PRIMEQUEST 520A/520/420Installation Planning Manual

(errata 2008/09/19 and 2008/12/18 incorporated)

Page 2: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Comments… Suggestions… Corrections…The User Documentation Department would like to know your opinion on this manual. Your feedback helps us to optimize our documentation to suit your individual needs.

Fax forms for sending us your comments are included at the back of the manual.

There you will also find the addresses of the relevant User Documentation Department.

Copyright and Trademarks

This manual is printed on paper treated with chlorine-free bleach.

Copyright © FUJITSU LIMITED and Fujitsu Technology Solutions GmbH 2006 - 2009.

All rights reserved.Delivery subject to availability; right of technical modifications reserved.

All hardware and software names used are trademarks of their respective manufacturers.

Page 3: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Environmental protection and serviceThe PRIMEQUEST systems have a long life expectancy, not only because of the excellent expansion options they offer, but also because of the quality of the products.

As technology continues to develop, however, ever greater volumes of data will need to be processed. More and more demands are being placed on storage capacity, speed and computer system design. So when you eventually want to replace your PRIMEQUEST system with a newer model and dispose of the old device, we can also offer you support in this area.

Recycling old computer equipment is already a tradition at Fujitsu Technology Solutions: We have been redeeming and reusing old computer systems for many years now. Even at the design stage, particular emphasis is placed on the reusability of components and materials.

Your PRIMEQUEST system is manufactured to the greatest possible extent from environ-mentally friendly materials that can be fully recycled.

Read on through the next sections for a brief look at some of the measures we have intro-duced in an effort to protect the environment as well as our tips and suggestions for environ-mentally friendly handling of your system.

Environmentally friendly product design and development

This product has been designed in accordance with Fujitsu Technology Solutions Guideline FSC 03230 “environmentally friendly product design and development”.

This means that the designers have taken into account critical factors such as durability, selection of materials and coding, emissions, packaging, the ease with which the product can be dismantled and the extent to which it can be recycled.

This saves resources and thus reduces the harm done to the environment.

Production and development of the PRIMEQUEST systems are certified in accordance with the environment management system DIN ISO 14001.

Note on saving energy

If your device does not have to remain switched on permanently, only switch it on when you are ready to use it and then switch it off again during long breaks and when you finish your work.

1

Page 4: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Environmental protection and service

Note on dealing with consumables

Please dispose of printer consumables and batteries in accordance with local government regulations.

Note on labeling plastic housing parts

Please avoid sticking your own labels on plastic housing parts wherever possible, since this makes it difficult to recycle them.

Take-back, recycling and disposal

Our remarketing and recycling center is certified in accordance with the ECO Audit Regulation of the European Community. Contact it for details on redeeming and reusing devices and consumables within Europe:

Tel. +49 (0) 5251 8 18010Fax +49 (0) 5251 8 18015URL http://www.ts.fujitsu.com/recycling

You can also consult your local Fujitsu Technology Solutions branch office/subsidiary.

Service

If you have any complaints in relation to missing/faulty parts, please contact the complaints department of Fujitsu Technology Solutions:

Tel. +49 (0) 5251 8 22222Fax +49 (0) 5251 8 22029

You can also submit complaints via the internet:

http://abgadwda.abg.fsc.net/RLC/Email: [email protected]

In case of a technical problem with Fujitsu Technology Solutions products, or If you have questions on setup or operation: our technical support specialists can offer fast and competent assistance: http://www.ts.fujitsu.com/support/helpdesk.html

You will also find information here on products, telephone numbers, etc.

The Call Management Center (CMC) can be reached in Germany as follows:

Tel. +49 01805 4040Fax +49 01805 336779

2

Page 5: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

DE Dieses Gerät ist entsprechend der europäischen Richtlinie 2002/96/EGüber Elektro- und Elektronikaltgeräte (waste electrical and electronic equipment - WEEE) gekennzeichnet. Die Richtlinie gibt den Rahmen für eine EU-weit gültige Rücknahme und Verwertung der Altgeräte vor.

EN This appliance is labelled in accordance with European Directive 2002/96/EG concerning used electrical and electronic appliances (waste electrical and electronic equipment - WEEE). The guideline determines the framework for the return and recycling of used appliances as applicable throughout the EU.

AR 2002/96/(waste electrical and electronic equipment - WEEE).

.BG 2002/96/EG

(waste electrical and electronic equipment - WEEE).

CS Tento spot ebi je ozna en v souladu s evropskou sm rnicí 2002/96/EG o nakládání s použitými elektrickými a elektronickými za ízeními (waste electrical and electronic equipment - WEEE). Tato sm rnice stanoví jednotný evropský (EU) rámec pro zp tný odb r a recyklování použitých za ízení.

DA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF om affald af elektrisk- og elektronisk udstyr (waste electrical and electronic equipment - WEEE). Dette direktiv angiver rammerne for indlevering og recycling af kasserede apparater gældende for hele EU.

EL µ µ 2002/96/(waste electrical and electronic equipment - WEEE).

µ µ ’ .ES Este aparato está marcado con la Directiva europea 2002/96/CE relativa al uso de aparatos eléctricos y electrónicos

(Residuos de aparatos eléctricos y electrónicos). La directiva proporciona el marco general válido en todo el ámbito de la Unión Europea para la retirada y la reutilización de los residuos de los aparatos eléctricos y electrónicos.

ET Käesolev seade on märgistatud vastavalt direktiivile 2002/96/EÜ elektri-ja elektroonikaseadmete jäätmete kohta. Direktiiv sätestab elektri- ja elektroonikaseadmete jäätmete tagastamise ja ringlussevõtu raamtingimused Euroopa Liidus.

FA 2002/96/EG ((waste electrical and electronic equipment - WEEE .

.FI Tämän laitteen merkintä perustuu käytettyjä sähkö- ja elektroniikkalaitteita (waste electrical and electronic equipment -

WEEE) koskevaan direktiiviin 2002/96/EG. Tämä direktiivi määrittää käytettyjen laitteiden palautus- ja kierrätys-säännökset koko EU:n alueella.

FR Cet appareil est marqué selon la directive européenne 2002/96/CE relative aux appareils électriques et électroniques usagés(waste electrical and electronic equipment - WEEE). La directive définit le cadre pour une reprise et une récupération des appareils usagés applicables dans les pays de la CE.

HE 2002/96/EG (waste electrical and electronic equipment - WEEE).

, , .HR Ovaj je ure aj ozna en u skladu s europskom smjernicom 2002/96/EG o otpadnim elektri nim i elektronskim ure ajima

(waste electrical and electronic equipment - WEEE). Smjernica odre uje okvir za povratak i zbrinjavanje otpadnih ure aja valjan u cijeloj Europskoj Uniji.

HU Ez a készülék az elhasznált villamossági és elektronikai készülékekr l szóló 2002/96/EK irányelvnek megfelel jelölést kapott.Ez az irányelv a már nem használt készülékek visszavételének és hasznosításának EU-szerte érvényes kereteit határozza meg.

IT Questo apparecchio dispone di contrassegno ai sensi della direttiva europea 2002/96/CE in materia di apparecchi elettrici ed elettronici (waste electrical and electronic equipment - WEEE). Questa direttiva definisce le norme per la raccolta e il riciclaggio degli apparecchi dismessi valide su tutto il territorio dell’Unione Europea.

KO / (waste electrical and electronic equipment - WEEE)2002/96/EG .

EU .LT Šis prietaisas yra pažym tas pagal Europos bendrijos direktyv 2002/96/EG d l naudot elektrini ir elektronini prietais

(waste electrical and electronic equipment - WEEE). Ši direktyva apibr žia visoje ES galiojan i naudot prietais gr žinimo ir perdirbimo tvark .

LV Š ier ce ir mar ta atbilstoši Eiropas direkt vai 2002/96/EG par elektriskaj m un elektroniskaj m ier c m (waste electrical and electronic equipment – WEEE). Direkt va nosaka veidu, k ES teritorij j realiz nolietoto ier u nodošana un p rstr de.

Page 6: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

MK 2002/96/ (waste electrical and electronic equipment – WEEE).

, .MS Alat ini bersesuaian dengan garis panduan Eropa 2002/96/EG tentang alat-alat tua elektrik dan elektronik (waste electrical

and electronic equipment - WEEE) .Garis panduan tersebut memberi rangka rujukan yang berlaku di seluruh Eropa untuk penerimaan balik dan penggunaan alat-alat tua.

NL Dit apparaat is gekenmerkt in overeenstemming met de Europese richtlijn 2002/96/EGbetreffende afgedankte elektrische en elektronische apparatuur (waste electrical and electronic equipment - WEEE). De richtlijn geeft het kader aan voor de in de EU geldige terugneming en verwerking van oude apparaten.

NO Dette apparatet er klassifisert i henhold til det europeiske direktivet 2002/96/EF om avhending av elektrisk- og elektronisk utstyr (waste electrical and electronic equipment – WEEE). Direktivet angir rammene for innlevering og gjenvinning av innbytteprodukter.

PL Urz dzenie to oznaczono zgodnie z europejsk wytyczn 2002/96/EG o zu ytych urz dzeniach elektrycznych i elektronicznych (waste electrical and electronic equipment - WEEE). Wytyczna ta okre la ramy obowi zuj cego w ca ej Unii Europejskiej odbioru i wtórnego wykorzystania starych urz dze .

PT Este aparelho está marcado em conformidade com a Directiva 2002/96/CE relativa aos resíduos de equipamentos eléctricos e electrónicos (waste electrical and electronic equipment - WEEE). A directiva estabelece o quadro para a criação de um sistema de recolha e valorização dos equipamentos usados válido em todos os Estados Membros da União Europeia.

RO Acest aparat este marcat corespunz tor directivei europene 2002/9/CE în privin a aparatelor electrice i electronice vechi (waste electrical and electronic equipment – WEEE). Directiva prescrie cadrul pentru o preluare înapoi, valabil în întreaga UE, i valorificarea aparatelor vechi.

RU 2002/96/EG (waste electrical and electronic equipment - WEEE).

.SK Tento spotrebi je ozna ený v súlade s európskou smernicou 2002/96/EG o nakladaní s použitými elektrickými a

elektronickými zariadeniami (waste electrical and electronic equipment - WEEE). Táto smernica stanoví jednotný európsky (EU) rámec pre spätný odber a recyklovanie použitých zariadení.

SL Ta naprava je ozna ena v skladu z evropsko smernico o odpadni elektri ni in elektronski opremi (waste electrical and electronic equipment - WEEE). V okviru smernice sta dolo ena prevzem in recikliranje starih naprav, ki veljata v celotni Evropski uniji.

SQ Ky aparat përmban shënjën e aparaturave elektrike dhe elektroteknike sipas Udhëzimit 2002/96/EG (waste electrical and electronic equipment - WEEE). Udhëzimi jep kuadrin ligjor për te drejtën e kthimit mbrapsht të aparaturave të përdorura në të gjithë BE.

SR Ovaj je aparat ozna en u skladu sa evropskom smernicom 2002/96/EGo otpadnim elektri nim i elektronskim aparatima (waste electrical and electronic equipment - WEEE). Smernica odre uje okvir za povratak i reciklažu otpadnih aparata koji važi u celoj Evropskoj Uniji.

SV Denna enhet är märkt i enlighet med der europeiska direktivet 2002/96/EG om avfall som utgörs av eller innehåller elektroniska produkter (waste electrical and electronic equipment - WEEE). Direktivet anger ramarna för inom EU giltigt återtagande och korrekt återvinning av uttjänta enheter.

TH European Guideline 2002/96/EG -( - – WEEE)

-TR Bu cihaz, ömrünü doldurmu elektrikli ve elektronik cihazlar ile ilgili Avrupa yönetmeli i 2002/96/EG’ye (waste electrical and

electronic equipment – WEEE) uygun ekilde i aretlenmi tir.Bu yönetmelik, eski cihazların geri alımı ve de erlendirilmesi ile ilgili AB-çapındaki uygulamaların çerçevesini belirtmektedir.

UK 2002/96/EG , (waste electrical and electronic equipment - WEEE).

, ,.

ZF 2002/96/EG WEEE

ZH 2002/96/EG waste electrical and electronic equipment – WEEE

Page 7: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

U41644-J-Z816-5-76 TEMPERATURE 1

The effect of temperature onthe reliability of IT installations

High ambient temperatures and the associated high component temperatures have adeleterious effect on all technical products and thus also on IT installations.

