PRICOL LIMITEDPlant III Perianaickenpalayam Coimbatore
INDUSRTIAL VISIT SEMINAR
Presented by,
ABHIN CHANDRAMOHAN , 8302
ARJUN CHANDRAN , 8309
DHEERAJ MURALI , 8316
PEEYUSH U, 8341
SHIJ IL P K , 8352
ABOUT PRICOL
PRICOL - Premier Instruments & Controls Limited
Started in 1975 as Automobile Ancillary Unit
Diversified toElectronic Control Instruments, Precision Machine Tools Panel and Sensor Instruments
Only Indian automotive instrumentation firm to obtain the coveted ISO 9001 Certificate
LOCATIONS
QUALITY & TPM TPM- Total Productive Manufacturing
TPM :- system with total involvement of all employees to achieve utilization of all resources.
Good quality achieved through i. Systematic training and motivation of
employeesii.Complying with customer requirements iii.Complying with statutory/regulatory
requirementsiv.Improving the efficiency and
effectiveness of the Quality Management Systems
CERTIFICATES
OHSAS 18001 International occupational health and safety management system specification
ISO 14000 Environmental management standards
ISO TS 16949Defect prevention and the reduction of
variation and waste in the supply chain
PRODUCTS
Idle Speed Control Valve
Oil pumpHydraulic Cab Tilting & Cylinder Assembly
Sintered components
CAB TILTING & CYLINDER ASSEMBLY
Pump Assembly Hand-operated reciprocating Piston type In-built Pressure Relief Valve
Cylinder Assembly Double Acting
CylinderBore Size- 25 mm, 35
mm & 50 mm
OIL PUMP
Geo rotor typeChain Driven /
Crankshaft DrivenInbuilt Pressure
Relief Valve
IDLE SPEED CONTROL VALVES
Part of the Fuel Management System
Controls the volume of air flowing through the throttle valve based on signals from ECU
Improves fuel efficiency by reducing and stabilizing the idle speed
SINTERED COMPONENTS
Oil-less BearingsGear Shifter partsPistonsSlack Adjuster Parts
GearsGerotorsHubsValve Plates
CUSTOMERS
DEPARTMENTSPDE Pumps
i. Endurance testingii.Protoshop
Pump production and assemblyCabin lift Production and
assemblyQuality controlHeat treatment Powder metallurgy
PDE PUMPS
RFQ
Flow Of Activities
Design & Drawings
Cost Estimation
EvaluationProtoshopManufacturing
RFQ
RFQ- request for quoteAn order from customerSpecifications of product like
dimensions, performance characteristic , duration of usage etc specified
Fed to PLM software PLM software used is WINDCHILLConnects sales, purchase, QE,
Materials section, production etc
DESIGN & DRAWINGDevelopers will sit together to decide on the
mode of operation
3 modes of development :-i. existing designii.modify a design iii.develop an entirely new design
Modifications to existing design preferred over entirely new design
Cost of development is considerably reduced
Dimensioned drawings are made in AUTOCAD
COST ESTIMATIONCosts of individual parts added
together to form the net costIncludes
i.Transportationii.Handling chargesiii.Tooling cost iv.Assembly line expensesv.Modification costvi.Development cost
EVALUATIONEvaluation of product is done
with respect to RFQ
Unsatisfactory Redisgn
Estimate of product passing the evaluation stage will be send to the customer.
If they are satisfied an order for sample product is placed.
PROTOTYPEDone in protoshop 2 type samples are created 1.Proto sample 2. Tooled up samplePrototypes tested for endurance
and performanceProducts send to the customerCustomer use those products and
send a report back contd
Feedback include corrections and alterations
Corrections made and product is send back
Procedure followed till a refined product is obtained
Frequent and orderly customer relations make up an essential part of PDE.
Proto type production is done by human beings without help of CNC machine.
