461.6 601.7 632.8 626.1

G. Asphalt 601.7 606.2 601.7 632.8 626.1

H. Glass and glass prods. 267.8 267.3 267.8 278.8 280.2

I. Hardware 386.1 387.2 388.9 383.7 383.7

J. Metal Pipes 430.0 429.8 436.9 424.1 424.1

K. PVC Pipes 461.8 460.5 461.8 464.7 464.7

L. Concrete Products 378.0 375.6 383.4 383.4 383.4

M. Plumbing Paints 224.8 224.7 227.5 227.5 227.5

N. Paints 259.0 258.6 258.9 255.4 255.4

O. Reinforcing Steel 802.7 814.3 804.2 800.5 802.7

P. Structural Steel 418.5 427.5 418.5 412.2 412.7

Q. GI Sheets 272.9 274.2 283.1 283.9 284.7

R. Aluminum & other MetalProducts 361.4 359.4 366.4 366.4 366.4

S. Exterior ElectricalEquipment Supplies 453.5 454.9 472.4 492.2 492.2

T. Interior ElectricalEquipment Supplies 361.4 359.4 370.5 371.0 371.0

U. Tileworks 261.2 258.7 251.1 251.1 251.1

V. Blasting Materials 172.2 172.2 172.2 172.2 172.2

W. Machinery andEquipment Rental 328.7 328.7 355.2 355.2 355.2

X. Electrical Rough-inMaterials 382.3 381.3 392.9 393.8 393.8

Y. PVC Pipes 338.4 336.1 338.4 343.1 343.1

Page 18: Price Index Phil

5757575757

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

5656565656

2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA2. GENERAL CONSTRUCTION DATA

MINIMUM WAGEMINIMUM WAGEMINIMUM WAGEMINIMUM WAGEMINIMUM WAGE

* ECOLA (Emergency Cost of Living Allowance)

Source : National Wages & Productivity Council,

Department of Labor and Employment

01 November 1990 NCR 01 17.00 106.0001 January 1991 NCR 02 12.00 118.0016 December 1993 NCR 03 17.00 135.0001 April 1994 NCR 03 10.00 145.0002 February 1996 NCR 04 16.00 161.0001 May 1996 NCR 04 4.00 165.0006 Febuary 1997 NCR 05 15.00 180.0001 May 1997 NCR 05 5.00 185.0006 February 1998 NCR 06 13.00 198.0031 October 1999 NCR 07 25.50 223.5001 November 2000 NCR 08 26.50 250.0005 November 2001* NCR 09 15.00 265.0001 Febuary 2002* NCR 09 15.00 280.0025 June 2004* NCR 10 20.00 300.0016 June 2005 NCR 11 25.00 325.0011 July 2006 NCR 12 25.00 350.0028 August 2007 NCR 13 12.00 362.0014 June 2008 NCR 14 15.00 377.0028 August 2008 NCR 14 5.00 382.0023 June 2010 NCR 15 22.00 404.00

Peso per Day Peso per Day Peso per Day Peso per Day Peso per Day

Wage Wage Wage Wage Wage Amnt. of Amnt. of Amnt. of Amnt. of Amnt. of Peso per Peso per Peso per Peso per Peso per Year Year Year Year Year Order # Order # Order # Order # Order # Increase Increase Increase Increase Increase Day Day Day Day Day

January 2,386.3 2,250.1 2,165.1 2,090.3February 2,300.6 2,211.0 2,121.2 2,048.9March 2,521.0 2,335.0 2,232.5 2,155.0April 2,511.4 2,413.6 2,312.7 2,176.2May 2,601.4 2,447.9 2,365.6 2,218.0June 2,556.8 2,317.0 2,255.8 2,110.2July 2,188.0 2,168.7 2,084.8August 2,234.1 2,146.7 2,062.9September 2,304.6 2,193.6 2,101.5October 2,064.8 2,131.2 2,036.1November 2,135.8 2,163.0 2,071.3December 2,143.7 2,219.3 2,123.5

YEAR 2010 YEAR 2010 YEAR 2010 YEAR 2010 YEAR 2010 2009 2009 2009 2009 2009 2008 2008 2008 2008 2008 20072007200720072007

ANNUALANNUALANNUALANNUALANNUAL 2,253.8 2,253.8 2,253.8 2,253.8 2,253.8 2,206.32,206.32,206.32,206.32,206.3 2,106.62,106.62,106.62,106.62,106.6

Q1 2,402.6 2,265.4 2,172.9 2,098.1 Q2 2,556.6 2,392.8 2,311.4 2,168.1 Q3 2,242.2 2,169.7 2,083.0 Q4 2,114.8 2,171.2 2,077.0