The following areas are particularly affected:

• FunctionalityThe propagation time of electrical signals increases with temperature. If the tem-perature increases beyond certain limits (at present approx. 100 °C crystal tempera-ture) this will lead to malfunctions, particularly in the case of fast processors.

• WearStorage media, and in this case particularly magnetic tapes, suffer from wear due tofriction. The amount of wear increases with temperature, and beyond a certain point(from about 45 °C tape temperature) it rises drastically.

• Failure rate and MTBFThe failure rate of a component, λ, is generally determined by mechanisms whosereaction time increases when heated and thus at higher temperatures. This meansthat the failure rate will also increase with temperature. The actual rate of increasewill depend on numerous additional factors, such as different component technology,where the component is installed, and so on.

The measure of a system’s reliability is generally given in terms of its MTBF (meantime between failures), which is the reciprocal of the failure rate (MTBF = 1/λ ). Ac-cording to the information in the document MIL-HDBK-217F (Reliability Prediction ofElectronic Equipment. Department of Defense, Washington, D.C. 1990) the variationwith ambient temperature of the MTBF value for an IT installation follows the pathshown in the following diagram. This graph is normalized on the MTBF value at anambient temperature of 25 °C.

You can see from this diagram that increasing the ambient temperature by around15 °C will halve the MTBF.

Relative MTBF depending on the ambienttemperature

020406080

100120140

15 25 35 45 55

Ambient temperature (°C)

Rel

.MT

BF

(%)

Rel. MTBF

Page 8: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

The effect of temperature on the reliability of IT installations

TEMPERATURE 2 U41644-J-Z816-5-76

Installation instructions

IT installations are generally designed in such a way that cooling air is drawn in throughthe door at the front and the warmed air expelled through the back of the system cabi-net.

The volume of air actually throughput will depend on the power of the fans that areused; for a fully configured high-end system it may be as much as 1200 m3/h. The heatthat needs to be extracted corresponds to the mains power consumption and this willdepend on the configuration. High-end systems may convert up to 4 kW to heat.

The following points should be noted to ensure optimal cooling:

In the machine room

• Provide an air-conditioning system with sufficient power to deal with the amount ofheat that will have to be extracted.

• Make air intake available from the false floor near to the front of the cabinets.

• Install suitable floor plates (e. g. slotted) to provide the required throughput of air.

• Extract exhaust air from the area behind the system cabinets.

• Always arrange cabinets with fronts and backs side by side (see the followingillustration).

• Where cabinets are arranged in several rows, always position the rows front-to-frontor back-to-back (see the following illustration).

• Make sure that rows are no closer together than the installation distance (1 m).

• Do not place isolated units in the corner of a room; they should be at least 1 m awayfrom all walls.

Inside the system

• Where units are not fully configured all vacant slots must be covered with blankingplates.

• Cables must be arranged to obstruct the air-flow as little as possible.

• Keep the openings for air intake and outlet clear.

Page 9: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

The effect of temperature on the reliability of IT installations

U41644-J-Z816-5-76 TEMPERATURE 3

Floor ( false floor )

Air intake

Ceiling

Air outlet

Sketch of the cooling function

Page 10: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

The effect of temperature on the reliability of IT installations

TEMPERATURE 4 U41644-J-Z816-5-76

Checklist for cooling-related malfunctions

Temperature of the input air (room temperature) is too high(desired temperature < 25 °C, maximum value < 32 °C)

Measuring points

The temperature should be measured at two places within the air intake area at the frontof the system:1. At floor level underneath the front door of the cabinet.2. In the middle of the front door of the cabinet.

Check the following

• Is the air-conditioner powerful enough and is it working properly?

• Have the cabinets been arranged as specified in the above installation instructions?

• Are the air intake and outlet openings of the room’s ventilation system located asspecified in the above installation instructions?

Temperature of the exhaust air from the system is too high = not enoughthroughput(desired temperature < Tinput + 10 °C)

Measuring points

The temperature should be measured at three places at the rear of the system:1. At the back of the cabinet in the middle of the back door.2. At the back of the cabinet next to the top air outlet opening on the back door.3. At the back of the cabinet 0.1 m below the room ceiling.

Check the following

• Are the cabinet’s air intake and outlet openings clear?

• Have the cables been positioned as directed by the installation instructions?

• Have all the necessary blanking plates been installed?

Page 11: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

FOR SAFE OPERATIONThis manual contains important information regarding the use and handling of this product. Read this manual thoroughly. Use the product according to the instructions and information available in this manual. Keep this manual handy for further reference.

Fujitsu and Fujitsu Technology Solutions make every effort to prevent users and bystanders from being injured or from suffering damage to their property. Use the product according to this manual.

ABOUT THIS PRODUCTThis product server is designed and manufactured for use in standard applications such as office work, personal device, household appliance, and general industrial applications. This product is not intended for use in nuclear-reactor control systems, aeronautical and space systems, air traffic control systems, mass transportation control systems, medical devices for life support, missile launch control systems or other specialized uses in which extremely high levels of reliability are required, the required levels of safety cannot be guaranteed, or a failure or operational error could be life-threatening or could cause physical injury (referred to hereafter as “high-risk” use). You shall not use this product without securing the sufficient safety required for the high-risk use. If you wish to use this product for high-risk use, please consult with sales representatives in charge before such use.

U41644-J-Z816-5-76

Page 12: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

RADIO FREQUENCY INTERFERENCE STATEMENT

The following notice is for EU users only.

The following notice is for USA users only.

Laser standards

WARNING: This is a product which meets Class A of EN55022. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures.

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

This equipment includes Class 1 laser products and complies with FDA Radiation Performance Standards, 21 CFR 1040.10 and 1040.11, and the International Laser Safety Standards IEC60825-1: 2001.

U41644-J-Z816-5-76

Page 13: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

TRADEMARK ACKNOWLEDGEMENTSAdobe, Acrobat, and Reader are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and/or other countries.Ethernet is a registered trademark of Fuji Xerox Co., Ltd. and Xerox Corporation in the United States and other countries.All other product names mentioned herein are the trademarks or registered trademarks of their respective owners.Every system and product name in this manual are not always noted with trademark (™) or registered trademark (®) symbols.

The contents of this manual shall not be disclosed in any way or reproduced in any media without the express written permission of Fujitsu Limited or Fujitsu Technology Solutions GmbH.

All Rights Reserved, Copyright FUJITSU LIMITED and Fujitsu Technology Solutions GmbH 2006 - 2009

U41644-J-Z816-5-76

Page 14: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 15: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Revision History (1/2)

Edition DateRevised section

(Added/ Deleted/ Altered)Details

01 2006-02-20 ⎯ ⎯02 2006-04-17 Section 1.3 (Altered)

Section 2.2.1 (Altered)

Section 2.2.2 (Altered)

Section 2.2.3 (Altered)

Appendix A.1 (Altered)

Appendix A.1.2 (Added)

• Modification of model names of PCI_Box and expansion file unit

• Addition of SCSI device with VHDCI connector in Figure 2.2

• Modification of the connector type of Gigabit Ethernet card (optical) in Figure 2.3

• Addition of the model names of Fibre Channel cable with an adapter

• Addition of description for the pull-out stabilizer and total revision

• Addition of conditions for mounting in non-Fujitsu racks

03 2006-08-11 Entire manual (Added/Altered)

Section 1.3 (Added/Altered)

Section 2.2.4 (Added)

Section 2.3 (Altered)

• Addition of the information about PRIMEQUEST 520

• Correction of illustrations due to change in specifications for the stabilizer

• Correction of erroneous descriptions

• Addition of the installation specification table for PRIMEQUEST 520

• Modification of values for installation specifications

• Addition of the illustration for the external interface connection port in PRIMEQUEST 520

• Correction due to change in specifications for the power distribution box for use in outside Japan

Note: In this table, a revised section is indicated by its section number in the current edition. An asterisk (*) indicates a section in the previous edition.

U41644-J-Z816-5-76

Page 16: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

03 2006-08-11 Section 2.4 (Altered)Appendix A.1.1 (Added)

Appendix A.2.3 (Altered)

• Modification of specifications for AC cables

• Addition of specifications and illustrations for the stabilizer

• Addition of illustrations for the cable routes• Modification of the cable port size in Figure

A.1204 2007-03-05 Entire manual

Section 2.4 (Altered)

• Correction of erroneous descriptions

• Modification of plug type for Japan.05 2007-08-31 Section 2.1 (Altered)

Section 2.2.1 (Altered)Section A.1.2 (Added)

• Addition of PEXU to Figure 2.1• Addition of PEXU to Figure 2.2• Addition of conditions for mounting in a non-

Fujitsu rack06 2008-03-10 Entire manual

Appendix A.1.1 (Added)

• Addition of information of PRIMEQUEST 520A

• Addition of description for selecting Fujitsu 19-inch global racks

07 2008-04-10 Section 2.2.1 (Altered) • Correction of the order codes of UPS cablesFujitsu Technology Solutions adapts text, substitutes the order number of the manual, adds Fujitsu Technology Solutions’ order numbers in manual references, changes the description where the PRIMEQUEST manuals are available, adds the specification and shape of the IEC 60309 power strip plugs used by Fujitsu Technology Solutions, refers to the documentation for Fujitsu Technology Solutions’ PRIMECENTER racks, deletes Fujitsu specific rack descriptions (section “A.2 Fujitsu 19-inch Global Racks”), substitutes the comment form, and corrects text according to the tables of corrections (errata) 2008/09/19 and 2008/12/18.

Note:

The PRIMEQUEST 520A model is not supported by Fujitsu Technology Solutions.

Note: In this table, a revised section is indicated by its section number in the current edition. An asterisk (*) indicates a section in the previous edition.

(1/2)

Edition DateRevised section

(Added/ Deleted/ Altered)Details

U41644-J-Z816-5-76

Page 17: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Preface1

This manual describes requirements and concepts for installation and facility planning for the PRIMEQUEST 520A*/520/420. Installation and facility planning should be performed together with your assigned Fujitsu representatives according to the instructions provided in this manual.

This manual is intended for persons introducing and planning the installation of a PRIMEQUEST server, or those who manage server operations. The reader of this manual is expected to have some knowledge of or experience with server installation planning.

Structure and Contents of this ManualThis manual is organized as described below:

CHAPTER 1 Installation ReferenceThis chapter provides equipment configurations, external views, installation specifications, and outline drawings of PRIMEQUEST units.

CHAPTER 2 Connection ReferenceThis chapter provides cable connection diagrams and lists of required cables.

CHAPTER 3 Precautions Pertaining to Delivery and InstallationThis chapter describes precautions regarding delivery and installation of the equipment.

Appendix A RacksThis appendix provides reference material for expansion racks in which a PRIMEQUEST 520A*/520/420, PCI_Box, and the power distribution box can be mounted.

Acronyms and Abbreviations, Index

Acronyms & AbbreviationsThis section provides the full spellings of the acronyms and abbreviations used in this manual.

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 i

Page 18: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 4

IndexThe index provides page references for keywords to allow the reader to quickly find necessary information.

Other Reference ManualsThe manuals listed below are related to this manual.Before installing the equipment, first read the PRIMEQUEST 500A/500/400Installation Manual (U41632-J-Z816-x-76/C122-E001EN) and see the relatedmanuals:

• SPARC Enterprise/PRIMEQUEST Installation Planning Manual (U41296-J-Z816-x-76/C120-H007EN)

• PRIMEQUEST 520A/520/420 System Design Guide (U41643-J-Z816-x-76/C122-B009EN)

Environmental Requirements for Using This ProductThis product is a general-purpose computer intended for use in a computer room.

Conventions for Alert MessagesThis manual uses the following conventions to show the alert messages. An alert message consists of an alert signal and alert statements.

Alert messages in the textIn the text, the alert messages are indented to distinguish them from regular text. A wider space precedes and follows the message to show where the message begins and ends.

(Example)

The template is created on a scale of 1:50. When printing the template from Acrobat® Reader® or Adobe® Reader® software, be sure to uncheck the checkbox of Fit to page on the Print dialog box.

This indicates information that could help the user to use the product more effectively.

ii U41644-J-Z816-5-76

Page 19: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

Reader Feedback• The Remote Customer Support System (REMCS) is not supported in Europe.• In this manual, it is assumed that two BMMs (optional products) can be connected to a single I/O

unit and IOX; this is reflected both in the explanations and in the figures included in this manual. At present, however, the PRIMEQUEST 420 series supports only connection to one BMM (BMM#0) per I/O unit and IOX.