Skilled labour is an essential part of protoshop.
contd
Pricol houses machines like lathe, surface grinder, filing machine, drilling machine, ultra finishing machines
Prototypes produced are tested for accuracy and dimensional correctness
Quality analysis of prototypes produced are done
Instruments like profile projector, hardness testing machines, gauges, circularity checker etc. are present
ENDURANCE & PERFORMANCE TESTING
Testing a product is generally done in three stages. 1.Before Endurance2. Endurance Test3. After Endurance.
Before Endurance testing Specifications are entered into test
report. Visually inspected for severe damage. Run in test rig to detect any loosely
fitted part
Endurance testing:- Major part of testing procedure. Product subjected to extreme conditionPumps are run at rated speed for 500 hours.
Every day the machine runs as three shifts.
Continuous supervision of testing is carried out.
After the prescribed testing duration report send to supervisor.
After Endurance test:- Data is verified by supervisor Checks whether value is in permissible range
If values within limits then the product is certified fit for working
TEST RIGS AT PRICOLVarious test rigs present at Pricol are
1. Endurance Test Rig -Oil Pump Assy – 4S2. Endurance Test Rig -Table Top Type3. Endurance Test Rig -AFC & Fuel Pump Assy4. Endurance Test Rig -Oil Pump Assy - 2S5. Endurance Test Rig- Actuator - 2S6. Endurance Test Rig-Cabin cylinder & Pump7. Climatic Chamber -Hot, Cold & Humidity Chamber
8. Vibrometer
PRICOL has the most modern PM plant in South India
Process of -Blending fine powdered materials,-Pressing them into a desired shape -Heating the compressed material
4 basic steps: (1) Powder manufacture(2) Powder mixing and blending(3) Compacting(4) Sintering
POWDER METALLURGY
Powdered metal - obtained from suppliers - stored in silos based on their grade number.
Blending: Proper mixing of powders and additives to achieve metal composition of desired quality.
Fe, Cu and C: major constituents
To the mixture lubricant named kenolube is added.
Blending is done by rotating the powdered mixture for about 40 minutes.
MH system like crane and EOT used to transport powder
3rd stage is compacting
Process of pressing the powder in die
Stage where the powders attain shape of product
Density of product is determined by tonnage used
Presses of tonnages 400T, 200T & 145T used
Die for compacting is made from tooling section
Spark cutting, wire cutting etc are used to cut tool from HSS.
Sintering: After compacting the product is heated
Heating stars at 350°C and ends at 1250°C.
Heating is gradual
After heating the product is passed to vibro de-burring system
Extra fins are removed by vibrating material along with marble like granules.
After de-burring the product is sized
These products are sent for heat treatment.
HEAT TREATMENT
Heat treatment of sintered product is carried out.
Rotary furnace is used to carry out heat treatment of sintered product
Parts are arranged in trays
Placed inside underground chamber from where it is heated
FURNACES
PRODUCTION & ASSEMBLY
Aluminum casting brought from other factories
Casting are finished and made dimensionally correct using CNC machines
Gears for pumps are procured from PM plant
Assembling is carried out in assembly line
Parts are brought into assembly line are entered in register
Man and machine together assemble the components
Compressed air operated screwdrivers are used
Each and every part cleaned by jet of compressed air
Entire room air conditioned to prevent dust
Assembled products are checked for flaws
Certified products are packed
Packed products send to store
Dispatching section is attached to store
QUALITY ENGINEERING
Quality of product is checked frequently
Randomly selected samples send to QE
Products are tested based on standards
Inspection grade slip gauges are kept here
Calibration of shop floor measuring insturment carried out
Instruments used at QE
Digital Superficial Rockwell Hardness Testing Machine
Vickers Hardness Testing Machine
Brinnel Hardness Testing Machine
Case Hardening Process Tester
Micro Vickers Hardness Testing Machine
Coordinate Measuring Machine
Profilometer
THANKS TO
M r s . D I V YA R S E N I O R O F F I C E R , T R A I N I N G , P R I C O L
Mr. RAJASEKHARAN H E A D P D E P U M P S , P R I C O L
M R . G E R A L D D E S I G N E N G I N E E R , P R I C O L
M r. S E N T H I L
S U P E R V I S O R , P R I C O L
THANK YOU