YEAR 2010 YEAR 2010 YEAR 2010 YEAR 2010 YEAR 2010 2009 2009 2009 2009 2009 2008 2008 2008 2008 2008 20072007200720072007

QUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLY 2,253.8 2,253.8 2,253.8 2,253.8 2,253.8 2,206.32,206.32,206.32,206.32,206.3 2,106.62,106.62,106.62,106.62,106.6

AVERAGE EARNINGS INDEXAVERAGE EARNINGS INDEXAVERAGE EARNINGS INDEXAVERAGE EARNINGS INDEXAVERAGE EARNINGS INDEXFOR CONSTRUCTIONFOR CONSTRUCTIONFOR CONSTRUCTIONFOR CONSTRUCTIONFOR CONSTRUCTION(1978 = 100)(1978 = 100)(1978 = 100)(1978 = 100)(1978 = 100)

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

2000 2010

Y E A R

2002 2004 2006 2008

Page 19: Price Index Phil

OTHER INFORMATIONOTHER INFORMATIONOTHER INFORMATIONOTHER INFORMATIONOTHER INFORMATIONPhilippine MapPhilippine MapPhilippine MapPhilippine MapPhilippine Map

Public Holidays Public Holidays Public Holidays Public Holidays Public Holidays

IDD Codes & Time DifferencesIDD Codes & Time DifferencesIDD Codes & Time DifferencesIDD Codes & Time DifferencesIDD Codes & Time Differences

Conversion FactorsConversion FactorsConversion FactorsConversion FactorsConversion Factors

DLS Professional ServicesDLS Professional ServicesDLS Professional ServicesDLS Professional ServicesDLS Professional Services

Quality SystemQuality SystemQuality SystemQuality SystemQuality System

Environmental SustainabilityEnvironmental SustainabilityEnvironmental SustainabilityEnvironmental SustainabilityEnvironmental Sustainability

Development ManagementDevelopment ManagementDevelopment ManagementDevelopment ManagementDevelopment Management

International Directory of DLS OfficesInternational Directory of DLS OfficesInternational Directory of DLS OfficesInternational Directory of DLS OfficesInternational Directory of DLS Offices

Page 20: Price Index Phil

8787878787

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

8686868686

5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION

PHILIPPINES KEY DATAPHILIPPINES KEY DATAPHILIPPINES KEY DATAPHILIPPINES KEY DATAPHILIPPINES KEY DATA

* Population of Philippines’ key cities only # Forecast / Projected

P O P U L A T I O NP O P U L A T I O NP O P U L A T I O NP O P U L A T I O NP O P U L A T I O N

Population (August 2007) 88.57M

Population# (2010) 94.01M

Urban Population * 30.14%

Population under 15 31.97%

Population over 65 3.31%

Ave. annual growth rate (2000 - 2007) 2.04%

GEOGRAPHYGEOGRAPHYGEOGRAPHYGEOGRAPHYGEOGRAPHY

Land Area 300,000 km2

Agricultural Area (2009) 42.98%

Capital City Manila

(population Metropolitan Manila) 11.55M

(population Manila) 1.66M

ECONOMY 2010ECONOMY 2010ECONOMY 2010ECONOMY 2010ECONOMY 2010

Monetary Unit Peso

Average Headline Inflation Rate

(2000 = 100) 3.81%

Gross Domestic Product (GDP)

(1Q to 3Q) Php 6,083.444bn

GDP per capita Php 68,685.15

CONSTRUCTION (1Q to 3Q)CONSTRUCTION (1Q to 3Q)CONSTRUCTION (1Q to 3Q)CONSTRUCTION (1Q to 3Q)CONSTRUCTION (1Q to 3Q)

Gross value of const. output Php 610.214bn

Net value of const. output Php 356.032bn

Net value of const. output as a

proportion of the GDP4.18%

PHILIPPINE MAPPHILIPPINE MAPPHILIPPINE MAPPHILIPPINE MAPPHILIPPINE MAP

Page 21: Price Index Phil

101101101101101

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

100100100100100

5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION

Special Services :Special Services :Special Services :Special Services :Special Services :

¤ Construction feasibility studies

¤ Budget formulation

¤ Analysis of cost/design options

¤ Cost planning

¤ Value engineering

¤ Cash flow evaluations

¤ Cost monitoring and/or cost control of

construction works

¤ Project management or co-ordination

¤ Reinstatement assessments for fire

insurance

¤ Quantifying mechanical and electrical

installation works

¤ Quantifying civil engineering works

¤ Definition and operation of plant

procurement programmes

¤ Cost engineering

¤ Evaluation and operation of serial

(maintenance) contracts

¤ Financial evaluation of “package” bid

contracts

¤ Cost and contract research

¤ Advice on litigation

¤ Tax treatment of construction expenditure

¤ Research and consultancy in all aspects

of construction economics

¤ Interior decoration and fitting-out works

¤ Preparation of fixed asset registers

Normal Services :Normal Services :Normal Services :Normal Services :Normal Services :