• If you find any errors or unclear statements in this manual, please fill in the "Reader’s Comment Form" sheet at the back of this manual and forward it to the address indicated at the bottom of the sheet.

• This manual is subject to revision without prior notice.• The PDF version of this manual is best viewed in Adobe® Reader® with a magnification of

100% and Single Page for the page layout.

U41644-J-Z816-5-76 iii

Page 20: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 21: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Contents

Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iStructure and Contents of this Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iOther Reference Manuals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iiEnvironmental Requirements for Using This Product . . . . . . . . . . . . . . . . . . . . . iiConventions for Alert Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii

CHAPTER 1 Installation Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11.1 Equipment Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11.2 Views of the Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-31.3 Installation Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-51.4 Equipment Floor Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-131.5 Cooling Air and Exhaust Flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-14

CHAPTER 2 Connection Reference. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12.1 Connection Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12.2 Signal Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4

2.2.1 Basic interfaces and peripherals . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-42.2.2 LAN and other device connections . . . . . . . . . . . . . . . . . . . . . . . . . 2-82.2.3 Notes on cabling PRIMEQUEST 520A/520/420 . . . . . . . . . . . . . . . 2-112.2.4 Details of external interface connection ports . . . . . . . . . . . . . . . . . 2-12

2.3 Power Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-162.3.1 Input power system diagram for the PRIMEQUEST 520A/520/420 2-162.3.2 Input power system diagram for the PRIMEQUEST 520A/520/420

including peripherals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-212.3.3 Power distribution box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30

2.4 Input Power Supply Unit Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-312.4.1 PRIMEQUEST 520A/520/420 main unit . . . . . . . . . . . . . . . . . . . . . 2-312.4.2 PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-322.4.3 Cables between the power distribution box and

power distribution panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-332.5 AC Cable Connection under a Free-Access Floor

(Only for Use inside Japan and General Use outside Japan) . . . . . . . . . . . 2-342.6 Circuit Breaker Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35

CHAPTER 3 Precautions Pertaining to Delivery and Installation. . . . . . . . 3-13.1 Elevator Load Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13.2 Earthquake Preparedness Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2

U41644-J-Z816-5-76 v

Page 22: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Contents

Appendix A Racks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1A.1 Where you can find information on PRIMECENTER racks . . . . . . . . . . . . . . . A-1A.2 Rack Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

A.2.1 Conditions for mounting in Fujitsu 19-inch global racks . . . . . . . . A-2A.2.2 Conditions for mounting in another company's rack . . . . . . . . . . . A-9

Acronyms & Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AB-1

Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IN-1

vi U41644-J-Z816-5-76

Page 23: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Contents

Figures

Figure 1.1 Configuration of the PRIMEQUEST 520A/520/420 main unit . . . 1-2Figure 1.2 External view of the PRIMEQUEST 520A/520/420 main unit . . . 1-3Figure 1.3 External view of the PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4Figure 1.4 Service area for the PRIMEQUEST 520A/520/420 main unit . . . 1-13Figure 1.5 Cooling air and exhaust flows of the

PRIMEQUEST 520A/520/420 main unit . . . . . . . . . . . . . . . . . . . . 1-14Figure 1.6 Cooling air and exhaust flows of the PCI_Box . . . . . . . . . . . . . . . 1-15Figure 2.1 Equipment cable connections (1/2) . . . . . . . . . . . . . . . . . . . . . . . 2-2Figure 2.2 Interface cable connections (basic interfaces and peripherals) . . 2-5Figure 2.3 Cable connections (LAN and other device connections) . . . . . . . 2-8Figure 2.4 External interface connection ports

in the PRIMEQUEST 520A/520 main unit . . . . . . . . . . . . . . . . . . 2-13Figure 2.5 External interface connection ports

in the PRIMEQUEST 420 main unit . . . . . . . . . . . . . . . . . . . . . . . 2-14Figure 2.6 External interface ports in the PCI_Box . . . . . . . . . . . . . . . . . . . . 2-15Figure 2.7 Input power system diagram for the

PRIMEQUEST 520A/520/420 (standard configuration) . . . . . . . . 2-17Figure 2.8 Input power system diagram for the PRIMEQUEST 520A/520/420

(dual power feed configuration) . . . . . . . . . . . . . . . . . . . . . . . . . . 2-18Figure 2.9 Input power system diagram for the PRIMEQUEST 520A/520/420

for outside Japan (general) (standard configuration) . . . . . . . . . . 2-19Figure 2.10 Input power system diagram for the PRIMEQUEST 520A/520/420

for outside Japan (general) (dual power feed configuration) . . . . 2-20Figure 2.11 Input power system diagram of the PRIMEQUEST 520A/520/420

including the peripherals in a single power feed configuration (including a redundant PSU) for use in Japan (1/2) . . . . . . . . . . . 2-22

Figure 2.12 Input power system diagram of the PRIMEQUEST 520A/520/420 including the peripherals in a dual power feed configuration for use in Japan (1/2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24

Figure 2.13 Input power system diagram of the PRIMEQUEST 520A/520/420 including the peripherals in a single power feed configuration (including a redundant PSU) for use outside Japan (general) (1/2) 2-26

Figure 2.14 Input power system diagram of the PRIMEQUEST 520A/520/420 including the peripherals in a dual power feed configuration for use outside Japan (general) (1/2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28

Figure 2.15 Power distribution box (for use in Japan) . . . . . . . . . . . . . . . . . . . 2-30Figure 2.16 Power distribution box (for use outside Japan) . . . . . . . . . . . . . . 2-30Figure 2.17 AC cable connection under a free-access floor

(only for use inside Japan and general use outside Japan) . . . . . 2-34

U41644-J-Z816-5-76 vii

Page 24: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Contents

Figure 2.18 Characteristics of circuit breakers in customers' distribution panels installed in Japan . . . . . . . . . . . . . 2-36

Figure 2.19 Characteristics of circuit breakers in customers' distribution panels installed outside Japan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37

Figure A.1 Pull-out stabilizer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3Figure A.2 Securing the rack with bolt stabilizers . . . . . . . . . . . . . . . . . . . . . . A-4Figure A.3 Securing a rack with leveling feet . . . . . . . . . . . . . . . . . . . . . . . . . A-5Figure A.4 Cable route . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-6Figure A.5 Assembling the rack mounting kit . . . . . . . . . . . . . . . . . . . . . . . . . A-10Figure A.6 Rack depth conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11Figure A.7 Rack column requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-12

viii U41644-J-Z816-5-76

Page 25: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Contents

Tables

Table 1.1 Units and their specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1Table 1.2 PRIMEQUEST 520A/520 main unit installation specifications

(Model name: MC3B0R211x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5Table 1.3 PRIMEQUEST 420 main unit installation specifications

(Model name: MC3A0R111x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8Table 1.4 PCI_Box installation specifications (Model name: MC-07PBa1x) . 1-10Table 1.5 Expansion file unit installation specifications

(Model name: MC-03F111x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12Table 1.6 SAS expansion file unit installation specifications

(Model name: MC-03F111x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12Table 2.1 Cable list (basic interface and peripherals) . . . . . . . . . . . . . . . . . . 2-6Table 2.2 Cable list (LAN and other device connection) . . . . . . . . . . . . . . . . 2-9Table 2.3 AC cable specifications for the PRIMEQUEST 520A/520/420

main unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-31Table 2.4 AC cable specifications for the PCI_Box. . . . . . . . . . . . . . . . . . . . 2-32Table 2.5 Specifications of the AC cables between the power distribution box

and power distribution panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-33Table 2.6 Requirements for circuit breakers in

customers' distribution panels installed in Japan . . . . . . . . . . . . . 2-35Table 2.7 Requirements for circuit breakers in customers’ distribution panels

installed outside Japan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37Table 3.1 Elevator load requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1Table A.1 Recommended number of units to be mounted in racks. . . . . . . . A-2Table A.2 Rack installation flow. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-7

U41644-J-Z816-5-76 ix

Page 26: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 27: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

CHAPTER 1 Installation Reference1

This chapter provides the information required for installing the PRIMEQUEST 520A*/520/420 server.

1.1 Equipment Configuration

Table 1.1 lists the units that comprise the PRIMEQUEST server and the specifications. Figure 1.1 shows a sample system configuration.

Table 1.1 Units and their specifications

*1 PCI Express units can be connected to only the PRIMEQUEST 520A*/520 main unit, and up to two units can be connected.

Remarks: Units listed in Table 1.1 are mounted in the 19-inch rack which conforms to EIA. For more information about the 19-inch rack, see Appendix A, "Racks."

*: not supported by Fujitsu Technology Solutions

Unit Specifications RemarksPRIMEQUEST 520A/520/420 main unit

Unit that can contain up to two system boards (maximum of 8 CPUs) and up to two IO Units (including IOX)

Standard equipmentSize of 12U

PCI_Box Device used to expand the number of PCI or PCI Express slots.Up to one unit can be connected to the PRIMEQUEST 520A*/520/420 main unit.Four PCI units or two PCI Express units can be added with each addition of a PCI_Box. (*1) (PCI units and PCI Express units can be mounted together.)Each PCI unit has three PCI slots, and each PCI Express unit has two PCI Express slots.

Size of 4U

U41644-J-Z816-5-76 1-1

Page 28: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

*1: PRIMEQUEST 520A*/520/420 is equipped with one 200-V power distribution box as standard.

*2: To connect a power supply to the PCI_Box and the expansion file unit, two 200-V power distribution boxes are required. For single power configuration, another power distribution box (optional) is required in addition to the standard power distribution box.For dual power feed in the PRIMEQUEST 520A*/520/420, a Dual Power Feed Option is required. The Dual Power Feed Option is equipped with one 200-V power distribution box. For connecting a power supply to the PCI_Box and the expansion file unit in dual power feed configuration, see Section 2.3, "Power Cable Connections."

Remark:For more information about the 19-inch rack, see Appendix A, "Racks."

Figure 1.1 Configuration of the PRIMEQUEST 520A*/520/420 main unit

*: not supported by Fujitsu Technology Solutions

PRIMEQUEST 520A/520/420 standard configurationPRIMEQUEST 520A/520/420 + PCI_Box + expansion file unit

PRIMEQUEST 520A/520/420

PRIMEQUEST 520A/520/420

PCI_Box (*2)

Power distribution box (*1)

Power distribution box (*2)

Expansion file unit (*2)

19-inch rack 19-inch rack

12U

12U

4U

3U

1U

1U

Power distribution box (*1)1U

1-2 U41644-J-Z816-5-76

Page 29: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

1.2 Views of the Units

The following figures show different views of the units:

External view of the PRIMEQUEST 520A/520/420 main unit (Figure 1.2)External view of the PCI_Box (Figure 1.3)

Figure 1.2 External view of the PRIMEQUEST 520A*/520/420 main unit

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 1-3

Page 30: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Figure 1.3 External view of the PCI_Box

1-4 U41644-J-Z816-5-76

Page 31: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

1.3 Installation Specifications

The following tables list the installation specifications for the units:

PRIMEQUEST 520A/520 main unit installation specifications (Model name: MC3B0R211x) (Table 1.2)PRIMEQUEST 420 main unit installation specifications (Model name: MC3A0R111x) (Table 1.3)PCI_Box installation specifications (Model name: MC-07PBa1x) (Table 1.4)Expansion file unit installation specifications (Model name: MC-03F111x) (Table 1.5)

Remark: In model names, a is any digit from 1 to 9 or any letter from A to Z, while x is any letter from A to Z or blank.

Table 1.2 PRIMEQUEST 520A*/520 main unit installation specifications (Model name: MC3B0R211x)

*: not supported by Fujitsu Technology Solutions

Item Value

Dimensions[mm (in.)]

Width 482 (18.98)Depth (*1) 820 (32.28)Height 530 (20.87)

Weight [kg (lb)] (*2) 150 (330)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*8) 10944 (10373)

Exhaust air flow

[m3/min (ft3/min)]

With fans operating at low speed

10.0 (353.1)

With fans operating at high speed

14.7 (519.1)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

U41644-J-Z816-5-76 1-5

Page 32: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

*1: This value does not include any projection.

*2: Value for the case with the maximum number of optional units allowed installed.Value not including the rack-mounting rails and cable management.The weight of the unit based on the equipment configuration can be calculated from the following formula:

A = Number of SBs mounted: From a minimum of one to a maximum of two

B = Number of IOUs mounted: From a minimum of zero to a maximum of one

C = Number of IOXs mounted: From a minimum of zero to a maximum of one

D = Number of Dual Power Feed Options mounted:From a minimum of zero to a maximum of one

*3: There must be no condensation.