¤ Preliminary cost advice and cost planning

¤ Advice on the type of contractual arrangementsto be used

¤ Advice on obtaining tenders

¤ Preparation of tendering documents

¤ Negotiation with contractors

¤ Visiting site and valuation of works in progress

¤ Assessing the cost of proposed variations

¤ Attending site and other meetings

¤ Preparation of financial statements

¤ Settlement of final cost with contractors andsub-contractors

¤ Advice on contractors’ claims

DLS PROFESSIONAL SERVICESDLS PROFESSIONAL SERVICESDLS PROFESSIONAL SERVICESDLS PROFESSIONAL SERVICESDLS PROFESSIONAL SERVICES

Page 22: Price Index Phil

103103103103103

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

102102102102102

5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION

QUALITY SYSTEMQUALITY SYSTEMQUALITY SYSTEMQUALITY SYSTEMQUALITY SYSTEM

DLS Philippines Inc. attained ISO 9001accreditation in September 1998 thensuccessfully converted to ISO 9001:2000 inDecember 2003 and to ISO 9001:2008 in January2010.

In addition to the Quantity Surveying Services,DLS Philippines Inc. was also certified for ISO9001:2008 for the following:

a) Development Management ConsultancyServices for Building and EngineeringSector; and

b) Envrionmental SustainabilityConsultancy Services for Building andEngineering Sector

DLS Philippines Inc. recognises the importanceof Quality Assurance especially in a country whereQuantity Surveying is not a well recognizedprofession and quality service is of paramountimportance. The establishment of a standardquality control system for all aspects of theservices being provided, coupled with our in-house staff training programmes, ensures thatDLS Philippines continues to provide the bestservices available to our clients.

ENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITY

Overview of Leadership in Energy &Overview of Leadership in Energy &Overview of Leadership in Energy &Overview of Leadership in Energy &Overview of Leadership in Energy &Environmental Design (LEED)Environmental Design (LEED)Environmental Design (LEED)Environmental Design (LEED)Environmental Design (LEED)

The U.S. based Leadership in Energy &Environmental Design (LEED) GreenBuilding System is a voluntary third-partyrating system in which credits are earnedfor satisfying specified green buildingcriteria. Projects are evaluated within sixenvironmental categories.

• Sustainable Sites• Water Efficiency• Energy & Atmosphere• Materials & Resources• Indoor Environmental Quality• Innovation & Design

Certified, Silver, Gold and Platinum levelsof green building certification are awardedbased on the total credits earned.

Page 23: Price Index Phil

105105105105105

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

104104104104104

5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION

ConstructionConstructionConstructionConstructionConstruction

• Provide pre-bid conferences andcontractor training

• Assist during construction, includingsubmittals and progress reports

• Monitor the implementation of greenguidelines or green site conditions

OperationsOperationsOperationsOperationsOperations

• Perform post-occupancy project audits -lessons learned

• Provide benchmarking of portfolioperformance

ProfessionalProfessionalProfessionalProfessionalProfessionalServicesServicesServicesServicesServices

Pre DesignPre DesignPre DesignPre DesignPre Design

Integrated sustainable design consultingensures available opportunities arerecognized and explored

• Assist in team selection• Evaluate project-specific opportunities

and challenges based on target LEEDCertification

• Create project-specific green guidelines

DesignDesignDesignDesignDesign

Team members work closely and effectivelytowards a green solution.

• Create sustainable design checklistincluding schedule and designimplications

• Thoroughly evaluate design at key stagesand provide detailed instructions to thedesign team

• Monitor design team responsibilities• Coordinate cost analysis with sustainable

design goals• Liaise with USGBC• Assist and compile LEED documentation

for certification

ProfessionalProfessionalProfessionalProfessionalProfessionalServicesServicesServicesServicesServices

Davis Langdon & Seah (Phils)Inc. is a member of US GreenBuilding Council (USGBC) andthe Philippine Green BuildingCouncil (PGBC).

Our environmentalsustainability servicesemployed highly skilledLeadership in Energy &Environmental Design -Accredited Professionals(LEED-®RAP).

Being part of LEEDBeing part of LEEDBeing part of LEEDBeing part of LEEDBeing part of LEED

Global LinkageGlobal LinkageGlobal LinkageGlobal LinkageGlobal Linkage

ENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITY

Page 24: Price Index Phil

107107107107107

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

106106106106106

5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION

Green BuildingGreen BuildingGreen BuildingGreen BuildingGreen BuildingFactsFactsFactsFactsFacts

An Up-front investmentof 2-5% in green buildingdesign, on average,results in life cyclesavings of 20% of thetotal construction cost.Source: The Costs and Financial Benefits ofGreen Buildings: A report to California’ssustainable Building Task Force, October 2003.