Air conditioning Noise [dB (A)] (*6) (*8) 56Sound power level [B (A)] (*6) (*8) 7.4Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating 3,040 W/3,200 VANot operating 200 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*7) 62 or lessLeakage current [mA] (*7) 3.5 or less

Unit weight = 103 + (11 x A) + (17 x B) + (4 x C) + (4 x D)

Item Value

1-6 U41644-J-Z816-5-76

Page 33: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7: These values are for each power cable.

*8: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

U41644-J-Z816-5-76 1-7

Page 34: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Table 1.3 PRIMEQUEST 420 main unit installation specifications (Model name: MC3A0R111x)

Item Value

Dimensions[mm (in.)]

Width 482 (18.98)Depth (*1) 820 (32.28)Height 530 (20.87)

Weight [kg (lb)] (*2) 150 (330)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 10620 (10066)

Exhaust air flow (*8)[m3/min (ft3/min)]

With fans operating at low speed

10.0 (353.1)

With fans operating at high speed

14.7 (519.1)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Noise [dB (A)] (*6) (*8) 56Sound power level [B (A)] (*6) (*8) 7.4Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating 2,950 W/3,100 VANot operating 200 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*7) 62 or lessLeakage current [mA] (*7) 3.5 or less

1-8 U41644-J-Z816-5-76

Page 35: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: This value does not include any projection.

*2: Value for the case with the maximum number of optional units allowed installed.Value not including the rack-mounting rails and cable management.The weight of the unit based on the equipment configuration can be calculated from the following formula:

A = Number of SBs mounted: From a minimum of one to a maximum of two

B = Number of IOUs mounted: From a minimum of zero to a maximum of one

C = Number of IOXs mounted: From a minimum of zero to a maximum of one

D = Number of Dual Power Feed Options mounted:From a minimum of zero to a maximum of one

*3: There must be no condensation.

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7: These values are for each power cable.

*8: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

Unit weight = 103 + (11 x A) + (17 x B) + (4 x C) + (4 x D)

U41644-J-Z816-5-76 1-9

Page 36: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Table 1.4 PCI_Box installation specifications (Model name: MC-07PBa1x)

Item Value

Dimensions[mm (in.)]

Width 482 (18.98)Depth (*1) 768 (30.24)Height 174 (6.85)

Weight [kg (lb)] (*2) 42 (92)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 2550 (2416.9)

Exhaust air flow (*7)[m3/min (ft3/min)]

With fans operating at low speed

4.49 (158.6)

With fans operating at high speed

5.85 (206.2)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Not operating(*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Noise [dB (A)] (*7) 56 (included in the main unit)

Sound power level [B (A)] (*7) 7.4 (included in the main unit)

Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating 736 W/750 VAStand-by 20 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*6) 30 or lessLeakage current [mA] (*6) 3.5 or less

1-10 U41644-J-Z816-5-76

Page 37: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: This value does not include any projection.

*2: Value for the case the maximum allowable number of optional units is mounted.Value not including the rack-mounting rails and cable management.

*3: There must be no condensation.

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: These values are for each power cable.

*7: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

U41644-J-Z816-5-76 1-11

Page 38: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Table 1.5 Expansion file unit installation specifications (Model name: MC-03F111x)

*1: This value does not include any projection.*2: Value for the case the maximum allowable number of optional units

(maximum configuration with 14 hard disk drive units) is mounted. Value not including the rack-mounting rails and cable management.

*3: There must be no condensation.*4: "Not operating" means the time when the equipment is stored.

[start of addition according to manual errata 2008/12/18]

Table 1.6 SAS expansion file unit installation specifications (Model name: MC-03F111x)

Item Value

Dimensions[mm (in.)]

Width 483 (19.01)Depth (*1) 646 (25.43)Height 133 (5.23)

Weight [kg (lb)] (*2) 34 (74.8)Air conditioning Maximum heat dissipation (in steady state)

[kJ/Hr (BTU/h)]1098 (1040.7)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] 5 to 35 (41 to 95)Humidity [%RH] 20 to 80

Not operating (*4)

Temperature [°C (°F)] -25 to 60 (-13 to 140)Humidity [%RH] 5 to 90

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz ± 1 HzMaximum power consumption/apparent power 305 W/310 VA

Item Value

Dimensions[mm (in.)]

Width 482.6 (19.01)Depth (*1) 490 (19.3)Height 133 (5.23)

Weight [kg (lb)] (*1) 25 (55.1)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 1368 (1298)

Temperature and humidity (*2)

Operating Temperature [°C] 5 to 40Humidity [%RH] 20 to 80

Not operating Temperature [°C] -40 to 60Humidity [%RH] 5 to 95

Power supply Input voltage tolerance and No. of phases 100 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz ± 3 HzMaximum power consumption/apparent power 380 W/384 VA

1-12 U41644-J-Z816-5-76

Page 39: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: Value for the case the maximum allowable number of optional units (maximum configuration with 20 hard disk drive units) is mounted..

*2: There must be no condensation.

[end of addition according to manual errata 2008/12/18]

1.4 Equipment Floor Plan

This section shows the installation area and the service area when the PRIMEQUEST 520A*/520/420 is installed in the Fujitsu 19-inch global rack. Refer to A.1, "Where you can find information on PRIMECENTER racks" for installation in PRIMECENTER racks.

Figure 1.4 Service area for the PRIMEQUEST 520A*/520/420 main unit

*: not supported by Fujitsu Technology Solutions

250(9.8)

700(27.6)

250(9.8)

800

(31.5

)1050

(41.3

)1200

(47.2

)

Pu

ll-o

ut

equ

ipm

ent

86

4 (

34

)

Are

a ta

ken

up b

y pu

ll-ou

t sta

biliz

er

480

(18.

9)

800(31.5)

800(31.5)

700(27.6)

320

(12.

6)89

5(3

5.2)

320

(12.

6)

Stabilizer(option)

Stabilizer(option)Stabilizer

(option)

MC-R7RC11

Maintenance area

Maintenance area

Front view

Unit: mm (in.)

Pull-out equipment

* This is a top view of the unit.

Stabilizer(option)

U41644-J-Z816-5-76 1-13

Page 40: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

1.5 Cooling Air and Exhaust Flows

This section explains the cooling air and exhaust flows of each cabinet.

Cooling air and exhaust flows of the PRIMEQUEST 520A/520/420 main unit (Figure 1.5)Cooling air and exhaust flows of the PCI_Box (Figure 1.6)

When planning the installation of the equipment, it is important to consider the flows of cooling air and exhaust. If the equipment is installed without giving proper consideration to these flows, a cabinet or rack may draw in the exhaust from another cabinet or rack and be adversely affected as a result. Particularly, a device that monitors the temperature of intake air may continue to output the alarm indicating abnormal intake temperature.

Figure 1.5 Cooling air and exhaust flows of the PRIMEQUEST 520A*/520/420 main unit

*: not supported by Fujitsu Technology Solutions

1-14 U41644-J-Z816-5-76

Page 41: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

Figure 1.6 Cooling air and exhaust flows of the PCI_Box

U41644-J-Z816-5-76 1-15

Page 42: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 43: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

CHAPTER 2 Connection Reference1

This chapter provides cable connection diagrams and lists of the applicable cables.

2.1 Connection Overview

Figure 2.1 shows an overview of equipment cable connections:

U41644-J-Z816-5-76 2-1

Page 44: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Figure 2.1 Equipment cable connections (1/2)

PRIMEQUEST 520A/520/420 series main unit

PCI Express card (x4 or x2) (*2)

PCI-X card (x4)

: Option

PCI card type:- LAN interface- SCSI interface- Fibre Channel

PCI card type:- LAN interface- SCSI interface- Fibre Channel

USB1.1/2.0 equipmentKeyboard, Mouse

USB1.1/2.0 equipmentKeyboard, Mouse

Display

1000Base-T LAN

Console

Fibre Channel

Console

Uninterruptible power supply (UPS)

Management LAN(for user, CE maintenance, REMCS)

BMC module (x2) USB2.0 (x2) COM (x1)

VGA (x1)

Display

Console

BMC module (x2) USB2.0 (x2) COM (x1)

VGA (x1)

CH interface (x4)

PCI_Box CTL interface (x1)

COM (x1)

UPC interface (x2)

LAN (x3:100Base-TX)

1Gbp-LAN (x4)1000Base-T

IOU (*1)

IOX (*3)

MMB

PCI_Box (x0-1)

PCIU (x1-4) (*4)

PCI_Box CTL interface (x1)

To *1

To *1(*6)

To *1

To *1

PCI-X card (x3)

PCIU interface (x1)

: Option

PEXU (x0-2) (*4) (*5)

PCI-Exp card (x2)

PCI Express unit interface (x2)

Up to 4 PCIUs or PEXUs can be mounted. PCIUs and PEXUs can be mounted together.

PCI Express card type:- Fibre Channel

2-2 U41644-J-Z816-5-76

Page 45: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: The main unit does not include an IOU/IOX Unit. IOU or IOX unit must be prepared.

*2: For PRIMEQUEST 520A*/520: x4For PRIMEQUEST 420: x2

*3: The main unit does not include an IOX. To connect the PCI_Box, one unit must be prepared.

*4: The PCI_Box includes neither a PCIU nor a PEXU. At least one of those units must be prepared.

*5: Up to two PEXUs can be connected to the PRIMEQUEST 520A*/520 main unit.

*6: PEXUs are connected by PCI unit cables (combination of CH#0/#1 and CH#2/#3 on the main unit side).

Figure 2.2 Equipment cable connections (2/2)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-3

Page 46: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.2 Signal Cable Connections

This section provides diagrams of signal-cable connections, lists of applicable cables, and notes on cabling.

Basic interfaces and peripherals (Section 2.2.1)LAN and other device connections (Section 2.2.2)Notes on cabling PRIMEQUEST 520A/520/420 (Section 2.2.3)Details of external interface connection ports (Section 2.2.4)

2.2.1 Basic interfaces and peripheralsFigure 2.2 shows the cable connections for the basic interfaces and peripheral units. Table 2.1 lists the applicable cables.

2-4 U41644-J-Z816-5-76

Page 47: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(1) Cable connection diagram

Remarks:The number in parenthesis corresponds to the number of the cables in Table 2.1.

Figure 2.2 Interface cable connections (basic interfaces and peripherals)

PRIMEQUEST 520A/520/420 series main unit

MMB (1 unit)

COM (1 port)Connector type: D-Sub 9 Pin male

UPC interface (2 ports)Connector type: D-Sub 9 Pin female

Connector type: Dedicated connector* 1 cable per PCIU* 2 cables per PEXU

Connector type: Micro D-sub 9 Pin*1 cable per PCI_Box

LAN (3 ports)Connector type: RJ45

PCI_Box CTL interface (1 port)

PCIU interface port (4 ports/IOU)

IOX (0 to 1 unit)

IOU (0 to 1 unit) / IOX (0 to 1 unit)

USB (2 ports/BMM)Connector type: USB Type-A 4 Pin

COM (1 port)Connector type: D-Sub 9 Pin male

BMM

Ultra320 SCSI portConnector type: VHDCI 68 Pin male

The Ultra320 SCSI port can be mounted in an IO Unit or in a PCI cassette of a PCI_Box.

Console

Display

Console

(6)

(10)

(10)

(10)

(10)

(9)

(8)

(8)

(3)

(3)

(3)

(4) or (5)

(1) (2)

*1

*2

To *1

To *1

Uninterruptible power supply(F987****)

Uninterruptible power supply(F987****)

Uninterruptible power supply(F987****)

PCI_Box (0 to 1 unit)

PCIU (1 to 4 units/PCI_Box)

PEXU (0 to 2 units/PCI_Box)

PCIU

PCIU

PCIU

or

PEXU

PCI_Box CTL interfaceConnector type: D-Sub 9 Pin female

PCI Express unit interface portConnector type: Dedicated connector

PCI unit interface portConnector type: Dedicated connector

VGAConnector type: D-Sub 15 Pin

USB 1.1/2.0 equipmentKeyboard, Mouse

Connector type: VHDCI 68Pin maleSCSI device (LTO library unit, etc.)

(7)

Connector type: HIDEC 68Pin maleSCSI device (DAT unit, a magnetic tape, etc.)

To *2

To *2

or

U41644-J-Z816-5-76 2-5

Page 48: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(2) Cable listWhen determining the total length of the external interface cable to be connected to the PRIMEQUEST 520A*/520/420, allow for an extra length of cable for pulling out the units.