Operating cost decrease 8-9%Building value increase 7.5%Return on investment improved 6.6%Occupancy ratio increase 3.5%Rent ratio increases 3%Source: McGraw Hill Construction, Greening ofCorporate America SmartMarket Report, 2007.

Green buildings consume less energy andfewer resourcesGreen buildings consume 15-20% averageless energy than conventional buildingsGreen buildings save, on average, 40% ofdrinkable / potable water

Corporate perception of whether greenfosters innovation: 57% agree; 28% neutraland 15% disagree.Source: McGraw Hill Construction, Greening ofCorporate America SmartMarket Report, 2007.

•••••

DEVELOPMENT MANAGEMENTDEVELOPMENT MANAGEMENTDEVELOPMENT MANAGEMENTDEVELOPMENT MANAGEMENTDEVELOPMENT MANAGEMENT

OUR APPROACHOUR APPROACHOUR APPROACHOUR APPROACHOUR APPROACH

We provide advice and consulting services atstrategic, policy and operational levels,concentrating on three key areas:

· Improving business performance· Making development and construction

more sustainable· Assessing market potential and key trends

Our multidisciplinary team is skilled in changemanagement, process improvement,procurement, sustainability, economics, marketanalysis and research.

In everything we do, we are committed tocreating value for our clients by:

· Working collaboratively with them· Developing a deep understanding of their

needs and aspirations· Providing tailor-made solutions· Being accessible and responsive

Integrated Project Management is based onfour distinctive phases in the project life cycle:

1. Business Needs and Project Inception

In the early stages of a project, Davis Langdon& Seah creates the conditions for success bydefining a set of value drivers based on anunderstanding of all stakeholder interests andrequirements.

PROJECT MANAGEMENTPROJECT MANAGEMENTPROJECT MANAGEMENTPROJECT MANAGEMENTPROJECT MANAGEMENT

ENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITYENVIRONMENTAL SUSTAINABILITY

Page 25: Price Index Phil

109109109109109

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

DA

VIS

LA

NG

DO

N &

SE

AH

(P

HIL

IPP

INE

S)

108108108108108

5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION5. OTHER INFORMATION

We consider needs, identify risk and can assist withbusiness planning. Where appropriate, we assistwith the production of feasibility and cost estimates,the development of master plans, option appraisals,overseeing of site acquisitions, management ofplanning consents and advice on funding strategies.We work with clients to manage the appointment ofsuitable consultants, including the agreement ofservices and fees.

2. Project Strategy & Development

At the early development stage we compile strategicand design briefs and produce an overall projectexecution plan. We oversee the production of coststo agree budgets and provide a detailed masterprogramme for project delivery.

We recommend the most appropriate procurementstrategy and manage the selection of the best valueconstruction team. We provide a single point ofcontact for the client when dealing with thirdparties, contractors and suppliers.

3. Project Control & Delivery

Prior to commencing, we make sure that acommercially viable solution has been agreed, thatall contracts are administered in the correct formand that necessary management procedures arein place. We set up systems and processes to enablethe sharing of information, management of changeand identification of potential risks to successfulproject delivery.

We monitor quality, time and costs and provideleadership to the team, resolving issues, liaisingwith third parties, and reporting on progress asagreed with the client.

4. Commissioning & Asset Management

In the final stages of the project, we overseecommissioning, agree completion, settle finalaccounts and enable the smooth transition of theasset through to ongoing management.

Post-handover, we instigate project reviews andfeed lessons learned to the client for future

The planning and programming team is a multi-functional group of professionals who arededicated to the primary managementrequirement of planning and programming. Ourapproach is to assist in controlling progress, notsimply monitoring it.

BenefitsBenefitsBenefitsBenefitsBenefits

Professional planning and programming

· Enhances management's understanding ofprogress and assists trade-offs and decisionmaking

· Reduces uncertainty in project completiondeadlines

· Avoids costly time overruns· Provides expert advice that designers and

clients understand· Gives high quality clear outputs that make

a real contribution to project success· Enables corrective action advice to mitigate

programme slippages and variations

PLANNINGPLANNINGPLANNINGPLANNINGPLANNING

Page 26: Price Index Phil

Philippines 2011

Davis Langdon & Seah Philippines Inc.

Construction Cost Handbook

4th Floor, Kings Court 1 Building2129 Pasong Tamo, Makati City 1231, Philippines

Tel: (632) 811 2971 Fax: (632) 811 [email protected]

DLS

PHILIPPIN

ES 2011C

onstruction Cost H

andbook