Table 2.1 Cable list (basic interface and peripherals)

*: not supported by Fujitsu Technology Solutions

NO. Name Order code JapanOutside Japan Packaging

Length [m (ft.)]

1 Twisted pair cable (Category 5 UTP cable)

TPCBL-B005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 100Base-TX or 10Base-T is used. (category 5)RJ45 8 Pin - RJ45 8 Pin

5 (16)TPCBL-B010 Y Y 10 (33)TPCBL-B015 Y Y 15 (49)TPCBL-B030 Y Y 30 (98)TPCBL-B050 Y Y 50 (164)

TPCBL-B100 Y Y 100 (328)

2 Enhanced category 5 UTP cable

TPCBL-C005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 1000Base-T, 100Base-TX, or 10Base-T is used.(category 5e)RJ45 8 Pin - RJ45 8 Pin

5 (16)TPCBL-C010 Y Y 10 (33)TPCBL-C015 Y Y 15 (49)TPCBL-C030 Y Y 30 (98)TPCBL-C050 Y Y 50 (164)

TPCBL-C100 Y Y100 (328)

3 UPS cable DCBL-UPK05 Y Y This cable is required for connection to the UPS (F987xx).

5 (16)

DCBL-UPK15 Y Y 15 (49)

4 UPS interface branch connector

UPS-B

Y Y

Branch connector box that is used to connect two UPS (F987xx) units to a single UPC interface. (Comes with a 2.2 m cable for connecting the device to the box.)

2.2 (7)

5 UPS interface six-branch connector

UPS-B1

Y Y

Branch connector box that is used to connect six UPS (F987xx) units to a single UPC interface. (Comes with a 2.5 m cable for connecting the device to the box.)

2.5 (8)

6 SCSI cable DCBL-SCP05 Y Y Optional: Select 5 or 10 m.VHDCI 68-pin, male to VHDCI 68-pin, male

5 (16)

DCBL-SCP10 Y Y 10 (33)

Y: Supported

2-6 U41644-J-Z816-5-76

Page 49: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

Y: Supported

7 SCSI cableDCBL-SCN05 Y Y

Optional: Select 5 or 10 m.VHDCI 68-pin, male to HIDEC 68-pin, male

5 (16)

DCBL-SCN10 Y Y10 (33)

8 RS232C cable (Dsub-9Pin-9Pin, cross cable)

FMV-CBL501Y Y

1.5 (5)

9 PCI_Box CTL cable (CA78005-0053)Y Y

One cable is equipped with the PCI_Box .

5 (16)

10 PCIU cable (5m) MC-07CA11Y Y

Two cables are required for connecting the PEXUs.

5 (16)

11 USB extension cable MC-07UE11Y Y

This cable is required for connecting the main unit to a keyboard/mouse.

3 (9)

12 VGA extension cable MC-07VE11Y Y

This cable is required for connecting the main unit to a display.

3 (9)

NO. Name Order code JapanOutside Japan Packaging

Length [m (ft.)]

U41644-J-Z816-5-76 2-7

Page 50: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.2.2 LAN and other device connectionsFigure 2.3 shows the cable connections for a LAN and other device connections. Table 2.2 lists the applicable cables.

(1) Cable connection diagram

Remarks:The number in parenthesis corresponds to the number of the cables in Table 2.2.

Figure 2.3 Cable connections (LAN and other device connections)

(1)(2)

(1)(2)

(3)(4)

(3)(4)

*1

*3

*3

1000Base-SX

10/100/1000Base-T

10/100/1000Base-T

*2

*4

To *1

To *1To *2

To *3

To *3To *4

Fibre Channel card (2G)Connector type: Duplex LC connector

Gigabit Ethernet card (optical)Connector type: Duplex LC

The Fibre Channel card, Gigabit Ethernet card (optical and electricity), and 10Gigabit Ethernet card (optical) are mounted in IO Units or in PCI cassettes of PCI_Boxes.

Printer, etc.Connector type: RJ45

Gigabit Ether switchConnector type: RJ45

(1)(2) 10GBase-SR

PRIMEQUEST 520A/520/420 series

LAN system interface

Fibre Channel cable connectors are available in two shape types (SC and LC). The type to be used depends on the cards or devices to be connected. Prepare a suitable cable after checking the type of equipment to be used.

10Gigabit Ethernet card (optical)Connector type: Duplex LC

Gigabit Ethernet card (electricity)Connector type: RJ45

1Gbp LAN port (IOU)Connector type: RJ45

10Gigabit Ether switchConnector type: Duplex SC, Duplex LC

Gigabit Ether switchConnector type: Duplex SC, Duplex LC, or MTRJ

Disk array deviceConnector type: Duplex SC or Duplex LC

Fibre channel switchConnector type: Duplex SC or Duplex LC

2-8 U41644-J-Z816-5-76

Page 51: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(2) Cable listWhen determining the total length of the external interface cable to be connected to the PRIMEQUEST 520A*/520/420, allow for an extra length of cable for pulling out the units.

Table 2.2 Cable list (LAN and other device connection)

*: not supported by Fujitsu Technology Solutions

No. Name Order code JapanOutside Japan

PackagingLength [m (ft.)]

(1) Multimode Fibre Channel Cable

CBL-MLLB02 Y Y Optional: Select 2, 5, or 15 m.Dual LC connector - Dual LC connector cable Sheathless

2 (7)CBL-MLLB05 Y Y 5 (16)

CBL-MLLB15 Y Y15 (49)

CBL-MLLC05 Y Y Optional: Select 5, 10, 20, 30, 40, or 50 m.Dual LC connector - Dual LC connector cable Sheathed

5 (16)CBL-MLLC10 Y Y 10 (33)CBL-MLLC20 Y Y 20 (66)CBL-MLLC30 Y Y 30 (98)CBL-MLLC40 Y Y 40 (132)CBL-MLLC50 Y Y 50 (164)

CBL-MLLA1A(Note)

Y Y

Optional: 100 m.Dual LC connector - Dual LC connector cable Sheathed

100 (328)

(2) Multimode Fibre Channel Cable

CBL-MLSB02 Y Y Optional: Select 2, 5, or 15 m.Dual LC connector - Dual SC connector cable Sheathless

2 (7)CBL-MLSB05 Y Y 5 (16)

CBL-MLSB15 Y Y15 (49)

CBL-MLSC05 Y Y Optional: Select 5, 10, 20, 30, 40, or 50 m.Dual LC connector - Dual SC connector cable Sheathed

5 (16)CBL-MLSC10 Y Y 10 (33)CBL-MLSC20 Y Y 20 (66)CBL-MLSC30 Y Y 30 (98)CBL-MLSC40 Y Y 40 (132)CBL-MLSC50 Y Y 50 (164)

CBL-MLSA1A(Note)

Y Y

Optional: 100 m.Dual LC connector - Dual SC connector cable Sheathed

100 (328)

Y: Supported

Note: Cannot be connected to the 10Gigabit Ethernet card (optical).

U41644-J-Z816-5-76 2-9

Page 52: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Y: Supported

(3) Twisted pair cable(category 5 UTP cable)

TPCBL-B005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 100Base-TX or 10Base-T is used. (Category 5e)RJ45 8 Pin - RJ45 8 Pin

5 (16)TPCBL-B010 Y Y 10 (33)TPCBL-B015 Y Y 15 (49)TPCBL-B030 Y Y 30 (98)TPCBL-B050 Y Y 50 (164)TPCBL-B100 Y Y 100 (328)

(4) Enhanced category 5 UTP cable

TPCBL-C005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 1000Base-T, 100Base-TX, or 10Base-T is used.(Category 5e)RJ45 8 Pin-RJ45 8 Pin

5 (16)TPCBL-C010 Y Y 10 (33)TPCBL-C015 Y Y 15 (49)TPCBL-C030 Y Y 30 (98)TPCBL-C050 Y Y 50 (164)

TPCBL-C100 Y Y 100 (328)

No. Name Order code JapanOutside Japan

PackagingLength [m (ft.)]

2-10 U41644-J-Z816-5-76

Page 53: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

2.2.3 Notes on cabling PRIMEQUEST 520A*/520/420When determining the total length of the cable to be connected to the PRIMEQUEST 520A*/520/420, allow for an extra length of cable for pulling out the units.

PRIMEQUEST 520A*/520/420 needs to be pulled out from the rack for maintenance. The cable is routed with the cable-management system. For the cable-management system, extra cable length of 2 m (6.6 ft.) is required.

Use a sheathless optical cable for the fibre channel cable. (If the sheath fibre channel cable has been laid, connect a sheathless optical Fibre Channel cable with an adapter (DCBL-FCE02 (SC-LC: 2m (6.6 ft.)), DCBL-FCE05 (SC-LC: 5m (16.4 ft.)), DCBL-FCG02 (LC-LC: 2m (6.6 ft.)) or DCBL-FCG05 (LC-LC: 5m (16.4 ft.))) to the sheath fibre channel cable.)Avoid laying the power cable close to metal cables such as RS232C or SCSI cables. If cables need to be crossed, avoid laying the sheathless optical cable under power cables or metal cables.

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-11

Page 54: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.2.4 Details of external interface connection portsThis section shows the locations of the external interface connection ports of PRIMEQUEST 520A*/520/420. Take these locations into account when calculating the excess lengths of connection cables.

External interface connection ports in the PRIMEQUEST 520A*/520 main unit (Figure 2.4)External interface connection ports in the PRIMEQUEST 420 main unit (Figure 2.5)External interface ports in the PCI_Box (Figure 2.6)

2-12 U41644-J-Z816-5-76

Page 55: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(1) PRIMEQUEST 520A*/520 main unit

Note: The above unit contains a Dual Power Feed Option.

Figure 2.4 External interface connection ports in the PRIMEQUEST 520A*/520 main unit

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-13

Page 56: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(2) PRIMEQUEST 420 main unit

Note: The above unit contains a Dual Power Feed Option.

Figure 2.5 External interface connection ports in the PRIMEQUEST 420 main unit

2-14 U41644-J-Z816-5-76

Page 57: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(3) PCI_Box

Figure 2.6 External interface ports in the PCI_Box

U41644-J-Z816-5-76 2-15

Page 58: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.3 Power Cable Connections

This section provides diagrams of the input power system for the PRIMEQUEST 520A*/520/420 and the PCI_Box.

Input power system diagram for the PRIMEQUEST 520A*/520/420 (Section 2.3.1)Input power system diagram for the PRIMEQUEST 520A/520/420 including peripherals (Section 2.3.2)Power distribution box (Section 2.3.3)

2.3.1 Input power system diagram for the PRIMEQUEST 520A*/520/420The figures in this section show the input power system diagrams for the PRIMEQUEST 520A*/520/420.

Standard configuration for use in Japan (including single power feed system and redundant power supply unit) (Figure 2.7)Dual power feed configuration for use in Japan (Figure 2.8)Standard configuration for outside Japan (general) (including single power feed system and redundant power supply unit) (Figure 2.9)Dual power feed configuration for outside Japan (general) (Figure 2.10)

*: not supported by Fujitsu Technology Solutions

2-16 U41644-J-Z816-5-76

Page 59: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(1) Standard configuration for use in Japan (including single power feed system and redundant power supply unit)

This section shows the input power system in the standard PRIMEQUEST 520A*/520/420 configuration for use in Japan (including a single power feed option and redundant power supply unit).

CB: Circuit breaker (overcurrent protector)

*1: Power cables (Input#0 to Input#2) are connected to PSUs (PSU#0 to PSU#2) as shown below, on a one-to-one basis.

*2: Each power cable is connected to each output group (including one overcurrent protector and two outlets) of the outlet box on a one-to-one basis. Do not connect for redundancy a power cable from a peripheral unit to the open outlet of the output group to which one power cable is already connected.

*3: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.7 Input power system diagram for the PRIMEQUEST 520A/520/420 (standard configuration)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-17

Page 60: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(2) Dual power feed configuration for use in JapanThis section shows the input power system and PSU locations in the PRIMEQUEST 520A*/520/420 containing a Dual Power Feed Option for use in Japan.For dual power feeding, a dual power feed option is required. This option consists of a power cable, one PSU, and one power distribution box.

CB: Circuit breaker (overcurrent protector)*1: Power cables (Input#0 to Input#3) are connected to PSUs (PSU#0 to PSU#3)

as shown below, on a one-to-one basis.

*2: Each power cable is connected to each output group (including one overcurrent protector and two outlets) of the outlet box on a one-to-one basis. Do not connect for redundancy a power cable from a peripheral unit to the open outlet of the output group to which one power cable is already connected.

*3: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.8 Input power system diagram for the PRIMEQUEST 520A*/520/420 (dual power feed configuration)

*: not supported by Fujitsu Technology Solutions

2-18 U41644-J-Z816-5-76

Page 61: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(3) Standard configuration for outside Japan (general) (including single power feed system and redundant power supply unit)

This section shows the input power system in the standard PRIMEQUEST 520A*/520/420 configuration for outside Japan (general) (including a single power feed option and redundant power supply unit).

CB: Circuit breaker (overcurrent protector)

*1: Power cables (Input#0 to Input#2) are connected to PSUs (PSU#0 to PSU#2) as shown below, on a one-to-one basis.

*2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.9 Input power system diagram for the PRIMEQUEST 520A*/520/420 for outside Japan (general) (standard configuration)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-19

Page 62: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(4) Dual power feed configuration for outside Japan (general)This section shows the input power system and PSU locations in the PRIMEQUEST 520A*/520/420 containing a Dual Power Feed Option for use outside Japan (general).For dual power feeding, a dual power feed option is required. This option consists of a power cable, one PSU, and one power distribution box.

CB: Circuit breaker (overcurrent protector)

*1: Power cables (Input#0 to Input#3) are connected to PSUs (PSU#0 to PSU#3) as shown below, on a one-to-one basis.

*2: For information about the circuit breakers on the customer’s distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.10 Input power system diagram for the PRIMEQUEST 520A*/520/420 for outside Japan (general) (dual power feed configuration)

*: not supported by Fujitsu Technology Solutions

2-20 U41644-J-Z816-5-76

Page 63: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

2.3.2 Input power system diagram for the PRIMEQUEST 520A*/520/420 including peripheralsThe figures in this section show the input power system diagrams for the PRIMEQUEST 520A*/520/420 when the PCI_Box and expansion file unit are connected.

Single power feed configuration for use in Japan (including a redundant power supply unit) (Figure 2.11)Dual power feed configuration for use in Japan (Figure 2.12)Single power feed configuration (including a redundant PSU) for use outside Japan (general) (Figure 2.13)Dual power feed configuration for use outside Japan (general) (Figure 2.14)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-21

Page 64: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(1) Single power feed configuration for use in Japan (including a redundant power supply unit)

Figure 2.11 shows the input power system diagram of the PRIMEQUEST 520A*/520/420 connected with the PCI_Box and expansion file unit in a single power feed configuration (including a redundant PSU) for use in Japan.

CB: Circuit breaker (overcurrent protector)

Figure 2.11 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a single power feed configuration

(including a redundant PSU) for use in Japan (1/2)

*: not supported by Fujitsu Technology Solutions

2-22 U41644-J-Z816-5-76

Page 65: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: Power cables (Input#0 to Input#2) of the main unit (PRIMEQUEST 520A*/520/420) are connected to PSUs (PSU#0 to PSU#2) as shown below, on a one-to-one basis.

*2: Each power cable is connected to each output group (including one overcurrent protector and two outlets) of the outlet box on a one-to-one basis. Do not connect for redundancy a power cable from a peripheral unit to the open outlet of the output group to which one power cable is already connected.

*3: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.11 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a single power feed configuration

(including a redundant PSU) for use in Japan (2/2)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-23

Page 66: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(2) Dual power feed configuration for use in JapanFigure 2.12 shows an input power system diagram of the PRIMEQUEST 520A*/520/420 connected with the PCI_Box and expansion file unit in a dual power feed configuration for use in Japan.

For dual power feeding, a dual power feed option is required. This option consists of a power cable, one PSU, and one power distribution box.

CB: Circuit breaker (overcurrent protector)

Figure 2.12 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a dual power feed configuration for use in

Japan (1/2)

*: not supported by Fujitsu Technology Solutions

2-24 U41644-J-Z816-5-76

Page 67: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: Power cables (Input#0 to Input#3) of the main unit (PRIMEQUEST 520A*/520/420) are connected to PSUs (PSU#0 to PSU#3) as shown below, on a one-to-one basis.

*2: Each power cable is connected to each output group (including one overcurrent protector and two outlets) of the outlet box on a one-to-one basis. Do not connect for redundancy a power cable from a peripheral unit to the open outlet of the output group to which one power cable is already connected.

*3: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.12 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a dual power feed configuration for use in

Japan (2/2)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-25

Page 68: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(3) Single power feed configuration (including a redundant PSU) for use outside Japan (general)

Figure 2.13 shows the input power system diagram of the PRIMEQUEST 520A*/520/420 connected with the PCI_Box and expansion file unit in a single power feed configuration (including a redundant PSU) for use outside Japan (general).

CB: Circuit breaker (overcurrent protector)

Figure 2.13 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a single power feed configuration (including a redundant PSU) for use outside Japan (general) (1/2)

*: not supported by Fujitsu Technology Solutions

2-26 U41644-J-Z816-5-76

Page 69: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: Power cables (Input#0 to Input#2) of the main unit (PRIMEQUEST 520A*/520/420) are connected to PSUs (PSU#0 to PSU#2) as shown below on a one-to-one basis.

*2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.13 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a single power feed configuration (including a redundant PSU) for use outside Japan (general) (2/2)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-27

Page 70: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

(4) Dual power feed configuration for use outside Japan (general)Figure 2.14 shows the input power system diagram of the PRIMEQUEST 520A*/520/420 connected with the PCI_Box and expansion file unit in a dual power feed configuration for use outside Japan (general).

For dual power feeding, a dual power feed option is required. This option consists of a power cable, one PSU, and one power distribution box.

CB: Circuit Breaker

Figure 2.14 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a dual power feed configuration for use

outside Japan (general) (1/2)

*: not supported by Fujitsu Technology Solutions

2-28 U41644-J-Z816-5-76

Page 71: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

*1: Power cables (Input#0 to Input#3) of the main unit (PRIMEQUEST 520A*/520/420) are connected to PSUs (PSU#0 to PSU#3) as shown below on a one-to-one basis.

*2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.14 Input power system diagram of the PRIMEQUEST 520A*/520/420 including the peripherals in a dual power feed configuration for use

outside Japan (general) (2/2)

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 2-29

Page 72: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.3.3 Power distribution boxPRIMEQUEST 520A*/520/420 is equipped with one power distribution box as standard. For use in Japan, the power distribution box contains four outlet groups each of which contains one overcurrent protector (CB) and two outlets as shown in Figure 2.15.

Figure 2.15 Power distribution box (for use in Japan)

The maximum rated current per output group is 12 A (for use in Japan). The maximum rated current per power distribution box (total current for four output groups) is 24 A.

Power cables of the PRIMEQUEST 520A*/520/420 and the PCI_Box are connected to each output group on a one-to-one basis.

The overcurrent protector (CB) protects each output group only. When power cables are connected to two outlets of an output group, be careful not to exceed the maximum rated current of the group.

When connecting power cables from the PRIMEQUEST 520A*/520/420 and the PCI_Box to power distribution boxes, connect the power cables to different output groups.Do not connect for redundancy a power cable from a peripheral unit to the open outlet of the output group to which one power cable is already connected.

For use outside Japan, the power distribution box contains one overcurrent protector (CB) per outlet as shown in Figure 2.16.

Figure 2.16 Power distribution box (for use outside Japan)

*: not supported by Fujitsu Technology Solutions

Output group1 Output group2 Output group3 Output group4

Outlet

Overcurrent protector

(CB)

OutletOvercurrent protector (CB)

87654321

2-30 U41644-J-Z816-5-76

Page 73: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

2.4 Input Power Supply Unit Connections

The following table lists the connection specifications for the input power supply unit.

PRIMEQUEST 520A/520/420 main unit (Section 2.4.1)Cables between PCI_Box and power distribution box (Section 2.4.2)Cables between the power distribution box and power distribution panel (Section 2.4.3)

2.4.1 PRIMEQUEST 520A*/520/420 main unitTable 2.3 lists the specifications for connecting the input power supply unit to the PRIMEQUEST 520A*/520/420 main unit.

Table 2.3 AC cable specifications for the PRIMEQUEST 520A*/520/420 main unit

Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.

*: not supported by Fujitsu Technology Solutions

Destination Plug type RemarksJAPAN Two-prong hook-type plug

with grounding electrode (250V15A) [NEMA standard name: L6-15P]

The main unit is equipped with one power distribution box as standard. The power cable of the main unit is connected to a power distribution box. Provide a wall-side outlet (of the power distribution board) according to the outlet shape given in Table 2.5, "Specifications of the AC cables between the power distribution box and power distribution panel."

Outside Japan Covered 3-pin plug (for power distribution box connection) IEC320-C14 type

The main unit is equipped with one power distribution box as standard. Connect the power cable of the main unit to the power distribution box.(10A-250VAC)IEC320-C13 type

U41644-J-Z816-5-76 2-31

Page 74: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.4.2 PCI_BoxTable 2.4 lists the specifications for connecting the input power supply unit to the PCI_Box.

Table 2.4 AC cable specifications for the PCI_Box

Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.

Destination Plug type RemarksJapan Two-prong twist-lock plug

with grounding electrode (250V15A)[NEMA standard name: L6-15P]

Connected to the standard or optional power distribution box of the main unit (PRIMEQUEST 520A*/520/420).

*: not supported by Fujitsu Technology Solutions

Outside Japan Covered 3-pin plug (for power distribution box connection)

Connected to the standard or optional power distribution box of the main unit (PRIMEQUEST 520A*/520/420).

2-32 U41644-J-Z816-5-76

Page 75: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

2.4.3 Cables between the power distribution box and power distribution panelTable 2.5 lists the specifications of the AC cables between the power distribution box and the power distribution panel.

Table 2.5 Specifications of the AC cables between the power distribution box and power distribution panel

Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.

DestinationAC cable

specificationPlug type Remarks

Japan - Two-prong twist-lock plug with grounding electrode (250V30A)[NEMA standard name: L6-30P]

Prepare the following power-receiving outlets:Outlet for two-prong twist-lock plug with grounding electrode (250V30A) [NEMA standard name: L6-30R]Embedded type: 3320-L6 (American Denki)Exposed type: 3321-L6 (American Denki)

Outside Japan - NEMA L6-30P NEMA L6-30R(North America only) 30A, 220 VAC

Fujitsu Technology Solutions only

- IEC60309 (32A)

U41644-J-Z816-5-76 2-33

Page 76: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

2.5 AC Cable Connection under a Free-Access Floor (Only for Use inside Japan and General Use outside Japan)

If AC cables are connected to the power distribution box (or main unit, PCI_Box) under a free-access floor, it is recommended the underfloor height be 300 mm (11.8 in.) or more in consideration of the shape of the AC cable connector, cable bending radius (see Figure 2.17 (1)).

However, if the underfloor height is less than 300 mm (11.8 in.), place outlets sideways (see Figure 2.17 (2)).

Prepare an outlet near the unit.

Remark 1: This drawing shows the Fujitsu 19-inch global rack with the main unit as an example.

Remark 2: Values in ( ) are in inches.

Figure 2.17 AC cable connection under a free-access floor (only for use inside Japan and general use outside Japan)

(1) When the underfloor height is 300 mm (11.8 in.) or more

(2) When the underfloor height is less than 300 mm (11.8 in.)

Unit: mm (in.)

Free-access floor

Outlet

Mor

e th

an

300

(11.

8) Les

s th

an 3

00 (

11.8

)

Outlet

Free-access floor

250

(9.8

)

2-34 U41644-J-Z816-5-76

Page 77: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

2.6 Circuit Breaker Characteristics

This section describes the circuit breaker characteristics.

(1) For customers in JapanTable 2.6 lists the requirements for the circuit breakers. Figure 2.18 shows the characteristics of the circuit breakers.

Table 2.6 Requirements for circuit breakers in customers' distribution panels installed in Japan

If breakers other than those specified above are used, they may be tripped at the occurrence of a device-internal short circuit, which in turn may cause the entire device to shut down. This may occur even if a PSU is present that provides a redundant configuration.

Main unit (PRIMEQUEST 520A*/520/420 base cabinet)

Extended power cabinet

*: not supported by Fujitsu Technology Solutions

PCI_Box

The breaking capacity must be 30 A or greater. The tripping time must be equal to or slower than the characteristics shown in Figure 2.18.

The breaking capacity must be 20 A or greater. The tripping time must be equal to or slower than the characteristics shown in Figure 2.18.

U41644-J-Z816-5-76 2-35

Page 78: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 2

Figure 2.18 Characteristics of circuit breakers in customers' distribution panels installed in Japan

180

120

60

40

20

10

6

4

2

1

40

20

10

6

4

2

1

0.6

0.4

0.5

0.1

0.06

0.04

0.02

0.01

1 1.5 2 3 4 5 6 7 8 10 15 20 30 40 50 80 100

Breaking tim

e

Current (ratio to the rated current)

min

s

Minimum

Maximum

2-36 U41644-J-Z816-5-76

Page 79: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(2) For customers outside JapanTable 2.7 lists the requirements for the circuit breakers. Figure 2.19 shows the characteristics of such circuit breakers.

Table 2.7 Requirements for circuit breakers in customers’ distribution panels installed outside Japan

Figure 2.19 Characteristics of circuit breakers in customers' distribution panels installed outside Japan

Main unit (PRIMEQUEST 520A*/520/420 base cabinet)

Extended power cabinet

*: not supported by Fujitsu Technology Solutions

PCI_Box

The breaking capacity must be 32 A or greater. The tripping time must be equal to or slower than the "D" characteristics (IEC898 or DIN0641 Part II) shown in Figure 2.19.

The breaking capacity must be 16 A or greater. The tripping time must be equal to or slower than "C" or "D" characteristics (IEC898 or DIN 0641 Part II) shown in Figure 2.19.

~~~DCB

1 2 3 4 5 6 7 8 10 20 30 40 50 80 1001.5 150.01

0.02

0.040.06

0.1

0.2

0.40.6

1

2

46

10

20

401

2

46

10

6040

20

120180

Current (ratio to the rated current)

Min

S

Breaking tim

e

U41644-J-Z816-5-76 2-37

Page 80: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 81: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

CHAPTER 3 Precautions Pertaining to Delivery and Installation

1

This chapter contains precautions regarding delivery and installation of the equipment.

3.1 Elevator Load Requirements

The equipment is wider than a typical server system. To load this equipment on an elevator, you may need to remove side panels and/or doors. Before loading equipment mounted in an expansion rack onto an elevator, see the elevator load requirements listed in Table 3.1. In this table, dimensions are stated in units of mm (in), and weight is stated in units of kg (lb).

Table 3.1 Elevator load requirements

Y: The equipment can be loaded.

N: The equipment cannot be loaded.

Elevator code

LoadInside dimensions of cage

Effective doorway dimensions

RackMC-R7RC11/21MC-R8RC11/21Width Depth Height Width Height

P-6-C0 400(880)

1150 (45) 900 (35) 2300 (91) 800 (31) 2100 (83)N

P-9-C0 600(1320)

1400 (55) 1100 (43) 2300 (91) 800 (31) 2100 (83)N

P-11-C0 750(1650)

1400 (55) 1350 (53) 2300 (91) 800 (31) 2100 (83)Y

P-13-C0 900(1980)

1600 (63) 1350 (53) 2300 (91) 900 (35) 2100 (83)Y

P-15-C0 1000(2200)

1600 (63)1800 (71)

1500 (59) 1300 (51)

2300 (91) 900 (35) 1000 (39)

2100 (83)Y

P-17-C0 1150(2530)

1800 (71)2000 (79)

1500 (59)1350 (53)

2300 (91) 1000 (39)1100 (43)

2100 (83)Y

P-20-C0 1350(2970)

1800 (71)2000 (79)

1700 (67) 1500 (59)

2300 (91) 1000 (39)1100 (43)

2100 (83)Y

P-24-C0 1600(3520)

2000 (79) 2150 (85)

1750 (69)1600 (63)

2300 (91) 1100 (43) 2100 (83)Y

U41644-J-Z816-5-76 3-1

Page 82: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

CHAPTER 3 Precautions Pertaining to Delivery and Installation

3.2 Earthquake Preparedness Measures

Earthquake preparedness measures are intended to prevent computers from falling over, to ensure the safety of operators, to prevent damage, and to enable the quick recovery of systems. Fujitsu has standardized the following techniques to prevent damage to computer systems resulting from an earthquake.

Securing techniques:Techniques that secure the equipment in place prevent toppling by providing resistance to the force of an earthquake.

The extent to which this technique is required depends upon the following factors:

Floor vibration levels at the location where the equipment is installedWhether or not a free-access floor is being usedStructure of the equipment

When selecting construction techniques for earthquake-preparedness measures and before starting construction work, contact Fujitsu's construction department.

3-2 U41644-J-Z816-5-76

Page 83: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A RacksThe PRIMEQUEST 520/420 rack-mount type (12U) and PCI_Box rack-mount type (4U) supplied by Fujitsu Technology Solutions are mounted or are to be mounted on a PRIMECENTER rack, which is the standard rack series used by Fujitsu Technology Solutions.

The system unit and the PCI_Box can also be mounted on a 19-inch rack that conforms to the Electronic Industries Association (EIA) standards. These racks must satisfy the structural conditions described in A.2, "Rack Mounting". That section A.2 assumes that the PRIMEQUEST 520/420 is normally installed in a rack manufactured by Fujitsu Ltd., but it can be read as conceptual information for using any other rack.

A detailed description for installing a PRIMEQUEST 520/420 in a PRIMECENTER rack is part of the maual PRIMEQUEST 520/420 Installation Instructions (U41658-J-Z816-x-76) edited by Fujitsu Technology Solutions.

A.1 Where you can find information on PRIMECENTER racks

The PRIMECENTER racks are supplied with a Technical Manual: "PRIMECENTER Rack System for PRIMERGY, PRIMEPOWER, BS2000, STORAGE" (U41282-J-Z156-x-74). Here you can find the technical specifications of the PRIMECENTER rack models and their expansion.

A.2 Rack Mounting

The PRIMEQUEST 520A*/520/420 (including peripherals) has been developed, and its operation guaranteed based on an assumption that it is mounted in the 19-inch global rack manufactured by Fujitsu. For safe operation of this equipment mounted in a Fujitsu 19-inch global rack, the conditions specified in Appendix A.2.1, "Conditions for mounting in Fujitsu 19-inch global racks," must be satisfied.

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 A-1

Page 84: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A Racks

If the PRIMEQUEST 520A*/520/420 is mounted not in a Fujitsu 19-inch global rack but in another type of rack such as a rack manufactured by another company, validation (verification of cooling in the rack and the rack strength) cannot be performed and operation cannot be guaranteed. In such cases, this verification is entirely the customer's responsibility.

If another company's rack must be used, refer to Appendix A.2.2, "Conditions for mounting in another company's rack," and consider appropriate racks.

A.2.1 Conditions for mounting in Fujitsu 19-inch global racksThis section describes the conditions for unit mounting in the 19-inch global racks manufactured by Fujitsu.

Two types of Fujitsu 19-inch global rack are available: one type has a stabilizer for preventing the rack from toppling, and the other type does not have it (the rack is designed to be secured to the floor). Order the appropriate type according to (4), "Selecting the rack type."

(1) Rack stabilityTo maintain the PRIMEQUEST 520A*/520/420 or add an optional unit to the system, the PRIMEQUEST 520A*/520/420 unit must be pulled out from the front of the rack. Appropriate measures such as securing the rack to the floor must be taken to prevent the rack from toppling when the PRIMEQUEST 520A*/520/420 unit is pulled out. There are two methods for preventing the rack from toppling. If the number of mounted units is not more than the recommended number of mounted units as indicated in Table A.1 and the mounting height not higher than the recommended mounting height indicated in the same table, use the first method. Otherwise, use the second method.

Table A.1 Recommended number of units to be mounted in racks

The following explains these rack-fixing methods.

*: not supported by Fujitsu Technology Solutions

RackRecommended

number of units to be mounted

Remarks

PRIMEQUEST 520A*/520/420

1 Mounting height is 24U or lower.

A-2 U41644-J-Z816-5-76

Page 85: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

a) Up to the recommended number of units is mounted and the mounting height is 24U or lower.

In principle, the recommended method of securing the rack to the floor is the same as that used if more than the recommended number of units is mounted or the mounting height is higher than 24U.

However, if the rack cannot be secured to the floor, mount a pull-out stabilizer supplied with the main unit (see Figure A.1).

To perform maintenance work or add an optional unit, pull out the pull-out stabilizer forward before pulling out the PRIMEQUEST 520A*/520/420 unit, as shown in Figure A.1.

Note: A rack without the stabilizer must always be secured to the floor even if the number of mounted units in the rack is less than the recommended number or the mounting height is lower than the recommended height of 24U.

Figure A.1 Pull-out stabilizer

b) More than the recommended number of units is mounted or the mounting height is higher than 24U.

*: not supported by Fujitsu Technology Solutions

(State when stabilizer is inserted)

Pull-out stabilizer

(State when stabilizer is pulled out)Pull-out stabilizer

PRIMEQUEST520A/520/420

PRIMEQUEST520A/520/420

Rack

Front

Rack

(State when stabilizer is inserted) (State when stabilizer is pulled out)

U41644-J-Z816-5-76 A-3

Page 86: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A Racks

Secure the rack in one of the following ways:

Note that because all rack-securing methods will require some construction work, a specialist will need to be consulted.

Securing the rack with bolt stabilizersAffix bolt stabilizers (*1) to the front and back and sides of the rack and anchor the stabilizers to the building structure (floor).

*1: The bolt stabilizers comprise an optional product. The following kit needs to be purchased:Earthquake proofing kit: MC-R1ST11 (Kit for the Fujitsu 19-inch global/basic rack.)MC-R1ST21 (Kit for the Fujitsu 19-inch global/expansion rack.)Note that the pull-out stabilizer supplied as standard is not required if the earthquake proofing kit (MC-R1ST11) is to be used. Note also that the standard pull-out stabilizer and the earthquake proofing kit (MC-R1ST11) cannot be used jointly. In cases where the pull-out stabilizer is not used, store it in a safe place in case the racks are moved in the feature.

Figure A.2 Securing the rack with bolt stabilizers

Securing the rack with leveling feetUse the threaded holes at the bottom of the rack leveling feet to anchor the leveling feet to the building structure (floor) (See Figure A.3). The rack leveling feet that are already built into the rack structure can be anchored with M20 bolts.

Note: The pull-out stabilizer supplied as standard is not required if the rack is secured with leveling feet. However, in consideration of the possibility that the racks will be moved in the future, Fujitsu recommends jointly using the standard pull-out stabilizers. In cases where the pull-out stabilizer is not used, store it in a safe place in case the racks are moved in the feature.

Right bolt stabilizer (*1)

Left bolt stabilizer (*1)

Bolted to floor

Rear bolt stabilizer

Front bolt stabilizer

A-4 U41644-J-Z816-5-76

Page 87: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

Figure A.3 Securing a rack with leveling feet

(2) Cable route inside the rackThe PRIMEQUEST 520A*/520/420 is equipped with a cable management system as standard equipment designed for mounting in a Fujitsu 19-inch global rack. By controlling cable slack with the cable management system, the PRIMEQUEST 520A*/520/420 unit can easily be pulled out from the rack while cables remain connected.

Cables as long as about two meters (6.6 ft.) are required for use of the cable management system. Consider this length when determining the length of each interface cable.

*: not supported by Fujitsu Technology Solutions

Front

Leveling foot

Height of floor250 to 400 mm(10 to 16 in.)

Bolt (M20)(Floorboard)

Frame

Anchor bolt

Supporting column

U41644-J-Z816-5-76 A-5

Page 88: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A Racks

Figure A.4 Cable route

(3) Other conditionsThe Fujitsu 19-inch global rack comes with blank panels for covering the front of unused space where no unit is mounted. If warm exhaust air from the PRIMEQUEST 520A*/520/420 unit flows to the front and reenters the unit, it may trigger a temperature alarm and cause a problem.

Be sure to cover the front of unused space by mounting the blank panels.

(4) Selecting the rack typeThe methods of selecting and installing Fujitsu 19-inch global racks are explained below.

1 Consider the requirements concerning the earthquake-resistance level and building conditions, and determine whether to secure the rack to the floor when installing it.

*: not supported by Fujitsu Technology Solutions

A-6 U41644-J-Z816-5-76

Page 89: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

If earthquake preparedness measures do not include securing the rack to the floorIn this method, the installed rack can withstand an acceleration force of up to 20 gal in a general-use building during an earthquake.The stabilizer mounted to the rack is used to prevent the rack from toppling, such as during maintenance of mounted units.If earthquake preparedness measures include securing the rack to the floorIn this method, the installed rack can withstand an acceleration force of up to 1000 gal in a general-use building during an earthquake.The rack is secured to the floor to prevent the rack from toppling, such as during maintenance of mounted units.

2 Select the rack type.

To install the rack without taking earthquake preparedness measures: Select a rack with the stabilizer -> Go to step 5.

To install the rack with earthquake preparedness measures taken: Select a rack without the stabilizer -> Go to step 3.

Note: Even if the building and floor where the rack will be installed are equipped with functionality for earthquake preparedness, the rack requires a mechanism for preventing it from toppling, such as during maintenance of mounted units. Unless the rack will be secured to the floor, be sure to select a rack with the stabilizer regardless of the building conditions.

3 If the rack will be secured to the floor, confirm the method of securing it.

If the earthquake proofing kit is used to secure the rack to the floor -> Go to step 4.

If the leveling feet are used to secure the rack to the floor -> Go to step 5.

Note 1: The only two methods that can be selected as the method of securing the rack are using the leveling feet to secure it or using the earthquake proofing kit to secure it. Select the appropriate method with consideration of the condition at the installation site, such as with regards to the construction of the floor.

Note 2: No operation can be performed on a rack without the stabilizer until the rack is secured to the floor. The rack must be secured to the floor to prevent it from toppling, such as during maintenance of mounted units.

4 To use the earthquake proofing kit to secure the rack, an optional earthquake proofing kit is required. The appropriate kits must be selected and prepared separately for basic racks and expansion racks.

5 Issue a construction order for installation.

Table A.2 Rack installation flow

U41644-J-Z816-5-76 A-7

Page 90: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A Racks

*1 The leveling feet can be used to secure the rack to the floor, even if the stabilizer remains mounted on the rack. The stabilizer is not functionally required.

*2 The rack with the stabilizer can be secured with the earthquake proofing kit to the floor, though the following restriction applies:The earthquake proofing kit and stabilizer cannot both be mounted on the rack. The stabilizer must be removed before the earthquake proofing kit is mounted.

*3 The construction personnel are responsible for preparing the bolts used to secure the rack to the floor.

*4 One type of earthquake proofing kit is available for basic racks, and another type is available for expansion racks:

MC-R1ST11 (for a basic rack): Front part x 1, rear part x 1, side part x 2, and a set of bolts for securing the rack

1. Considering requirements for securing a rack with earthquake preparedness measures taken

2. Selecting a rack 3. Selecting a

method of securing the rack

4. Preparing the required options

Rack not secured to the floor Rack with the stabilizer• MC-R7RC11

(40U basic)• MC-R7RC21

(40U expansion)• MC-R8RC11

(36U basic)• MC-R8RC21

(36U expansion)

- (*1),(*2) None

Rack secured to the floor Rack without the stabilizer• MC-R7RC12

(40U basic)• MC-R7RC22

(40U expansion)• MC-R8RC12

(36U basic)• MC-R8RC22

(36U expansion)

Method of securing it with the earthquake proofing kit

Earthquake proofing kit (*3),(*4)MC-R1ST11 (for a basic rack)MC-R1ST21 (for an expansion tack)

Method of securing it with leveling feet

None (*3)

A-8 U41644-J-Z816-5-76

Page 91: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

MC-R1ST21 (for an expansion rack): Front part x 1, rear part x 1, and a set of bolts for securing the rack

If the earthquake proofing kit for a basic rack is purchased for an expansion rack, the parts that are mounted on the sides of the rack are extra.

If the earthquake proofing kit for an expansion rack is purchased for a basic rack, the parts that are mounted on the sides of the rack are required. No operation can be performed on the rack until these parts are mounted.

A.2.2 Conditions for mounting in another company's rackThe PRIMEQUEST 520A*/520/420 (including peripherals) has been developed, and its operation guaranteed based on an assumption that it is mounted in the 19-inch global rack manufactured by Fujitsu. If the PRIMEQUEST 520A*/520/420 is mounted not in a Fujitsu 19-inch global rack but in another type of rack such as a rack manufactured by another company, validation (verification of cooling in the rack and the rack strength) cannot be performed and operation cannot be guaranteed. In such cases, this verification is entirely the customer's responsibility.

Note: If a problem arises because the PRIMEQUEST 520A*/520/420 (including peripherals) is mounted in another company's rack, Fujitsu does not guarantee system operation.

Examples:Cooling problem caused by an inadequate cool air supply due to the rack structure, or earthquake-proofing problem due to the insufficient strength of another company's rack

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 A-9

Page 92: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A Racks

If another company's rack must be used, confirm that the rack under consideration satisfies the following structural conditions:

Note: The rack mounting kit that is supplied with the PRIMEQUEST 520A*/520/420 can be used only for mounting in the 19-inch global rack manufactured by Fujitsu.To mount the PRIMEQUEST 520A*/520/420 in another type of rack, the rail mounting bracket must be mounted on the left rear column of the rack. To do so, prepare the following screws and washers:Screw set CA-06503-K901(Components: Flat head machine screw (M5x16) x3, WASHER x3)

Figure A.5 Assembling the rack mounting kit

(1) Rack stability conditionsTo maintain the PRIMEQUEST 520A*/520/420 or add an optional unit to the system, the PRIMEQUEST 520A*/520/420 unit must be pulled out from the front of the rack. Appropriate measures, such as securing the rack to the floor, must be taken to prevent the rack from toppling when PRIMEQUEST 520A*/520/420 unit is pulled out.

*: not supported by Fujitsu Technology Solutions

Flat head machine screw (M5x16) x3WASHER x3

Rail mounting bracket

Left rear column of rack

A-10 U41644-J-Z816-5-76

Page 93: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(2) Rack depth conditionsThe PRIMEQUEST 520A*/520/420 unit is mounted with slide rails (which come with the PRIMEQUEST 520A*/520/420) in a rack. Therefore, the rack must satisfy the conditions specified below as follows: (1) rack depth measured as the distance between the front and rear columns; (2) distance between the inside surface of the front rack cover and the front face of the front columns; and (3) distance between the front face of the front columns and the inside surface of the rear rack cover.

Note: To perform maintenance work from one of the sides, the front cover may need to be removed or other measures may need to be taken, depending on the thickness of the front cover or the angle of the cover when open.

Figure A.6 Rack depth conditions

*: not supported by Fujitsu Technology Solutions

Front

Front cover (note)

Columns

Columns

Rear cover

(2) Distance between inside surface of front rack cover and front face of front columns: 40 to 90 mm (1.6 to 3.5 in.)

(3) Distance between front face of front columns and inside surface of rear rack cover: 935 mm (36.8 in.) or more

(1) Permissible distance between columns: 690 to 750 mm (27 to 31 in.)

U41644-J-Z816-5-76 A-11

Page 94: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Appendix A Racks

(3) Rack column requirements

Figure A.7 Rack column requirements

(4) Cable route inside the rackTo maintain the PRIMEQUEST 520A*/520/420 or add an optional unit to the system, the PRIMEQUEST 520A*/520/420 unit must be pulled out from the front of the rack. If this equipment is mounted in a rack manufactured by another company, the cable management mechanism cannot be used in the rack. Therefore, there would be no supported capability for pulling out the mounted PRIMEQUEST 520A*/520/420 unit while cables remain connected. In this case, turn off the unit power before disconnecting cables and pulling out the unit.

*: not supported by Fujitsu Technology Solutions

CC

B

A

44.4515.875

12.7

DE

(Rack column holes)

A: Unit front panel mounting space: 483 mm (19.0 in.) or more

B: Distance between right and left unit mounting holes (common to front and rear columns): 465 mm (18.3 in.)

C: Distance between right and left columns (common to front and rear columns): 450 mm (17.7 in.) or more

D: EIA standard, universal pitch

E: Side dimension of each square hole: 9 to 9.5 mm (0.354 to 0.374 in.)

A-12 U41644-J-Z816-5-76

Page 95: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Laufende K/F 1

(5) Other conditionsIn addition to structural conditions, the following conditions must be taken into consideration:

Equipment cooling when mounted in a rackOnce the rack has been installed, make sure that the temperature inside the rack satisfies the conditions specified in Section 1.3, "Installation Specifications."Particularly, make sure that exhaust air from the PRIMEQUEST 520A*/520/420 unit does not reenter the air intake on the side of the unit, by taking measures such as covering the front of empty space in the rack.Reserving a work area (service area) for maintenanceReserve a service area for maintenance work by a certified service engineer.Referring to the description of the service area for Fujitsu racks in Section 1.4, "Equipment Floor Plan," and the installation manual for the rack used, determine the appropriate service area.

*: not supported by Fujitsu Technology Solutions

U41644-J-Z816-5-76 A-13

Page 96: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 97: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Acronyms & AbbreviationsAACS AC Section

CCB Circuit BreakerCPU Central Processing Unit

FFC Fibre Channel

IIEC International Electrotechnical

Commission

LLAN Local Area Network

PPCI Peripheral Component InterconnectPSU Power Supply Unit (AC to DC)

SSB System BoardSCSI Small Computer System Interface

UUPS Uninterruptible Power SupplyUTP Unshielded Twisted Pair

VVHDCI Very High Density Cable Interconnect

WWAN Wide Area Network

U41644-J-Z816-5-76 AB-1

Page 98: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 99: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Index

AAC cable connection

under free-access floor . . . . . . . . . . . . . 2-34AC cable specification

main unit . . . . . . . . . . . . . . . . . . . . . . . . 2-31PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . 2-32power distribution box . . . . . . . . . . . . . . 2-33power distribution panel . . . . . . . . . . . . . 2-33

Ccable connection diagram

basic interface and peripheral . . . . . . . . . 2-5LAN and other device . . . . . . . . . . . . . . . 2-8

cable listbasic interface and peripheral . . . . . . . . . 2-6LAN and other device . . . . . . . . . . . . . . . 2-9

cabling, note on . . . . . . . . . . . . . . . . . . . . . . 2-11circuit breaker characteristic

in Japan . . . . . . . . . . . . . . . . . . . . . . . . . 2-36outside Japan . . . . . . . . . . . . . . . . . . . . 2-38

circuit breaker requirementin Japan . . . . . . . . . . . . . . . . . . . . . . . . . 2-35outside Japan . . . . . . . . . . . . . . . . . . . . 2-37

condition for mounting in Fujitsu 19-inch global rack

rack stability . . . . . . . . . . . . . . . . . . . . . . . A-2connection overview . . . . . . . . . . . . . . . . . . . 2-1cooling air and exhaust flow . . . . . . . . . . . . 1-14

Eearthquake preparedness measures . . . . . . 3-2elevator load requirement . . . . . . . . . . . . . . . 3-1equipment configuration . . . . . . . . . . . . . . . . 1-1

equipment floor plan . . . . . . . . . . . . . . . . . . 1-13external interface connection port . . . . . . . . 2-12

FFujitsu Technology Solutions . . . . . . . . 2-33, A-1 . . . . . . . . . . . . . . . . (see also "Revision History")

IIEC 60309 . . . . . . . . . . . . . . . . . . . . . . . . . . 2-33input power supply unit connection . . . . . . . 2-31input power system diagram

peripheral . . . . . . . . . . . . . . . . . . . . . . . . 2-21PRIMEQUEST 520A/520/420 . . . 2-16, 2-21

LLAN and other device connection . . . . . . . . . 2-8

Ppower cable connection . . . . . . . . . . . . . . . . 2-16PRIMECENTER . . . . . . . . . . . . . . . . . . . . . . . A-1

Rrack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

Ssignal cable connection . . . . . . . . . . . . . . . . . 2-4

Uunit, view . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

U41644-J-Z816-5-76 IN-1

Page 100: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 101: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Comments on PRIMEQUEST 520A/520/420Installation Planning Manual

U41644-J-Z816-5-76

Fujitsu Technology Solutions GmbHUser Documentation33094 PaderbornGermany

Fax: (++49) 700 / 372 00001

e-mail: [email protected] http://manuals.ts.fujitsu.com

CommentsSuggestionsCorrections

Submitted by

Page 102: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18
Page 103: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18

Comments on PRIMEQUEST 520A/520/420Installation Planning Manual

U41644-J-Z816-5-76

Fujitsu Technology Solutions GmbHUser Documentation33094 PaderbornGermany

Fax: (++49) 700 / 372 00001

e-mail: [email protected] http://manuals.ts.fujitsu.com

CommentsSuggestionsCorrections

Submitted by

Page 104: PRIMEQUEST 520A/520/420 INSTALLATION …manuals.ts.fujitsu.com/file/6832/pq520a_420_ipm_v5c.pdfPRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18